Sealing structure and method for blocking reserved hole of underground station
By forming a sealing module with prefabricated UHPC boards, combined with the construction methods of lifting and casting modules, the problems of long sealing period and high construction risks in underground station construction are solved, and the construction period is shortened and the risk is controllable.
CN119686382APending Publication Date: 2025-03-25NINGBO CONSTR GRP
0 Cites 1 Cited by
Patent Information
- Application Number
- CN202510101132.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2025-03-25
AI Technical Summary
Technical Problem
The prior art methods used for reserved hole sealing in underground station construction have a long construction period and high construction risks, which cannot meet the requirements of short construction period and small risks.
Method used
Prefabricated ultra-high performance concrete (UHPC) panels are used as sealing modules. Through the combination of lifting and casting modules, a closed structure is formed without erecting a bracket, ensuring structural strength and controlling construction risks.
Benefits of technology
It shortens the construction period and controllable construction risks, ensuring rapid and safe sealing of reserved holes at underground stations.
✦ Generated by Eureka AI based on patent content.
Abstract
The invention relates to the technical field of construction engineering, in particular to a sealing structure and method for sealing a reserved hole of an underground station, the sealing structure is used for sealing the reserved hole in an end wall, the sealing structure is characterized by comprising a sealing module arranged on the reserved hole, and the sealing module comprises a plurality of UHPC plates arranged in parallel; the reserved holes are blocked through the prefabricated UHPC plates, a support does not need to be erected, the structural strength is ensured, and meanwhile the advantages of being short in construction period and controllable in construction risk are achieved.