Public information collection, storage and sharing platform for building construction project
By designing a public information collection, storage and sharing platform for construction projects, and using data collection and module analysis to identify construction quality, the problem of traditional platforms not being able to identify construction quality is solved, and the accurate identification and early warning of quality status is achieved, and construction costs are reduced.
Patent Information
- Application Number
- CN202411896494.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-04-25
AI Technical Summary
Traditional public information collection, storage and sharing platforms for construction projects cannot effectively identify and judge the quality status of construction projects, resulting in rework and increased quality accidents, thereby increasing construction costs.
A public information collection, storage and sharing platform including data acquisition module, steel module, earthwork module, concrete module and processing and early warning module is designed. The platform analyzes steel, earthwork and concrete information to generate steel grade values, soil grade values and concrete grade values, and determines and warns the construction quality through the processing warning module.
It realizes accurate identification and timely notification of the quality status of construction projects, reduces the occurrence of rework and quality accidents, and reduces construction costs.
Smart Images

Figure CN119886924A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction project information collection, storage and sharing, and in particular to a public information collection, storage and sharing platform for building construction projects. Background Art
[0002] With the increasing quality requirements of construction projects and the increasing competition in the construction industry, project management needs to be more and more refined. At the same time, project management involves many participants, and there are also many types of project materials and information. According to traditional paper documents and email communication, it is impossible to understand the status of project construction in a timely manner. Therefore, a public information collection, storage, and sharing platform for construction projects came into being.
[0003] As competition in the construction industry intensifies, the construction quality of construction projects becomes increasingly important, and ensuring the construction quality of projects is the foundation for an enterprise.
[0004] However, when the traditional public information collection, storage, and sharing platform for construction projects is in operation, it is unable to identify and judge the quality status of construction projects in all aspects, and it is even more unable to send the project quality status to many participants in a timely manner, resulting in frequent rework of construction projects and quality accidents, which increases the construction costs of enterprises. Therefore, how to identify the quality status of construction projects and send the project quality status to many participants in a timely manner is a technical problem that needs to be solved.
[0005] In order to solve the above defects, a technical solution is now provided. Summary of the invention
[0006] In order to solve the technical problems raised by the above background technology, the present invention is proposed. The embodiment of the present invention provides a public information collection, storage and sharing platform for building construction projects.
[0007] The purpose of the present invention can be achieved through the following technical solutions: a public information collection, storage and sharing platform for construction projects, including a data acquisition module, a steel module, an earthwork module, a concrete module and a processing and early warning module.
[0008] The data acquisition module is used to collect steel element information, joint information, earthwork information and concrete information, and send it to the steel module, earthwork module and concrete module for storage and shared query;
[0009] The steel module is used to analyze the steel element performance and steel bar status of the steel element information and joint information to obtain the steel grade value of the construction project;
[0010] The earthwork module is used to analyze the earthwork filling and excavation status of the construction project earthwork information to obtain the soil quality grade value of the construction project;
[0011] The concrete module is used to analyze the concrete pouring status of the concrete information to obtain the concrete quality grade value of the construction project;
[0012] The processing and early warning module receives the steel grade value, the soil grade value and the concrete grade value of the construction project, judges and analyzes the construction quality of the construction project based on the value, compares it with the set comparison interval, and issues corresponding early warning and processing.
[0013] Furthermore, the steel grade value analysis steps of the construction project are as follows:
[0014] Obtain the number of joints in the construction project where the compression steel bars are directly greater than 28 mm and the tension steel bars are directly greater than 25 mm, and mark them as the compression bias binding number and the tension bias binding number respectively, and sum them up to get the binding anomaly value. Compare the lap length of the steel bar lap joint with 300 mm, and count the proportion of construction projects exceeding 300 mm, mark it as the lap length compliance rate, obtain the joint percentage of each part, and perform average processing to get the joint anomaly value;
[0015] The steel property grade value, steel bar machine cloth grade value, joint crack value, welding quality deviation value, binding deviation value, lap length compliance rate and joint deviation value are processed according to the graphical construction to obtain the steel grade value GJZ of the construction project.
[0016] Furthermore, the welding quality deviation value analysis steps are as follows:
[0017] By projecting laser stripes onto the weld surface of the weld joint, using a camera to capture the image of the emitted light, analyzing the deformation of the light pattern in the image and combining the triangulation principle, the three-dimensional coordinates of each point on the weld surface are obtained, and a three-dimensional model of the weld surface is established. After comparison with the set reference plane, the distance deviations from each point on the weld surface to the reference plane are counted, and the weld surface deviation of the weld joint is obtained by summing them up; the vertical distance from the bottom of each bite edge of the weld joint to the surface of the parent material is measured, and the average value is marked as the average bite edge depth. The starting and ending points of each bite edge of the joint are counted to obtain the length of each bite edge, and the total length of the bite edge is obtained by summing them up. The average bite depth and the total bite length are summed to obtain the bite value of the weld joint; the ray penetrates the weld of the weld joint, and the internal image of the weld is obtained on the digital detector. The image is gray-scaled and compared with the set threshold. When it is less than the set value, it is determined to be a pore, and the number of pores in the weld joint is counted to obtain the weld excess height yg of the weld joint. The weld surface deflection, the bite value of the weld joint and the number of pores in the weld joint are marked as fp, jb and qk respectively, and normalized with the weld excess height yg of the weld joint. According to the set formula The weld quality value Hz of the welding joint is calculated, where g1, g2, g3, g4, g5, g6 and g7 are the set influencing factor coefficients, d is a natural constant, and the number of welding joints in the entire construction project that are less than the set weld quality threshold is counted and marked as the weld quality deviation value.
[0018] Furthermore, the socket crack value analysis steps are as follows:
[0019] An acoustic emission sensor is arranged on the sleeve surface of the mechanical joint to obtain an acoustic emission signal, the signal voltage of the acoustic emission is integrated in the time domain to obtain the sleeve acoustic emission signal energy, the duration and signal amplitude in the acoustic emission signal are obtained, and the result is summed with the sleeve acoustic emission signal energy to obtain the sleeve crack value of the mechanical joint; the contact sensor is moved along the thread surface of the sleeve steel wire head, and the sensor contact force and displacement changes are counted. When the displacement change exceeds the set displacement change threshold and the contact force decreases by more than the set decrease percentage threshold, the point is judged as a broken tooth, and the fluctuation frequency and amplitude of the contact force signal are obtained. When the fluctuation frequency is lower than the set fluctuation frequency threshold and the amplitude is lower than the set amplitude threshold, the point is judged as a bald tooth, and the sleeve steel wire is Starting from the starting end of the screwing, the head is divided into three equal parts, namely the first part, the second part and the third part, and the weighting coefficients c1, c2 and c3 are set respectively, among which c1>c2>c3, and the weight C is set as the position marked as the sleeve. The number of broken teeth and bald teeth in each part of the sleeve is counted, and the number of broken teeth and bald teeth in each position are multiplied by the set weight C, and the sum is obtained to obtain the sleeve tooth sink value of the mechanical joint. The sleeve crack value of the mechanical joint and the sleeve tooth sink value of the mechanical joint are weighted and calculated, and multiplied by the corresponding weight factor coefficient to obtain the sleeve crack value of the mechanical joint. The sleeve crack value of the mechanical joint is compared with the set threshold value, and the values below the threshold range, within the threshold range and above the threshold range are counted, and the sleeve crack value Jt is obtained by analysis and calculation.
[0020] Furthermore, the steps for analyzing the property grade value of the steel material and the steel bar machine grade value are as follows:
[0021] By irradiating the surface of steel in the construction project with X-rays, detecting the energy and intensity of the emitted characteristic X-ray fluorescence, and comparing and analyzing with the calibration curve of standard steel with known phosphorus, sulfur, nitrogen, nickel, chromium, molybdenum and silicon content, the phosphorus, sulfur, nitrogen, nickel, chromium, molybdenum and silicon content values of the steel are obtained. The phosphorus, sulfur and nitrogen content of the steel are summed to obtain the reduced value of the mechanical properties of the steel. The nickel, chromium and molybdenum content of the steel are summed to obtain the improved value of the mechanical properties of the steel. The improved value of the mechanical properties of the steel, the reduced value of the mechanical properties and the silicon content of the steel are marked as jj, jt and gh respectively, and normalized according to the set formula The property grade value Gx of the steel is obtained, where a1, a2, a3, a4 and a5 are all set weight factor coefficients;
[0022] Obtain the part where the steel bar is subjected to greater tensile stress, and count the number of mechanical joints and welded joints in this part, and sum them up to get the total number of mechanical joints and the total number of welded joints. Divide the total number of mechanical joints by the total number of welded joints to get the steel bar machine grade value.
[0023] Furthermore, the soil quality grade analysis steps of the construction project are as follows:
[0024] The soil layer reserve value, fill soil deviation value, ground water clearance value and soil opening section value in the earthwork information of the construction project are obtained, and the soil quality grade value TZJ of the construction project is calculated.
[0025] Furthermore, the steps of analyzing the deviation of fill quality are as follows:
[0026] The backfill soil layer thickness, backfill machinery travel speed and backfill soil moisture content in the earthwork information of the construction project are obtained, and the backfill soil grade deviation jp is calculated to obtain the backfill soil quality deviation Tp.
[0027] Furthermore, the backfill soil grade deviation analysis steps are as follows:
[0028] Step 1: For the backfill soil obtained in the earthwork project, put the standard sieve with the largest aperture on the top layer, and put a set of sieves with apertures arranged in descending order on the vibrating sieve machine. Use the vibrating sieve machine to vibrate for a certain period of time, respectively obtain the mass of the particles on the sieves of each aperture, and obtain the mass of the soil particles in the weighing chassis that pass through the sieve with the smallest aperture;
[0029] Step 2: Analyze and obtain the cumulative sieve residue percentage Bi, where i represents the sieve number;
[0030] Step 3: With the logarithm of particle size as the horizontal axis and the cumulative percentage of sieve residue as the vertical axis, correspond the data points calculated in step 2 to the coordinate graph, connect them with broken lines to obtain the particle grading broken line graph of backfill soil, calculate the angle between the particle grading broken line of each coordinate point and the horizontal line, and sum them up, marking it as the backfill soil grade deviation jp.
[0031] Furthermore, the concrete quality grade analysis steps of the construction project are as follows:
[0032] The free fall height, pouring interval time and concrete mixing time in concrete pouring are obtained and marked as zy, jj and hjs respectively. According to the set formula model HZZ=1 / (z1×zy+z2×jj+z3×|hjs-Z1|), the concrete quality grade value HZZ of the construction project is calculated, where z1, z2 and z3 are the set correction factor coefficients of free fall height, pouring interval time and concrete mixing time respectively, and Z1 is the set reference concrete mixing time.
[0033] Furthermore, the corresponding early warning and processing analysis steps are as follows:
[0034] The steel quality grade value GJZ, soil quality grade value TZJ and concrete quality grade value HZZ of the construction project are calculated to obtain the comprehensive quality grade value of the construction project;
[0035] When the comprehensive quality grade value of the construction project is in the comparison interval GG0, a signal of serious quality defects of the construction project is issued, an alarm is sounded, and it is sent to the person in charge of the construction unit, the person in charge of the construction unit and the person in charge of the supervision unit through the sharing platform with text style label one. When the comprehensive quality grade value of the construction project is in the comparison interval GG1, a signal of quality defects of the construction project is issued, an alarm is sounded, and it is sent to the person in charge of the project of the construction unit, the person in charge of the construction unit and the person in charge of the supervision unit through the sharing platform with text style label two. When the comprehensive quality grade value of the construction project is in the comparison interval GG2, a general signal of the construction project quality is issued, and it is sent to the project personnel of the construction unit, the project manager of the construction unit and the project general supervision engineer of the supervision unit through the sharing platform with text style label three. When the comprehensive quality grade value of the construction project is in the comparison interval GG3, a signal of good quality of the construction project is issued, and it is sent to the project personnel of the construction unit, the person in charge of the project quality of the construction unit and the project supervision engineer of the supervision unit through the sharing platform with text style label four.
[0036] Compared with the prior art, the present invention has the following beneficial effects:
[0037] 1. The present invention obtains the steel quality grade of the construction project by analyzing the steel element performance and steel bar status of the steel element information and the joint information, obtains the soil quality grade of the construction project by analyzing the earthwork filling and excavation status of the construction project, and obtains the concrete quality grade of the construction project by analyzing the concrete pouring status of the concrete information. The quality status of the construction project can be identified from various aspects such as steel element composition, steel bar joints, earthwork excavation and backfilling, and concrete pouring, thereby increasing the accuracy of identification;
[0038] 2. The present invention receives the steel grade value, soil grade value and concrete grade value of the construction project, and analyzes the construction quality of the construction project based on the received value, compares it with the set comparison interval, and issues corresponding early warning and processing. It can timely identify and judge the quality status of the construction project, and can timely send the project quality status to many participants, which greatly reduces the occurrence of rework and quality accidents in the construction project, and reduces the construction cost of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. The following drawings are not intentionally scaled according to the actual sizes, and the focus is on illustrating the main purpose of the present invention.
[0040] Figure 1 It is a system block diagram of the present invention. DETAILED DESCRIPTION
[0041] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work also fall within the scope of protection of the present invention.
[0042] like Figure 1 As shown, a public information collection, storage and sharing platform for construction projects includes a data acquisition module, a steel module, an earthwork module, a concrete module and a processing and early warning module.
[0043] The data acquisition module is used to collect steel element information, joint information, earthwork information and concrete information, and send it to the steel module, earthwork module and concrete module for storage and shared query.
[0044] The steel module is used to receive steel element information and joint information, and analyze the steel element performance and steel bar status based on this information to obtain the steel grade value of the construction project. The specific analysis is as follows:
[0045] By irradiating the surface of steel in the construction project with X-rays, detecting the energy and intensity of the emitted characteristic X-ray fluorescence, and comparing and analyzing with the calibration curve of standard steel with known phosphorus, sulfur, nitrogen, nickel, chromium, molybdenum and silicon content, the phosphorus, sulfur, nitrogen, nickel, chromium, molybdenum and silicon content values of the steel are obtained. The phosphorus, sulfur and nitrogen content of the steel are summed to obtain the reduced value of the mechanical properties of the steel. The nickel, chromium and molybdenum content of the steel are summed to obtain the improved value of the mechanical properties of the steel. The improved value of the mechanical properties of the steel, the reduced value of the mechanical properties and the silicon content of the steel are marked as jj, jt and gh respectively, and normalized according to the set formula The steel grade value Gx is obtained, where a1, a2, a3, a4 and a5 are all set weight factor coefficients to improve the accuracy of the calculation. Specifically, a4>a1, a2>a5, e is a natural constant with a value of 2.718, and b is a natural constant with a value of 5.114. It should be noted that, as can be seen from the formula, when the silicon element is between 0.2% and 1%, the performance evaluation of the steel is better;
[0046] Obtain the parts where the steel bars are subjected to greater tensile stress, and count the number of mechanical joints and welded joints in the parts, where the parts subjected to greater tensile stress refer to the positive bending moment area in the middle of the beam span, the negative bending moment area at the end of the beam, the tensile area of the inclined section, the positive bending moment area in the middle of the plate span, the negative bending moment area at the plate edge support, the column top, the column bottom, the plastic hinge area at the end of the column, and the independent foundation bottom plate, and sum them up to obtain the total number of mechanical joints and the total number of welded joints, and divide the total number of mechanical joints by the total number of welded joints to obtain the steel bar machine layout grade value;
[0047] An acoustic emission sensor is arranged on the sleeve surface of the mechanical joint to obtain an acoustic emission signal, the signal voltage of the acoustic emission is integrated in the time domain to obtain the sleeve acoustic emission signal energy, the duration and signal amplitude in the acoustic emission signal are obtained, and the result is summed with the sleeve acoustic emission signal energy to obtain the sleeve crack value of the mechanical joint; the contact sensor is moved along the thread surface of the sleeve steel wire head, and the sensor contact force and displacement change are counted. When the displacement change exceeds the set displacement change threshold and the contact force decreases by more than the set decrease percentage threshold, the point is judged as a broken tooth, wherein the set displacement change threshold is 0.5 mm, and the set decrease percentage threshold is 25%. The fluctuation frequency and amplitude of the contact force signal are obtained. When the fluctuation frequency is lower than the set fluctuation frequency threshold and the amplitude is lower than the set amplitude threshold, the point is judged as a bald tooth. The sleeve steel wire head is divided into three equal parts starting from the starting end of the screwing, which are the first and second equal parts respectively. , the second and third equal parts, set weighting coefficients c1, c2 and c3 respectively, where c1>c2>c3, set weight C at the position marked as the sleeve, match it with the position of broken tooth and bald tooth judgment, count the number of broken teeth and bald teeth in each equal part of the sleeve, multiply the number of broken teeth and bald teeth at each position by the set weight C, sum them up to get the sleeve tooth sink value of the mechanical joint, weightedly calculate the sleeve crack value of the mechanical joint and the sleeve tooth sink value of the mechanical joint, and multiply them by the corresponding weight factor coefficient to get the sleeve crack value of the mechanical joint, compare the sleeve crack value of the mechanical joint with the set threshold, mark it below the threshold range as DY1, mark it within the threshold range as DY2, and mark it above the threshold range as DY3, calculate the proportion of DY1 and DY3 in the entire construction project data, mark them as KDY1 and KDY3 respectively, normalize the proportion values KDY1 and KDY3, and use the set formula The joint crack value Jt is calculated, where yx1 and yx2 are the set weight factor coefficients of the proportion of values below the threshold range and the proportion of values above the threshold range, respectively, and the specific values are 1.254 and 3.214, respectively, and λ is the set correction factor coefficient, and the specific value is 1.055;
[0048] By projecting laser stripes onto the weld surface of the welding joint, using the camera to capture images of the emitted light at different angles, analyzing the deformation of the light pattern in the image and combining the triangulation principle, the three-dimensional coordinates of each point on the weld surface are obtained, and a three-dimensional model of the weld surface is established. After comparison with the set reference plane, the distance deviations from each point on the weld surface to the reference plane are counted, and the weld surface deviation of the welding joint is obtained by summing them up; the vertical distance from the bottom of each undercut of the welding joint to the surface of the parent material is measured, and the average value is marked as the average depth of the undercut, and the starting and ending points of each undercut of the joint are counted to obtain the length of each undercut, and the undercut is obtained by summing. Total length, sum the average bite depth and the total bite length to get the bite value of the weld joint; penetrate the weld of the weld joint through the ray, get the internal image of the weld on the digital detector, process the image in grayscale, and compare it with the set threshold. When it is less than the set value, it is judged as a pore, count the number of pores in the weld joint, and get the weld excess height yg of the weld joint. Mark the weld surface deflection, the bite value and the number of pores in the weld joint as fp, jb and qk respectively, and normalize them with the weld excess height yg of the weld joint. According to the set formula The weld quality value Hz of the welded joint is calculated, where g1, g2, g3, g4, g5, g6 and g7 are all set influencing factor coefficients, and the specific values are 1.025, 2.145, 3.125, 1.026, 1.001, 2.888 and 2.155 respectively. d is a natural constant, and its value is 5.668. It should be noted that, from the formula, when the weld bead height of the welded joint is 0-3 mm, the higher the quality of the weld, the weld quality value of the welded joint is compared with the set weld quality threshold, and the number of welded joints with a value less than the set weld quality threshold in the entire construction project is counted, and marked as the weld quality deviation value;
[0049] Obtain the number of joints in the construction project where the compression steel bars are directly greater than 28 mm and the tension steel bars are directly greater than 25 mm, and mark them as the compression bias binding number and the tension bias binding number respectively, and sum them up to get the binding anomaly value. Compare the lap length of the steel bar lap joint with 300 mm, and count the proportion of construction projects exceeding 300 mm, mark it as the lap length compliance rate, obtain the joint percentage of each part, and perform average processing to get the joint anomaly value;
[0050] The steel property grade value, steel bar machine cloth grade value, joint crack value, welding quality deviation value, binding difference value, lap length compliance rate and joint difference value are normalized, and a cuboid is constructed with the steel property grade value as the bottom length of the cuboid, the steel bar machine cloth grade value as the bottom width and the lap length compliance rate as the height of the cuboid. A cube is constructed inside the cuboid with the sum of the joint crack value, welding quality deviation value, binding difference value and joint difference value as the side length, where the center point of the cube coincides with the center point of the cuboid, and the non-overlapping volume formed by the cuboid and the cube is identified and marked as the steel grade value GJZ of the construction project.
[0051] The earthwork module receives earthwork information of the construction project, analyzes the earthwork filling and excavation status, and obtains the soil quality grade value of the construction project. The specific analysis is as follows:
[0052] The soil layer reserve value, fill quality deviation value, ground water clearance value and soil opening layer value in the earthwork information of the construction project are obtained, and they are marked as Ty, Tp, Dl and Td respectively, and normalized. According to the set formula TZJ=ρ×(xe1×Ty+xe3×Dl) / (xe2×Tp+xe4×Td), the soil quality grade value TZJ of the construction project is obtained, wherein xe1, xe2, xe3 and xe4 are the weight factor coefficients set for the soil layer reserve value, fill quality deviation value, ground water clearance value and soil opening layer value respectively, and the values are 1.219, 3.125, 3.214 and 2.145 respectively, and ρ is the set correction factor coefficient used to improve the accuracy of the calculation. The specific value is determined by personnel in this professional field.
[0053] It should be noted that the soil layer reservation value refers to the thickness of the reserved soil layer when excavating the earthwork project close to the base by manual excavation; the ground water clearance value refers to the distance between the groundwater and the base of the working pit during the construction of the earthwork project; the soil excavation layer value refers to the sum of the thickness of the earthwork layered excavation and the length of the segmented excavation.
[0054] It should also be noted that the steps for solving the fill soil deviation are as follows:
[0055] Step 1: For the backfill soil obtained in the earthwork project, put the standard sieve with the largest aperture on the top layer, and put a set of sieves with apertures arranged in descending order on the vibrating screen machine. Use the vibrating screen machine to vibrate for a certain period of time, and obtain the mass of the particles on the sieves of each aperture, marked as mi, i represents the serial number of the sieve, and obtain the mass of the soil particles in the weighing chassis that pass through the sieve with the smallest aperture, marked as mn;
[0056] Step 2: According to the formula The cumulative percentage of residue Bi is calculated, where f is the maximum value of the sieve number. The sieves start from the one with the largest aperture and the corresponding one is the one with the smallest aperture.
[0057] Step 3: With the logarithm of particle size as the horizontal axis and the cumulative percentage of sieve residue as the vertical axis, correspond the data points calculated in step 2 to the coordinate graph, connect them with broken lines, and obtain the particle gradation broken line graph of backfill soil. Calculate the angle between the particle gradation broken line of each coordinate point and the horizontal line, and sum them up, marking it as the backfill soil grade deviation jp;
[0058] Obtain the backfill soil layer thickness, backfill machinery travel speed and backfill soil moisture content in the earthwork information of the construction project, and mark them as hfh, hjx and hhl respectively, and normalize them with the backfill soil grade deviation jp. According to the set formula The backfill quality deviation Tp is obtained, where h1, h2, h3 and h4 are all set weight factor coefficients, H1 is the set reference backfill machinery travel speed, and H2 is the set reference backfill soil moisture content.
[0059] The concrete module receives concrete information, analyzes the concrete pouring status, and obtains the concrete quality grade value of the construction project. The specific analysis is as follows:
[0060] The free fall height, pouring interval time and concrete mixing time in concrete pouring are obtained and marked as zy, jj and hjs respectively. According to the set formula model HZZ=1 / (z1×zy+z2×jj+z3×|hjs-Z1|), the concrete quality grade value HZZ of the construction project is calculated, where z1, z2 and z3 are the set correction factor coefficients of free fall height, pouring interval time and concrete mixing time respectively, and the specific values are 1.21, 2.14 and 1.02 respectively, and Z1 is the set reference concrete mixing time.
[0061] The processing and early warning module receives the steel grade value, soil grade value and concrete grade value of the construction project, and makes a judgment and analysis on the construction quality of the construction project based on the value, and compares it with the set comparison interval, and issues corresponding early warnings and processing. The specific analysis is as follows:
[0062] The steel quality grade GJZ, soil quality grade TZJ and concrete quality grade HZZ of the construction project are normalized and weighted, and the weight factor coefficients are x1, x2 and x3 respectively, to obtain the comprehensive quality grade of the construction project;
[0063] Compare the comprehensive quality level of the construction project with the set comparison intervals GG0, GG1, GG2 and GG3, and the comparison intervals GG0, GG1, GG2 and GG3 are increased in a certain gradient;
[0064] When the comprehensive quality level of the construction project is in the comparison interval GG0, a signal of serious defects in the quality of the construction project is issued, an alarm is sounded, and the text "There are serious defects in the quality of the construction project. Please ask the heads of each unit to jointly establish a quality rectification team" is sent to the person in charge of the construction unit, the person in charge of the construction unit and the person in charge of the supervision unit through the sharing platform. When the comprehensive quality level of the construction project is in the comparison interval GG1, a signal of serious defects in the quality of the construction project is issued, an alarm is sounded, and the text "There are defects in the quality of the construction project. Please ask the recipients of each unit to jointly establish a quality rectification team" is sent to the person in charge of the project of the construction unit, the person in charge of the construction unit, and the person in charge of the supervision unit through the sharing platform. The person in charge of the people and supervision unit, when the comprehensive quality level of the construction project is in the comparison interval GG2, a signal of general construction project quality is issued, and the text format "The quality of the construction project is general, please increase the inspection frequency of the construction unit and supervision unit personnel" is sent to the project personnel of the construction unit, the project manager of the construction unit and the project general supervision engineer of the supervision unit through the sharing platform; when the comprehensive quality level of the construction project is in the comparison interval GG3, a signal of good construction project quality is issued, and the text format "The quality of the construction project is good" is sent to the project personnel of the construction unit, the person in charge of the project quality of the construction unit and the project supervision engineer of the supervision unit through the sharing platform.
[0065] The above is an explanation of the present invention and should not be considered as a limitation thereof. Although several exemplary embodiments of the present invention have been described, it will be readily appreciated by those skilled in the art that many modifications may be made to the exemplary embodiments without departing from the novel teachings and advantages of the present invention. Therefore, all such modifications are intended to be included within the scope of the present invention as defined in the claims. It should be understood that the above is an explanation of the present invention and should not be considered as being limited to the specific embodiments disclosed, and modifications to the disclosed embodiments and other embodiments are intended to be included within the scope of the appended claims. The present invention is defined by the claims and their equivalents.
Claims
1. A public information collection, storage and sharing platform for construction projects, characterized in that: include: Data collection module, used to collect steel element information, joint information, earthwork information and concrete information, and send it to the steel module, earthwork module and concrete module for storage and shared query; The steel module is used to analyze the steel element performance and steel bar status based on the steel element information and joint information to obtain the steel grade value of the construction project; The earthwork module is used to analyze the earthwork filling and excavation status of the construction project earthwork information and obtain the soil quality grade value of the construction project; The concrete module is used to analyze the concrete pouring status of concrete information and obtain the concrete quality grade value of the construction project; The processing and early warning module receives the steel grade value, soil grade value and concrete grade value of the construction project, judges and analyzes the construction quality of the construction project based on the value, compares it with the set comparison interval, and issues corresponding early warnings and processing.
2. A public information collection, storage and sharing platform for construction projects according to claim 1, characterized in that: The steel grade value analysis steps for the construction project are as follows: Obtain the number of joints in the construction project where the compression steel bars are directly greater than 28 mm and the tension steel bars are directly greater than 25 mm, and mark them as the compression bias binding number and the tension bias binding number respectively, and sum them up to get the binding anomaly value. Compare the lap length of the steel bar lap joint with 300 mm, and count the proportion of construction projects exceeding 300 mm, mark it as the lap length compliance rate, obtain the joint percentage of each part, and perform average processing to get the joint anomaly value; The steel property grade value, steel bar machine cloth grade value, joint crack value, welding quality deviation value, binding deviation value, lap length compliance rate and joint deviation value are processed according to the graphical construction to obtain the steel grade value GJZ of the construction project.
3. A public information collection, storage and sharing platform for construction projects according to claim 2, characterized in that: The welding quality deviation value analysis steps are as follows: By projecting laser stripes onto the weld surface of the weld joint, using a camera to capture the image of the emitted light, analyzing the deformation of the light pattern in the image and combining the triangulation principle, the three-dimensional coordinates of each point on the weld surface are obtained, and a three-dimensional model of the weld surface is established. After comparison with the set reference plane, the distance deviations from each point on the weld surface to the reference plane are counted, and the weld surface deviation of the weld joint is obtained by summing them up; the vertical distance from the bottom of each bite edge of the weld joint to the surface of the parent material is measured, and the average value is marked as the average bite edge depth. The starting and ending points of each bite edge of the joint are counted to obtain the length of each bite edge, and the total length of the bite edge is obtained by summing them up. The average bite depth and the total bite length are summed to obtain the bite value of the weld joint; the ray penetrates the weld of the weld joint, and the internal image of the weld is obtained on the digital detector. The image is gray-scaled and compared with the set threshold. When it is less than the set value, it is determined to be a pore, and the number of pores in the weld joint is counted to obtain the weld excess height yg of the weld joint. The weld surface deflection, the bite value of the weld joint and the number of pores in the weld joint are marked as fp, jb and qk respectively, and normalized with the weld excess height yg of the weld joint. According to the set formula The weld quality value Hz of the welding joint is calculated, where g1, g2, g3, g4, g5, g6 and g7 are the set influencing factor coefficients, d is a natural constant, and the number of welding joints in the entire construction project that are less than the set weld quality threshold is counted and marked as the weld quality deviation value.
4. A public information collection, storage and sharing platform for construction projects according to claim 2, characterized in that: The steps of analyzing the socket crack value are as follows: An acoustic emission sensor is arranged on the sleeve surface of the mechanical joint to obtain an acoustic emission signal, the signal voltage of the acoustic emission is integrated in the time domain to obtain the sleeve acoustic emission signal energy, the duration and signal amplitude in the acoustic emission signal are obtained, and the result is summed with the sleeve acoustic emission signal energy to obtain the sleeve crack value of the mechanical joint; the contact sensor is moved along the thread surface of the sleeve steel wire head, and the sensor contact force and displacement changes are counted. When the displacement change exceeds the set displacement change threshold and the contact force decreases by more than the set decrease percentage threshold, the point is judged as a broken tooth, and the fluctuation frequency and amplitude of the contact force signal are obtained. When the fluctuation frequency is lower than the set fluctuation frequency threshold and the amplitude is lower than the set amplitude threshold, the point is judged as a bald tooth, and the sleeve steel wire is Starting from the starting end of the screwing, the head is divided into three equal parts, namely the first part, the second part and the third part, and the weighting coefficients c1, c2 and c3 are set respectively, among which c1>c2>c3, and the weight C is set as the position marked as the sleeve. The number of broken teeth and bald teeth in each part of the sleeve is counted, and the number of broken teeth and bald teeth in each position are multiplied by the set weight C, and the sum is obtained to obtain the sleeve tooth sink value of the mechanical joint. The sleeve crack value of the mechanical joint and the sleeve tooth sink value of the mechanical joint are weighted and calculated, and multiplied by the corresponding weight factor coefficient to obtain the sleeve crack value of the mechanical joint. The sleeve crack value of the mechanical joint is compared with the set threshold value, and the values below the threshold range, within the threshold range and above the threshold range are counted, and the sleeve crack value Jt is obtained by analysis and calculation.
5. A public information collection, storage and sharing platform for construction projects according to claim 2, characterized in that: The analysis steps of the steel material property grade and steel bar machine grade are as follows: By irradiating the surface of steel in the construction project with X-rays, detecting the energy and intensity of the emitted characteristic X-ray fluorescence, and comparing and analyzing with the calibration curves of standard steels with phosphorus, sulfur, nitrogen, nickel, chromium, molybdenum and silicon content, the phosphorus, sulfur, nitrogen, nickel, chromium, molybdenum and silicon content values of the steel are obtained. The phosphorus, sulfur and nitrogen content of the steel are summed to obtain the reduced value of the mechanical properties of the steel. The nickel, chromium and molybdenum content of the steel are summed to obtain the improved value of the mechanical properties of the steel. The improved value of the mechanical properties of the steel, the reduced value of the mechanical properties and the silicon content of the steel are marked as jj, jt and gh respectively, and normalized according to the set formula The property grade value Gx of the steel is obtained, where a1, a2, a3, a4 and a5 are all set weight factor coefficients; Obtain the part where the steel bar is subjected to greater tensile stress, and count the number of mechanical joints and welded joints in this part, and sum them up to get the total number of mechanical joints and the total number of welded joints. Divide the total number of mechanical joints by the total number of welded joints to get the steel bar machine grade value.
6. A public information collection, storage and sharing platform for construction projects according to claim 1, characterized in that: The soil quality grade analysis steps for the construction project are as follows: The soil layer reserve value, fill soil deviation value, ground water clearance value and soil opening section value in the earthwork information of the construction project are obtained, and the soil quality grade value TZJ of the construction project is calculated.
7. A public information collection, storage and sharing platform for construction projects according to claim 6, characterized in that: The steps of fill quality deviation analysis are as follows: The backfill soil layer thickness, backfill machinery travel speed and backfill soil moisture content in the earthwork information of the construction project are obtained, and the backfill soil grade deviation jp is calculated to obtain the backfill soil quality deviation Tp.
8. A public information collection, storage and sharing platform for construction projects according to claim 7, characterized in that: The backfill soil grade deviation analysis steps are as follows: Step 1: For the backfill soil obtained in the earthwork project, put the standard sieve with the largest aperture on the top layer, and put a set of sieves with apertures arranged in descending order on the vibrating sieve machine. Use the vibrating sieve machine to vibrate for a certain period of time, respectively obtain the mass of the particles on the sieves of each aperture, and obtain the mass of the soil particles in the weighing chassis that pass through the sieve with the smallest aperture; Step 2: Analyze and obtain the cumulative sieve residue percentage Bi, where i represents the sieve number; Step 3: With the logarithm of particle size as the horizontal axis and the cumulative percentage of sieve residue as the vertical axis, correspond the data points calculated in step 2 to the coordinate graph, connect them with broken lines to obtain the particle grading broken line graph of backfill soil, calculate the angle between the particle grading broken line of each coordinate point and the horizontal line, and sum them up, marking it as the backfill soil grade deviation jp.
9. A public information collection, storage and sharing platform for construction projects according to claim 1, characterized in that: The concrete quality grade analysis steps for the construction project are as follows: The free fall height, pouring interval time and concrete mixing time in concrete pouring are obtained and marked as zy, jj and hjs respectively. According to the set formula model HZZ=1 / (z1×zy+z2×jj+z3×|hjs-Z1|), the concrete quality grade value HZZ of the construction project is calculated, where z1, z2 and z3 are the set correction factor coefficients of free fall height, pouring interval time and concrete mixing time respectively, and Z1 is the set reference concrete mixing time.
10. A public information collection, storage and sharing platform for construction projects according to claim 1, characterized in that: The corresponding early warning and processing analysis steps are as follows: The steel quality grade value GJZ, soil quality grade value TZJ and concrete quality grade value HZZ of the construction project are calculated to obtain the comprehensive quality grade value of the construction project; When the comprehensive quality grade value of the construction project is in the comparison interval GG0, a signal of serious quality defects of the construction project is issued, an alarm is sounded, and it is sent to the person in charge of the construction unit, the person in charge of the construction unit and the person in charge of the supervision unit through the sharing platform with text style label one. When the comprehensive quality grade value of the construction project is in the comparison interval GG1, a signal of quality defects of the construction project is issued, an alarm is sounded, and it is sent to the person in charge of the project of the construction unit, the person in charge of the construction unit and the person in charge of the supervision unit through the sharing platform with text style label two. When the comprehensive quality grade value of the construction project is in the comparison interval GG2, a general signal of the construction project quality is issued, and it is sent to the project personnel of the construction unit, the project manager of the construction unit and the project general supervision engineer of the supervision unit through the sharing platform with text style label three. When the comprehensive quality grade value of the construction project is in the comparison interval GG3, a signal of good quality of the construction project is issued, and it is sent to the project personnel of the construction unit, the person in charge of the project quality of the construction unit and the project supervision engineer of the supervision unit through the sharing platform with text style label four.
Citation Information
Patent Citations
Intelligent engineering construction project management system
CN105373875A
building construction management system and method based on BIM
CN109523107A
Reinforced concrete structure construction overburden intelligent monitoring safety early warning system
CN115930887A
Intelligent monitoring system for petrochemical engineering construction site
CN117670120A
Hydraulic engineering construction quality digital acceptance management platform
CN118657415A