Open pit coal mine mining method and device and coal mine mining operation system

By determining the mining sequence in open-pit coal mines, first performing roof stripping and coal seam penetration, the quality problem of raw coal caused by coal-rock mixing is solved, independent operations of coal seams and rock layers are realized, and the probability of coal-rock mixing is reduced.

CN119412055APending Publication Date: 2025-02-11SHENHUA XINJIANG ENERGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411336197.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2025-02-11

AI Technical Summary

Technical Problem

In the prior art, coal-rock mixed results in poor quality of raw coal, and coal-rock mixed problems will occur after blasting.

Method used

By obtaining the regional information of the coal mine, determining the mining sequence, first performing peeling operations on the top plate peeling area until the coal seam operation area is exposed, and then blasting operations and mining operations are carried out on the coal seam operation area until the bottom plate peeling area is collected.

Benefits of technology

The independent operation of coal seams and rock layers is achieved, and the independent bursting of coal seams reduces the probability of coal-rock mixing and improves the quality of raw coal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119412055A_ABST
    Figure CN119412055A_ABST
Patent Text Reader

Abstract

The invention provides an open pit coal mine mining method and device and a coal mine mining operation system. The method comprises the steps that area information of a coal mine is obtained, the area information comprises at least one of information of a roof stripping area, information of a coal seam operation area and information of a floor stripping area, the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operation area is an area with coal in the coal mine, and the floor stripping area is an area with rocks on the bottom of the coal mine; the bottom plate stripping area is an area with rocks at the bottom of the coal mine; the mining sequence is determined according to the area information, so that coal mining is conducted according to the mining sequence, and the mining sequence is the sequence that stripping operation is conducted on the roof stripping area till the coal seam operation area is exposed, and then blasting operation and mining and loading operation are conducted on the coal seam operation area till collection is conducted on the floor stripping area. According to the scheme, the problems that in the prior art, coal and rock are mixed, so that the quality of raw coal is poor, and coal and rock are mixed after blasting are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of coal mining, and in particular to an open-pit coal mining method, an open-pit coal mining device, a computer program product, and a coal mining operation system. Background Art

[0002] my country's open-pit coal mines account for more than 23% of the country's total coal production, and the coal resource inventory is huge. Coal suitable for open-pit mining is mainly distributed in the northwest of my country. In the current coal seam mining plan, the quality of raw coal caused by coal-rock mixing is poor, and the problem of coal-rock mixing will appear after blasting. Summary of the invention

[0003] The main purpose of the present application is to provide an open-pit coal mining method, an open-pit coal mining device, a computer program product and a coal mining operation system, so as to at least solve the problem of poor raw coal quality caused by coal-rock mixing in the prior art, and the problem of coal-rock mixing after blasting.

[0004] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a mining method for an open-pit coal mine is provided, comprising: obtaining regional information of the coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area and information of a bottom stripping area, wherein the roof stripping area is an area on the top of the coal mine with rocks, the coal seam operating area is an area in the coal mine including coal, and the bottom stripping area is an area on the bottom of the coal mine with rocks; determining a mining sequence according to the regional information so that coal is mined in accordance with the mining sequence, wherein the mining sequence is the sequence of first performing stripping operations on the roof stripping area until the coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the coal seam operating area until the bottom stripping area is collected.

[0005] Optionally, after determining the mining order according to the regional information, the method further includes: obtaining the mining belt width, wherein the mining belt width is the construction width during the lateral stripping operation; and performing stripping operations on the roof stripping area according to the mining belt width until stripping reaches the coal seam operating area.

[0006] Optionally, obtaining the width of the mining belt includes: obtaining width-related information, wherein the width-related information includes one or more of a blast pile width, a rock looseness coefficient, a step height, a blast pile height, and a blast pile shape coefficient; and calculating the width of the mining belt according to a width calculation formula, wherein the width calculation formula is:

[0007]

[0008] A represents the width of the mining zone, b represents the width of the blast pile, k s represents the rock looseness coefficient, H represents the step height, H' represents the blast pile height, ε d represents the shape factor of the explosion pile.

[0009] Optionally, after determining the mining order according to the regional information, the method further includes: obtaining the direction of the coal seam roof; performing coal seam drilling and blasting operations on the coal seam operating area according to the direction of the coal seam roof; arranging openings in the coal seam operating area after the coal seam drilling and blasting operations; and performing mining and loading operations on the coal seam operating area after the coal seam drilling and blasting operations according to the positions of the openings.

[0010] Optionally, after determining the mining order according to the regional information, the method further includes: obtaining information of the bottom plate stripping area of ​​the Nth operation; using the information of the bottom plate stripping area of ​​the Nth operation as information of the top plate stripping area of ​​the N+1th operation, and performing the N+1th coal mining operation according to the mining order.

[0011] Optionally, after determining the mining order according to the area information, the method further includes: acquiring positioning information of the coal mining equipment; determining a target area for the current operation according to the mining order; determining whether the coal mining equipment is located in the target area for operation according to the positioning information, and obtaining a positioning result; when the positioning result indicates that the coal mining equipment is located in the target area for operation, determining that the coal mining equipment is operating out of bounds and generating an alarm message.

[0012] Optionally, after determining the mining order according to the regional information, the method further includes: obtaining a coal mining speed; and when the coal mining speed is less than a preset speed threshold, controlling drainage equipment to operate so as to drain the coal mine.

[0013] According to another aspect of the present application, a mining device for an open-pit coal mine is provided, comprising: a first acquisition unit, for acquiring regional information of the coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area and information of a bottom stripping area, wherein the roof stripping area is an area on the top of the coal mine with rocks, the coal seam operating area is an area in the coal mine including coal, and the bottom stripping area is an area on the bottom of the coal mine with rocks; a mining unit, for determining a mining sequence according to the regional information so as to mine coal in accordance with the mining sequence, wherein the mining sequence is a sequence of first performing stripping operations on the roof stripping area until the coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the coal seam operating area until the bottom stripping area is collected.

[0014] According to another aspect of the present application, a computer program product is provided, comprising a computer program, wherein when the computer program is executed by a processor, the steps of any one of the open-pit coal mining methods are implemented.

[0015] According to another aspect of the present application, a coal mining operation system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing any one of the open-pit coal mining methods.

[0016] By applying the technical solution of the present application, the working line with mixed coal and rock is divided into different areas, and the operation sequence and content of different areas can be set. After the roof stripping area is stripped as a whole, the coal seam operating area is exposed, and then blasting operations are carried out in the coal seam operating area, thereby realizing independent operations of coal seams and rock seams, independent penetration and blasting of coal seams, and reducing the probability of coal and rock mixing. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0018] Figure 1 A hardware structure block diagram of a mobile terminal for executing a mining method for an open-pit coal mine provided in an embodiment of the present application is shown;

[0019] Figure 2 A schematic diagram of a process of an open-pit coal mine mining method provided according to an embodiment of the present application is shown;

[0020] Figure 3 A schematic diagram showing the regional division of a coal mine;

[0021] Figure 4 A top view schematic diagram of the arrangement of the horizontal mining and blasting area is shown;

[0022] Figure 5 A schematic side view of the arrangement of the horizontal mining and blasting area is shown;

[0023] Figure 6 A schematic top view of the joint horizontal mining advancement of the working lines is shown;

[0024] Figure 7 A side view schematic diagram of the joint horizontal mining and advancement of the working lines is shown;

[0025] Figure 8 A top view schematic diagram of the vertical mining and blasting area layout is shown;

[0026] Fig. 9 A schematic side view of the vertical mining and blasting area layout is shown;

[0027] Fig.10 A schematic diagram of three mining zones is shown;

[0028] Fig.11 A schematic diagram of coal seam penetration and blasting is shown;

[0029] Fig.12 The schematic diagram of the longitudinal mining advancement of the working line is shown;

[0030] Fig.13 It shows the schematic diagram of the advancement of the work line from vertical mining to horizontal mining;

[0031] Fig.14 A structural block diagram of a mining device for an open-pit coal mine provided according to an embodiment of the present application is shown.

[0032] The above drawings include the following reference numerals:

[0033] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION

[0034] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0035] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0036] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0037] The occurrence conditions of coal resources affect the choice of open-pit mining methods. According to the occurrence conditions of coal seams and the layout of working lines, they can be divided into two main categories: horizontal mining and vertical mining. Among them, vertical mining refers to a mining method in which the direction of the working line is consistent with the direction of the coal seam and it advances along the inclination. For horizontal mining, the working line is consistent with the inclination of the coal seam and it advances along the strike. Different mining methods have different application conditions and the resulting application effects. Since the vertical mining working line is consistent with the direction of the coal seam, the coal seam and rock strata steps are independently divided, while the horizontal mining working line has a mixture of coal and rock steps, especially all coal-bearing steps within the coal seam mining depth range are coal-rock mixed steps, which has a certain impact on the control of the coal-rock interface, especially the coal-rock mixing under blasting conditions. In order to reduce the impact of blasting on coal-rock mixing under horizontal mining conditions, it is necessary to propose a mining plan for horizontal mining working lines in open-pit coal mines. By controlling the number of mining widths of the mining belt at the coal-rock interface and adjusting the coal seam blasting and mining operation procedures, the longitudinal arrangement of the coal seam blasting working face under horizontal mining working line conditions can be achieved, and then the coal-rock mixing problem under horizontal mining conditions can be solved by the coal-rock mixed area mining procedure.

[0038] As introduced in the background technology, the quality of raw coal in the prior art is poor due to the mixing of coal and rock, and coal and rock will appear after blasting. In order to solve the above problems, the embodiments of the present application provide an open-pit coal mining method, an open-pit coal mining device, a computer program product and a coal mining operation system.

[0039] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0040] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 FIG. 1 is a hardware structure block diagram of a mobile terminal for an open-pit coal mining method according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0041] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the display method of device information in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0042] In this embodiment, a method for mining an open-pit coal mine running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0043] Figure 2 1 is a schematic diagram of a process flow of an open-pit coal mining method according to an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:

[0044] Step S201, obtaining regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0045] Specifically, the coal mine area can be divided into three areas, namely, the roof stripping area, the coal seam operating area and the floor stripping area. The roof stripping area is the area that needs to be stripped, and there are a large number of rocks in the roof stripping area. The coal seam operating area has coal and is used for subsequent mining and loading. The floor stripping area is the area with rocks exposed after the coal in the coal seam operating area is mined and loaded.

[0046] Step S202, determining the mining sequence according to the above-mentioned regional information, so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is firstly performing stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0047] Specifically, the mining sequence is pre-established in this plan. The first step is to strip the roof stripping area until the coal seam operating area is exposed. The second step is to blast the coal seam operating area. The third step is to mine and load the coal seam operating area until the bottom stripping area is exposed.

[0048] Through this embodiment, the working line with mixed coal and rock is divided into different areas, and the operation sequence and content of different areas can be set. After the roof stripping area is stripped as a whole, the coal seam operating area is exposed, and then blasting operations are carried out on the coal seam operating area, thereby realizing independent operations of coal seams and rock seams, and independent penetration and blasting of coal seams, and reducing the probability of coal and rock mixing.

[0049] Specifically, under the conditions of horizontal mining in open-pit coal mines, the mining and stripping work line is arranged perpendicular to the ore body, moves along the ore body, and perforates and loosens the rock mass, and then the electric shovel cooperates with the single bucket truck for stripping. The section trench is arranged at the end of the open-pit mine, excavated perpendicular to the ore body, and pushed from one end to the other. In this way, the mine pit is gradually formed by cyclic advancement and deepening.

[0050] Specifically, perforation blasting can be carried out on the coal / rock / coal-rock mixed steps, and then the normal electric shovel can be used with a single bucket truck for mining and stripping. Figure 3 As shown, it includes the top roof stripping area, the coal seam operating area and the bottom plate stripping area.

[0051] Under normal horizontal mining conditions, the working line is arranged and advanced along the direction of the ore body. After reaching the boundary, it returns to advance to the next step or moves the equipment to the other end to continue advancing in the same direction of the next step. Under this condition, the amount of soil discharge is relatively uniform, and the height of soil discharge work in each time period is consistent.

[0052] In this plan, the working line advancement direction is consistent with normal horizontal mining, but when the lowest step advances to the coal seam, the advancement is stopped and the two lower steps are waited for to be advanced to the same position. During this period, the lowest step is waiting for the two lower steps to advance, resulting in accumulated soil discharge, which in turn causes delayed soil discharge. Subsequently, when the coal seam is advanced longitudinally, a large amount of soil discharge space is released, and at this time there is a rapid soil discharge phenomenon.

[0053] Specifically, this plan involves a working face controlled mining plan for coal-rock mixing control under the condition of a horizontal mining working line with inclined thin coal seams, so as to reduce the reduction in raw coal quality caused by coal-rock mixing, especially the coal-rock mixing problem after blasting.

[0054] Specifically, under the existing horizontal mining line arrangement conditions, if mixed drilling and blasting are used in the step perforation blasting process, it will inevitably cause coal-rock mixing and reduce the quality of raw coal at the coal-rock interface. If the coal seams are drilled and blasted separately, the inclination of the coal seams will affect the safe operation of the equipment. The existing horizontal mining line cannot solve the problem of reduced coal and rock quality caused by blasting in the coal-rock mixed area, especially under the conditions of inclined thin coal seams. To this end, a mining plan for the horizontal mining line of open-pit coal mines is proposed, which focuses on dividing the working line containing coal and rock mixtures into different sections, adjusting the coal seam drilling and blasting area to a longitudinal working face by controlling the number of mining belts and the advancement sequence in different sections, and adjusting the step division of the coal-rock mixed area through the mining procedure to achieve the longitudinal arrangement of the coal seam working face and independent drilling and blasting, thereby reducing coal and rock mixing.

[0055] Specifically, the adoption of this scheme can directly avoid the division of coal-rock mixed steps by adjusting the mining procedures, thereby reducing the reduction in raw coal quality at the interface caused by coal-rock mixed penetration and explosion, and can effectively realize coal-rock step mining and raw coal quality control under horizontal mining conditions (it can effectively increase the initial raw coal output and speed up the initial construction progress of the coal mine).

[0056] During the specific implementation process, after determining the mining order according to the above-mentioned regional information, the above-mentioned method also includes the following steps: obtaining the width of the mining belt, wherein the width of the mining belt is the construction width during the horizontal stripping operation; according to the width of the mining belt, performing stripping operations on the above-mentioned roof stripping area until stripping reaches the above-mentioned coal seam operating area.

[0057] In this plan, the width of the mining belt is predefined, and the stripping operation is carried out according to this predefined width until the coal seam working area is completely exposed. By pre-setting a reasonable mining width, the process of stripping operations can be optimized, unnecessary repetitive labor and waste of resources can be reduced, and mining efficiency can be further improved.

[0058] Specifically, the width of the mining belt can be determined according to geological conditions, equipment capacity, and mining efficiency, and can be determined according to the environment of the coal mine site. Those skilled in the art can set a suitable width of the mining belt.

[0059] Specifically, with the coal seam roof and floor as the dividing line, the horizontal mining work line steps are divided into three sections: roof stripping area, coal seam operation area, and floor stripping area. The coal seam operation area and floor stripping area are regarded as slow mining sections. According to the order of advancing the mining belts one by one, the roof stripping area is first stripped according to the mining belt width A, so that the step horizontal mining work step advancement width reaches iA (i = 1, 2, ... n), and within this width, the coal seam operation area of ​​this step is exposed along the strike direction,

[0060] Specifically, this direction is regarded as the working face of the coal seam operation area, and the steps of the coal seam within its width range are transformed into local longitudinal mining working faces under horizontal mining conditions. The coal seam steps are distinguished as coal-rock mixtures in the direction of the horizontal mining working line, and the coal seam steps here are independently set. This direction is used as the free face for coal seam penetration and blasting, and the coal seam penetration and blasting area is arranged with the coal seam exposed here, and the open incision is arranged at the exposed surface of the coal seam along the horizontal mining working line to carry out mining and loading operations on the coal seam. When the raw coal mining within the width range of iA (i=1, 2, ...n) is completed, the top plate stripping area operation procedure is repeated for the bottom plate stripping area until the bottom plate operation area is stripped and the advancement distance of the i mining belts of the horizontal mining working line is achieved, and then the above mining procedures are executed in sequence to complete the next i mining belt operations, and the cycle is repeated in sequence.

[0061] Specifically, Figure 4 and Figure 5 As shown in the figure, with the coal seam roof and floor as the dividing line, when the number of coal seams is n (2), the horizontal mining work line can be divided into n+2 (4) sections: stripping area, coal seam operation area, stripping area, coal seam operation area. First, the opening eye is arranged on the left side of the first mining belt, and then the stripping operation of the first mining belt is carried out according to the mining belt width A in the stripping area, and the stripping is carried out to the coal seam roof to expose the coal surface.

[0062] Specifically, Figure 6 and Figure 7 As shown, the second mining zone width A is stripped to the coal seam roof, and an opening is arranged on one side close to the coal seam and pushed back so that the exposed width of the coal seam step side reaches 2A.

[0063] Specifically, Figure 8 and Fig. 9 As shown, similarly, the cutting eyes are arranged from the left side, and the third mining belt width A is continued to be stripped to the coal seam roof, so that the exposed width of the coal seam step side reaches 3A.

[0064] In the specific implementation process, the width of the mining belt can be obtained by the following steps: obtaining width related information, wherein the width related information includes one or more of the blast pile width, rock loose coefficient, step height, blast pile height and blast pile shape coefficient; calculating the width of the mining belt according to the width calculation formula, wherein the width calculation formula is:

[0065]

[0066] A represents the width of the above-mentioned mining zone, b represents the width of the above-mentioned blast pile, and k s represents the loose coefficient of the rock, H represents the height of the step, H' represents the height of the blast pile, ε d Represents the above-mentioned burst pile shape factor.

[0067] In this solution, the width can be accurately calculated through the width calculation formula, further reducing unnecessary repetitive work and waste of resources, and further improving efficiency.

[0068] Specifically, three mining zones can be stripped out, with specific layouts as follows: Fig.10 shown.

[0069] Specifically, the blast pile width refers to the horizontal width of the rubble deposits produced by blasting. The size of the blast pile width will affect the distribution range and shape of the rubble deposits after blasting.

[0070] Specifically, the rock looseness coefficient refers to the degree of rock fragmentation after blasting, that is, the degree of looseness of the rock after fragmentation. The larger the rock looseness coefficient, the more thorough the rock fragmentation, and the higher the uniformity and stability of the crushed rock deposit.

[0071] Specifically, step height refers to the height of the step-like structure in the rubble deposit produced by blasting. The size of the step height will affect the slope and stability of the rubble deposit.

[0072] Specifically, the blast pile height refers to the vertical height of the rubble pile produced by blasting. The size of the blast pile height will affect the stability and accumulation shape of the rubble pile.

[0073] Specifically, the blast pile shape coefficient refers to the horizontal shape of the rubble pile produced by blasting. The size of the blast pile shape coefficient will affect the slope, stability and accumulation form of the rubble pile.

[0074] The unit of the width of the blast pile can be meter, the unit of the step height can be meter, and the unit of the blast pile height can be meter.

[0075] The calculation formula for the width of the burst pile is: b≤f(R wp +R xmax )-c, f is the excavator specification utilization coefficient, generally ≤0.9; c is the distance from the center line of the road to the bottom line of the blasting slope, generally 2 to 3m, R wp R is the standing horizontal excavation radius, m; xmax is the maximum unloading radius, m.

[0076] During the specific implementation process, after determining the mining order according to the above-mentioned regional information, the above-mentioned method also includes the following steps: obtaining the direction of the coal seam roof; performing coal seam drilling and blasting operations on the above-mentioned coal seam operating area according to the above-mentioned coal seam roof direction; arranging openings in the above-mentioned coal seam operating area after the coal seam drilling and blasting operations; and performing mining and loading operations on the above-mentioned coal seam operating area after the coal seam drilling and blasting operations according to the positions of the above-mentioned openings.

[0077] In this plan, the coal seam is broken up by blasting to facilitate subsequent mining and loading. Blasting operations are carried out in this direction to more effectively control the scope and effect of blasting and ensure that the coal seam can be fully broken up. Opening holes are one or more starting mining points or incisions set up in the coal seam operating area. This incision serves as the starting point for mining and loading operations, guiding subsequent coal mining operations and further improving mining efficiency.

[0078] Specifically, the direction of the coal seam roof can be measured and determined before coal seam mining. The direction of the coal seam roof has important guiding significance for subsequent mining operations. The penetration and blasting operation is to break the coal seam and part of the rock layer above it by blasting for subsequent mining. The penetration and blasting operation is carried out according to the direction of the coal seam roof, which can more effectively control the scope and effect of the blasting. The opening cut is one or more starting mining points or incisions set in the coal seam operating area. These incisions will serve as the starting point for mining and loading operations. After the opening cut is arranged, the coal mining equipment enters the coal seam operating area along the opening cut to carry out mining and loading operations.

[0079] Specifically, Fig.11 As shown in the figure, the direction of the coal seam roof is the direction of the blasting free surface, and the coal seam penetration and blasting operation is carried out in the exposed coal seam area. Fig.12 As shown, along the horizontal mining line, the coal seam exposed surface is arranged with cutting holes to carry out mining and loading operations on the coal seam. Fig.12 The box in the middle indicates the incision.

[0080] In some embodiments, after determining the mining order according to the above-mentioned regional information, the above-mentioned method also includes the following steps: obtaining the information of the above-mentioned bottom plate stripping area of ​​the Nth operation; using the information of the above-mentioned bottom plate stripping area of ​​the Nth operation as the information of the above-mentioned top plate stripping area of ​​the N+1th operation, and performing the N+1th coal mining operation according to the above-mentioned mining order.

[0081] In this plan, after each coal mining operation is completed, a new bottom plate stripping area will be formed, that is, the rock area originally below the coal seam. The bottom plate stripping area of ​​the Nth operation will be used as the top plate stripping area for the N+1th operation, which reduces the workload of repeated measurement and evaluation, improves mining efficiency, and helps maintain the continuity of mining operations.

[0082] Specifically, Fig.13 As shown, Fig.13The box in the middle indicates the opening of the cut. When the coal seam mining operation leaves a mining belt width, the next stage of horizontal mining and stripping work is carried out. The coal seam longitudinal advancement mining and rock stratum horizontal stripping work are carried out simultaneously, and the second and third mining belts to the bottom plate stripping area are stripped in turn. The three mining belts are fully stripped, and the expansion of the width of the three mining belts is completed. Through the above content, the stripping operation of the subsequent three mining belts is continued.

[0083] In some embodiments, after determining the mining order according to the above-mentioned area information, the above-mentioned method also includes the following steps: obtaining the positioning information of the coal mining equipment; determining the target area of ​​the current operation according to the above-mentioned mining order; determining whether the above-mentioned coal mining equipment is located in the above-mentioned target area for operation according to the above-mentioned positioning information, and obtaining a positioning result; when the above-mentioned positioning result indicates that the above-mentioned coal mining equipment is located in the above-mentioned target area for operation, determining that the above-mentioned coal mining equipment is operating out of bounds and generating an alarm message.

[0084] In this solution, the current position of the coal mining equipment can be obtained. If the coal mining equipment is not in the target area of ​​the current operation, it is considered that the coal mining equipment has crossed the boundary and an alarm can be issued to prompt the coal mining staff to avoid errors in the coal mining sequence, thereby ensuring better efficiency and accuracy of the coal mining operation.

[0085] Specifically, the coal mining equipment may be a coal mining machine, a conveyor, a hydraulic press, a crushing equipment, and the like.

[0086] In some embodiments, after determining the mining order according to the above-mentioned regional information, the above-mentioned method also includes the following steps: obtaining the coal mining speed; when the above-mentioned coal mining speed is less than a preset speed threshold, controlling the drainage equipment to operate so as to drain the above-mentioned coal mine.

[0087] In this plan, if the coal mining speed is relatively slow, it may be caused by excessive water accumulation. When there is a lot of water accumulation, the coal mining equipment cannot run at the predetermined speed and there will be certain obstacles. Therefore, if the coal mining speed is relatively slow, the drainage equipment can be controlled to drain water, so as to ensure the safety of the coal mining equipment and coal mining workers.

[0088] Specifically, the drainage equipment can be a centrifugal water pump, an axial flow pump, a submersible pump, etc. Of course, it can also be any other feasible equipment that can be used for drainage.

[0089] Specifically, the preset speed threshold may be 5 M / S, 3 M / S, 8 M / S, etc., and of course, may also be any other feasible threshold.

[0090] Specifically, the operation of the drainage equipment can also be controlled according to the bottom water level and the drainage volume. For example, if the bottom water level exceeds the water level threshold, or the drainage volume is greater than the predetermined drainage volume, more drainage equipment is added to perform drainage processing.

[0091] Specifically, during the stripping operation and when arranging the opening of the cutting eye, the opening of the cutting eye can be arranged on the left side, just like the direction of the mining sequence. The overall horizontal mining advancement direction remains unchanged, that is, from left to right. In the subsequent blasting operation, the coal mining is advanced longitudinally until the width of three mining belts is mined.

[0092] The embodiment of the present application also provides a mining device for an open-pit coal mine. It should be noted that the mining device for an open-pit coal mine in the embodiment of the present application can be used to execute the mining method for an open-pit coal mine provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0093] The following is an introduction to the open-pit coal mine mining device provided in the embodiment of the present application.

[0094] Fig.14 1 is a structural block diagram of an open-pit coal mine mining device according to an embodiment of the present application. Fig.14 As shown, the device comprises:

[0095] A first acquisition unit 10 is used to acquire regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area including coal in the coal mine, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0096] The mining unit 20 is used to determine the mining sequence according to the above-mentioned regional information so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is to first perform stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then perform blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0097] Through this embodiment, the working line with mixed coal and rock is divided into different areas, and the operation sequence and content of different areas can be set. After the roof stripping area is stripped as a whole, the coal seam operating area is exposed, and then blasting operations are carried out on the coal seam operating area, thereby realizing independent operations of coal seams and rock seams, and independent penetration and blasting of coal seams, and reducing the probability of coal and rock mixing.

[0098] During the specific implementation process, the above-mentioned device also includes a second acquisition unit and a stripping unit. The second acquisition unit is used to obtain the width of the mining belt after determining the mining order according to the above-mentioned area information, wherein the above-mentioned mining belt width is the construction width during the horizontal stripping operation; the stripping unit is used to perform stripping operations on the above-mentioned roof stripping area according to the above-mentioned mining belt width until stripping reaches the above-mentioned coal seam operating area.

[0099] In this plan, the width of the mining belt is predefined, and the stripping operation is carried out according to this predefined width until the coal seam working area is completely exposed. By pre-setting a reasonable mining width, the process of stripping operations can be optimized, unnecessary repetitive labor and waste of resources can be reduced, and mining efficiency can be further improved.

[0100] In the specific implementation process, the second acquisition unit includes an acquisition module and a calculation module. The acquisition module is used to acquire width-related information, wherein the width-related information includes one or more of the blast pile width, rock loose coefficient, step height, blast pile height and blast pile shape coefficient; the calculation module is used to calculate the width of the mining belt according to the width calculation formula, wherein the width calculation formula is:

[0101]

[0102] A represents the width of the above-mentioned mining zone, b represents the width of the above-mentioned blast pile, and k s represents the loose coefficient of the rock, H represents the height of the step, H' represents the height of the blast pile, ε d Represents the above-mentioned burst pile shape factor.

[0103] In this solution, the width can be accurately calculated through the width calculation formula, further reducing unnecessary repetitive work and waste of resources, and further improving efficiency.

[0104] During the specific implementation process, the above-mentioned device also includes a third acquisition unit, a first processing unit, a second processing unit and a third processing unit. The third acquisition unit is used to obtain the direction of the coal seam roof after determining the mining order according to the above-mentioned regional information; the first processing unit is used to perform coal seam penetration and blasting operations on the above-mentioned coal seam operating area according to the above-mentioned coal seam roof direction; the second processing unit is used to arrange openings in the above-mentioned coal seam operating area after the coal seam penetration and blasting operations; the third processing unit is used to perform mining and loading operations on the above-mentioned coal seam operating area after the coal seam penetration and blasting operations according to the positions of the above-mentioned openings.

[0105] In this plan, the coal seam is broken up by blasting to facilitate subsequent mining and loading. Blasting operations are carried out in this direction to more effectively control the scope and effect of blasting and ensure that the coal seam can be fully broken up. Opening holes are one or more starting mining points or incisions set up in the coal seam operating area. This incision serves as the starting point for mining and loading operations, guiding subsequent coal mining operations and further improving mining efficiency.

[0106] In some embodiments, the above-mentioned device also includes a fourth acquisition unit and a fourth processing unit. The fourth acquisition unit is used to obtain the information of the above-mentioned bottom plate stripping area of ​​the Nth operation after determining the mining order according to the above-mentioned area information; the fourth processing unit is used to use the information of the above-mentioned bottom plate stripping area of ​​the Nth operation as the information of the above-mentioned top plate stripping area of ​​the N+1th operation, and perform the N+1th coal mining operation according to the above-mentioned mining order.

[0107] In this plan, after each coal mining operation is completed, a new bottom plate stripping area will be formed, that is, the rock area originally below the coal seam. The bottom plate stripping area of ​​the Nth operation will be used as the top plate stripping area for the N+1th operation, which reduces the workload of repeated measurement and evaluation, improves mining efficiency, and helps maintain the continuity of mining operations.

[0108] In some embodiments, the above-mentioned device also includes a fifth acquisition unit, a first determination unit, a second determination unit and a fifth processing unit. The fifth acquisition unit is used to obtain the positioning information of the coal mining equipment after determining the mining order according to the above-mentioned area information; the first determination unit is used to determine the target area of ​​the current operation according to the above-mentioned mining order; the second determination unit is used to determine whether the above-mentioned coal mining equipment is located in the above-mentioned target area for operation according to the above-mentioned positioning information, and obtain a positioning result; the fifth processing unit is used to determine that the above-mentioned coal mining equipment is operating out of bounds and generate an alarm message when the above-mentioned positioning result indicates that the above-mentioned coal mining equipment is operating in the above-mentioned target area.

[0109] In this solution, the current position of the coal mining equipment can be obtained. If the coal mining equipment is not in the target area of ​​the current operation, it is considered that the coal mining equipment has crossed the boundary and an alarm can be issued to prompt the coal mining staff to avoid errors in the coal mining sequence, thereby ensuring better efficiency and accuracy of the coal mining operation.

[0110] In some embodiments, the above-mentioned device also includes a sixth acquisition unit and a control unit. The sixth acquisition unit is used to obtain the coal mining speed after determining the mining order according to the above-mentioned regional information; the control unit is used to control the drainage equipment to drain the above-mentioned coal mine when the above-mentioned coal mining speed is less than a preset speed threshold.

[0111] In this plan, if the coal mining speed is relatively slow, it may be caused by excessive water accumulation. When there is a lot of water accumulation, the coal mining equipment cannot run at the predetermined speed and there will be certain obstacles. Therefore, if the coal mining speed is relatively slow, the drainage equipment can be controlled to drain water, so as to ensure the safety of the coal mining equipment and coal mining workers.

[0112] The above-mentioned open-pit coal mining device includes a processor and a memory, and the above-mentioned first acquisition unit and mining unit are stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions. The above-mentioned modules are all located in the same processor; or, the above-mentioned modules are located in different processors in any combination.

[0113] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the problem of poor raw coal quality caused by coal-rock mixing and coal-rock mixing after blasting in the prior art can be solved by adjusting kernel parameters.

[0114] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0115] An embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the open-pit coal mining method.

[0116] Specifically, open-pit coal mining methods include:

[0117] Step S201, obtaining regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0118] Step S202, determining the mining sequence according to the above-mentioned regional information, so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is firstly performing stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0119] An embodiment of the present invention provides a processor, and the processor is used to run a program, wherein the above-mentioned open-pit coal mine mining method is executed when the above-mentioned program is run.

[0120] Specifically, open-pit coal mining methods include:

[0121] Step S201, obtaining regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0122] Step S202, determining the mining sequence according to the above-mentioned regional information, so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is firstly performing stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0123] An embodiment of the present invention provides a device, which includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, at least steps of a mining method for an open-pit coal mine are implemented.

[0124] Specifically, open-pit coal mining methods include:

[0125] Step S201, obtaining regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0126] Step S202, determining the mining sequence according to the above-mentioned regional information, so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is firstly performing stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0127] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0128] A computer program product includes a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the open-pit coal mining method in each embodiment of the present application are implemented.

[0129] Specifically, open-pit coal mining methods include:

[0130] Step S201, obtaining regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0131] Step S202, determining the mining sequence according to the above-mentioned regional information, so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is firstly performing stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0132] The present application provides a coal mining operation system, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the one or more memories and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the above-mentioned open-pit coal mining methods.

[0133] Specifically, open-pit coal mining methods include:

[0134] Step S201, obtaining regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine;

[0135] Step S202, determining the mining sequence according to the above-mentioned regional information, so that coal is mined in accordance with the above-mentioned mining sequence, wherein the above-mentioned mining sequence is firstly performing stripping operations on the above-mentioned roof stripping area until the above-mentioned coal seam operating area is exposed, and then performing blasting operations and mining and loading operations on the above-mentioned coal seam operating area until the above-mentioned bottom plate stripping area is collected.

[0136] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.

[0137] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0138] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0139] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0141] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0142] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0143] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0144] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0145] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0146] 1) The open-pit coal mining method of the present application divides the coal-rock mixed working line into different areas, and can set the operation sequence and operation content of different areas. After the roof stripping area is stripped as a whole, the coal seam operation area is exposed, and then the coal seam operation area is blasted, thereby realizing independent operation of the coal seam and the rock layer, realizing independent penetration and blasting of the coal seam, and reducing the probability of coal-rock mixing.

[0147] 2) The mining device of the open-pit coal mine of the present application divides the working line of the mixed coal and rock into different areas, and can set the working sequence and content of the different areas. After the roof stripping area is stripped as a whole, the coal seam working area is exposed, and then the coal seam working area is blasted, thereby realizing independent operation of the coal seam and the rock layer, realizing independent penetration and blasting of the coal seam, and reducing the probability of coal and rock mixing.

[0148] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for mining open-pit coal mines, characterized in that: include: Acquire regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine; The mining sequence is determined according to the regional information so that coal is mined in accordance with the mining sequence, wherein the mining sequence is to first perform stripping operations on the roof stripping area until the coal seam operating area is exposed, and then perform blasting operations and mining and loading operations on the coal seam operating area until the bottom plate stripping area is collected.

2. The method according to claim 1, characterized in that After determining the mining sequence according to the regional information, the method further includes: Obtaining the width of the mining belt, wherein the width of the mining belt is the width of the construction during the transverse stripping operation; According to the width of the mining zone, the roof stripping area is stripped until it reaches the coal seam operating area.

3. The method according to claim 2, characterized in that Get the width of the mining zone, including: Acquire width-related information, wherein the width-related information includes one or more of a blast pile width, a rock looseness coefficient, a step height, a blast pile height, and a blast pile shape coefficient; The width of the mining belt is calculated according to the width calculation formula, wherein the width calculation formula is: A represents the width of the mining zone, b represents the width of the blast pile, k s represents the rock looseness coefficient, H represents the step height, H' represents the blast pile height, ε d represents the shape factor of the explosion pile.

4. The method according to claim 1, characterized in that After determining the mining sequence according to the regional information, the method further includes: Obtain the direction of the coal seam roof; Perform coal seam blasting operations in the coal seam operating area according to the direction of the coal seam roof; Arranging cutting holes in the coal seam operation area after the coal seam drilling and blasting operation; According to the position of the cut hole, mining and loading operations are carried out in the coal seam operating area after the coal seam drilling and blasting operations.

5. The method according to claim 1, characterized in that After determining the mining sequence according to the regional information, the method further includes: Obtaining information of the bottom plate peeling area of ​​the Nth operation; The information of the bottom plate stripping area of ​​the Nth operation is used as the information of the top plate stripping area of ​​the N+1th operation, and the N+1th coal mining operation is performed according to the mining sequence.

6. The method according to claim 1, characterized in that After determining the mining sequence according to the regional information, the method further includes: Obtaining the location information of coal mining equipment; Determining the target area of ​​the current operation according to the mining sequence; Determine whether the coal mining equipment is located in the target area for operation according to the positioning information, and obtain a positioning result; When the positioning result indicates that the coal mining equipment is operating in the target area, it is determined that the coal mining equipment is operating out of bounds and an alarm message is generated.

7. The method according to claim 1, characterized in that After determining the mining sequence according to the regional information, the method further includes: Get the coal mining speed; When the coal mining speed is less than a preset speed threshold, the drainage equipment is controlled to operate so as to drain the coal mine.

8. A mining device for an open-pit coal mine, characterized in that: include: A first acquisition unit is used to acquire regional information of a coal mine, wherein the regional information includes at least one of information of a roof stripping area, information of a coal seam operating area, and information of a floor stripping area, wherein the roof stripping area is an area with rocks on the top of the coal mine, the coal seam operating area is an area in the coal mine that includes coal, and the floor stripping area is an area with rocks on the bottom of the coal mine; A mining unit is used to determine a mining sequence according to the area information so that coal is mined in accordance with the mining sequence, wherein the mining sequence is to first perform stripping operations on the roof stripping area until the coal seam operating area is exposed, and then perform blasting operations and mining operations on the coal seam operating area until the bottom plate stripping area is collected.

9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the open-pit coal mining method described in any one of claims 1 to 7 are implemented.

10. A coal mining operation system, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing the open-pit coal mining method described in any one of claims 1 to 7.