A log exception priority dynamic calculation method, device, equipment and medium
By matching the process affiliation and assigning cycle time constraint labels to the production logs, and combining this with the standard scheduling execution path graph, the spread and priority of anomaly impacts are calculated. This addresses the shortcomings of traditional log anomaly handling in monitoring, enabling precise location and dynamic optimization of production anomalies.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- BEIJING YOUTEJIE INFORMATION TECH
- Filing Date
- 2026-04-20
- Publication Date
- 2026-07-17
AI Technical Summary
Existing technologies cannot accurately map logs to production cycle time when handling production log anomalies, and lack assessment and priority calculation of the chain reaction impact of anomalies, resulting in wasted production resources and delivery delays.
By continuously collecting production logs, matching process affiliations and assigning cycle time constraint labels, mapping them to the standard scheduling execution path map, calculating the actual completion cycle and the spread of abnormal impacts, combining multi-factor fusion calculations to determine priority ranking, and dynamically updating the abnormal handling priority.
It achieves a complete closed loop from log data to on-site actionable measures, quickly locates anomalies, ensures stable production operation, adapts to the needs of different production scenarios, and improves the pertinence and operability of anomaly handling.
Smart Images

Figure CN122412759A_ABST