Traditional atrium aerial work equipment has a long installation cycle and poor flexibility, making it difficult to adapt to complex shape construction. Especially when the ultra-high atrium height is ≥15 meters, the equipment has problems of high cost, insufficient stability and safety.
It provides an adaptive lifting platform, including a structural roof stent, electric hoist, platform protection net and control box, and realizes the lifting and lifting of the main keel by controlling the length of the lower guide chain of the electric hoist without setting up a scaffold.
It greatly improves construction efficiency, reduces material investment, shortens construction period, ensures the safety and stability of construction, and adapts to the needs of different construction heights.
Smart Images

Figure CN120159172A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of super-high atrium decoration construction, and particularly to an adaptive lifting platform for super-high atrium ceiling and side wall decoration and a construction method therefor. Background Art
[0002] In traditional high-altitude operations in atriums, scaffolds or fixed lifting platforms are mostly used, which have problems such as long installation periods, poor flexibility, and difficulty in adapting to complex-shaped construction. When constructing a super-high atrium with a height ≥ 15 meters, the existing equipment has the following defects: the cost of scaffold erection is high and it affects cross-operation; the stability and safety of high-altitude operations are insufficient.
[0003] Therefore, in view of the above technical problems, it is necessary to propose an adaptive lifting platform for super-high atrium ceiling and side wall decoration and a construction method therefor. Summary of the Invention
[0004] The purpose of the present invention is to provide an adaptive lifting platform for super-high atrium ceiling and side wall decoration and a construction method therefor. When in use, by controlling the length of the guide chain released by the electric hoist, the hoisting and lifting of the main keel can be achieved, eliminating the need for scaffold erection and solving the above technical problems.
[0005] To achieve the above purpose, the present invention provides the following technical solutions:
[0006] An adaptive lifting platform for super-high atrium ceiling and side wall decoration, comprising a structural roof truss, a structural wall, suspension points, electric hoists, a platform safety net, a lifting platform, and a control box. The structural roof truss is installed on top of the structural wall. The structural roof truss is provided with a plurality of suspension points. The upper end of the electric hoist is connected to the suspension point, and the lower end of the electric hoist is connected to the lifting platform. The platform safety net is arranged around the lifting platform, and the control box is connected to the electric hoist.
[0007] Preferably, the structural roof truss is made of a steel frame.
[0008] Preferably, the lifting platform includes a main keel, profiled steel sheets, and secondary keels. A plurality of secondary keels are lapped on the main keel, and the profiled steel sheets are installed on the secondary keels.
[0009] Preferably, the main keel is provided with keel lugs connected to the electric hoist.
[0010] Preferably, both the main keel and the secondary keel are made of rectangular steel pipes with a cross-sectional size of 400 mm × 200 mm × 5 mm.
[0011] Preferably, the upper surface of the profiled steel sheet is provided with anti-slip lines.
[0012] Preferably, the lower surface of the profiled steel sheet is provided with grid stiffeners.
[0013] Preferably, a triangular reinforcing plate is arranged inside the rectangular steel pipe.
[0014] A construction method of an adaptive lifting platform applicable to the decoration of the ceiling and side walls of a super-high atrium, the construction method comprising the following construction steps:
[0015] S1. Structural checking calculation, checking the bearing capacity of the roof structural beam according to the atrium span;
[0016] S2. Mark the positions of the electric hoists 4 on the structural roof truss according to the original design drawings, and take good hoisting point measures, and install the lifting platform on the ground;
[0017] S3. The lifting platform is lifted by an electric hoist and lifted synchronously through a control box. During the lifting process of the lifting platform, it is necessary to stop regularly to check the electric hoist, the hoist chain and the suspended formwork to ensure that the system is always in a horizontal state during the lifting process until the design elevation;
[0018] S4. After the installation of the lifting platform is completed, the construction load should be controlled when entering the next process to ensure that the construction load is 2 KN / m2, and at the same time, the material stacking should be avoided from being concentrated;
[0019] S5. After the construction of the structural roof truss and the decorative surface layer of the structural wall is completed, the lifting platform is lifted and lowered through the control box, and then the lifting platform is lowered to the ground synchronously through the reserved hole by using the electric hoist, and the lifting platform is removed and transported out in sequence to complete the entire construction process.
[0020] The structural settlement in step S1 includes the calculation of the structural roof truss and the bearing capacity calculation of the structural wall. The deformation deflection calculation formula of the structural roof truss is: Where q k is the load standard value, E is the elastic modulus of the material, I is the moment of inertia of the cross section, [v] is the allowable deflection, and the bending bearing capacity checking calculation formula of the structural wall is: Where ρ is the reinforcement ratio, h0 = h - a s , h0 is the effective height, and the crack checking calculation formula of the structural wall is w max represents the maximum crack width calculated according to the quasi-permanent combination or standard combination of loads and considering the influence of long-term action, and the unit is usually mm, which is the target value of the formula calculation. α c is the influence coefficient of the non-uniform coefficient of longitudinal tensile reinforcement strain between cracks; ψ is the non-uniform coefficient of longitudinal tensile reinforcement strain between cracks, ρ te is the effective reinforcement ratio, [w] is the allowable crack width, r is the coefficient related to the surface characteristics of the longitudinal tensile reinforcement, σ sk is the stress of the longitudinal tensile reinforcement of the reinforced concrete member calculated according to the standard combination or quasi-permanent combination of loads, Es The elastic modulus of the steel bars, c is the distance from the outer edge of the outermost layer of longitudinally tensioned steel bars to the bottom edge of the tensioned zone, and d is the diameter of the longitudinally tensioned steel bars, with the unit of mm.
[0021] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0022] 1. The present invention changes the status quo of high traditional construction costs and low efficiency in the fine decoration of ultra-high atriums, greatly improves work efficiency. When the invention is specifically used, the input of formwork materials is small and the construction period is short. In future similar fine decoration constructions of ultra-high atriums, the platform system can be customized and improved according to the actual situation on site, so that the project can be completed efficiently and safely.
[0023] 2. The structural roof truss adopts a steel frame, which has high strength and good stability and can provide reliable support for the entire lifting platform. The lifting platform adopts a combined structure of main keels, secondary keels and profiled steel sheets. The main keels and secondary keels adopt rectangular steel pipes and are provided with triangular reinforcing plates. Anti-slip patterns and grid reinforcing ribs are respectively arranged on the upper and lower surfaces of the profiled steel sheets, greatly improving the strength, stiffness and load-bearing capacity of the lifting platform, ensuring the safety of construction personnel and materials. The setting of the platform safety net effectively prevents construction personnel and items from falling, improving the safety of construction.
[0024] 3. The coordinated use of electric hoists and control boxes realizes the synchronous lifting of the lifting platform, can flexibly adjust the platform height according to construction needs, adapts to different construction height requirements, improves construction efficiency. The design of the keel ear plates facilitates the connection and disassembly of the electric hoists and the lifting platform, and is convenient for the installation and maintenance of the equipment.
[0025] 4. In the construction method, structural checking calculations are carried out first to ensure the safety of the structure, avoid safety accidents caused by insufficient structural load-bearing capacity. During the lifting process, the construction load is regularly inspected and controlled to ensure the smooth operation of the lifting platform and the safety of the construction process. After the construction is completed, the platform can be smoothly lowered and removed, facilitating the turnover and use of the equipment and reducing the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of the present invention;
[0027] Figure 2 It is a front view hoisting schematic diagram of the present invention;
[0028] Figure 3 It is a connection schematic diagram of the structural roof truss and the structural wall of the present invention;
[0029] Figure 4 It is a structural diagram of the lifting platform of the present invention;
[0030] Figure 5 It is an upper schematic diagram of the profiled steel sheet of the present invention;
[0031] Figure 6 Schematic diagram of the lower part of the profiled steel sheet of the present invention;
[0032] Figure 7 Structural diagram of the rectangular steel pipe of the present invention;
[0033] Figure 8 Flow chart of the construction method of the present invention.
[0034] Reference numerals in the figure: 1, structural roof truss; 2, structural wall; 3, lifting point; 4, electric hoist; 5, platform safety net; 6, lifting platform; 7, main keel; 8, profiled steel sheet; 9, secondary keel; 10, control box; 11, keel ear plate; 12, rectangular steel pipe; 13, anti-slip pattern; 14, grid reinforcement; 15, triangular reinforcement plate. Detailed implementation manners
[0035] It should be noted that, without conflict, the embodiments in the present invention and the features in the embodiments can be combined with each other.
[0036] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation to the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, the features defined with "first", "second", etc. may explicitly or implicitly include one or more of such features. In the description of the present invention, unless otherwise specified, the meaning of "a plurality" is two or more.
[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection", "coupling" should be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be directly connected or indirectly connected through an intermediate medium, and it may be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
[0038] The following will describe the embodiments of the present invention in detail with reference to the drawings, but the present invention can be implemented in many different ways defined and covered by the claims.
[0039] As Figure 1 and combined with Figures 2 to 8 shown, an adaptive lifting platform for the decoration of the ceiling and side walls of an ultra-high atrium includes a structural roof truss 1, a structural wall 2, lifting points 3, electric hoists 4, a platform safety net 5, a lifting platform 6, and a control box 10. The structural roof truss 1 is installed on the top of the structural wall 2. The structural roof truss 1 is provided with a plurality of lifting points 3. The upper end of the electric hoist 4 is connected to the lifting point 3, and the lower end of the electric hoist 4 is connected to the lifting platform 6. The platform safety net 5 is arranged around the lifting platform 6, and the control box 10 is connected to the electric hoist 4.
[0040] The beneficial effects of adopting the above technical solution: The structural roof truss 1 provides a support foundation for the entire platform. The electric hoist 4 realizes the lifting function of the platform. The control box 10 is used to control the operation of the electric hoist 4. The platform safety net 5 ensures the safety of construction workers. This structural design enables the platform to adapt to the construction environment of the ultra-high atrium, improving the convenience and safety of construction.
[0041] Furthermore, the structural roof truss 1 is made of a steel frame.
[0042] The beneficial effects of adopting the above technical solution: The structural roof truss 1 is made of a steel frame. The steel frame has high strength and toughness and can bear large loads. During the construction of the ultra-high atrium, it is necessary to bear the weight of the lifting platform 6 and the personnel and materials during the construction process. The steel frame structure can ensure the stability and reliability of the structural roof truss 1, providing a solid support for the entire lifting platform system.
[0043] Furthermore, the lifting platform 6 includes main keels 7, profiled steel sheets 8, and secondary keels 9. A plurality of secondary keels 9 are lapped on the main keels 7, and the profiled steel sheets 8 are installed on the secondary keels 9.
[0044] The beneficial effects of adopting the above technical solution: The lifting platform 6 adopts a combined structure of main keels 7, secondary keels 9, and profiled steel sheets 8. The secondary keels 9 are lapped on the main keels 7, and the profiled steel sheets 8 are installed on the secondary keels 9. This structural design enables the lifting platform 6 to have good integrity and load-bearing capacity. The main keels 7 and secondary keels 9 form a frame structure that can effectively transfer loads. The profiled steel sheets 8 provide a working platform for construction workers, meeting the construction requirements for the decoration of the ceiling and side walls of the ultra-high atrium.
[0045] Furthermore, the main keel 7 is provided with keel ear plates 11 connected to the electric hoist 4.
[0046] Beneficial effects of adopting the above technical solution: The main keel 7 is provided with keel lugs 11 for connecting with the electric hoist 4, which facilitates the connection and disassembly of the electric hoist 4 and the lifting platform 6. During the construction process, the electric hoist 4 can be quickly and accurately connected to the lifting platform 6, improving the installation efficiency of the equipment. At the same time, the design of the keel lugs 11 can ensure the reliability of the connection and the stability of the lifting platform 6 during the lifting process.
[0047] Further, both the main keel 7 and the secondary keel 9 are made of rectangular steel pipes 12 with a cross-sectional size of 400mm×200mm×5mm.
[0048] Beneficial effects of adopting the above technical solution: The main keel 7 and the secondary keel 9 are made of rectangular steel pipes 12 with a cross-sectional size of 400mm×200mm×5mm. This kind of rectangular steel pipe 12 has high strength and stiffness. While meeting the load-bearing requirements of the lifting platform 6, it can reasonably control the material consumption and reduce the cost. The structural form of the rectangular steel pipe 12 is also convenient for processing and installation, improving the construction efficiency.
[0049] Further, anti-slip patterns 13 are provided on the upper surface of the profiled steel sheet 8.
[0050] Beneficial effects of adopting the above technical solution: Anti-slip patterns 13 are provided on the upper surface of the profiled steel sheet 8, increasing the surface friction. During the construction process, when construction workers walk and work on the profiled steel sheet 8, it can effectively prevent slipping, improve the construction safety, and reduce the occurrence of safety accidents.
[0051] Further, grid stiffeners 14 are provided on the lower surface of the profiled steel sheet 8.
[0052] Beneficial effects of adopting the above technical solution: Grid stiffeners 14 are provided on the lower surface of the profiled steel sheet 8, enhancing the bending resistance and load-bearing capacity of the profiled steel sheet 8. When bearing the construction load, the grid stiffeners 14 can effectively disperse the load and prevent the profiled steel sheet 8 from deforming, ensuring the stability and reliability of the lifting platform 6.
[0053] Further, triangular stiffening plates 15 are arranged inside the rectangular steel pipe 12.
[0054] Beneficial effects of adopting the above technical solution: Triangular stiffening plates 15 are arranged inside the rectangular steel pipe 12, further improving the strength and stiffness of the main keel 7 and the secondary keel 9. The triangular stiffening plates 15 can enhance the torsion resistance and bending resistance of the rectangular steel pipe 12, enabling the lifting platform 6 to maintain good structural performance when bearing complex loads and ensuring construction safety.
[0055] A construction method for an adaptive lifting platform applicable to the decoration of ultra-high atrium ceilings and side walls, the construction method includes the following construction steps:
[0056] S1. Structural checking calculation. Check the bearing capacity of the roof structural beam according to the atrium span.
[0057] S2. On the structural truss 1, mark the position of the electric hoist 4 according to the original design drawings, and take measures for the lifting points 3. Install the lifting platform 6 on the ground.
[0058] S3. Lift the lifting platform 6 with the electric hoist 4. Through the control box 10, lift it synchronously. During the lifting process of the lifting platform 6, it is necessary to stop regularly to check the electric hoist 4, the hoist chain and the suspended formwork to ensure that the system is always in a horizontal state during the lifting process until the design elevation.
[0059] S4. After the installation of the lifting platform 6 is completed, when entering the next process, control the construction load to ensure that the construction load is 2 KN / m², and at the same time, avoid concentrated stacking of material loads.
[0060] S5. After the construction of the decorative surface layer of the structural truss 1 and the structural wall 2 is completed, realize the lifting and lowering of the lifting platform 6 through the control box 10, and then use the electric hoist 4 to synchronously lower the lifting platform 6 to the ground through the reserved hole, and then dismantle the lifting platform 6 in turn and transport it out to complete the entire construction process.
[0061] The structural settlement in step S1 includes the calculation of the structural truss and the bearing capacity calculation of the structural wall. The deformation deflection calculation formula of the structural truss is: where q k is the load standard value, E is the elastic modulus of the material, I is the section moment of inertia, [v] is the allowable deflection. The bending bearing capacity checking calculation formula of the structural wall is: where ρ is the reinforcement ratio, h0 = h - a s , h0 is the effective height. The crack checking calculation formula of the structural wall is w max represents the maximum crack width calculated according to the quasi-permanent combination or standard combination of loads and considering the influence of long-term action. The unit is usually mm, which is the target value of the formula calculation. α c is the influence coefficient of the non-uniform strain coefficient of the longitudinal tension reinforcement between cracks; ψ is the non-uniform strain coefficient of the longitudinal tension reinforcement between cracks, ρ te is the effective reinforcement ratio, [w] is the allowable crack width, r is the coefficient related to the surface characteristics of the longitudinal tension reinforcement, σ sk is the stress of the longitudinal tension reinforcement of the reinforced concrete member calculated according to the standard combination or quasi-permanent combination of loads, E s is the elastic modulus of the reinforcement, c is the distance from the outer edge of the outermost layer of longitudinal tension reinforcement to the bottom edge of the tension zone, d is the diameter of the longitudinal tension reinforcement, and the unit is mm.
[0062] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0063] 1. The present invention changes the status quo of high traditional construction costs and low efficiency in the fine decoration of ultra-high atriums, greatly improves work efficiency. When the invention is specifically used, the input of scaffolding materials is small and the construction period is short. In future similar fine decoration constructions of ultra-high atriums, the platform system can be customized and improved according to the actual situation on site, so that the project can be completed efficiently and safely.
[0064] 2. The structural roof truss 1 is made of steel frame, which has high strength and good stability, and can provide reliable support for the entire lifting platform. The lifting platform 6 adopts a combined structure of main keels 7, secondary keels 9 and profiled steel sheets 8. The main keels 7 and secondary keels 9 are made of rectangular steel pipes 12 and triangular reinforcing plates 15 are provided. Anti-slip patterns 13 and grid reinforcing ribs 14 are respectively arranged on the upper and lower surfaces of the profiled steel sheet 8, which greatly improves the strength, stiffness and load-bearing capacity of the lifting platform 6, ensures the safety of construction personnel and materials. The setting of the platform safety net 5 effectively prevents construction personnel and items from falling, and improves the safety of construction.
[0065] 3. The coordinated use of the electric hoist 4 and the control box 10 realizes the synchronous lifting of the lifting platform 6, can flexibly adjust the platform height according to construction needs, adapts to different construction height requirements, improves construction efficiency. The design of the keel ear plate 11 facilitates the connection and disassembly of the electric hoist 4 and the lifting platform 6, and is convenient for the installation and maintenance of the equipment.
[0066] 4. In the construction method, structural checking calculations are carried out first to ensure the safety of the structure, avoid safety accidents caused by insufficient structural load-bearing capacity. During the lifting process, the construction load is regularly inspected and controlled to ensure the stable operation of the lifting platform 6 and the safety of the construction process. After the construction is completed, the platform can be smoothly lowered and demolished, which is convenient for the turnover and use of the equipment and reduces the construction cost.
[0067] Electric hoist 4 lifting system: Adopt 4 - 8 groups of linked electric hoist 4 arrays, preferably ring chain type, rated load ≥ 2T, realize synchronous lifting through the wireless control module, synchronous error ≤ 3cm, the top fixing device includes an adaptive fixture that can adapt to different structural beam sizes
[0068] Lifting platform 6, the main frame is welded and formed by square steel 400×200×5mm and I-beam I16. The working surface adopts a double-layer structure: the lower layer is a profiled steel sheet 8 with a thickness ≥ 1.2mm, and the upper layer is paved with a 18mm thick fireproof wood formwork. A telescopic hanging rack is set on the side, with a maximum overhang of 1.5m and a load-bearing capacity of 200kg / m 2
[0069] Control box 10, integrated with a PLC control system including a height sensor and an inclination sensor, equipped with a dual braking device, mechanical + electromagnetic braking, and the remote control terminal has a three-dimensional positioning display function
[0070] The construction method includes the following construction steps:
[0071] S1: Structural checking: Check the bearing capacity of the roof structural beam according to the atrium span.
[0072] S2 Equipment installation: Install the track-type fixed base on the structural beam, arrange the electric hoist 4 array spacing ≤ 3m × 3m, assemble the modular platform system and connect the lifting points.
[0073] S3: Dynamic adjustment, calibrate the platform levelness error ≤ 5mm / m in real time through a laser rangefinder, and adjust the extension length of the side hanger according to the construction progress.
[0074] S4: Cooperative operation, the ceiling and side wall processes are implemented synchronously.
[0075] Assembly process: Fabricate the main keel 7, secondary keel 9 and profiled steel sheet 8 in the factory or at the construction site according to the design requirements. The main keel 7 and secondary keel 9 adopt rectangular steel pipes 12 with a cross-sectional size of 400mm × 200mm × 5mm, and triangular reinforcement plates 15 are welded inside the rectangular steel pipes 12. Anti-slip patterns 13 are processed on the upper surface of the profiled steel sheet 8, and grid reinforcement ribs 14 are welded on the lower surface. Assemble the main keel 7 and secondary keel 9 on the ground, lap the secondary keel 9 on the main keel 7 and fix it, and then install the profiled steel sheet 8 on the secondary keel 9 to form the lifting platform 6.
[0076] Install keel ear plates 11 on the main keel 7 for connecting with the electric hoist 4, determine the position of the electric hoist 4 on the structural roof truss 1 according to the design drawings, and take measures for the lifting points 3. Connect the upper end of the electric hoist 4 with the lifting point 3 and the lower end with the keel ear plate 11 of the lifting platform 6. Install platform safety nets 5 around the lifting platform 6.
[0077] Construction process: Conduct structural checking according to step S1 of the construction method to ensure that the structural roof truss 1 and structural wall 2 can safely bear the lifting platform 6 and construction loads. Start the control box 10 and control the electric hoist 4 to lift the lifting platform 6 synchronously. During the lifting process, stop the lifting at regular time intervals, check the electric hoist 4, hoist chain and formwork, adjust the lifting speed and height, and ensure that the lifting platform 6 is always in a horizontal state until it is lifted to the design elevation.
[0078] After the installation of the lifting platform 6 is completed, the construction personnel carry out the decoration work of the ultra-high atrium ceiling and side walls on the platform. During the construction process, strictly control the construction load to ensure that the construction load does not exceed 2KN / m2, and avoid concentrated stacking of material loads.
[0079] After the construction of the decorative surface layer of the structural roof truss 1 and the structural wall 2 is completed, the electric hoist 4 is controlled by the control box 10 to synchronously lower the lifting platform 6, and the lifting platform 6 is lowered to the ground through the reserved hole. Each component of the lifting platform 6 is removed in sequence and transported out of the construction site.
[0080] Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art can understand that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An adaptive lifting platform for super high atrium ceiling and side wall decoration, characterized by: The invention comprises a structural roof truss (1), a structural wall (2), a suspension point (3), an electric hoist (4), a platform protection net (5), a lifting platform (6) and a control box (10), wherein the structural roof truss (1) is installed on the top of the structural wall (2), the structural roof truss (1) is provided with a plurality of suspension points (3), the upper end of the electric hoist (4) is connected to the suspension points (3), the lower end of the electric hoist (4) is connected to the lifting platform (6), the lifting platform (6) is provided with a platform protection net (5) around it, and the control box (10) is connected to the electric hoist (4).
2. The ultra-high atrium ceiling and side wall decoration adaptive lifting platform as claimed in claim 1, characterized in that: The structural roof truss (1) is a steel frame.
3. The self-adaptive lifting platform for super-high atrium ceiling and side wall decoration as claimed in claim 1, characterized in that: The lifting platform (6) comprises a main keel (7), a corrugated steel plate (8) and a secondary keel (9), a plurality of secondary keels (9) are overlapped on the main keel (7), and the corrugated steel plate (8) is installed on the secondary keel (9).
4. The ultra-high atrium ceiling and side wall decoration adaptive lifting platform as claimed in claim 3, characterized in that: The main keel (7) is provided with a keel ear plate (11) connected to the electric hoist (4).
5. The ultra-high atrium ceiling and side wall decoration adaptive lifting platform as claimed in claim 3, characterized in that: The main keel (7) and the secondary keel (9) are both made of rectangular steel tubes (12) with cross-sectional dimensions of 400 mm×200 mm×5 mm.
6. The ultra-high atrium ceiling and side wall decoration adaptive lifting platform as claimed in claim 3, characterized in that: The upper surface of the corrugated steel plate (8) is provided with anti-slip grooves (13).
7. The self-adaptive lifting platform for super-high atrium ceiling and side wall decoration as claimed in claim 3, characterized in that: The lower surface of the corrugated steel plate (8) is provided with grid reinforcement ribs (14).
8. The self-adaptive lifting platform for super-high atrium ceiling and side wall decoration as claimed in claim 5, characterized in that: A triangular reinforcement plate (15) is arranged inside the rectangular steel tube (12).
9. A construction method for a super-high atrium ceiling and side wall decoration adaptive lifting platform as described in any one of claims 1-8, characterized in that: The construction method includes the following construction steps: S1. Structural verification: check the bearing capacity of the roof structure beams according to the span of the atrium; S2. Arrange the position of the electric hoist (4) on the structural roof truss (1) according to the original design drawing, take measures for the hanging point (3), and install the lifting platform (6) on the ground; S3, the lifting platform (6) is lifted by the electric hoist (4), and the lifting is performed synchronously through the control box (10). During the lifting process of the lifting platform (6), it is necessary to stop regularly to check the electric hoist (4), the hoist chain and the hanging mold to ensure that the system is always in a horizontal state during the lifting process until the design elevation is reached; S4. After the lifting platform (6) is installed, the construction load should be controlled when entering the next step to ensure that the construction load is 2KN / m 2 , while avoiding concentrated stacking of materials; S5. After the decorative surface construction of the structural roof truss (1) and the structural wall (2) is completed, the lifting platform (6) is raised and lowered by the control box (10), and then the lifting platform (6) is synchronously lowered to the ground through the reserved hole by the electric hoist (4), and the lifting platform (6) is dismantled and transported out in turn, completing the entire construction process.
10. The construction method of the super-high atrium ceiling and side wall decoration adaptive lifting platform as claimed in claim 9, characterized in that: The structural settlement in step S1 includes the calculation of the structural roof truss and the calculation of the structural wall bearing, wherein the calculation formula of the structural roof truss deformation deflection is: where q k is the standard value of load, E is the elastic modulus of the material, I is the section inertia moment, [v] is the allowable deflection, and the calculation formula for the bending bearing capacity of the structural wall is: in ρ is the reinforcement ratio, h0=ha s , h0 is the effective height, and the crack verification formula of the structural wall is: w max To express the maximum crack width calculated according to the quasi-permanent load combination or standard load combination and taking into account the influence of long-term action, the unit is usually mm. It is the target value calculated by the formula. c is the influence coefficient of the uneven strain coefficient of the longitudinal tensile reinforcement between cracks; ψ is the uneven strain coefficient of the longitudinal tensile reinforcement between cracks, ρ te is the effective reinforcement ratio, [w] is the allowable crack width, r is the coefficient related to the surface characteristics of the longitudinal tensile reinforcement, σ sk The stress of the longitudinal tensile reinforcement of reinforced concrete members calculated according to the standard load combination or quasi-permanent load combination, E s The elastic modulus of the steel bar, c is the distance from the outer edge of the outermost longitudinal tensile steel bar to the bottom edge of the tensile zone, and d is the diameter of the longitudinal tensile steel bar, in mm.