Partition isolation filling method for mining inclined working face paste filling
By using the partition isolation filling method on the inclined working surface of the coal mining machine at a large mining height in the deep buried coal seam area, the goaf area is divided into the area to be filled and the sealing area, and the isolation wall and support mechanism are used to seal it, which solves the problems of low paste filling efficiency and top plate collapse, and achieves an efficient and safe paste filling effect.
Patent Information
- Application Number
- CN202411970268.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-03-25
AI Technical Summary
In the inclined working surface of the coal mining machine at a high level in the deep buried coal seam area, the filling method of the paste is slow and low in efficiency, resulting in uneven filling of the paste, which easily leads to the collapse of the roof plate, and has problems such as safety risks and high raw material loss.
The partition isolation and filling method of the paste filling of the inclined working face is used to divide the goaf into the section to be filled and the sealing section, and seal it through the isolation wall and support mechanism to ensure that the paste is filled evenly and supports the roof.
The paste filling efficiency and filling rate are improved, the stability of the goaf top plate is ensured, the safety risks of coal mining are reduced, and raw materials and labor costs are saved.