Soil remediation method based on laterite-nickel ore smelting tailing landfill
By laying the base layer in the tailings landfill area of the laterite nickel ore smelting tailings, setting up landfill layers, drainage layers and greening soil layers, and planting green plants, the soil pollution problem caused by direct landfill of tailings is solved, and the ecological restoration of soil and the healthy growth of vegetation is achieved.
Patent Information
- Application Number
- CN202411939752.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-03-18
AI Technical Summary
Direct landfill of laterite nickel ore smelting tailings leads to soil pollution in the landfill area, and existing repair methods are difficult to effectively restore ecologically.
Soil repair method based on the smelting tailings of laterite nickel ore is adopted, including laying a base layer in the soil area to be filled, setting up a landfill layer (combined with the wet tailings of laterite nickel ore, ignition tailings and humus soil), and setting up a drainage layer and a greening soil layer on it, and finally planting greening plants on the greening soil layer.
Through this method, the heavy metal activity in the sludge of laterite nickel ore smelting tailings can be effectively reduced, the pollution hazard to soil, the soil restoration efficiency can be improved, the vegetation growth can be promoted, and the ecological restoration of landfill areas can be achieved.