Data center construction and data analysis method and system for energy enterprise

By establishing a unified data acquisition channel and multi-level data warehouse in the data center of energy enterprises and building an analysis model, the data island problem is solved, efficient data integration and intelligent analysis are achieved, and the operation strategy of energy enterprises is optimized.

CN119646101APending Publication Date: 2025-03-18HUANENG YIMIN COAL POWER CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202411503995.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

In the process of intelligent transformation, energy companies lack top-level design capabilities, resulting in data silos between different digital systems, and the inability to efficient data integration, real-time analysis and intelligent prediction, affecting the optimization of operational strategies.

Method used

By establishing a unified data acquisition channel for multi-systems, building a multi-level data warehouse and classification management system, establishing a unified external data output and utilization channel, building a unit efficiency analysis model, peak shaving analysis model and prediction model, to achieve efficient integration and intelligent analysis of data.

Benefits of technology

Eliminate data silos between systems, realize efficient integration and real-time analysis of different data sources, optimize the operation strategies of energy enterprises, and improve the work efficiency and utilization of data centers.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a data center construction and data analysis method and system for an energy enterprise, and relates to the technical field of energy management and data analysis, and the method comprises the steps: building a unified data collection channel for multiple systems; building a multi-level data warehouse and a classification management system; external unified data output and utilization channels are established, and data required by data analysis is output in a standardized manner; by constructing a unit efficiency analysis model, a peak regulation condition analysis model, a plant station fire coal daily analysis model and a prediction model, the operation condition of a power plant is comprehensively analyzed, the power generation efficiency of the next day is predicted, and the power generation strategy of the unit is adjusted in real time. According to the invention, active acquisition and transmission of subsystem data are realized by establishing an external unified data channel, the data acquisition and development workload of a data center is reduced, total acquisition of the subsystem data is realized, the development workload of an external API interface of the data center is reduced, and the working efficiency and utilization rate of the energy industry data center are improved.