Power control method and device, terminal and storage medium

By determining the upward transmission power based on the TPC command and time type, the problem of large cross -link interference between terminals is solved, and signal coverage and delay performance are realized.

CN119342564APending Publication Date: 2025-01-21CHINA MOBILE COMM LTD RES INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310883482.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-07-18
Publication Date
2025-01-21

AI Technical Summary

Technical Problem

In the prior art, the terminal does not configure two power control adjustment states, or only one power control adjustment state is used by default, resulting in large cross-link interference between the terminals.

Method used

By determining the uplink transmission power based on the receiving TPC command and the time type of upward transmission timing in the terminal, the terminal transmission power is used to use different upward transmission power in the SBFD time slot and the non -SBFD time slot.

Benefits of technology

Effectively reduce link interference between terminals and improve signal coverage and delayed performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119342564A_ABST
    Figure CN119342564A_ABST
Patent Text Reader

Abstract

The invention discloses a power control method and device, a terminal and a storage medium, and the method comprises the steps: the terminal determines the uplink transmission power at a first uplink transmission time according to a first numerical value; wherein the first value is determined at least based on first information and a TPC command; the first information represents the time type of the first uplink transmission opportunity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of wireless technology, and in particular to a power control method, device, terminal and storage medium. Background Art

[0002] The Sub Band non-overlapping Full Duplex (SBFD) system divides the uplink sub-band and downlink sub-band in the time-division duplex (TDD) spectrum into non-overlapping frequency domains, so as to achieve simultaneous uplink and downlink transmission of the base station at the same time. However, at present, there are cases where the terminal is not configured with two power control adjustment states or the terminal uses only one power control adjustment state by default, resulting in large cross-link interference between terminals. Summary of the invention

[0003] To solve related technical problems, the embodiments of the present application provide a power control method, device, terminal and storage medium.

[0004] The technical solution of the embodiment of the present application is implemented as follows:

[0005] The present application provides a power control method, which is applied to a terminal. The method includes:

[0006] Determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein,

[0007] The first value is determined based on at least first information and a Transmit Power Control (TPC) command; the first information represents a time type of the first uplink transmission opportunity.

[0008] Optionally, in the above solution, determining the uplink transmission power at the first uplink transmission opportunity according to the first value includes:

[0009] In a case where the terminal is configured with only one power control adjustment state, and / or in a case where the terminal is using only one power control adjustment state, the uplink transmission power at the first uplink transmission opportunity is determined according to the first value.

[0010] Optionally, in the above solution, the time type of the first uplink transmission opportunity includes a first time type and a second time type; wherein,

[0011] The first time type includes at least one of the following:

[0012] SBFD time slot;

[0013] SBFD symbol;

[0014] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0015] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0016] The second time type includes at least one of the following:

[0017] Non-SBFD time slot;

[0018] Non-SBFD symbols;

[0019] Uplink timeslot configured on the network side;

[0020] Uplink symbols configured on the network side;

[0021] Flexible time slots not configured with uplink frequency domain resources;

[0022] Flexible symbols are not configured with uplink frequency domain resources.

[0023] Optionally, in the above scheme, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and the first power value; the first power value represents the power value configured by the network side or the pre-set power value;

[0024] When the time type of the first uplink transmission opportunity is the second time type, the first value is represented by a cumulative value of the TPC command.

[0025] Optionally, in the above solution, when the time type of the first uplink transmission opportunity is the first time type, the first value is characterized by a cumulative value of a first TPC command sent by the base station in a first time period;

[0026] When the time type of the first uplink transmission opportunity is the second time type, the first value is characterized by a cumulative value of a second TPC command sent by the base station in a second time period;

[0027] The first TPC command represents a TPC command belonging to the first time type; the second TPC command represents a TPC command belonging to the second time type.

[0028] Optionally, in the above scheme, the first TPC command is carried in first downlink control information (DCI, Downlink Control Information); a cyclic redundancy check (CRC, Cyclic Redundancy Check) of the first DCI is scrambled by a first radio network temporary identifier (RNTI, Radio Network Temporary Identifier);

[0029] The second TPC signaling is carried in a second DCI; the CRC of the second DCI is scrambled by a second RNTI.

[0030] Optionally, in the above solution, the first TPC command is carried in a third DCI, and the third DCI carries information indicating the first time type;

[0031] The second TPC signaling is carried in a third DCI, and the third DCI carries information indicating the second time type.

[0032] The present application also provides a power control method, which is applied to a base station. The method includes:

[0033] Send DCI to the terminal; wherein,

[0034] The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

[0035] Optionally, in the above scheme,

[0036] The first time type includes at least one of the following:

[0037] SBFD time slot;

[0038] SBFD symbol;

[0039] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0040] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0041] The second time type includes at least one of the following:

[0042] Non-SBFD time slot;

[0043] Non-SBFD symbols;

[0044] Uplink timeslot configured on the network side;

[0045] Uplink symbols configured on the network side;

[0046] Flexible time slots not configured with uplink frequency domain resources;

[0047] Flexible symbols are not configured with uplink frequency domain resources.

[0048] Optionally, in the above solution, sending DCI to the terminal includes:

[0049] Sending a first DCI and / or a second DCI to the terminal; wherein,

[0050] The CRC of the first DCI is scrambled by a first RNTI; the first RNTI corresponds to the first time type; the first DCI carries a first TPC command belonging to the first time type;

[0051] The CRC of the second DCI is scrambled using a second RNTI; the second RNTI corresponds to the second time type; the second DCI carries a second TPC command belonging to the second time type;

[0052] Optionally, in the above solution, sending DCI to the terminal includes:

[0053] Sending a third DCI to the terminal; wherein,

[0054] The third DCI carries the first TPC command belonging to the first time type and information for indicating the first time type, or the third DCI carries the second TPC command belonging to the second time type and information for indicating the second time type.

[0055] The present application also provides a power control device, including:

[0056] A determination unit, configured to determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein,

[0057] The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

[0058] The present application also provides a power control device, including:

[0059] A sending unit, configured to send DCI to a terminal; wherein:

[0060] The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

[0061] The embodiment of the present application also provides a terminal, comprising: a first processor and a first communication interface; wherein,

[0062] The first processor is used to determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein,

[0063] The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

[0064] The embodiment of the present application further provides a base station, comprising: a second processor and a second communication interface; wherein,

[0065] The second communication interface is used to send DCI to the terminal; wherein,

[0066] The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

[0067] The embodiment of the present application further provides a terminal, comprising: a first processor and a first memory for storing a computer program that can be run on the processor,

[0068] Wherein, the first processor is used to execute the steps of any of the above-mentioned terminal side power control methods when running the computer program.

[0069] The embodiment of the present application further provides a base station, comprising: a second processor and a second memory for storing a computer program that can be run on the processor,

[0070] Wherein, the second processor is used to execute the steps of any power control method on the base station side when running the computer program.

[0071] An embodiment of the present application also provides a storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of any power control method on the terminal side or the steps of any power control method on the base station side are implemented.

[0072] In the power control method, device, terminal and storage medium provided by the embodiments of the present application, the terminal determines a first value based on at least the time type of the first uplink transmission opportunity and the received TPC command, and determines the uplink transmission power at the first uplink transmission opportunity according to the determined first value. By determining the uplink transmission power of the uplink transmission opportunity through the above scheme, the terminal can use different uplink transmission powers in the SBFD time slot and the non-SBFD time slot, thereby ensuring that the link interference between the terminals can be effectively reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] Figure 1 A schematic diagram of a power control method implementation flow in an embodiment of the present application;

[0074] Figure 2This is a schematic diagram of another power control method implementation flow in an embodiment of the present application;

[0075] Figure 3 This is a schematic diagram of the structure of a power control device according to an embodiment of the present application;

[0076] Figure 4 This is a schematic diagram of the structure of another power control device according to an embodiment of the present application;

[0077] Figure 5 This is a schematic diagram of the terminal structure of an embodiment of the present application;

[0078] Figure 6 This is a schematic diagram of the base station structure of an embodiment of the present application. DETAILED DESCRIPTION

[0079] In the TDD spectrum, at the same time, the base station can only send downlink signals or receive uplink signals, resulting in limited uplink resources, and the uplink coverage and latency performance of the TDD spectrum are limited. SBFD technology configures different subbands in one carrier as different transmission directions, so that there are both downlink and uplink transmission opportunities at the same time, thereby reducing the latency of the TDD system, and because the uplink transmission resources are increased, the uplink coverage is also improved.

[0080] In the SBFD system, the transmission directions of different terminals in the SBFD time slot are different, so cross-link interference between terminals will occur. In the non-SBFD time slot, the transmission direction of all terminals in the cell is the same. In order to reduce cross-link interference between terminals, one solution is to use different power control parameters in the SBFD time slot (time slots configured with uplink subbands and downlink subbands) and non-SBFD time slots (time slots without uplink subbands and downlink subbands, that is, traditional TDD time slots). For example, two sets of closed-loop power control states are used, so that the uplink transmission power of the terminal can be adjusted according to different cross-link interference situations. For example, the transmission power of the terminal is reduced in the SBFD subframe to reduce cross-link interference between terminals. In addition, under different antenna architectures, the number of base station receiving antennas is different for SBFD time slots and non-SBFD time slots. Therefore, if the same coverage is to be achieved in SBFD time slots and non-SBFD time slots, the power of the terminal in the SBFD time slot needs to be higher than the power in the non-SBFD time slot. Therefore, different power control parameters also need to be configured.

[0081] At present, there is a situation in which the terminal is not configured with two power control adjustment states in closed-loop power control, or, in some cases, the terminal uses only one power control adjustment state by default. For example, the new radio (NR) uplink power control supports configuring two sets of closed-loop power control adjustment state indexes for the terminal, and the closed-loop power control value accumulation is calculated separately according to each set of closed-loop power control adjustment state index. However, if the base station uses DCI format 0_0 scheduling or DCI format 0_1 ​​scheduling, and there is no physical uplink shared channel (PUSCH) indicated by the SRI field in the DCI, at this time, the terminal only uses the closed-loop power control adjustment state with index 0 by default, so it is impossible to use different uplink transmission powers in SBFD time slots and non-SBFD time slots, and it is impossible to reduce cross-link interference between terminals by adjusting power parameters.

[0082] Based on this, in each embodiment of the present application, the terminal determines a first value based on at least the time type of the first uplink transmission opportunity and the received TPC command, and determines the uplink transmission power at the first uplink transmission opportunity according to the determined first value. By determining the uplink transmission power of the uplink transmission opportunity through the above scheme, the terminal can use different uplink transmission powers at uplink transmission opportunities of different time types, thereby ensuring that link interference between terminals can be effectively reduced.

[0083] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0084] The present application embodiment provides a power control method, which is applied to a terminal. Figure 1 , the method comprising:

[0085] Step 101: Determine an uplink transmission power at a first uplink transmission opportunity according to a first value.

[0086] The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

[0087] Here, the first value may be understood as an uplink channel and / or a component of the transmission power of the uplink channel.

[0088] In actual application, when the terminal is only configured with one power control adjustment state, the terminal determines the uplink transmission power at the first uplink transmission opportunity according to the first numerical value; and / or, when the terminal only uses one power control adjustment state, the terminal determines the uplink transmission power at the first uplink transmission opportunity according to the first numerical value.

[0089] Among them, the power control adjustment state can be configured by the network side for the terminal, or can be a default in the protocol. Taking the closed-loop power control adjustment state index as an example, in an embodiment of the present application, when the network side only configures one set of closed-loop power control adjustment state indexes for the terminal, or the network side instructs the terminal to use only one set of closed-loop power control adjustment state indexes, or the protocol defaults to configuring only one set of closed-loop power control adjustment state indexes for the terminal, or the terminal uses only one set of closed-loop power control adjustment state indexes by default according to the protocol, the terminal determines the uplink transmission power of each uplink transmission opportunity according to the first value.

[0090] The first information is used to describe the time type to which the transmission opportunity of the uplink channel and / or the uplink signal belongs. In this embodiment, the time type may include a first time type and a second time type.

[0091] The first time type may include at least one of the following:

[0092] SBFD time slot;

[0093] SBFD symbol;

[0094] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0095] Downlink symbols or flexible symbols are configured with uplink frequency domain resources.

[0096] The second time type may include at least one of the following:

[0097] Non-SBFD time slot;

[0098] Non-SBFD symbols;

[0099] Uplink timeslot configured on the network side;

[0100] Uplink symbols configured on the network side;

[0101] Flexible time slots not configured with uplink frequency domain resources;

[0102] Flexible symbols are not configured with uplink frequency domain resources.

[0103] In an embodiment of the present application, the terminal determines different uplink transmission powers for uplink transmission opportunities of different time types according to the first value.

[0104] Here, the uplink frequency domain resource can be understood as an uplink subband or uplink transmission resource in the SBFD system. The SBFD time slot can be understood as a time slot in which an uplink subband is configured in the SBFD system, and the SBFD symbol can be understood as a symbol in which an uplink subband is configured in the SBFD system.

[0105] In one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value can be represented as the sum of the cumulative value of the TPC command and the first power value; the first power value represents the power value configured by the network side or the pre-set power value; when the time type of the first uplink transmission opportunity is the second time type, the first numerical value can be represented as the cumulative value of the TPC command.

[0106] Here, the terminal determines whether to add a power value configured by the network side or predefined by the protocol based on the accumulated value of the TPC command according to the time type of the uplink transmission opportunity to determine the uplink transmission power of the uplink transmission opportunity.

[0107] Specifically, when the time type of the first uplink transmission opportunity belongs to the first time type, the first value is determined according to the following method:

[0108] The first value=the accumulated value of the TPC command within the set time period+the first power value.

[0109] When the time type of the first uplink transmission opportunity belongs to the second time type, the first value is determined according to the following method:

[0110] First value=the accumulated value of TPC commands within a set time period.

[0111] The first power value may be a positive number or a negative number.

[0112] In another embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value is represented by the sum of the cumulative value of the TPC command and the first power value; the first power value represents the power value configured on the network side or the pre-set power value; when the time type of the first uplink transmission opportunity is the second time type, the first numerical value is represented by the cumulative value of the TPC command.

[0113] Specifically, when the time type of the first uplink transmission opportunity belongs to the first time type, the first value is determined according to the following method:

[0114] First value=the accumulated value of TPC commands within a set time period.

[0115] When the time type of the first uplink transmission opportunity belongs to the second time type, the first value is determined according to the following method:

[0116] The first value=the accumulated value of the TPC command within the set time period+the first power value.

[0117] The first power value may be a positive number or a negative number.

[0118] It should be noted that in actual application, the following situation 1 is equivalent to situation 2:

[0119] Case 1, the first power value is a positive number, corresponding to the first time type, the first value = the cumulative value of the TPC command within the set time period + the first power value, corresponding to the second time type, the first value = the cumulative value of the TPC command within the set time period.

[0120] Case 2, the first power value is a negative number, corresponding to the first time type, the first value = the cumulative value of the TPC command within the set time period, corresponding to the second time type, the first value = the cumulative value of the TPC command within the set time period + the first power value.

[0121] Exemplarily, for a physical uplink shared channel (PUSCH), a first value of a component of the uplink transmission power is determined according to the following method:

[0122]

[0123] Wherein, l represents the index of the closed-loop power control adjustment state of the terminal, Characterization in set D i The accumulated value of the TPC command of the PUSCH in y represents the first power value. When the uplink transmission opportunity belongs to the first time type, x=1, and when the uplink transmission opportunity belongs to the second time type, x=0; or when the uplink transmission opportunity belongs to the first time type, x=0, and when the uplink transmission opportunity belongs to the second time type, x=1. Set D i Characterizes the period from PUSCH transmission opportunity i-i0 to before symbols to PUSCH transmission opportunity i before K PUSCH(i) The TPC command received by the terminal between symbols, where i0>0, is to meet the transmission timing i-i0 before K symbols before transmission opportunity i PUSCH(i) The smallest positive integer before the last symbol. That is, all TPC commands received after the last power adjustment are accumulated. If PUSCH is scheduled by DCI, K PUSCH(i) The number of symbols between the last symbol of PDCCH and the first symbol of PUSCH transmission. If PUSCH transmission is configured by ConfiguredGrantConfig, D i The value of is the number of symbols per time slot multiplied by the smallest k2 value in PUSCH-ConfigCommon.

[0124] In the above embodiment, the terminal determines whether to add a power value to the uplink transmission power according to the type of uplink transmission opportunity. In addition, the accumulated values ​​of TPC commands belonging to different time types can be calculated respectively to determine the uplink transmission power of the uplink transmission opportunity of the corresponding time type:

[0125] In one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value can be represented as the cumulative value of the first TPC command sent by the base station in the first time period; when the time type of the first uplink transmission opportunity is the second time type, the first numerical value can be represented as the cumulative value of the second TPC command sent by the base station in the second time period.

[0126] The first TPC command represents a TPC command belonging to the first time type; the second TPC command represents a TPC command belonging to the second time type.

[0127] Here, the TPC command sent by the network side carries indication information for indicating the time type to which the TPC command carried by the TPC command belongs, or for indicating that the TPC command carried by the TPC command belongs to only one of the first time type and the second time type. In this way, the terminal determines the first power based on the cumulative value of TPC commands received within a certain time period that are consistent with the indicated time type.

[0128] Specifically, when the time type of the first uplink transmission opportunity belongs to the first time type, the first value may be determined in the following manner:

[0129] First value=the accumulated value of TPC commands belonging to the first time type in the first time period.

[0130] When the time type of the first uplink transmission opportunity belongs to the second time type, the first value is determined according to the following method:

[0131] The first value=the accumulated value of the TPC commands belonging to the second time type in the second time period.

[0132] In actual application, the first time period and the second time period may be the same time period, or may be time periods with partial overlap, or may be time periods that do not overlap.

[0133] In one embodiment, the first TPC command may be carried in a first DCI; the CRC of the first DCI may be scrambled by a first RNTI; the second TPC command may be carried in a second DCI; and the CRC of the second DCI may be scrambled by a second RNTI.

[0134] Here, the CRC of the DCI is scrambled with different RNTIs, so that the time type to which the TPC command carried by the DCI belongs is indicated by different scrambling methods. For example, the TPC command carried by the DCI scrambled with CRC using RNTI#1 belongs to the first time type, and the TPC command carried by the DCI scrambled with CRC using RNTI#2 belongs to the second time type.

[0135] In one embodiment, the first TPC command is carried in a third DCI, and the third DCI carries information indicating the first time type; or, the second TPC command is carried in a third DCI, and the third DCI carries information indicating the second time type.

[0136] In actual application, information indicating the time type to which the TPC command belongs can be carried in the information field of the DCI, for example, indicating whether the TPC command carried by the DCI belongs to the first time type or the second time type. In this way, the terminal can determine the time type to which the TPC command carried in the DCI belongs through the information carried in the information field of the DCI.

[0137] Correspondingly, the embodiment of the present application also provides a power control method, which is applied to a base station. Figure 2 , the method comprising:

[0138] Step 201: Send DCI to the terminal.

[0139] The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

[0140] In one embodiment, the first time type may include at least one of the following:

[0141] SBFD time slot;

[0142] SBFD symbol;

[0143] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0144] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0145] The second time type may include at least one of the following:

[0146] Non-SBFD time slot;

[0147] Non-SBFD symbols;

[0148] Uplink timeslot configured on the network side;

[0149] Uplink symbols configured on the network side;

[0150] Flexible time slots not configured with uplink frequency domain resources;

[0151] Flexible symbols are not configured with uplink frequency domain resources.

[0152] In one embodiment, sending the DCI to the terminal includes:

[0153] Sending a first DCI and / or a second DCI to the terminal; wherein,

[0154] The CRC of the first DCI is scrambled using a first RNTI; the first RNTI corresponds to the first time type; the first DCI carries a first TPC command belonging to the first time type;

[0155] The CRC of the second DCI is scrambled using a second RNTI; the second RNTI corresponds to the second time type; the second DCI carries a second TPC command belonging to the second time type;

[0156] In one embodiment, sending the DCI to the terminal includes:

[0157] Sending a third DCI to the terminal; wherein,

[0158] The third DCI carries the first TPC command belonging to the first time type and information for indicating the first time type, or the third DCI carries the second TPC command belonging to the second time type and information for indicating the second time type.

[0159] In the embodiment of the present application, the terminal determines a first value based on at least the time type of the first uplink transmission opportunity and the received TPC command, and determines the uplink transmission power at the first uplink transmission opportunity according to the determined first value. By determining the uplink transmission power of the uplink transmission opportunity through the above scheme, the terminal can use different uplink transmission powers at uplink transmission opportunities of different time types. For example, it can effectively distinguish the closed-loop power control of SBFD time slots and non-SBFD time slots, thereby ensuring that the link interference between terminals can be effectively reduced.

[0160] In order to implement the power control method on the terminal side of the embodiment of the present application, the embodiment of the present application also provides a power control device, which is arranged on the terminal, such as Figure 3 As shown, the device comprises:

[0161] The determining unit 301 is configured to determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein,

[0162] The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

[0163] Optionally, in one embodiment, the determination unit 301 is used to determine the uplink transmission power at the first uplink transmission opportunity according to the first value when the terminal is only configured with one power control adjustment state and / or when the terminal only uses one power control adjustment state.

[0164] Optionally, in one embodiment, the time type of the first uplink transmission opportunity includes a first time type and a second time type; wherein,

[0165] The first time type includes at least one of the following:

[0166] SBFD time slot;

[0167] SBFD symbol;

[0168] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0169] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0170] The second time type includes at least one of the following:

[0171] Non-SBFD time slot;

[0172] Non-SBFD symbols;

[0173] Uplink timeslot configured on the network side;

[0174] Uplink symbols configured on the network side;

[0175] Flexible time slots not configured with uplink frequency domain resources;

[0176] Flexible symbols are not configured with uplink frequency domain resources.

[0177] Optionally, in one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and a first power value; the first power value represents a power value configured by the network side or a preset power value;

[0178] When the time type of the first uplink transmission opportunity is the second time type, the first value is represented by a cumulative value of the TPC command.

[0179] Optionally, in one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value is characterized as a cumulative value of the TPC command;

[0180] When the time type of the first uplink transmission opportunity is the second time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and the first power value; the first power value represents the power value configured by the network side or the pre-set power value.

[0181] Optionally, in one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first value is characterized by a cumulative value of a first TPC command sent by the base station in a first time period;

[0182] When the time type of the first uplink transmission opportunity is the second time type, the first value is characterized by a cumulative value of a second TPC command sent by the base station in a second time period;

[0183] The first TPC command represents a TPC command belonging to the first time type; the second TPC command represents a TPC command belonging to the second time type.

[0184] Optionally, in one embodiment, the first TPC command is carried in a first DCI; a cyclic redundancy check CRC of the first DCI is scrambled by a first RNTI;

[0185] The second TPC command is carried in a second DCI; the CRC of the second DCI is scrambled by a second RNTI.

[0186] Optionally, in an embodiment, the first TPC command is carried in a third DCI, and the third DCI carries information indicating the first time type; or,

[0187] The second TPC command is carried in a third DCI, and the third DCI carries information indicating the second time type.

[0188] In actual application, the determining unit 301 may be implemented by a processor in the power control device.

[0189] In order to implement the power control method at the base station side of the embodiment of the present application, the embodiment of the present application also provides a power control device, which is arranged on the base station, such as Figure 4 As shown, the device comprises:

[0190] The sending unit 401 is used to send DCI to the terminal; wherein,

[0191] The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

[0192] Optionally, in one embodiment, the first time type includes at least one of the following:

[0193] SBFD time slot;

[0194] SBFD symbol;

[0195] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0196] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0197] The second time type includes at least one of the following:

[0198] Non-SBFD time slot;

[0199] Non-SBFD symbols;

[0200] Uplink timeslot configured on the network side;

[0201] Uplink symbols configured on the network side;

[0202] Flexible time slots not configured with uplink frequency domain resources;

[0203] Flexible symbols are not configured with uplink frequency domain resources.

[0204] Optionally, in an embodiment, the sending unit 401 is configured to send the first DCI and / or the second DCI to the terminal; wherein,

[0205] The CRC of the first DCI is scrambled using a first RNTI; the first RNTI corresponds to the first time type; the first DCI carries a first TPC command belonging to the first time type;

[0206] The CRC of the second DCI is scrambled using a second RNTI; the second RNTI corresponds to the second time type; the second DCI carries a second TPC command belonging to the second time type;

[0207] Optionally, in an embodiment, the sending unit 401 is configured to send a third DCI to the terminal; wherein,

[0208] The third DCI carries the first TPC command belonging to the first time type and information for indicating the first time type, or the third DCI carries the second TPC command belonging to the second time type and information for indicating the second time type.

[0209] In actual application, the sending unit 401 can be implemented by a communication interface in the power control device.

[0210] It should be noted that: the power control device provided in the above embodiment only uses the division of the above program modules as an example to illustrate when performing power control. In actual applications, the above processing can be assigned to different program modules as needed, that is, the internal structure of the device is divided into different program modules to complete all or part of the processing described above. In addition, the power control device provided in the above embodiment and the power control method embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0211] Based on the hardware implementation of the above program modules, and in order to implement the method on the terminal side of the embodiment of the present application, the embodiment of the present application also provides a terminal, such as Figure 5 As shown, the terminal 500 includes:

[0212] The first communication interface 501 is capable of exchanging information with other network nodes;

[0213] The first processor 502 is connected to the first communication interface 501 to implement information exchange with other network nodes, and is used to execute the method provided by one or more technical solutions of the terminal side when running a computer program. The computer program is stored in the first memory 503.

[0214] Specifically, the first processor 502 is configured to determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein,

[0215] The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

[0216] In one embodiment, the first processor 502 is used to determine the uplink transmission power at the first uplink transmission opportunity according to the first value when the terminal is only configured with one power control adjustment state and / or when the terminal only uses one power control adjustment state.

[0217] Optionally, in one embodiment, the time type of the first uplink transmission opportunity includes a first time type and a second time type; wherein,

[0218] The first time type includes at least one of the following:

[0219] SBFD time slot;

[0220] SBFD symbol;

[0221] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0222] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0223] The second time type includes at least one of the following:

[0224] Non-SBFD time slot;

[0225] Non-SBFD symbols;

[0226] Uplink timeslot configured on the network side;

[0227] Uplink symbols configured on the network side;

[0228] Flexible time slots not configured with uplink frequency domain resources;

[0229] Flexible symbols are not configured with uplink frequency domain resources.

[0230] Optionally, in one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and a first power value; the first power value represents a power value configured by the network side or a preset power value;

[0231] When the time type of the first uplink transmission opportunity is the second time type, the first value is represented by a cumulative value of the TPC command.

[0232] Optionally, in one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first numerical value is characterized as a cumulative value of the TPC command;

[0233] When the time type of the first uplink transmission opportunity is the second time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and the first power value; the first power value represents the power value configured by the network side or the pre-set power value.

[0234] Optionally, in one embodiment, when the time type of the first uplink transmission opportunity is the first time type, the first value is characterized by a cumulative value of a first TPC command sent by the base station in a first time period;

[0235] When the time type of the first uplink transmission opportunity is the second time type, the first value is characterized by a cumulative value of a second TPC command sent by the base station in a second time period;

[0236] The first TPC command represents a TPC command belonging to the first time type; the second TPC command represents a TPC command belonging to the second time type.

[0237] Optionally, in one embodiment, the first TPC command is carried in a first DCI; a cyclic redundancy check CRC of the first DCI is scrambled by a first RNTI;

[0238] The second TPC command is carried in a second DCI; the CRC of the second DCI is scrambled by a second RNTI.

[0239] Optionally, in an embodiment, the first TPC command is carried in a third DCI, and the third DCI carries information indicating the first time type; or,

[0240] The second TPC command is carried in a third DCI, and the third DCI carries information indicating the second time type.

[0241] It should be noted that the specific processing process of the first processor 502 and the first communication interface 501 can be understood by referring to the above method.

[0242] Of course, in actual application, the various components in the terminal 500 are coupled together through the bus system 504. It can be understood that the bus system 504 is used to realize the connection and communication between these components. In addition to the data bus, the bus system 504 also includes a power bus, a control bus, and a status signal bus. However, for the sake of clarity, Figure 5 Various buses are labeled as bus system 504 .

[0243] The first memory 503 in the embodiment of the present application is used to store various types of data to support the operation of the terminal 500. Examples of such data include: any computer program used to operate on the terminal 500.

[0244] The method disclosed in the above embodiment of the present application can be applied to the first processor 502, or implemented by the first processor 502. The first processor 502 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the first processor 502. The above-mentioned first processor 502 may be a general-purpose processor, a digital signal processor (DSP, Digital Signal Processor), or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. The first processor 502 can implement or execute the various methods, steps and logic block diagrams disclosed in the embodiments of the present application. A general-purpose processor may be a microprocessor or any conventional processor, etc. In combination with the steps of the method disclosed in the embodiment of the present application, it can be directly embodied as a hardware decoding processor to execute, or it can be executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium, which is located in the first memory 503, and the first processor 502 reads the information in the first memory 503 and completes the steps of the above method in combination with its hardware.

[0245] In an exemplary embodiment, the terminal 500 may be implemented by one or more application specific integrated circuits (ASIC), DSP, programmable logic device (PLD), complex programmable logic device (CPLD), field programmable gate array (FPGA), general processor, controller, microcontroller (MCU), microprocessor, or other electronic components to execute the aforementioned method.

[0246] Based on the hardware implementation of the above program modules, and in order to implement the method on the base station side of the embodiment of the present application, the embodiment of the present application also provides a base station, such as Figure 6 As shown, the base station 600 includes:

[0247] The second communication interface 601 is capable of exchanging information with other network nodes;

[0248] The second processor 602 is connected to the second communication interface 601 to implement information exchange with other network nodes, and is used to execute the method provided by one or more technical solutions of the base station side when running a computer program. The computer program is stored in the second memory 603.

[0249] Specifically, the second communication interface 601 is used to send DCI to the terminal; wherein,

[0250] The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

[0251] Optionally, in one embodiment, the first time type includes at least one of the following:

[0252] SBFD time slot;

[0253] SBFD symbol;

[0254] A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources;

[0255] Downlink symbols or flexible symbols configured with uplink frequency domain resources;

[0256] The second time type includes at least one of the following:

[0257] Non-SBFD time slot;

[0258] Non-SBFD symbols;

[0259] Uplink timeslot configured on the network side;

[0260] Uplink symbols configured on the network side;

[0261] Flexible time slots not configured with uplink frequency domain resources;

[0262] Flexible symbols are not configured with uplink frequency domain resources.

[0263] Optionally, in one embodiment, the second communication interface 601 is used to send the first DCI and / or the second DCI to the terminal; wherein,

[0264] The CRC of the first DCI is scrambled using a first RNTI; the first RNTI corresponds to the first time type; the first DCI carries a first TPC command belonging to the first time type;

[0265] The CRC of the second DCI is scrambled using a second RNTI; the second RNTI corresponds to the second time type; the second DCI carries a second TPC command belonging to the second time type;

[0266] Optionally, in one embodiment, the second communication interface 601 is used to send a third DCI to the terminal; wherein,

[0267] The third DCI carries the first TPC command belonging to the first time type and information for indicating the first time type, or the third DCI carries the second TPC command belonging to the second time type and information for indicating the second time type.

[0268] It should be noted that the specific processing process of the second processor 602 and the second communication interface 601 can be understood by referring to the above method.

[0269] Of course, in actual application, the various components in the base station 600 are coupled together through the bus system 604. It can be understood that the bus system 604 is used to realize the connection and communication between these components. In addition to the data bus, the bus system 604 also includes a power bus, a control bus, and a status signal bus. However, for the sake of clarity, Figure 6 Various buses are labeled as bus system 604 .

[0270] The second memory 603 in the embodiment of the present application is used to store various types of data to support the operation of the base station 600. Examples of such data include: any computer program used to operate on the base station 600.

[0271] The method disclosed in the above embodiment of the present application can be applied to the second processor 602, or implemented by the second processor 602. The second processor 602 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the second processor 602. The above-mentioned second processor 602 may be a general-purpose processor, DSP, or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. The second processor 602 can implement or execute the various methods, steps and logic block diagrams disclosed in the embodiments of the present application. A general-purpose processor may be a microprocessor or any conventional processor, etc. In combination with the steps of the method disclosed in the embodiment of the present application, it can be directly embodied as a hardware decoding processor to execute, or it can be executed by a combination of hardware and software modules in the decoding processor. The software module can be located in a storage medium, which is located in the second memory 603. The second processor 602 reads the information in the second memory 603 and completes the steps of the above method in combination with its hardware.

[0272] In an exemplary embodiment, the base station 600 may be implemented by one or more ASICs, DSPs, PLDs, CPLDs, FPGAs, general purpose processors, controllers, MCUs, Microprocessors, or other electronic components to perform the aforementioned methods.

[0273] It can be understood that the memory (first memory 503, second memory 60) of the embodiment of the present application can be a volatile memory or a non-volatile memory, and can also include both volatile and non-volatile memories. Among them, the non-volatile memory can be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), a magnetic random access memory (FRAM), a flash memory, a magnetic surface memory, an optical disc, or a compact disc read-only memory (CD-ROM); the magnetic surface memory can be a disk memory or a tape memory. The volatile memory can be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static random access memory (SRAM), synchronous static random access memory (SSRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDRSDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct RAM bus random access memory (DRRAM).The memories described in the embodiments of the present application are intended to include, but are not limited to, these and any other suitable types of memories.

[0274] In an exemplary embodiment, the embodiment of the present application further provides a storage medium, namely a computer storage medium, specifically a computer-readable storage medium, for example, including a first memory 503 storing a computer program, and the computer program can be executed by the first processor 502 of the terminal 500 to complete the steps of the aforementioned terminal side method. For another example, a second memory 603 storing a computer program can be executed by the second processor 602 of the base station 600 to complete the steps of the aforementioned base station side method. The computer-readable storage medium can be a memory such as FRAM, ROM, PROM, EPROM, EEPROM, FlashMemory, magnetic surface storage, optical disk, or CD-ROM.

[0275] It should be noted that: "first", "second", etc. are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.

[0276] The term "and / or" herein is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the term "at least one" herein represents any combination of at least two of any one or more of a plurality of. For example, including at least one of A, B, and C can represent including any one or more elements selected from the set consisting of A, B, and C.

[0277] In addition, the technical solutions described in the embodiments of the present application can be combined arbitrarily without conflict.

[0278] The above description is only a preferred embodiment of the present application and is not intended to limit the protection scope of the present application.

Claims

1. A power control method, characterized in that: Applied to a terminal, the method comprises: Determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein, The first value is determined based on at least first information and a transmission power control TPC command; the first information represents a time type of the first uplink transmission opportunity.

2. The method according to claim 1, characterized in that The determining the uplink transmission power at the first uplink transmission opportunity according to the first value includes: In a case where the terminal is configured with only one power control adjustment state, and / or in a case where the terminal is using only one power control adjustment state, the uplink transmission power at the first uplink transmission opportunity is determined according to the first value.

3. The method according to claim 1, characterized in that: The time type of the first uplink transmission opportunity includes a first time type and a second time type; wherein, The first time type includes at least one of the following: The sub-bands do not overlap the full-duplex SBFD time slots; SBFD symbol; A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources; Downlink symbols or flexible symbols configured with uplink frequency domain resources; The second time type includes at least one of the following: Non-SBFD time slot; Non-SBFD symbols; Uplink timeslot configured on the network side; Uplink symbols configured on the network side; Flexible time slots not configured with uplink frequency domain resources; Flexible symbols are not configured with uplink frequency domain resources.

4. The method according to claim 3, characterized in that In a case where the time type of the first uplink transmission opportunity is the first time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and the first power value; the first power value represents a power value configured by the network side or a preset power value; When the time type of the first uplink transmission opportunity is the second time type, the first value is represented by a cumulative value of the TPC command.

5. The method according to claim 3, characterized in that: When the time type of the first uplink transmission opportunity is the first time type, the first value is characterized as a cumulative value of the TPC command; When the time type of the first uplink transmission opportunity is the second time type, the first numerical value is represented by the sum of the accumulated value of the TPC command and the first power value; the first power value represents the power value configured by the network side or the pre-set power value.

6. The method according to claim 3, characterized in that When the time type of the first uplink transmission opportunity is the first time type, the first value is characterized by a cumulative value of a first TPC command sent by the base station in a first time period; When the time type of the first uplink transmission opportunity is the second time type, the first value is characterized by a cumulative value of a second TPC command sent by the base station in a second time period; The first TPC command represents a TPC command belonging to the first time type; the second TPC command represents a TPC command belonging to the second time type.

7. The method according to claim 6, characterized in that The first TPC command is carried in the first downlink control information DCI; the cyclic redundancy check CRC of the first DCI is scrambled by the first radio network temporary identifier RNTI; The second TPC command is carried in a second DCI; The CRC of the second DCI is scrambled by the second RNTI.

8. The method according to claim 6, characterized in that The first TPC command is carried in a third DCI, and the third DCI carries information indicating the first time type; or, The second TPC command is carried in a third DCI, and the third DCI carries information indicating the second time type.

9. A power control method, characterized in that: Applied to a base station, the method comprises: Send DCI to the terminal; wherein, The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

10. The method according to claim 9, characterized in that The first time type includes at least one of the following: SBFD time slot; SBFD symbol; A downlink timeslot or a flexible timeslot configured with uplink frequency domain resources; Downlink symbols or flexible symbols configured with uplink frequency domain resources; The second time type includes at least one of the following: Non-SBFD time slot; Non-SBFD symbols; Uplink timeslot configured on the network side; Uplink symbols configured on the network side; Flexible time slots not configured with uplink frequency domain resources; Flexible symbols are not configured with uplink frequency domain resources.

11. The method according to claim 10, characterized in that The sending of DCI to the terminal includes: Sending a first DCI and / or a second DCI to the terminal; wherein, The CRC of the first DCI is scrambled using a first RNTI; the first RNTI corresponds to the first time type; the first DCI carries a first TPC command belonging to the first time type; The CRC of the second DCI is encrypted with a second RNTI; the second RNTI corresponds to the second time type; and the second DCI carries a second TPC command belonging to the second time type.

12. The method according to claim 10, characterized in that The sending of DCI to the terminal includes: Sending a third DCI to the terminal; wherein, The third DCI carries the first TPC command belonging to the first time type and information for indicating the first time type, or the third DCI carries the second TPC command belonging to the second time type and information for indicating the second time type.

13. A power control device, characterized in that: include: A determination unit, configured to determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein, The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

14. A power control device, characterized in that: include: A sending unit, configured to send DCI to a terminal; wherein: The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

15. A terminal, characterized in that: include: A first processor and a first communication interface; wherein, The first processor is used to determine the uplink transmission power at the first uplink transmission opportunity according to the first value; wherein, The first value is determined based on at least first information and a TPC command; the first information represents a time type of the first uplink transmission opportunity.

16. A base station, characterized in that: include: A second processor and a second communication interface; wherein, The second communication interface is used to send DCI to the terminal; wherein, The TPC command carried in the DCI belongs to the first time type or the second time type of the uplink transmission opportunity.

17. A terminal, characterized in that: include: a first processor and a first memory for storing a computer program executable on the processor, Wherein, when the first processor is used to run the computer program, the steps of the method described in any one of claims 1 to 8 are executed.

18. A base station, characterized in that: include: a second processor and a second memory for storing a computer program executable on the processor, Wherein, when the second processor is used to run the computer program, the steps of the method described in any one of claims 9 to 12 are executed.

19. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the computer program implements the steps of the method according to any one of claims 1 to 8, or implements the steps of the method according to any one of claims 9 to 12.