Building construction quality evaluation processing method and system based on BIM data analysis

By constructing a three-dimensional spatial prediction model based on BIM data, the problem of lack of dynamic simulation and real-time feedback in building construction quality evaluation in the existing technology is solved, real-time quality monitoring and identification of potential problems at the building construction site are realized, and construction accuracy and efficiency are improved.

CN119720362AActive Publication Date: 2025-03-28MIDDLE EAST INFRASTRUCTURE TECH GRP CO LTD
7 Cites 3 Cited by

Patent Information

Application Number
CN202510223252.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-27
Publication Date
2025-03-28
Estimated Expiration
2045-02-27

AI Technical Summary

Technical Problem

The existing BIM technology has limitations in building construction quality assessment, especially in accurately predicting construction quality and solving problems such as component collisions and interference, which lack dynamic simulation and real-time feedback.

Method used

By scanning the building construction site, an initial BIM model is constructed, and spatial dimension positioning data and component connection data are obtained through BIM data to build a three-dimensional spatial prediction model. The model combines time series data from the construction process to predict component quality and identify potential spatial collisions or interference.

Benefits of technology

Real-time quality monitoring of the building construction site is realized, potential problems are identified, human errors and construction errors are reduced, and construction accuracy and efficiency are improved.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a building construction quality evaluation processing method and system based on BIM data analysis, and the method comprises the following operation steps: scanning the building information of a building construction site, and constructing an initialized BIM model; adding BIM data to the initialized BIM model; obtaining spatial size positioning data through the BIM data, further determining component connection data of the component according to the spatial size positioning data, and constructing a three-dimensional space prediction model according to the spatial size positioning data and the component connection data; construction starting point time and construction ending end point time are preset for construction procedures of the building construction site, and a time prediction model is generated; and inputting the time sequence of the construction process into the three-dimensional space prediction model, and predicting the quality of the component of the building construction site.
Need to check novelty before this filing date? Find Prior Art