Coke oven refractory brick whole life cycle traceability management method and system based on internet of things

By adopting an IoT-based full lifecycle traceability management method for coke oven refractory bricks, combined with BIM pre-layout models and IoT technology, the problems of missing control over the construction sequence and data gaps in the management of coke oven refractory bricks have been solved. This has enabled precise control over the construction sequence and deep integration of full lifecycle data, thereby improving the intelligence and refinement of management.

CN122472329APending Publication Date: 2026-07-28CHINA FIRST METALLURGICAL GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610727329.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-05-25
Publication Date
2026-07-28

AI Technical Summary

Technical Problem

The existing management model for coke oven refractory bricks is mainly based on traditional manual management, with a low level of intelligence. It cannot meet the needs of intelligent construction and digital operation and maintenance of modern coke oven projects. Problems include lack of control over the bricklaying sequence, data gap between construction and operation and maintenance, low data utilization, and reliance on manual experience for management decisions.

Method used

A full life-cycle traceability management method for coke oven refractory bricks based on the Internet of Things (IoT) is adopted. By combining BIM pre-layout models with IoT non-contact identification technology, standardized brick slab units for masonry sequence are constructed to solidify the construction sequence at the source. Data collection, storage and analysis throughout the entire life cycle are achieved through IoT identification tags and structured historical databases.

Benefits of technology

It has enabled precise control over the construction sequence, broken down information silos, provided scientific prediction of hidden damage and precise preparation of overhaul materials, improved the intelligence and refinement of coke oven refractory brick management, and promoted the transformation from experience-driven to data-driven.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122472329A_ABST
    Figure CN122472329A_ABST
Patent Text Reader

Abstract

The application belongs to the technical field of intelligent construction and digital operation and maintenance, and particularly discloses a coke oven refractory brick full life cycle tracing management method and system based on an Internet of Things. The method takes a coke oven masonry BIM pre-layout model as a data basis and a space calibration basis, integrates the refractory bricks with clear construction sequence dependency into standardized masonry sequence brick board units, and arranges Internet of Things identification tags. By constructing a standardized association account of the brick board unit-space position-masonry sequence, the state evolution of the refractory bricks from the board distribution, the transfer, the on-site positioning, the partial use to the masonry completion is monitored in real time. Taking the unit ID or the section code as an index, a full life cycle structured history database is constructed, and relying on the database, an intelligent analysis model is trained to realize the refractory brick loss rule analysis, the implicit damage site prediction and the replacement material demand calculation. The application realizes the predictive maintenance of the coke oven refractory bricks and has wide engineering application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of intelligent construction and digital operation and maintenance technology, and more specifically, relates to a method and system for full life cycle traceability management of coke oven refractory bricks based on the Internet of Things. Background Technology

[0002] As the core industrial equipment of the coking production system, the coke oven is constructed from a vast number of refractory bricks of various specifications, with extensive use of irregularly shaped bricks. This results in a complex structure and stringent construction requirements. Misuse of bricks not only makes later corrections difficult but also easily leads to structural defects and permanent quality hazards, directly impacting the coke oven's service life, production efficiency, and safety. The full life-cycle management of refractory bricks is a crucial aspect of coke oven construction and subsequent operation and maintenance. However, current coke oven refractory brick management models are still primarily based on traditional manual management with low levels of automation, failing to meet the demands of modern intelligent construction and digital operation and maintenance of coke ovens. This has revealed numerous problems that urgently need to be addressed in practical engineering applications, specifically in the following aspects: 1. Lack of control over the construction sequence leads to significant potential quality risks: Traditional refractory brick management focuses on individual bricks or batches of materials, emphasizing quantity statistics and warehousing management. It fails to consider the sequential dependencies and spatial constraints between refractory bricks, making systematic control of the construction sequence impossible. Existing intelligent brick-dispensing or automated stacking systems only cover the material preparation stage and do not extend to the construction site. The refractory brick retrieval and placement on the construction site still heavily rely on the operator's manual experience and judgment, easily leading to problems such as incorrect retrieval, omissions, and incorrect placement. This not only increases construction costs and prolongs the construction period but also poses serious quality risks to the coke oven structure.

[0003] 2. Data disconnect between construction and operation / maintenance, creating information silos: Key information during the construction phase, such as the sequence and spatial location of refractory bricks, masonry techniques, construction personnel, and construction time, lacks systematic and structured storage. Data from the construction phase is not effectively linked to data from later operation / maintenance and maintenance phases, creating information silos where each stage operates independently. During maintenance, it is impossible to trace the original information of refractory bricks based on construction data, nor can maintenance records be used to predict hidden damage. This results in a lack of scientific data support for replacement material preparation, easily leading to waste due to excessive material preparation or delays in maintenance due to insufficient preparation.

[0004] 3. Low data utilization and reliance on manual experience in management decisions: A large amount of data generated during the construction, operation, and maintenance of coke oven refractory bricks is scattered and stored in different systems or paper archives without standardization, integration, or structured accumulation. It is impossible to conduct analysis of refractory brick wear patterns and study the damage characteristics of key parts based on historical data. Management decisions such as coke oven construction control, overhaul maintenance, and material procurement still rely heavily on manual experience, lack scientific data support, have a low level of management refinement, and are difficult to achieve predictive maintenance and intelligent management of coke oven refractory bricks.

[0005] In summary, the existing management model for coke oven refractory bricks is no longer suitable for the needs of intelligent construction and digital operation and maintenance in modern coke oven engineering. The industry urgently needs a coke oven refractory brick full life cycle traceability management solution that is practical, easy to operate, and highly implementable. This solution should take the construction sequence as the core and the brick slab unit of the masonry sequence as the management carrier to achieve precise control of the construction sequence and deep integration and effective traceability of data across the entire chain of construction, operation and maintenance, and repair. It should provide scientific data support for the preparation of replacement materials during the repair phase and the prediction of hidden damage, thereby comprehensively improving the intelligence and precision of coke oven refractory brick management. Summary of the Invention

[0006] To address the aforementioned deficiencies or improvement needs of existing technologies, this invention provides a method and system for full lifecycle traceability management of coke oven refractory bricks based on the Internet of Things (IoT). Considering the complex structure of irregularly shaped refractory bricks in coke ovens, the stringent requirements of their construction process, the strong logical dependencies in their construction sequence, and the severe gaps in maintenance and repair data, an intelligent management device based on BIM pre-layout models and IoT non-contact identification is designed. The structure and specific configuration of key components such as standardized brick-plate units for standardized construction sequences, industrial-grade IoT identification tags, and a structured historical database covering the entire lifecycle are studied and designed. This effectively solves industry pain points such as incorrect selection and placement of refractory bricks on construction sites, information silos formed by gaps in construction and maintenance data, and excessive reliance on manual experience for maintenance decisions. It also provides beneficial effects such as precise monitoring of the entire construction process, scientific prediction of hidden damage, and accurate preparation of overhaul materials.

[0007] To achieve the above objectives, according to one aspect of the present invention, a method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things is proposed, comprising the following steps: Step 1: Based on the BIM pre-layout model of coke oven masonry, the furnace body is divided into several independent masonry sections and assigned a unique permanent code. The spatial coordinates, process parameters and preset masonry sequence of each masonry section are simultaneously calibrated to construct a spatial and logical benchmark. Step 2: According to the preset masonry sequence, refractory bricks with a construction sequence dependency within the same masonry section are stacked on the load-bearing structure to form a standardized masonry sequence brick plate unit. Internet of Things identification tags are then placed on the outside of the brick plate unit to solidify the construction sequence at the source. Step 3: Associate and bind the brick slab unit with the code of the masonry section to which it belongs, its absolute spatial location, construction procedure and planned time, and build a standardized association ledger of "brick slab unit-spatial location-masonry sequence", and automatically verify the consistency between the binding information and the BIM model; Step 4: Identify the IoT identifier of the brick unit in real time to achieve dynamic management of the status evolution of the refractory bricks. The status evolution includes five core states: bricks have been prepared, bricks have been transported, bricks are in place on site, bricks have been partially used, and bricklaying has been completed. During the construction process, the order of brick unit use and construction progress are dynamically monitored based on the associated ledger and the current status. When the actual operation status deviates from the preset order, an early warning is automatically issued. Step 5: Using the unique ID of the brick panel unit or the masonry section code as an index, systematically collect and store the process records during the construction phase, the inspection records during the operation and maintenance phase, and the damage and replacement records during the repair phase, to build a structured historical database that spans the entire life cycle. Step six: Based on the historical database, model training is performed to construct a refractory brick loss pattern analysis model, a hidden damage prediction model, and a replacement material demand calculation model. The models are then used to provide auxiliary decision support for maintenance plan formulation, precise material preparation, and management optimization.

[0008] As a further preferred option, step one, constructing the BIM pre-layout model for coke oven masonry, includes: (11) Based on the original design drawings of the coke oven, a full-scale three-dimensional digital model covering the carbonization chamber, combustion chamber, heat storage chamber and inclined zone was constructed using BIM technology to fully map the physical structure of the furnace body; (12) Based on the structural characteristics of the furnace body and the actual construction process division principle, the three-dimensional digital model is decomposed into several independent and non-overlapping masonry sections, and a unique permanent code is assigned to each masonry section. This serves as the core index for data throughout its entire lifecycle. (13) Dynamically calibrate the absolute spatial coordinates of each masonry section in the three-dimensional digital model. The permanent encoding The expansion joint requirements, mortar fullness process parameters, key construction nodes and quality acceptance standards corresponding to this location are deeply bound in multiple dimensions to establish a standardized digital archive, which serves as the spatial calibration basis for subsequent information binding and verification. (14) In the model layer, clarify the spatial sequence of each refractory brick and its masonry level, and determine the preset masonry sequence of refractory bricks in each masonry section. ; (15) Based on the above modeling and sequence planning, output a standardized construction planning scheme including spatial location, material specifications and construction sequence, as the legal basis for subsequent brick and slab unit construction and on-site construction correction.

[0009] As a further preferred option, a pre-defined masonry sequence is used. The calculation formulas include: in, This represents the i-th refractory brick in the k-th segment, and Order indicates the priority index of this refractory brick in the construction process.

[0010] As a further preferred option, in step two, the specific steps for the physical construction of the brick slab unit in the masonry sequence include: (21) Extract the logical sequence of refractory bricks with clear construction sequence dependencies within the same masonry section based on the BIM pre-layout model, and set the refractory bricks in the section together. The masonry unit is divided into several standardized sub-sequences according to the preset size of the masonry unit; Step two: Using general-purpose construction pallets, material racks, or special load-bearing structures as physical carriers, the refractory bricks in the sub-sequence are physically grouped and stacked according to the preset masonry sequence. During the stacking process, the spatial stacking order of the refractory bricks on the physical carrier is ensured. The actual masonry sequence used on the construction site Formula for satisfying consistency mapping constraints: in, Let f represent the i-th refractory brick in the unit, and f be a preset spatial logic mapping function; (22) Industrial-grade temperature-resistant and dust-resistant QR code or RFID electronic tags are deployed in the non-stressed area outside the bearing structure, and a unique identifier ID is assigned to each brick unit to establish a unique identification mechanism of one code per brick to adapt to the complex environment of the coke oven construction site. (23) The structured information of the brick unit is entered into the identification tag through the Internet of Things writing device, including the unique ID, the type of internal refractory brick, production batch, specification parameters, manufacturer, preset masonry sequence and permanent code of the masonry section. The tag serves as a digital link between the physical entity and the standardized association ledger, realizing the consistent control of the entire process of refractory brick from material preparation to on-site masonry.

[0011] As a further preferred option, the specific steps for multi-dimensional information association, binding, and verification in step three include: (31) Automatically obtain the unique ID of the brick slab unit in step two, and use it as the primary key to logically link it with the masonry section code divided in step one. Through the indexing effect of the permanent code, automatically associate the brick slab unit with the corresponding absolute spatial location of the section, on-site construction procedure, planned masonry time, and planned construction personnel to construct a multi-dimensional association mapping function: in, A unique ID for each brick panel unit. Code the masonry section. These are absolute spatial coordinates. For marking construction procedures, For planned time series, Pre-set construction personnel information; (32) Extract the internal refractory brick masonry sequence attribute recorded in the identification tag. and link it with the preset logical sequence in the BIM pre-layout model. Real-time comparison and verification are performed, and the verification logic follows the deviation judgment formula, including: If the calculation result If the set is not empty, it is determined that there is an information deviation, an early warning is automatically issued and the current binding process is locked, and the type and location of the deviation information are recorded in a structured manner. (33) Monitor the deviation correction status in real time until the physical stacking or digital information correction is completed according to the early warning prompt, so that... Once the value approaches zero and the verification is passed, the mapping relationship is solidified, generating a standardized association ledger that integrates spatial pose, construction logic, and time dimensions, providing a static data benchmark for dynamic monitoring in the subsequent construction phase and accurate traceability in the operation and maintenance phase.

[0012] As a further preferred option, step four, dynamic sequence control includes dynamic management of the evolution of the refractory brick state, specifically including the following steps: (41) Preset the five core state dimensions of the entire life cycle of the brick panel unit and construct a state set. ;in, For the already matched board, It has been transferred. The site is now in place. For partial use, The masonry work is now complete. (42) In the already assembled board and already transferred In this process, the digital integration platform and IoT data acquisition devices work together to achieve automatic triggering, identification, and updating of the state. The transition logic satisfies the state transition function: in, For the sensing events captured by IoT data acquisition devices, the system automatically records the status flow from the storage area to the construction area based on the event type. (43) They are already in place on site. Partial use The masonry work has been completed. In this process, by scanning the identification tag, the status can be confirmed with one click and the closed-loop recording can be achieved. Each status change is recorded synchronously with the operation time, operator and geographical location, generating structured status evolution trajectory data. (44) During the construction process, extract the current state brick slab unit in state and its preset masonry sequence O in the associated ledger Compared to the previous completion status Brick slab unit sequence O Perform sequential logic determination; (45) Based on the state evolution distribution of brick slab units in each of the masonry sections, calculate the construction completion rate in real time. According to the degree of completion of construction The construction progress is dynamically monitored and compared with the planned time series in the standardized digital archive, providing data support for the dynamic adjustment of the construction organization.

[0013] As a further preferred option, the construction completion rate The calculation formulas include: The determination formula for the timing logic is as follows: If the above inequality holds true, it is determined that there is a logical deviation between the current actual operation state and the preset sequence, and an early warning command is immediately issued to guide the correction through terminal feedback.

[0014] As a further preferred option, step five specifically includes the following steps: (51) Multi-dimensional data collection is carried out during the construction, operation and maintenance and overhaul stages of the entire life cycle of refractory bricks; (52) Using the unique ID of the brick slab unit or the code of the masonry section as the core data index, construct a full life cycle structured data tuple. : in, The primary key of the index, Indicates the stage of the life cycle. This represents the corresponding process, operation and maintenance, or repair feature vector for this stage. A timestamp generated or stored for the data; (55) According to the spatial and logical dimensions of “brick unit-masonry section code-refractory brick batch-masonry process-operation and maintenance record-inspection archive”, the data tuples of different stages in step three are deeply integrated and mapped, and a digital archive that runs through the entire life cycle is constructed by establishing logical foreign key relationships of data at each stage in the database layer. (56) Based on the service time of the coke oven, newly generated operation and maintenance data are continuously added to the historical database. Based on the data time sequence association method, the evolution trajectory of the performance decay and loss law of refractory bricks is constructed within the database.

[0015] As a further preferred embodiment, step six, which involves constructing the refractory brick loss pattern analysis model, the hidden damage prediction model, and the replacement material demand calculation model, includes: (61) Based on the historical database, the corresponding permanent code is used. data tuples Based on the temperature, pressure load, and service time during its operation and maintenance phase, a loss calculation model based on spatiotemporal coupling is constructed. : in, This is the material loss kernel function based on temperature T and pressure P. The state transition in the state evolution trajectory has reached the point where the field is in place. timestamp, The model quantifies the performance degradation rate of a specific masonry section by using the local replacement frequency recorded in the historical database for that section. and This is a correction factor; (62) Based on absolute spatial coordinates Combined with maintenance feature vectors of adjacent coded segments in the historical database The spatial probability mapping algorithm is used to calculate the latent damage risk value of the target coordinate point. : in, For the set of codes that are spatially adjacent to the target segment, The weighting coefficients are based on the correlation of historical damage. For spatial Euclidean distances. Material deviation factor This is a correction factor; (63) Based on the number of refractory bricks in each section in step two Based on material specifications and attributes, calculate the total amount of materials to be prepared during the overhaul phase. : Where M represents the total number of sections planned for maintenance. This is an indicator function that determines when the risk value exceeds a preset threshold. Replacement needs should be factored in. The inventory redundancy coefficient is calculated based on the replacement records in the historical database. (64) After each maintenance task is completed, the measured damage data and replacement records shall be used as the new data. Store the data tuple Adjusting the loss kernel function using the backpropagation algorithm Correction coefficients in and This enables the intelligent analysis model to be continuously iterated and optimized as data accumulates.

[0016] According to another aspect of the present invention, an Internet of Things-based full life-cycle traceability management system for coke oven refractory bricks is also provided, comprising: The digital spatial calibration module is used to construct a BIM pre-layout model of coke oven masonry based on the coke oven design drawings. It divides the furnace body into several independent masonry sections and assigns them unique permanent codes. It also simultaneously calibrates the spatial coordinates, process parameters, and preset masonry sequence of each masonry section. The unit physical construction module is used to stack refractory bricks in the same masonry section in groups using a load-bearing structure according to the preset masonry sequence, thereby constructing a standardized masonry sequence brick plate unit. The non-stressed area on the outside of the brick plate unit is equipped with Internet of Things identification tags to achieve physical solidification of the construction sequence. The multidimensional information binding module is used to automatically obtain the unit ID of the brick slab unit, associate and map it with the permanent code, absolute spatial location, construction procedure and planned time, construct and generate a standardized association ledger, and automatically verify the consistency between the association ledger and the BIM pre-layout model. The Internet of Things (IoT) data acquisition module includes a portable barcode scanning terminal and a system input terminal, which are used to identify the identification tags in real time to obtain the circulation status of the brick slab unit, and systematically collect process records during the construction phase, inspection records during the operation and maintenance phase, and damage and replacement records during the repair phase. The status evolution and dynamic monitoring module is used to dynamically manage the five core states of the brick slab unit: slabs already allocated, transported, in place on site, partially used, and masonry completed. Based on the associated ledger and the current state, it dynamically monitors the order of brick slab unit use and construction progress, and automatically triggers an early warning when a deviation in the order occurs. A structured historical database is used to standardize and deeply integrate the full lifecycle data acquired by the IoT data acquisition module, using the unit ID or the permanent code as a data index, to build a digital archive that runs through the entire chain of construction, operation and maintenance. The intelligent analysis and decision-making module is used to train and run a lightweight intelligent analysis model based on the structured historical database. It performs analysis of refractory brick loss patterns, prediction of hidden damage locations, and calculation of replacement material requirements for major repairs, providing data-driven decision support for maintenance plan formulation and management optimization.

[0017] In summary, compared with the prior art, the above-described technical solutions conceived by this invention mainly possess the following technical advantages: 1. This invention proposes a brick-plate unit management model for masonry sequence, achieving source control of construction sequence: breaking through the limitations of traditional management of single or batch refractory bricks, it innovatively integrates refractory bricks with clear construction sequence dependencies within the same masonry section into standardized brick-plate units for masonry sequence, thereby solidifying the construction sequence at the source, fundamentally eliminating the problem of incorrect selection and masonry on the construction site, solving the industry pain point of lack of masonry sequence control in traditional management, and significantly improving the accuracy of construction control.

[0018] 2. This invention adopts a non-contact IoT identification solution, which is well-suited to actual engineering operations: IoT tags are only deployed on the non-stressed areas outside the brick unit, and the entire operation is carried out only at the brick unit level. This perfectly matches the actual engineering characteristics of coke oven construction, operation, maintenance, and repair, and fundamentally solves the industry problem of poor implementation of existing traceability solutions, thus possessing extremely strong engineering application value.

[0019] 3. This invention achieves deep integration of construction sequence control and full-cycle data traceability, breaking down information silos: using brick slab units of the masonry sequence as carriers and masonry section codes as data indexes, it realizes precise control of construction sequence and deep integration and structured storage of data across the entire chain of construction-operation-maintenance-repair. From a technical perspective, it breaks down information silos in each link and achieves effective and traceable management of the entire life cycle data of coke oven refractory bricks for the first time.

[0020] 4. This invention constructs a lightweight refractory brick state evolution mechanism to achieve full traceability of state: preset the state dimensions of refractory bricks throughout the entire process, and adopt a lightweight update method of "automatic triggering + one-click code scanning confirmation" to achieve real-time updates of refractory brick state without increasing the complexity of on-site operations. Moreover, each state change retains a complete operation trajectory, realizing full life cycle traceability of refractory brick state.

[0021] 5. This invention constructs a maintenance prediction system based on historical data, realizing the transformation from experience-driven to data-driven: relying on integrated structured historical data of "construction-operation-maintenance" to train and build a lightweight intelligent analysis model, and through historical data mining, it realizes the precise preparation of replacement materials, scientific prediction of hidden damage parts, and targeted maintenance for major overhauls, providing scientific data support for maintenance decisions and promoting the fundamental transformation of coke oven refractory brick management from "experience-driven" to "data-driven".

[0022] 6. This invention designs a closed-loop mechanism for data accumulation and model iteration to achieve continuous optimization of management level: It constructs a closed-loop system of "data collection - data integration - model training - model iteration - decision optimization", the structured historical database can be continuously accumulated and improved, and the intelligent model can be continuously iterated and optimized according to new data, ensuring the accuracy and applicability of the system and achieving continuous improvement of the management level of coke oven refractory bricks.

[0023] 7. The system of this invention has strong adaptability and low modification cost, and has broad prospects for industry promotion: The system adopts a lightweight design and completes the construction of brick and slab units by relying on general construction equipment. There is no need to modify the existing construction process and equipment, and it does not increase the complexity of on-site operation. The modification cost is low and the operation is simple. It is not only suitable for the construction and overhaul of coke ovens of various specifications, but can also be directly promoted to the full life cycle management of refractory bricks in other high-temperature industrial furnaces such as blast furnaces and rotary kilns. It has broad engineering application value and industry promotion prospects. Attached Figure Description

[0024] Figure 1 The overall system architecture and data flow diagram of this invention; Figure 2 A schematic diagram of the module logic for constructing brick slab units in the masonry sequence; Figure 3 This is a schematic diagram illustrating the working logic of the sequence and spatial position binding module of the present invention; Figure 4 This is a schematic diagram of the working process of the refractory brick state evolution and update module of the present invention; Figure 5 This is a schematic diagram illustrating the architecture and acquisition range of the IoT full-lifecycle data acquisition module of the present invention; Figure 6 A logical diagram of the intelligent analysis and decision support module based on historical data in this invention; Figure 7 This is a schematic diagram of the overall workflow of the present invention. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.

[0026] like Figures 1 to 7 As shown, this invention provides an IoT-based method for full lifecycle traceability management of coke oven refractory bricks. Its core principle follows engineering design principles of adapting to actual construction and maintenance, and lightweight operation. It uses a coke oven masonry BIM pre-construction model as the data foundation and spatial calibration basis, brick slab units representing the masonry sequence as the core management carrier, and permanent codes for masonry sections as the core data index. It integrates IoT contactless identification technology and lightweight data acquisition technology to construct an integrated intelligent management system that combines "precise control of construction sequence + effective traceability of full-cycle data + data support for maintenance decisions." This enables intelligent management of coke oven refractory bricks throughout the entire process, from material preparation and on-site construction to daily operation and maintenance and major repairs. More specifically, the coke oven refractory brick full life cycle traceability management system of this invention uses the coke oven masonry BIM pre-masonry model as the core data foundation, the refractory brick masonry sequence as the core control element, and the masonry sequence brick slab unit as the core management carrier. It integrates technologies such as the Internet of Things, big data, and intelligent analysis to achieve precise control over the entire process of coke oven refractory brick construction sequence and the collection, storage, traceability, and analysis of data across the entire chain of construction-operation-maintenance-repair. This provides solid data support for the precise preparation of replacement materials during coke oven overhauls and the scientific prediction of hidden damage areas. Technically, it breaks down information silos between different stages, realizing the transformation of coke oven refractory brick management from "experience-driven" to "data-driven." It mainly includes five core functional modules: a brick slab unit construction module for masonry sequence, a sequence and spatial location binding module, a refractory brick state evolution update module, an IoT full life cycle data acquisition module, and an intelligent analysis and auxiliary decision-making module based on historical data. The modules are interconnected and work in synergy to form a complete lifecycle traceability management system for refractory bricks, covering the entire process of new coke oven construction, daily operation and maintenance, and major overhaul. The system is easy to operate and lightweight, requiring no changes to existing construction processes or additional equipment modifications. It closely matches the actual engineering practices of coke oven construction and maintenance, possessing strong engineering feasibility and practicality. The specific implementation plan includes the following steps: Step 1: Based on the BIM pre-layout model of coke oven masonry, the furnace body is divided into several independent masonry sections and assigned a unique permanent code. The spatial coordinates, process parameters and preset masonry sequence of each masonry section are simultaneously calibrated to construct a spatial and logical benchmark.

[0027] In this step, constructing the BIM pre-layout model of the coke oven masonry includes: (11) Based on the original design drawings of the coke oven, a full-scale three-dimensional digital model covering the carbonization chamber, combustion chamber, heat storage chamber and inclined zone was constructed using BIM technology to fully map the physical structure of the furnace body; (12) Based on the structural characteristics of the furnace body and the actual construction process division principle, the three-dimensional digital model is decomposed into several independent and non-overlapping masonry sections, and a unique permanent code is assigned to each masonry section. This serves as the core index for data throughout its entire lifecycle. (13) Dynamically calibrate the absolute spatial coordinates of each masonry section in the three-dimensional digital model. The permanent encoding The expansion joint requirements, mortar fullness process parameters, key construction nodes and quality acceptance standards corresponding to this location are deeply bound in multiple dimensions to establish a standardized digital archive, which serves as the spatial calibration basis for subsequent information binding and verification. (14) In the model layer, clarify the spatial sequence of each refractory brick and its masonry level, and determine the preset masonry sequence of refractory bricks in each masonry section. ; (15) Based on the above modeling and sequence planning, output a standardized construction planning scheme including spatial location, material specifications and construction sequence, as the legal basis for subsequent brick and slab unit construction and on-site construction correction.

[0028] As a further preferred option, a pre-defined masonry sequence is used. The calculation formulas include: in, This represents the i-th refractory brick in the k-th segment, and Order indicates the priority index of this refractory brick in the construction process.

[0029] Step 2: According to the preset masonry sequence, refractory bricks with a construction sequence dependency within the same masonry section are stacked on the load-bearing structure to form a standardized masonry sequence brick slab unit. Internet of Things (IoT) identification tags are then placed on the outside of the brick slab unit to solidify the construction sequence from the source.

[0030] In this step, the bricklaying sequence unit construction module breaks through the limitations of traditional management of single or batch refractory bricks. It combines refractory bricks in the same masonry section with a clear construction sequence dependency according to the preset sequence of the BIM pre-masonry model into standardized bricklaying sequence units, thereby solidifying the construction sequence at the source and fundamentally eliminating the problem of incorrect selection and masonry on the construction site. At the same time, the bricklaying unit serves as a carrier to realize the traceability management of refractory brick full life cycle data.

[0031] 1. Physical Construction: The physical construction of the brick slab units relies on general construction pallets, material racks, or special load-bearing structures to complete the grouping and stacking, without the need for additional modification of existing construction equipment, and adapts to the existing construction conditions on the construction site; the refractory bricks in the brick slab units are combined and stacked in strict accordance with the pre-set masonry sequence of the BIM pre-masonry model, ensuring that the masonry sequence of the brick slab units is completely consistent with the actual masonry sequence on site, and realizing the physical solidification of the construction sequence.

[0032] 2. Information Identification: QR code / RFID electronic tags are deployed on the non-load-bearing areas of the outer side of the brick slab unit. The tags are made of industrial-grade heat-resistant and dust-resistant materials to adapt to the environmental characteristics of the construction site. Each brick slab unit corresponds to a unique identifier, realizing "one slab, one code". The tag records core information such as the unique ID of the brick slab unit, the type of refractory brick in the unit, production batch, specifications, manufacturer, preset masonry sequence, and the code of the masonry section to which it belongs. The identification carrier is reusable, and the identification operation is carried out only at the brick slab unit level throughout the entire process.

[0033] 3. Sequence solidification: The assembly and sequence solidification of brick slab units are completed at the material preparation station. Through standardized operations at the preparation station, it is ensured that each brick slab unit leaving the preparation station has a clear and unique preset masonry sequence, realizing source control of the construction sequence and fundamentally eliminating problems such as incorrect selection and masonry of refractory bricks on the construction site, thereby reducing potential construction quality risks.

[0034] Specifically, in this step, the specific steps for the physical construction of the brick slab unit in the masonry sequence include: (21) Extract the logical sequence of refractory bricks with clear construction sequence dependencies within the same masonry section based on the BIM pre-layout model, and set the refractory bricks in the section together. The masonry unit is divided into several standardized sub-sequences according to the preset size of the masonry unit; Step two: Using general-purpose construction pallets, material racks, or special load-bearing structures as physical carriers, the refractory bricks in the sub-sequence are physically grouped and stacked according to the preset masonry sequence. During the stacking process, the spatial stacking order of the refractory bricks on the physical carrier is ensured. The actual masonry sequence used on the construction site Formula for satisfying consistency mapping constraints: in, Let f represent the i-th refractory brick in the unit, and f be a preset spatial logic mapping function; (22) Industrial-grade temperature-resistant and dust-resistant QR code or RFID electronic tags are deployed in the non-stressed area outside the bearing structure, and a unique identifier ID is assigned to each brick unit to establish a unique identification mechanism of one code per brick to adapt to the complex environment of the coke oven construction site. (23) The structured information of the brick unit is entered into the identification tag through the Internet of Things writing device, including the unique ID, the type of internal refractory brick, production batch, specification parameters, manufacturer, preset masonry sequence and permanent code of the masonry section. The tag serves as a digital link between the physical entity and the standardized association ledger, realizing the consistent control of the entire process of refractory brick from material preparation to on-site masonry.

[0035] Step 3: Associate and bind the brick slab unit with the code of its masonry section, absolute spatial location, construction procedure and planned time to build a standardized association ledger of "brick slab unit-spatial location-masonry sequence" and automatically verify the consistency of the binding information with the BIM model.

[0036] In this step, the sequence and spatial location binding module is the core link to realize the association between the physical location and digital information of refractory bricks and to achieve full life cycle traceability. By spatial calibration of the BIM model and binding with multi-dimensional information, a correlation ledger of "brick unit-spatial location-laying sequence" is constructed to realize the dual retention of physical identification and digital ledger of refractory brick information.

[0037] 1. BIM Model Spatial Calibration: Based on the BIM pre-layout model of coke oven masonry, according to the structural characteristics of the coke oven body and the principle of construction process division, the coke oven body is divided into several independent masonry sections. Each masonry section is assigned a unique permanent code. This code is deeply bound to the absolute spatial coordinates, process parameters, key construction nodes, quality acceptance standards and other information of the section, forming a standardized digital archive of the masonry section, which provides a spatial calibration basis for subsequent information binding.

[0038] 2. Multi-dimensional information binding: Based on the spatial calibration data of the BIM model, the system automatically associates and binds brick slab units with information such as the code of the masonry section to which they belong, the absolute spatial location of the section, the on-site construction procedures, the planned masonry time, and the planned construction personnel. This forms a standardized association ledger of "brick slab unit ID - masonry section code - preset masonry sequence - absolute spatial location - construction procedure", realizing a one-to-one correspondence between the physical information and digital information of brick slab units, and ensuring that the information of refractory bricks is traceable and searchable.

[0039] 3. Information Binding Verification: The system is equipped with an automatic verification function. After the information binding is completed, it automatically verifies the consistency between the information such as the combination method of the brick slab unit, the internal refractory brick masonry sequence attribute, and the spatial location of the unit and the BIM pre-built model. If any information deviation occurs, the system will automatically issue an early warning prompt, and the operator can make timely corrections to ensure the accuracy and effectiveness of the bound information, laying a solid foundation for subsequent construction control and data traceability.

[0040] More specifically, the steps for multi-dimensional information association, binding, and verification in this process include: (31) Automatically obtain the unique ID of the brick slab unit in step two, and use it as the primary key to logically link it with the masonry section code divided in step one. Through the indexing effect of the permanent code, automatically associate the brick slab unit with the corresponding absolute spatial location of the section, on-site construction procedure, planned masonry time, and planned construction personnel to construct a multi-dimensional association mapping function: in, A unique ID for each brick panel unit. Code the masonry section. These are absolute spatial coordinates. For marking construction procedures, For planned time series, Pre-set construction personnel information; (32) Extract the internal refractory brick masonry sequence attribute recorded in the identification tag. and link it with the preset logical sequence in the BIM pre-layout model. Real-time comparison and verification are performed, and the verification logic follows the deviation judgment formula, including: If the calculation result If the set is not empty, it is determined that there is an information deviation, an early warning is automatically issued and the current binding process is locked, and the type and location of the deviation information are recorded in a structured manner. (33) Monitor the deviation correction status in real time until the physical stacking or digital information correction is completed according to the early warning prompt, so that... Once the value approaches zero and the verification is passed, the mapping relationship is solidified, generating a standardized association ledger that integrates spatial pose, construction logic, and time dimensions, providing a static data benchmark for dynamic monitoring in the subsequent construction phase and accurate traceability in the operation and maintenance phase.

[0041] Step four: Identify the IoT identifier of the brick panel unit in real time to realize dynamic management of the status evolution of the refractory bricks. The status evolution includes five core states: panel already assembled, transported, in place on site, partially used, and masonry completed. During the construction process, the order of taking the brick panel unit and the construction progress are dynamically monitored according to the associated ledger and the current status. When the actual operation status deviates from the preset order, an early warning is automatically issued.

[0042] In this step, the refractory brick status evolution update module systematically and dynamically manages the entire life cycle status of coke oven refractory bricks from the completion of plate assembly to overhaul replacement. It presets the status dimensions of the entire process and adopts a lightweight update method that combines automatic triggering and manual confirmation to achieve real-time updates and trajectory retention of refractory brick status.

[0043] 1. Full-process status dimension preset: Based on the actual flow process of coke oven refractory bricks, the status dimensions of the brick plate unit throughout the entire life cycle are preset, including five core statuses: plate already assembled, transported, in place on site, partially used, and masonry completed. The entire process covers key construction links such as material preparation, on-site transport, and on-site masonry, ensuring that the status of refractory bricks is complete and traceable.

[0044] 2. Lightweight Status Update Method: Utilizing an "automatic trigger + manual confirmation" lightweight update method, it adapts to the actual operations on construction sites without requiring additional operational procedures. 3. Automatic Triggering: After the brick panel unit completes the assembly and transfer from the storage area to the construction site storage area, the status is automatically identified and updated through the linkage between the system and IoT data collection devices, without the need for manual intervention; 4. Manual Confirmation: At key construction milestones such as the placement of brick slab units on site, partial removal, and completion of masonry, on-site management personnel can scan the brick slab unit identifiers with a portable barcode scanner to achieve one-click confirmation of status. This operation is simple, efficient, and adaptable to the fast-paced construction needs of construction sites.

[0045] 5. Full-process status tracking: For each status change of the brick panel unit, the system will automatically record detailed information such as the status change time, operator, operation location, and reason for the change, thus constructing a full-process status evolution trajectory of the brick panel unit. This enables full traceability of the refractory brick status and provides detailed and accurate raw data for subsequent construction process analysis, construction quality traceability, and historical data accumulation.

[0046] Specifically, in this step, dynamic sequence control includes the dynamic management of the evolution of refractory brick states, and the specific steps include: (41) Preset the five core state dimensions of the entire life cycle of the brick panel unit and construct a state set. ;in, For the already matched board, It has been transferred. The site is now in place. For partial use, The masonry work is now complete. (42) In the already assembled board and already transferred In this process, the digital integration platform and IoT data acquisition devices work together to achieve automatic triggering, identification, and updating of the state. The transition logic satisfies the state transition function: in, For the sensing events captured by IoT data acquisition devices, the system automatically records the status flow from the storage area to the construction area based on the event type. (43) They are already in place on site. Partial use The masonry work has been completed. In this process, by scanning the identification tag, the status can be confirmed with one click and the closed-loop recording can be achieved. Each status change is recorded synchronously with the operation time, operator and geographical location, generating structured status evolution trajectory data. (44) During the construction process, extract the current state brick slab unit in state and its preset masonry sequence O in the associated ledger Compared to the previous completion status Brick slab unit sequence O Perform sequential logic determination; (45) Based on the state evolution distribution of brick slab units in each of the masonry sections, calculate the construction completion rate in real time. According to the degree of completion of construction The construction progress is dynamically monitored and compared with the planned time series in the standardized digital archive, providing data support for the dynamic adjustment of the construction organization.

[0047] Preferably, the construction completion rate The calculation formulas include: The determination formula for the timing logic is as follows: If the above inequality holds true, it is determined that there is a logical deviation between the current actual operation state and the preset sequence, and an early warning command is immediately issued to guide the correction through terminal feedback.

[0048] Step 5: Using the unique ID of the brick slab unit or the masonry section code as an index, systematically collect and store the process records during the construction phase, the inspection records during the operation and maintenance phase, and the damage and replacement records during the repair phase, to build a structured historical database that spans the entire life cycle.

[0049] In this step, the IoT full-cycle data acquisition module adopts non-contact, lightweight IoT data acquisition technology, with brick slab units and masonry section codes as the core acquisition objects, to realize the systematic acquisition and structured storage of data throughout the entire life cycle of coke oven refractory brick construction, operation and maintenance, and repair. All acquisition operations are in line with the actual project and adapted to the on-site operating conditions.

[0050] 1. Data Acquisition Terminal Configuration: Configuring a lightweight, industrial-grade data acquisition terminal, suitable for actual operation at construction sites and during maintenance and repair phases. It is simple and easy to operate, including: Portable barcode scanner: It adopts a temperature-resistant, dust-resistant, and drop-resistant design, which is suitable for the environmental characteristics of the construction site. On-site management personnel can perform operations such as status update, information query, and data entry by scanning the brick unit mark with the barcode scanner, without complicated operation. System-side data entry terminal: Adapts to the data recording needs of various stages of construction, operation and maintenance, and repair. It can directly enter core data of each stage, realizing rapid and standardized data collection and storage.

[0051] 2. Full Lifecycle Data Collection Scope: Using brick unit IDs or masonry section codes as data indexes, systematic and structured collection of full lifecycle data for coke oven refractory bricks is achieved. The collection scope covers three major stages, ensuring data integrity and relevance. Construction phase: Collect full-process construction data, including brick and slab unit combination information, masonry sequence, spatial location, construction personnel, construction time, quality acceptance records, and process connection status; Operation and maintenance phase: Collect core operation and maintenance data such as daily inspection records, routine maintenance records, runtime statistics, and abnormal situation records for each lining section of the coke oven; During the maintenance phase, comprehensive maintenance data is collected for each masonry section, including the damaged parts, the extent of damage, the type / batch / specification of replacement materials, maintenance personnel, maintenance time, maintenance plan, and its effectiveness.

[0052] 3. Structured Data Storage: All collected lifecycle data are indexed by brick unit ID or masonry section code, and are standardized, cleaned, classified, and stored in a structured manner. Invalid data is removed and biased data is corrected to build a full lifecycle database of coke oven refractory bricks. This ensures the standardization, integrity, and relevance of the data, providing high-quality and reliable data support for subsequent intelligent analysis and decision support based on historical data.

[0053] Specifically, this step includes the following steps: (51) Multi-dimensional data collection is carried out during the construction, operation and maintenance and overhaul stages of the entire life cycle of refractory bricks; (52) Using the unique ID of the brick slab unit or the code of the masonry section as the core data index, construct a full life cycle structured data tuple. : in, The primary key of the index, Indicates the stage of the life cycle. This represents the corresponding process, operation and maintenance, or repair feature vector for this stage. A timestamp generated or stored for the data; (53) According to the spatial and logical dimensions of “brick unit-masonry section code-refractory brick batch-masonry process-operation and maintenance record-inspection archive”, the data tuples of different stages in step three are deeply integrated and mapped, and a digital archive that runs through the entire life cycle is constructed by establishing logical foreign key relationships of data at each stage in the database layer. Based on the service timeline of the coke oven, newly generated operation and maintenance data are continuously added to the historical database. Based on the data timeline association method, the evolution trajectory of the performance degradation and wear of refractory bricks is constructed within the database.

[0054] Step six: Based on the historical database, model training is performed to construct a refractory brick loss pattern analysis model, a hidden damage prediction model, and a replacement material demand calculation model. The models are then used to provide auxiliary decision support for maintenance plan formulation, precise material preparation, and management optimization.

[0055] In this step, the intelligent analysis and decision support module based on historical data is the core link in upgrading the management of coke oven refractory bricks from "data traceability" to "intelligent decision-making". It relies on the full life cycle database to carry out intelligent model training, build a multi-dimensional intelligent analysis system, and mine the loss patterns and damage characteristics of refractory bricks through historical data, so as to provide scientific auxiliary decision-making basis for coke oven construction control, maintenance preparation, overhaul maintenance and management optimization.

[0056] 1. Full lifecycle data integration: Deeply clean, merge, and integrate the structured data collected throughout the construction, operation, maintenance, and repair processes. Construct an integrated historical database according to the dimensions of "brick unit - masonry section code - refractory brick batch - masonry process - operation and maintenance record - repair archive" to achieve interconnection and interoperability of data in each link, providing a comprehensive and accurate data source for intelligent model training.

[0057] 2. Lightweight Intelligent Model Training: Relying on an integrated structured historical database, big data analysis, machine learning and other technologies are used to train and construct models for analyzing the loss patterns of refractory bricks, predicting hidden damage in key parts, and calculating the demand for replacement materials during major repairs. All models adopt a lightweight design, are easy to operate and learn, and can be continuously iterated and optimized based on newly collected historical data to ensure the accuracy, applicability and timeliness of the models.

[0058] 3. Multi-scenario Intelligent Decision-Making Assistance: The trained intelligent model can be deeply applied to multiple core scenarios in the management of coke oven refractory bricks, providing scientific and accurate data support for various management decisions and realizing the transformation from "experience-based judgment" to "data-driven prediction": During the construction phase, the model monitors information such as the order of brick and tile unit retrieval, status changes, and construction progress in real time. If abnormal status, deviation in the retrieval order, or delay in construction progress occurs, the system will automatically issue an early warning to guide on-site operators to correct the deviation in a timely manner, avoid problems such as incorrect bricklaying and rework, and ensure construction quality and progress. During the overhaul preparation phase, the model combines the coke oven's service life, operation and maintenance records, and historical overhaul archives to accurately calculate the proportion of refractory brick damage in each masonry section during the overhaul, as well as the type, specifications, and precise quantity of replacement materials. This provides data support for the accurate preparation of replacement materials, avoiding waste due to excessive material preparation or delays in overhaul due to insufficient preparation. During the overhaul and maintenance phase, the model accurately predicts the hidden damage sections and damaged parts of various parts of the coke oven by mining the wear patterns and damage characteristics of refractory bricks in historical data. This guides targeted inspections and replacements during the overhaul process, enabling predictive maintenance of the coke oven and avoiding structural problems caused by untreated hidden damage, thus effectively extending the service life of the coke oven. During the management optimization phase, the model analyzes the quality performance and loss patterns of refractory bricks from different suppliers and production batches, as well as the construction effects and quality stability of different masonry techniques. This provides scientific data for refractory brick procurement, supplier selection, and masonry process optimization, comprehensively improving the refinement and intelligence of coke oven refractory brick management.

[0059] Specifically, in this step, the construction of the refractory brick loss law analysis model, the hidden damage prediction model, and the replacement material demand calculation model includes: (61) Based on the historical database, the corresponding permanent code is used. data tuples Based on the temperature, pressure load, and service time during its operation and maintenance phase, a loss calculation model based on spatiotemporal coupling is constructed. : in, This is the material loss kernel function based on temperature T and pressure P. The state transition in the state evolution trajectory has reached the point where the field is in place. timestamp, The model quantifies the performance degradation rate of a specific masonry section by using the local replacement frequency recorded in the historical database for that section. and This is a correction factor; (62) Based on absolute spatial coordinates Combined with maintenance feature vectors of adjacent coded segments in the historical database The spatial probability mapping algorithm is used to calculate the latent damage risk value of the target coordinate point. : in, For the set of codes that are spatially adjacent to the target segment, The weighting coefficients are based on the correlation of historical damage. For spatial Euclidean distances. Material deviation factor This is a correction factor; (63) Based on the number of refractory bricks in each section in step two Based on material specifications and attributes, calculate the total amount of materials to be prepared during the overhaul phase. : Where M represents the total number of sections planned for maintenance. This is an indicator function that determines when the risk value exceeds a preset threshold. Replacement needs should be factored in. The inventory redundancy coefficient is calculated based on the replacement records in the historical database. (64) After each maintenance task is completed, the measured damage data and replacement records shall be used as the new data. Store the data tuple Adjusting the loss kernel function using the backpropagation algorithm Correction coefficients in and This enables the intelligent analysis model to be continuously iterated and optimized as data accumulates.

[0060] The method of this invention, relying on the synergistic interaction of the above five core modules, realizes intelligent and data-driven management of the entire process of coke oven refractory bricks, from material preparation to overhaul and maintenance. The overall workflow is as follows: 1. BIM Model Pre-planning: Based on the coke oven design drawings, a BIM pre-layout model of coke oven masonry is constructed. According to the furnace body structure and construction procedures, the furnace body is divided into several independent masonry sections. Each section is assigned a unique permanent code. The spatial coordinates, process parameters, and key construction nodes of the sections are marked. At the same time, the preset masonry sequence of refractory bricks in each section and the on-site construction procedures are determined to form a standardized construction planning scheme. 2. Brick and slab unit construction: According to the pre-set masonry sequence of the BIM pre-built model, refractory bricks in the same masonry section are combined into standardized masonry sequence brick and slab units at the slab assembly station. The physical load is achieved by using general construction pallets / material racks. QR codes / RFID tags are placed on the non-stressed areas on the outside of the brick and slab units, and core information such as brick and slab unit ID, refractory brick foundation information, masonry sequence, and section code are written in, so as to realize the source solidification of "one code per slab" and construction sequence. 3. Sequence and Spatial Binding: After the completed brick slab unit is imported into the management system, the system automatically binds the brick slab unit with its respective masonry section code, absolute spatial location, construction procedure, and planned masonry time in multiple dimensions to form a standardized association ledger, and automatically verifies the consistency between the binding information and the BIM model to ensure that the information is accurate. 4. Full-process sequential control of construction: After the brick and slab units are transferred from the storage area to the construction site, the site management personnel can update the status of the brick and slab units with one click using a portable barcode scanner. During the construction process, the brick and slab units are taken in strict accordance with the bound masonry sequence. The system monitors the order of taking brick and slab units and the construction progress in real time. If deviation occurs, an automatic warning is issued to achieve precise control of the entire construction sequence. After the masonry is completed, the "masonry completed" status is confirmed, and complete and traceable construction data is retained. 5. IoT full-cycle data collection: During the construction phase, portable barcode scanners are used to collect and upload data throughout the entire construction process. During the operation and maintenance phase, the system-end input terminal is used to complete the standardized input of core data. All data is indexed by brick unit ID or section code to achieve structured storage and interconnection of data throughout the entire life cycle. 6. Historical data accumulation and model training: The system standardizes and integrates the collected full life cycle data to build an integrated structured historical database of "construction-operation and maintenance-repair". Based on the database, intelligent models such as refractory brick loss analysis, hidden damage prediction, and replacement material calculation are trained and continuously iterated and optimized. 7. Intelligent Assistance and Management Optimization: The trained intelligent model will be applied to core scenarios such as construction correction, maintenance preparation, overhaul and maintenance, and management optimization, providing scientific data support for various management decisions, realizing predictive maintenance and intelligent management of coke oven refractory bricks, extending the service life of coke ovens, and comprehensively improving the level of intelligent construction and digital operation and maintenance of coke oven projects.

[0061] According to another aspect of the present invention, an Internet of Things-based full life-cycle traceability management system for coke oven refractory bricks is also provided, comprising: The digital spatial calibration module is used to construct a pre-layout model of coke oven masonry based on the coke oven design drawings. It divides the oven body into several independent masonry sections and assigns them unique permanent codes. It also simultaneously calibrates the spatial coordinates, process parameters, and preset masonry sequence of each masonry section. The unit physical construction module is used to stack refractory bricks in the same masonry section in groups using a load-bearing structure according to the preset masonry sequence, thereby constructing a standardized masonry sequence brick plate unit. The non-stressed area on the outside of the brick plate unit is equipped with Internet of Things identification tags to achieve physical solidification of the construction sequence. The multidimensional information binding module is used to automatically obtain the unit ID of the brick slab unit, associate and map it with the permanent code, absolute spatial location, construction procedure and planned time, construct and generate a standardized association ledger, and automatically verify the consistency between the association ledger and the BIM pre-layout model. The Internet of Things (IoT) data acquisition module includes a portable barcode scanning terminal and a system input terminal, which are used to identify the identification tags in real time to obtain the circulation status of the brick slab unit, and systematically collect process records during the construction phase, inspection records during the operation and maintenance phase, and damage and replacement records during the repair phase. The status evolution and dynamic monitoring module is used to dynamically manage the five core states of the brick slab unit: slabs already allocated, transported, in place on site, partially used, and masonry completed. Based on the associated ledger and the current state, it dynamically monitors the order of brick slab unit use and construction progress, and automatically triggers an early warning when a deviation in the order occurs. A structured historical database is used to standardize and deeply integrate the full lifecycle data acquired by the IoT data acquisition module, using the unit ID or the permanent code as a data index, to build a digital archive that runs through the entire chain of construction, operation and maintenance. The intelligent analysis and decision-making module is used to train and run a lightweight intelligent analysis model based on the structured historical database. This model performs analysis of refractory brick wear patterns, predicts hidden damage locations, and calculates the demand for replacement materials during major repairs. This provides data-driven decision support for maintenance plan development and management optimization. Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things, characterized in that, Includes the following steps: Step 1: Based on the BIM pre-layout model of coke oven masonry, the furnace body is divided into several independent masonry sections and assigned a unique permanent code. The spatial coordinates, process parameters and preset masonry sequence of each masonry section are simultaneously calibrated to construct a spatial and logical benchmark. Step 2: According to the preset masonry sequence, refractory bricks with a construction sequence dependency within the same masonry section are stacked on the load-bearing structure to form a standardized masonry sequence brick plate unit. Internet of Things identification tags are then placed on the outside of the brick plate unit to solidify the construction sequence at the source. Step 3: Associate and bind the brick slab unit with the code of the masonry section to which it belongs, its absolute spatial location, construction procedure and planned time, and build a standardized association ledger of "brick slab unit-spatial location-masonry sequence", and automatically verify the consistency between the binding information and the BIM model; Step 4: Identify the IoT identifier of the brick unit in real time to achieve dynamic management of the status evolution of the refractory bricks. The status evolution includes five core states: bricks have been prepared, bricks have been transported, bricks are in place on site, bricks have been partially used, and bricklaying has been completed. During the construction process, the order of brick unit use and construction progress are dynamically monitored based on the associated ledger and the current status. When the actual operation status deviates from the preset order, an early warning is automatically issued. Step 5: Using the unique ID of the brick panel unit or the masonry section code as an index, systematically collect and store the process records during the construction phase, the inspection records during the operation and maintenance phase, and the damage and replacement records during the repair phase, to build a structured historical database that spans the entire life cycle. Step six: Based on the historical database, model training is performed to construct a refractory brick loss pattern analysis model, a hidden damage prediction model, and a replacement material demand calculation model. The models are then used to provide auxiliary decision support for maintenance plan formulation, precise material preparation, and management optimization.

2. The method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 1, characterized in that, Step one, constructing the BIM pre-layout model for coke oven masonry, includes: (11) Based on the original design drawings of the coke oven, a full-scale three-dimensional digital model covering the carbonization chamber, combustion chamber, heat storage chamber and inclined zone was constructed using BIM technology to fully map the physical structure of the furnace body; (12) Based on the structural characteristics of the furnace body and the actual construction process division principle, the three-dimensional digital model is decomposed into several independent and non-overlapping masonry sections, and a unique permanent code is assigned to each masonry section. This serves as the core index for data throughout its entire lifecycle. (13) Dynamically calibrate the absolute spatial coordinates of each masonry section in the three-dimensional digital model. The permanent encoding The expansion joint requirements, mortar fullness process parameters, key construction nodes and quality acceptance standards corresponding to this location are deeply bound in multiple dimensions to establish a standardized digital archive, which serves as the spatial calibration basis for subsequent information binding and verification. (14) In the model layer, clarify the spatial sequence of each refractory brick and its masonry level, and determine the preset masonry sequence of refractory bricks in each masonry section. ; (15) Based on the above modeling and sequence planning, output a standardized construction planning scheme including spatial location, material specifications and construction sequence, as the legal basis for subsequent brick and slab unit construction and on-site construction correction.

3. The method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 2, characterized in that, Preset masonry sequence Calculation formula include: in, This represents the i-th refractory brick in the k-th segment, and Order indicates the priority index of this refractory brick in the construction process.

4. The method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 1, characterized in that, In step two, the specific steps for the physical construction of the brick slab unit in the masonry sequence include: (21) Extract the logical sequence of refractory bricks with clear construction sequence dependency in the same masonry section according to the BIM pre-layout model, and divide the set of refractory bricks in the section into several standardized sub-sequences according to the preset masonry unit scale. Step two: Using general-purpose construction pallets, material racks, or special load-bearing structures as physical carriers, the refractory bricks in the sub-sequence are physically grouped and stacked according to the preset masonry sequence. During the stacking process, the spatial stacking order of the refractory bricks on the physical carrier is ensured. The masonry sequence used on the construction site satisfies the consistency mapping constraint formula: in, Represents the i-th refractory brick in the unit. f This is a preset spatial logic mapping function; (22) Industrial-grade temperature-resistant and dust-resistant QR code or RFID electronic tags are deployed in the non-stressed area outside the bearing structure, and a unique identifier ID is assigned to each brick unit to establish a unique identification mechanism of one code per brick to adapt to the complex environment of the coke oven construction site. (23) The structured information of the brick unit is entered into the identification tag through the Internet of Things writing device, including the unique ID, the type of internal refractory brick, production batch, specification parameters, manufacturer, preset masonry sequence and permanent code of the masonry section. The tag serves as a digital link between the physical entity and the standardized association ledger, realizing the consistent control of the entire process of refractory brick from material preparation to on-site masonry.

5. The method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 1, characterized in that, Step three, the specific steps for multi-dimensional information association, binding, and verification include: (31) Automatically obtain the unique ID of the brick slab unit in step two, and use it as the primary key to logically link it with the masonry section code divided in step one. Through the indexing effect of the permanent code, automatically associate the brick slab unit with the corresponding absolute spatial location of the section, on-site construction procedure, planned masonry time, and planned construction personnel to construct a multi-dimensional association mapping function: in, A unique ID for each brick panel unit. Code the masonry section. These are absolute spatial coordinates. For marking construction procedures, For planned time series, Pre-set construction personnel information; (32) Extract the internal refractory brick masonry sequence attribute recorded in the identification tag. and link it with the preset logical sequence in the BIM pre-layout model. Real-time comparison and verification are performed, and the verification logic follows the deviation judgment formula, including: If the calculation result If the set is not empty, it is determined that there is an information deviation, an early warning is automatically issued and the current binding process is locked, and the type and location of the deviation information are recorded in a structured manner. (33) Monitor the deviation correction status in real time until the physical stacking or digital information correction is completed according to the early warning prompt, so that... Once the value approaches zero and the verification is passed, the mapping relationship is solidified, generating a standardized association ledger that integrates spatial pose, construction logic, and time dimensions, providing a static data benchmark for dynamic monitoring in the subsequent construction phase and accurate traceability in the operation and maintenance phase.

6. The method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 1, characterized in that, Step four, dynamic sequential control, includes the dynamic management of the evolution of refractory brick states. Specific steps include: (41) Preset the five core state dimensions of the entire life cycle of the brick panel unit and construct a state set. Among them, the ones that have already been fitted with boards are... It has been transferred. The site is now in place. For partial use, The masonry work is now complete. (42) In the already assembled board and already transferred In this process, the digital integration platform and IoT data acquisition devices work together to achieve automatic triggering, identification, and updating of the state. The transition logic satisfies the state transition function: in, For the sensing events captured by IoT data acquisition devices, the system automatically records the status flow from the storage area to the construction area based on the event type. (43) They are already in place on site. Partial use The masonry work has been completed. In this process, by scanning the identification tag, the status can be confirmed with one click and the closed-loop recording can be achieved. Each status change is recorded synchronously with the operation time, operator and geographical location, generating structured status evolution trajectory data. (44) During the construction process, extract the current state brick slab unit in state and its preset masonry sequence O in the associated ledger Compared to the previous completion status brick slab unit sequence Perform sequential logic determination; (45) Based on the state evolution distribution of brick slab units in each of the masonry sections, calculate the construction completion rate in real time. According to the degree of completion of construction The construction progress is dynamically monitored and compared with the planned time series in the standardized digital archive, providing data support for the dynamic adjustment of the construction organization.

7. A method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 6, characterized in that, The degree of completion of construction Calculation formula include: The determination formula for the timing logic is as follows: If the above inequality holds true, it is determined that there is a logical deviation between the current actual operation state and the preset sequence, and an early warning command is immediately issued to guide the correction through terminal feedback.

8. The method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 1, characterized in that, Step five specifically includes the following steps: (51) Multi-dimensional data collection is carried out during the construction, operation and maintenance and overhaul stages of the entire life cycle of refractory bricks; (52) Using the unique ID of the brick slab unit or the code of the masonry section as the core data index, construct a full life cycle structured data tuple. : in, The primary key of the index, Indicates the stage of the life cycle. This represents the corresponding process, operation and maintenance, or repair feature vector for this stage. A timestamp generated or stored for the data; (53) According to the spatial and logical dimensions of “brick unit - masonry section code - refractory brick batch - masonry process - operation and maintenance record - maintenance archive”, the data tuples of different stages in step three are deeply integrated and mapped. By establishing logical foreign key relationships of data at each stage in the database layer, a digital archive that runs through the entire life cycle is constructed. (54) Based on the coke oven service timeline, continuously add newly generated operation and maintenance data to the historical database, and construct the evolution trajectory of refractory brick performance decay and wear law within the database according to the data timeline association method.

9. A method for full life-cycle traceability management of coke oven refractory bricks based on the Internet of Things as described in claim 1, characterized in that, Step six, which involves constructing an analysis model for the loss patterns of refractory bricks, a model for predicting hidden damage locations, and a model for calculating the demand for replacement materials, includes: (61) Based on the historical database, the corresponding permanent code is used. data tuples Based on the temperature, pressure load, and service time during its operation and maintenance phase, a loss calculation model based on spatiotemporal coupling is constructed. : Where is the material loss kernel function based on temperature T and pressure P. The state transition in the state evolution trajectory has reached the point where the field is in place. timestamp, The model quantifies the performance degradation rate of a specific masonry section by using the local replacement frequency recorded in the historical database for that section. and This is a correction factor; (62) Based on absolute spatial coordinates Combined with maintenance feature vectors of adjacent coded segments in the historical database The spatial probability mapping algorithm is used to calculate the latent damage risk value of the target coordinate point. : in, For the set of codes that are spatially adjacent to the target segment, The weighting coefficients are based on the correlation of historical damage. For spatial Euclidean distances. Material deviation factor This is a correction factor; (63) Based on the number of refractory bricks in each section in step two Based on material specifications and attributes, calculate the total amount of materials to be prepared during the overhaul phase. : Where M represents the total number of sections planned for maintenance. This is an indicator function that determines when the risk value exceeds a preset threshold. Replacement needs should be factored in. The inventory redundancy coefficient is calculated based on the replacement records in the historical database. (64) After each maintenance task is completed, the measured damage data and replacement records shall be used as the new data. Store the data tuple Adjusting the loss kernel function using the backpropagation algorithm Correction coefficients in and This enables the intelligent analysis model to be continuously iterated and optimized as data accumulates.

10. A traceability management system for the entire lifecycle of coke oven refractory bricks based on the Internet of Things, characterized in that, include: The digital spatial calibration module is used to construct a BIM pre-layout model of coke oven masonry based on the coke oven design drawings. It divides the furnace body into several independent masonry sections and assigns them unique permanent codes. It also simultaneously calibrates the spatial coordinates, process parameters, and preset masonry sequence of each masonry section. The unit physical construction module is used to stack refractory bricks in the same masonry section in groups using a load-bearing structure according to the preset masonry sequence, thereby constructing a standardized masonry sequence brick plate unit. The non-stressed area on the outside of the brick plate unit is equipped with Internet of Things identification tags to achieve physical solidification of the construction sequence. The multidimensional information binding module is used to automatically obtain the unit ID of the brick slab unit, associate and map it with the permanent code, absolute spatial location, construction procedure and planned time, construct and generate a standardized association ledger, and automatically verify the consistency between the association ledger and the BIM pre-layout model. The Internet of Things (IoT) data acquisition module includes a portable barcode scanning terminal and a system input terminal, which are used to identify the identification tags in real time to obtain the circulation status of the brick slab unit, and systematically collect process records during the construction phase, inspection records during the operation and maintenance phase, and damage and replacement records during the repair phase. The status evolution and dynamic monitoring module is used to dynamically manage the five core states of the brick slab unit: slabs already allocated, transported, in place on site, partially used, and masonry completed. Based on the associated ledger and the current state, it dynamically monitors the order of brick slab unit use and construction progress, and automatically triggers an early warning when a deviation in the order occurs. A structured historical database is used to standardize and deeply integrate the full lifecycle data acquired by the IoT data acquisition module, using the unit ID or the permanent code as a data index, to build a digital archive that runs through the entire chain of construction, operation and maintenance. The intelligent analysis and decision-making module is used to train and run a lightweight intelligent analysis model based on the structured historical database. It performs analysis of refractory brick loss patterns, prediction of hidden damage locations, and calculation of replacement material requirements for major repairs, providing data-driven decision support for maintenance plan formulation and management optimization.