Integral lifting type steel structure elevator shaft platform and construction method

The integrated steel structure elevator shaft platform with an automated support system addresses the inefficiencies and safety concerns of current assembly methods by enabling rapid and secure assembly, reducing manual labor and enhancing safety through its innovative support mechanisms.

CN119616185AActive Publication Date: 2025-03-14CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411876261.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-03-14
Estimated Expiration
2044-12-19

AI Technical Summary

Technical Problem

Current methods for constructing and assembling integrated steel structure elevator shaft platforms are time-consuming and require extensive manual labor, posing safety risks due to the need for manual support and inspection, which complicates the process and increases the number of steps involved in ensuring safety.

Method used

The proposed solution involves a steel structure elevator shaft platform with a wall structure featuring internal support slots and a platform structure equipped with a plastic cleaning sleeve, an elevator ring, and a support system that includes adjustable and locking mechanisms to facilitate rapid assembly and support, utilizing a combination of screws, rollers, and adjustable components to ensure secure positioning and safety.

Benefits of technology

This method allows for faster and safer assembly of the elevator shaft platform by enabling the platform to be lifted and supported automatically, reducing manual intervention and the risk of accidents, while ensuring the structural integrity and safety of the platform during use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119616185A_ABST
    Figure CN119616185A_ABST
Patent Text Reader

Abstract

The invention discloses an integral lifting type steel structure elevator shaft platform and a construction method, and relates to the technical field of elevator shaft platform construction.The integral lifting type steel structure elevator shaft platform comprises a wall structure, a plastic cleaning sleeve is connected to the inner side of the outer wall of the wall structure in a clamped mode, and a platform structure is connected to the inner side of the plastic cleaning sleeve in an inserted mode; a lifting ring is installed on the inner side of the bottom of the platform structure through bolts, the wall structure is characterized in that the wall structure comprises an elevator shaft wall, a supporting groove is formed in the outer wall of the inner side of the elevator shaft wall, the platform structure comprises a construction platform, and a main beam is installed on the outer wall of the bottom of the construction platform through bolts; a supporting bottom frame is installed on the outer wall of the bottom of the main beam through bolts. After a lifting hook is installed on a lifting ring, when the lifting ring pulls the platform structure to ascend, the lifting ring enters the inner side of a supporting groove through supporting legs, so that the platform structure can be supported, the platform structure has the supporting capacity, the supporting effect of the platform structure is rapidly achieved, and the plastic cleaning sleeve is manually treated; therefore, the effect that the supporting legs are inserted into the inner sides of the supporting grooves can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of elevator shaft platform construction, and in particular to an integrally-lifting steel structure elevator shaft platform and a construction method thereof. Background Art

[0002] In the current existing technology, the overall lifting steel structure elevator shaft platform is usually suitable for elevator construction group installation, especially the overall lifting steel structure elevator shaft platform required for high-rise buildings, which also has special requirements for safety. Traditional elevator shaft platforms require a lot of manpower and materials to build, and there are also great risks during the construction.

[0003] However, the existing technology still has shortcomings, such as the following aspects: It takes a lot of time to build the overall lifting steel structure elevator shaft platform, and after the lap is completed, manual operation is still required for support, which leads to the need for manual operation to unfold the support frame during use, and the function of testing and using is required to ensure safety, which leads to the problem of numerous steps when using the overall lifting steel structure elevator shaft platform. Summary of the invention

[0004] The present invention provides an integrally-lifting steel structure elevator shaft platform and a construction method to solve the problems raised in the above-mentioned background technology.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: An integral lifting type steel structure elevator shaft platform and construction method, comprising a wall structure, a plastic cleaning sleeve is clamped on the inner side of the outer wall of the wall structure, a platform structure is plugged on the inner side of the plastic cleaning sleeve, and a lifting ring is installed on the inner bolt of the bottom of the platform structure, characterized in that: the wall structure comprises an elevator shaft wall, and a support groove is opened on the outer wall of the inner side of the elevator shaft wall; The platform structure includes a construction platform, the outer wall bolts at the bottom of the construction platform are installed with a main beam, the outer wall bolts at the bottom of the main beam are installed with a supporting frame, the outer wall bolts on the inner side of the construction platform are installed with a beam plate, and the inner side of the bottom of the supporting frame is installed with the outer wall bolts on both sides of the top of the lifting ring.

[0006] Preferably, support feet are rotatably connected to both sides of the outer wall of the support frame, and a bottom connecting block is installed on the left bolt on the top of the support foot.

[0007] Preferably, a telescopic rod is rotatably connected to the inner side of the bottom connecting block, a return spring is sleeved on the outer wall of the telescopic rod, and one end of the top of the telescopic rod is rotatably connected to the top connecting block.

[0008] Preferably, the top of the top connecting block is bolted to the outer wall of the bottom of the construction platform, and a rotation groove is provided on the outer wall of one end of the supporting foot, and a roller is rotatably connected to the inner side of the rotation groove.

[0009] Preferably, a blocking plate is bolted to the outer wall on the inner side of the top of the supporting chassis, a mounting plate is bolted to the outer wall on one side of the main beam and located on one side of the blocking plate, and a limiting block is bolted to the top of the mounting plate.

[0010] Preferably, the inner side of the limit block is slidably connected to the limit side plate, a push column is welded to the outer wall of one side of the limit side plate, the inner side of the top of the push column is threadedly connected to a threaded rod, the top of the threaded rod is fixedly sleeved with a limit ring, and a rotating handle is welded to one end of the top of the push column.

[0011] Preferably, a No. 1 card slot is provided on the outer walls on both sides of the support groove, and the plastic cleaning sleeve includes a plastic outer frame, and the outer walls on both sides of the plastic outer frame are fixedly connected with plastic side panels, and a positioning block is bolted to the outer wall of one side of the plastic side panel, and the outer wall of the positioning block is clamped with the inner side of the No. 1 card slot.

[0012] Preferably, a telescopic slot is provided on the outer wall of the plastic side panel, a rotating rod is rotatably connected to the outer wall on one side inside the telescopic slot, and a handle is bolted to the outer wall of the rotating rod.

[0013] Preferably, rubber blocks are installed on the bolts on the upper and lower sides of one end of the handle, and second card slots are provided on the outer walls on the upper and lower sides of the telescopic slot and on the surfaces on the upper and lower sides of the rubber block.

[0014] According to the technical solution of the above granular monoammonium phosphate preparation device, a granular monoammonium phosphate preparation device and a preparation process thereof are also provided, comprising the following steps: Step 1: Cleaning and assembling the support groove. Before construction, clean the support groove first by pulling the plastic cleaning sleeve out from the inside of the support groove to remove the gravel inside the support groove. Step 2: Assemble the platform structure and the lifting ring, by bolting the platform structure and the lifting ring together, and then assemble the inner side of the top of the lifting ring on the upper surface of the platform structure with a hook, and then pull it up; Step 3: Control the rotation of the support foot. When the platform structure is pulled upward, the roller on the inner side of one end of the support foot is squeezed by the outer wall of the elevator shaft wall, so that one end of the support foot rotates on the inner side of the support frame. The column can be pushed down by rotating the handle to control the rotation angle of the support foot. Step 4: Support and fix the support legs. When the support legs are located on the inner side, the blocking plates are used to limit their position so that the platform structure can be supported when it descends.

[0015] In summary, this technical solution mainly has the following beneficial effects: By installing a hook on the lifting ring, when it pulls the platform structure to rise, the supporting feet can enter the inner side of the supporting groove, thereby supporting it, so that the platform structure has the ability to support, so that it can quickly provide support effects, and by manually handling the plastic cleaning sleeve, it can be ensured that the supporting feet are inserted into the inner side of the supporting groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the main structure of the present invention.

[0017] Figure 2 It is a schematic diagram of the cross-sectional structure of the support groove of the present invention.

[0018] Figure 3 It is a schematic diagram of the structure of the plastic cleaning sleeve of the present invention.

[0019] Figure 4 It is a schematic cross-sectional view of the second card slot of the present invention.

[0020] Figure 5 It is a schematic diagram of the platform structure of the present invention.

[0021] Figure 6 It is a schematic cross-sectional view of the platform structure of the present invention.

[0022] Figure 7 It is a schematic diagram of the limit block structure of the present invention.

[0023] In the figure: 1. wall structure; 11. elevator shaft wall; 12. support groove; 121. No. 1 card slot; 2. platform structure; 21. construction platform; 22. beam plate; 23. support frame; 24. top connecting block; 241. telescopic rod; 242. return spring; 243. bottom connecting block; 25. main beam; 26. mounting plate; 261. limit block; 262. push column; 263. limit side plate; 264. threaded rod; 265. limit ring; 266. rotating handle; 27. blocking plate; 28. support foot; 281. rotating groove; 282. roller; 3. lifting ring; 4. plastic cleaning sleeve; 41. plastic outer frame; 42. plastic side plate; 421. telescopic groove; 422. rotating rod; 423. handle; 424. No. 2 card slot; 425. rubber block; 43. positioning block. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0025] like Figure 1 - Figure 7As shown, an integral lifting type steel structure elevator shaft platform and construction method, comprising a wall structure 1, a plastic cleaning sleeve 4 is clamped on the inner side of the outer wall of the wall structure 1, a platform structure 2 is inserted on the inner side of the plastic cleaning sleeve 4, a lifting ring 3 is installed on the inner side bolt of the bottom of the platform structure 2, the wall structure 1 comprises an elevator shaft wall 11, and a support groove 12 is opened on the inner side outer wall of the elevator shaft wall 11; The platform structure 2 includes a construction platform 21, the outer wall bolts at the bottom of the construction platform 21 are installed with a main beam 25, the outer wall bolts at the bottom of the main beam 25 are installed with a supporting frame 23, the outer wall bolts on the inner side of the construction platform 21 are installed with a beam plate 22, and the inner side of the bottom of the supporting frame 23 is installed with the outer wall bolts on both sides of the top of the lifting ring 3.

[0026] It should be noted that, in this embodiment, by assembling the platform structure 2, the hook is fixed on the inner side of the top of the lifting ring 3, so that the supporting frame 23 is pulled up by the hook, and the top of the supporting frame 23 is connected to the beam plate 22 through the main beam 25, providing support for the beam plate 22.

[0027] The supporting legs 28 are rotatably connected to both sides of the outer wall of the supporting base frame 23, and a bottom connecting block 243 is installed with a bottom connecting block 243 on the left side of the top of the supporting leg 28. The inner side of the bottom connecting block 243 is rotatably connected to a telescopic rod 241, and a return spring 242 is sleeved on the outer wall of the telescopic rod 241. One end of the top of the telescopic rod 241 is rotatably connected to a top connecting block 24, and the top of the top connecting block 24 is bolted to the outer wall of the bottom of the construction platform 21. A rotating groove 281 is provided on the outer wall of one end of the supporting leg 28, and a roller 282 is rotatably connected to the inner side of the rotating groove 281.

[0028] It should be noted that, in the present embodiment, when the lifting ring 3 is pulled, the supporting frame 23 is driven to rise through the lifting ring 3. When the supporting frame 23 rises, the roller 282 on the inner side of the rotating groove 281 slides with the outer wall of the elevator shaft wall 11, and then the supporting frame 23 is driven to rise through the lifting ring 3. At the same time, one end of the supporting foot 28 moves to the inner side of the plastic cleaning sleeve 4 on the inner side of the supporting groove 12, and the top connecting block 24 and the bottom connecting block 243 are pushed by the reset spring 242 on the outer wall of the telescopic rod 241, so that the supporting foot 28 is reset. When the control lifting ring 3 is slightly lowered, the supporting foot 28 is limited by the blocking plate 27, so that the bottom of one end of the supporting foot 28 is located on the inner side of the plastic cleaning sleeve 4, so that the supporting foot 28 becomes a supporting point.

[0029] The outer wall bolts on the inner side of the top of the supporting base frame 23 are installed with a blocking plate 27, the outer wall of one side of the main beam 25 and one side of the blocking plate 27 are installed with a mounting plate 26, the top of the mounting plate 26 is bolted with a limiting block 261, the inner side of the limiting block 261 is slidably connected to the limiting side plate 263, a pushing column 262 is welded to the outer wall of one side of the limiting side plate 263, the inner side of the top of the pushing column 262 is threadedly connected to a threaded rod 264, the top of the outside of the threaded rod 264 is fixedly sleeved with a limiting ring 265, and one end of the top of the pushing column 262 is welded with a rotating handle 266.

[0030] It should be noted that, in the present embodiment, the support foot 28 is limited by the blocking plate 27, so that when the support foot 28 is located on the inner side of the plastic outer frame 41, the support foot 28 is limited, so that the bottom of the blocking plate 27 is used to limit the top, so that when the support foot 28 rotates, it is limited, so that the support foot 28 can play a supporting role, and when the rotating handle 266 is rotated, the threaded rod 264 is driven to rotate by the bottom of the rotating handle 266, so that the outer wall of the threaded rod 264 and the inner side of the top of the pushing column 262 are threadedly rotated, and at the same time, the limiting side plates 263 on the outer walls of both sides of the pushing column 262 are located on the inner side of the limiting block 261 to be limited, so that it slides, and one end of the bottom of the pushing column 262 pushes the support foot 28, so that it maintains the rotation angle of the support foot 28, so that it is convenient to descend.

[0031] The outer walls on both sides of the support groove 12 are provided with a No. 1 card slot 121, and the plastic cleaning sleeve 4 includes a plastic outer frame 41, and the outer walls on both sides of the plastic outer frame 41 are fixedly connected with plastic side panels 42, and the outer wall of one side of the plastic side panel 42 is bolted with a positioning block 43, and the outer wall of the positioning block 43 is clamped with the inner side of the No. 1 card slot 121, and the outer wall of the plastic side panel 42 is provided with a telescopic groove 421, and the outer wall of one side of the inner side of the telescopic groove 421 is rotatably connected with a rotating rod 422, and the outer wall of the rotating rod 422 is bolted with a handle 423, and the upper and lower sides of one end of the handle 423 are bolted with a rubber block 425, and the outer walls on the upper and lower sides of the telescopic groove 421 and the surfaces located on the upper and lower sides of the rubber block 425 are provided with a No. 2 card slot 424.

[0032] It should be noted that, in the present embodiment, a support groove 12 is reserved during casting of the elevator shaft wall 11, and then the plastic cleaning sleeve 4 is inserted into the inner side of the support groove 12. Thus, in order to prevent debris and other debris from entering the interior during installation of the elevator, so that the supporting foot 28 cannot enter the inner side, the handle 423 is pulled to separate the outer wall rubber blocks 425 at both ends of the handle 423 from the inner side of the No. 2 slot 424. When pulling the rubber block 425, the rubber blocks 425 on both sides are pulled in two opposite directions to drive the plastic side panels 42 on both sides of the plastic outer frame 41 to move closer to each other, so that the positioning block 43 is separated from the inner side of the No. 1 slot 121, and the plastic outer frame 41 is pulled out of the inner side of the support groove 12, and the debris and other debris inside the support groove 12 are taken out for cleaning, and then the plastic outer frame 41 is pressed back, and the handle 423 is also pressed back at the same time.

[0033] According to the above embodiments, a granular monoammonium phosphate preparation device and a preparation process thereof are also provided, comprising the following steps: Step 1: Cleaning and assembling the support groove. Before construction, clean the support groove by pulling the plastic cleaning sleeve 4 out of the inner side of the support groove 12, thereby taking out the gravel inside the support groove 12; Step 2: Assemble the platform structure and the lifting ring, by installing the platform structure 2 and the lifting ring 3 together with bolts, and then assemble the inner side of the top of the lifting ring 3 on the upper surface of the platform structure 2 with a hook, and then pull it up; Step 3: Control the rotation of the support leg. When the platform structure 2 is pulled upward, the roller 282 on the inner side of one end of the support leg 28 is squeezed by the outer wall of the elevator shaft wall 11, so that one end of the support leg 28 rotates on the inner side of the support frame 23. The column 262 can be pushed downward by rotating the handle 266 to control the rotation angle of the support leg 28. Step 4: Support and fixation with support legs. When the support legs 28 are located on the inner side, the blocking plate 27 limits their position so that the platform structure 2 can be supported when it descends.

[0034] The working principle of the present invention is as follows: the hook is fixed to the inner side of the top of the lifting ring 3 after the platform structure 2 is operated, so that the supporting frame 23 is pulled up by the hook, and the top of the supporting frame 23 is connected to the beam plate 22 through the main beam 25, providing support for the beam plate 22. When the lifting ring 3 is pulled, the supporting frame 23 is driven to rise through the lifting ring 3. When the supporting frame 23 rises, the roller 282 inside the rotating groove 281 slides with the outer wall of the elevator shaft wall 11, and then the supporting frame 23 is driven to move upward through the lifting ring 3. At the same time, one end of the supporting foot 28 moves to the inner side of the plastic cleaning sleeve 4 inside the supporting groove 12, and the top connecting block 24 and the bottom connecting block 243 are pushed by the reset spring 242 on the outer wall of the telescopic rod 241, so that the supporting foot 28 is reset, and the control lifting ring 3 is slightly lowered, so that the supporting foot 28 is limited by the blocking plate 27, so that the bottom of one end of the supporting foot 28 is located on the inner side of the plastic cleaning sleeve 4, so that the supporting foot 28 becomes a supporting point. The blocking plate 27 is used to limit the support foot 28, so that when the support foot 28 is located on the inner side of the plastic outer frame 41, the support foot 28 is limited, so that the bottom of the blocking plate 27 is used to limit the top, so that when the support foot 28 rotates, it is limited, so that the support foot 28 can play a supporting role, and when the handle 266 is rotated, the threaded rod 264 is driven to rotate by rotating the bottom of the handle 266, so that the outer wall of the threaded rod 264 and the inner side of the top of the pushing column 262 are threadedly rotated, and at the same time, the limiting side plates 263 on the outer walls of both sides of the pushing column 262 are located on the inner side of the limiting block 261 to be limited, so that it slides, and one end of the bottom of the pushing column 262 pushes the support foot 28, so that it maintains the rotation angle of the support foot 28, so that it is convenient to descend. The support groove 12 is reserved during casting of the elevator shaft wall 11, and then the plastic cleaning sleeve 4 is inserted into the inner side of the support groove 12. Therefore, in order to prevent debris such as gravel from entering the interior during the installation of the elevator during subsequent use, the outer wall rubber blocks 425 at both ends of the handle 423 are separated from the inner side of the No. 2 slot 424 by pulling the handle 423. When pulling the rubber block 425, the rubber blocks 425 on both sides are pulled in two opposite directions to drive the plastic side panels 42 on both sides of the plastic outer frame 41 to move closer to each other, so that the positioning block 43 is separated from the inner side of the No. 1 slot 121, and the plastic outer frame 41 is pulled out of the inner side of the support groove 12, and the debris such as gravel inside the support groove 12 is taken out for cleaning, and then the plastic outer frame 41 is pressed back, and the handle 423 is also pressed back at the same time.

[0035] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. An integral lifting type steel structure elevator shaft platform and construction method, comprising a wall structure (1), a plastic cleaning sleeve (4) is clamped on the inner side of the outer wall of the wall structure (1), a platform structure (2) is plugged on the inner side of the plastic cleaning sleeve (4), and a lifting ring (3) is installed on the inner side bolt of the bottom of the platform structure (2), characterized in that: The wall structure (1) comprises an elevator shaft wall (11), wherein the inner outer wall of the elevator shaft wall (11) is provided with a support groove (12); The platform structure (2) comprises a construction platform (21), wherein the outer wall bolts at the bottom of the construction platform (21) are mounted with a main beam (25), the outer wall bolts at the bottom of the main beam (25) are mounted with a support frame (23), the outer wall bolts on the inner side of the construction platform (21) are mounted with a beam plate (22), and the inner side of the bottom of the support frame (23) is mounted with the outer wall bolts on both sides of the top of the lifting ring (3).

2. The integral lifting steel structure elevator shaft platform and construction method according to claim 1, characterized in that: Support legs (28) are rotatably connected to both sides of the outer wall of the support base frame (23), and a bottom connection block (243) is installed on the left bolt on the top of the support leg (28).

3. The integral lifting steel structure elevator shaft platform and construction method according to claim 2, characterized in that: The inner side of the bottom connection block (243) is rotatably connected to a telescopic rod (241), the outer wall of the telescopic rod (241) is sleeved with a return spring (242), and one end of the top of the telescopic rod (241) is rotatably connected to a top connection block (24).

4. The integral lifting steel structure elevator shaft platform and construction method according to claim 3, characterized in that: The top of the top connection block (24) is bolted to the outer wall of the bottom of the construction platform (21), and a rotation groove (281) is formed on the outer wall of one end of the support foot (28), and a roller (282) is rotatably connected to the inner side of the rotation groove (281).

5. The integral lifting steel structure elevator shaft platform and construction method according to claim 1, characterized in that: A blocking plate (27) is bolted to the outer wall on the inner side of the top of the supporting chassis (23); a mounting plate (26) is bolted to the outer wall on one side of the main beam (25) and located on one side of the blocking plate (27); and a limiting block (261) is bolted to the top of the mounting plate (26).

6. The integral lifting steel structure elevator shaft platform and construction method according to claim 5, characterized in that: The inner side of the limit block (261) is slidably connected to a limit side plate (263); a push column (262) is welded to the outer wall of one side of the limit side plate (263); the inner side of the top of the push column (262) is threadedly connected to a threaded rod (264); the top of the threaded rod (264) is fixedly sleeved with a limit ring (265); and a rotating handle (266) is welded to one end of the top of the push column (262).

7. The integral lifting steel structure elevator shaft platform and construction method according to claim 1, characterized in that: The outer walls on both sides of the support groove (12) are provided with a first clamping groove (121), the plastic cleaning sleeve (4) comprises a plastic outer frame (41), the outer walls on both sides of the plastic outer frame (41) are fixedly connected with plastic side panels (42), a positioning block (43) is bolted to the outer wall of one side of the plastic side panel (42), and the outer wall of the positioning block (43) is clamped with the inner side of the first clamping groove (121).

8. The integral lifting steel structure elevator shaft platform and construction method according to claim 7, characterized in that: The outer wall of the plastic side plate (42) is provided with a telescopic slot (421), the outer wall of one side inside the telescopic slot (421) is rotatably connected to a rotating rod (422), and a handle (423) is bolted to the outer wall of the rotating rod (422).

9. The integral lifting steel structure elevator shaft platform and construction method according to claim 8, characterized in that: A rubber block (425) is bolted to the upper and lower sides of one end of the handle (423), and a second clamping groove (424) is provided on the outer walls of the upper and lower sides of the telescopic slot (421) and on the surfaces of the upper and lower sides of the rubber block (425).

10. An integrally-lifting steel structure elevator hoistway platform and construction method according to any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: cleaning and assembling the support groove. Before construction, the support groove is cleaned by pulling the plastic cleaning sleeve (4) out of the inner side of the support groove (12), thereby removing the gravel inside the support groove (12); Step 2: assembling the platform structure and the lifting ring, by bolting the platform structure (2) and the lifting ring (3) together, and then assembling the inner side of the top of the lifting ring (3) on the upper surface of the platform structure (2) with a lifting hook, and then pulling it up; Step 3: Controlling the rotation of the support leg. When the platform structure (2) is pulled upward, the roller (282) on the inner side of one end of the support leg (28) is squeezed by the outer wall of the elevator shaft wall (11), so that one end of the support leg (28) rotates on the inner side of the support base frame (23). The column (262) can be pushed downward by using the rotating handle (266), so as to control the rotation angle of the support leg (28). Step 4: Support and fixation by the support legs. When the support legs (28) are located on the inner side, the blocking plate (27) limits their position so that the platform structure (2) can be supported when it descends.

Citation Information

Patent Citations

  • Self-contained device for cleaning and coating hold surfaces in a bulk carrier

    CA2242128A1

  • Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same

    CN102322135A

  • Method and mounting system for mounting lift components

    CN104379488A

  • Elevator shaft standard operation platform and implementation platform

    CN106320681A

  • Wallboard switch socket structure and cleaning room

    CN106639038A