A Coal Supply Chain Operation Method and System Based on Big Data Value Chain
By acquiring and analyzing transportation routes, environmental and real-time material status information, the system identifies and assesses the risks of time deviations, temporary storage and quality damage in the coal supply chain. This solves the problem of insufficient information synchronization in the existing system, enables accurate identification and timely response to chain risks, and improves operational efficiency and quality assurance.
Patent Information
- Application Number
- CN202611299614.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-26
- Publication Date
- 2026-11-10
AI Technical Summary
Existing coal supply chain operation systems suffer from deficiencies in information synchronization, insufficient integration of multi-source data, and a single risk assessment mechanism. As a result, they are unable to identify and respond to chain risks that lead to transportation delays and quality damage in a timely and accurate manner, which affects operational efficiency and coal quality.
By acquiring transportation route rules, environmental conditions, and real-time material status information, the system identifies risk events such as time deviations, temporary storage, and quality damage, establishes causal relationships, assigns initial risk values, calculates cumulative risk indices, and triggers early warnings.
It enables quantitative assessment of chain risks, improves the operational efficiency and material quality assurance level of the supply chain, and ensures the timeliness and accuracy of operations.
Smart Images

Figure CN123070720A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of supply chain operation technology, and more specifically, to a coal supply chain operation method and system based on big data value chain. Background Technology
[0002] In large-scale industrial production, the coal supply chain encompasses the entire process from mining, washing, storage, distribution, transportation, and transshipment to final receiving. Its stability and efficiency are crucial. Existing supply chain operation systems rely on static historical data and fixed infrastructure for route planning, aiming to minimize distance and time. While this provides reliable guidance in stable environments, it struggles to cope with dynamic changes. When permanent speed limits are implemented due to railway subsidence, local dispatch centers update their internal rules, but the information exchange interface between the supply chain management platform and the dispatch center lacks real-time updates and granularity, preventing the structured synchronization of speed limit information to the supply chain planning process. This leads to the system still estimating transportation time based on outdated speeds, resulting in systemic biases, overestimating the amount of coal en route, underestimating replenishment time, and causing a disconnect between managers' understanding of inventory. Train delays prevent timely loading, and coal is temporarily stored in open-air port yards without record-keeping. Rainfall can cause excessive moisture content, substandard net calorific value, or coal deterioration. Because the platform does not record temporary storage and rainfall information, the receiving party can only attribute quality problems to the coal mine and supplier, leading to unclear responsibility attribution. Furthermore, the system's emergency warnings were based on a single threshold, failing to identify chain risks in transportation, warehousing, and quality caused by speed limits, and thus failing to initiate emergency measures, resulting in decreased operational efficiency and cargo loss. Summary of the Invention
[0003] This application aims to address at least one of the technical problems existing in the prior art. To this end, this application proposes a coal supply chain operation method and system based on big data value chain, aiming to solve the problem in the existing coal supply chain operation system that, due to deficiencies in information synchronization, insufficient integration of multi-source data, and a single risk assessment mechanism, it is impossible to identify and respond to chain risks from transportation delays to quality damage in a timely and accurate manner, thereby affecting operational efficiency and coal quality.
[0004] In a first aspect, embodiments of this application provide a coal supply chain operation method based on a big data value chain, including: Obtain rule information defining the operational status of the transportation route, environmental conditions of the storage area, and real-time status information of materials in transit; Based on the rule information and the real-time status information, time deviation events in the material transportation process are identified. These time deviation events characterize events in which there is a deviation between the actual time and the preset time during the material transportation process. Based on the time deviation event and the real-time status information, a temporary storage event is identified, wherein the temporary storage event characterizes the event caused by the port berth occupancy rate when the time deviation event occurs; Based on the temporary storage event and the environmental condition information, identify quality damage risk events, wherein the quality damage risk events characterize events caused by environmental factors at the time the temporary storage event occurs; The time deviation event, the temporary storage event, and the quality damage risk event are causally correlated. A preset initial risk value is assigned to each causally correlated risk event. Based on the preset initial risk value, a cumulative risk index is calculated to reflect the severity of the entire risk chain from the source physical change to the final quality damage. An early warning is triggered when the cumulative risk index reaches a preset risk index.
[0005] According to some embodiments of this application, identifying time deviation events during material transportation based on the rule information and the real-time status information includes: Based on the real-time status information, the real-time location, destination, and latest speed limit information are obtained; The estimated arrival time is calculated based on the real-time location, the destination, and the latest speed limit information. Calculate the absolute value of the estimated arrival time and the arrival time in the rule information, compare the absolute value of the time with a preset time threshold, and identify time deviation events in the material transportation process.
[0006] According to some embodiments of this application, identifying the temporary storage event based on the time deviation event and the real-time status information includes: The deviation time is obtained based on the described time deviation event; The port berth occupancy rate within the deviation time period is obtained based on the real-time status information. Temporary storage events are identified by comparing the port berth occupancy rate with the preset occupancy rate.
[0007] According to some embodiments of this application, identifying quality impairment risk events based on the temporary storage event and the environmental condition information includes: The start and end times and location of the temporary storage event are obtained based on the temporary storage event. Based on the environmental condition information, obtain the rainfall corresponding to the start and end times and location of the temporary storage event; By comparing the rainfall amount with the first preset rainfall amount, quality damage risk events are identified.
[0008] According to some embodiments of this application, the step of calculating a cumulative risk index based on the preset initial risk value, reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment, includes: Based on the causal relationships and transmission effects among the risk events, the preset initial risk value is adjusted to obtain the target risk value; The cumulative risk index is calculated based on the target risk value, reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment.
[0009] According to some embodiments of this application, adjusting the preset initial risk value to obtain a target risk value based on the causal relationship and transmission effect between the risk events includes: When the temporary storage event is caused by the time deviation event, the preset initial risk value of the temporary storage event is increased to obtain the target risk value of the temporary storage event; If the rainfall during the temporary storage event exceeds a second preset rainfall amount, the preset initial risk value of the quality damage risk event is increased to obtain the target risk value of the quality damage risk event.
[0010] According to some embodiments of this application, the calculation of a cumulative risk index reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment based on the target risk value includes: The preset weight of the target risk value is dynamically adjusted based on the causal relationship between the risk events to obtain the adjusted weight. The stronger the causal relationship between the risk events, the larger the target risk value and the preset weight. The cumulative risk index, which reflects the severity of the entire risk chain from the initial physical change to the final quality impairment, is calculated based on the adjusted weights and the target risk value.
[0011] According to some embodiments of this application, after triggering the warning, the method further includes: Obtain the current risk scenario corresponding to the cumulative risk index; Based on the current risk scenario, multiple intervention measures are simulated and simulation results for different intervention measures are provided. The simulation results are used to assist decision-makers in selecting response strategies.
[0012] According to some embodiments of this application, the step of simulating multiple intervention measures and providing simulation results for different intervention measures based on the current risk scenario includes: Based on the current risk scenario, continuously monitor and update the occupancy and availability of key resources, including port berths, loading and unloading equipment, alternative transportation vehicles, and spare coal reserves. Based on the occupancy and availability of the key resources, various intervention measures are simulated and simulation results for different intervention measures are provided.
[0013] Secondly, this application also discloses a coal supply chain operation system based on big data value chain, including: The acquisition module is used to acquire rule information defining the operation status of the transportation route, environmental condition information of the storage area, and real-time status information of materials in transit. The first identification module is used to identify time deviation events in the material transportation process based on the rule information and the real-time status information. The time deviation events represent events in which there is a deviation between the actual time and the preset time in the material transportation process. The second identification module is used to identify a temporary storage event based on the time deviation event and the real-time status information, wherein the temporary storage event represents an event caused by the port berth occupancy rate when the time deviation event occurs. The third identification module is used to identify quality damage risk events based on the temporary storage event and the environmental condition information, wherein the quality damage risk event characterizes an event caused by environmental factors when the temporary storage event occurs; The calculation module is used to establish a causal relationship between the time deviation event, the temporary storage event, and the quality damage risk event, assign a preset initial risk value to each causally related risk event, and calculate a cumulative risk index based on the preset initial risk value to obtain a risk index that reflects the severity of the entire risk chain from the source physical change to the final quality damage. The early warning module is used to trigger an early warning when the cumulative risk index reaches a preset risk index.
[0014] The technical solution according to the embodiments of this application has at least the following beneficial effects: The coal supply chain operation method based on big data value chain disclosed in this application can comprehensively perceive the dynamic changes of each link in the supply chain by acquiring rule information, environmental condition information, and real-time material status information. This method innovatively introduces a chain-like risk identification mechanism. First, it identifies time deviation events during material transportation, solving the problem of inaccurate transportation time estimation caused by static data and information synchronization defects in existing systems. Based on this, it further identifies temporary storage events caused by abnormal port berth occupancy rates due to time deviations, revealing the potential correlation between transportation delays and resource occupation. More importantly, this method incorporates environmental factors, identifying quality damage risk events based on temporary storage events and environmental condition information, effectively solving the problem of difficulty in tracing the causes of material quality damage in existing technologies. By causally linking these risk events and assigning preset initial risk values, a cumulative risk index reflecting the entire risk chain from initial physical changes to final quality damage is calculated, thereby overcoming the limitations of single-dimensional early warning in existing technologies and achieving quantitative assessment of chain-like risks. Ultimately, an early warning is triggered when the cumulative risk index reaches a preset threshold, enabling supply chain managers to identify and respond to the entire risk chain from transportation delays to quality damage in a timely and accurate manner, significantly improving the operational efficiency, risk management capabilities, and material quality assurance level of the coal supply chain.
[0015] Additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description
[0016] The accompanying drawings are used to provide a further understanding of the technical solutions of this application and constitute a part of the specification. They are used together with the embodiments of this application to explain the technical solutions of this application and do not constitute a limitation on the technical solutions of this application.
[0017] Figure 1 A flowchart illustrating a coal supply chain operation method based on big data value chain, provided as an embodiment of this application; Figure 2 This is a schematic diagram of a coal supply chain operation system based on big data value chain, provided as an embodiment of this application. Detailed Implementation
[0018] To make the objectives, technical methods, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0019] It should be noted that the meaning of "multiple" (or "more than") in the description of the embodiments of this application refers to two or more, and "greater than," "less than," "exceeding," etc. are understood to exclude the number itself, while "above," "below," "within," etc. are understood to include the number itself. If "first," "second," etc. are used in the description, they are only for the purpose of distinguishing technical features and should not be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated or the order of the technical features indicated.
[0020] In this application embodiment, "at least one" refers to one or more, and "more than one" refers to two or more. "And / or" describes the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent the existence of A alone, the simultaneous existence of A and B, or the existence of B alone. A and B can be singular or plural. The character " / " generally indicates that the preceding and following related objects are in an "or" relationship. "At least one of the following" and similar expressions refer to any combination of these items, including any combination of singular or plural items. For example, at least one of a, b, and c can represent: the existence of a alone, the existence of b alone, the existence of c alone, the simultaneous existence of a and b, the simultaneous existence of a and c, the simultaneous existence of b and c, or the simultaneous existence of a, b, and c, where a, b, and c can be single or multiple.
[0021] In the description of this application, unless otherwise expressly defined, terms such as "setup," "installation," and "connection" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this application in conjunction with the specific content of the technical solution.
[0022] The coal supply chain operation method based on big data value chain provided in this application can be applied to a terminal, a server, or software running on either a terminal or a server. In some embodiments, the terminal can be a smartphone, tablet, laptop, desktop computer, etc.; the server can be configured as an independent physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server providing basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communication, middleware services, domain name services, security services, content delivery networks (CDN), and big data and artificial intelligence platforms; the software can be an application that implements the coal supply chain operation method based on big data value chain, but is not limited to the above forms.
[0023] This application can be applied to numerous general-purpose or special-purpose computer system environments or configurations. Examples include: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronics devices, network PCs, minicomputers, mainframe computers, and distributed computing environments including any of the above systems or devices. This application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc., that perform specific tasks or implement specific abstract data types. This application can also be practiced in distributed computing environments where tasks are performed by remote processing devices connected via communication networks. In distributed computing environments, program modules can reside in local and remote computer storage media, including storage devices. It should be noted that in various specific embodiments of this invention, when processing is required based on data related to the characteristics of an object (e.g., user attributes or sets of attribute information), permission or consent from the corresponding object is obtained first, and the collection, use, and processing of this data comply with relevant laws and standards. Furthermore, when the embodiments of the present invention need to obtain the attribute information of an object, they will obtain the separate permission or separate consent of the corresponding object through pop-up windows or redirection to a confirmation page. After obtaining the separate permission or separate consent of the corresponding object, they will then obtain the relevant data of the object necessary for the embodiments of the present invention to operate normally.
[0024] See Figure 1 , Figure 1 This is a flowchart illustrating a coal supply chain operation method based on a big data value chain, provided as an embodiment of this application. The coal supply chain operation method based on a big data value chain provided in this embodiment includes, but is not limited to, steps S110 to S160, which are described in detail below.
[0025] Step S110: Obtain the rule information defining the operation status of the transportation route, the environmental condition information of the storage area, and the real-time status information of the materials in transit; Step S120: Based on the rule information and real-time status information, identify time deviation events in the material transportation process. Time deviation events represent events in which the actual time and the preset time deviate during the material transportation process. Step S130: Based on the time deviation event and real-time status information, identify the temporary storage event. The temporary storage event represents the event caused by the port berth occupancy rate when the time deviation event occurs. Step S140: Based on the temporary storage event and environmental condition information, identify quality damage risk events. Quality damage risk events characterize events caused by environmental factors at the time of the temporary storage event. Step S150: Establish a causal relationship between time deviation events, temporary storage events, and quality damage risk events; assign a preset initial risk value to each causally related risk event; and calculate a cumulative risk index based on the preset initial risk value to reflect the severity of the entire risk chain from the source physical change to the final quality damage. Step S160: When the cumulative risk index reaches the preset risk index, trigger an early warning.
[0026] It should be noted that "rule information" refers to various specifications and standards that define the operational status of transportation routes, such as railway speed limits, port operating hours, and ship navigation plans. This information can be static or dynamically updated. "Environmental condition information" refers to external environmental data of the storage area (e.g., port yards), such as rainfall, temperature, humidity, and wind speed. This information is crucial for assessing the risk of material quality damage. "Real-time status information of materials in transit" refers to the immediate data of coal in transit, including but not limited to its current location, speed, estimated arrival time, and other real-time data that may affect its transportation status. "Time deviation events" refer to situations where there is a significant difference between the actual arrival time and the pre-planned arrival time during material transportation. "Temporary storage events" refer to situations where materials are temporarily stored at non-predetermined locations or for non-predetermined times due to time deviations or other reasons, such as the temporary stockpiling of coal in port yards. "Quality damage risk events" refer to the potential risk that, during temporary storage, environmental factors (e.g., rainfall) may cause adverse changes in the physical or chemical properties of materials, thereby affecting their final use value. "Causal relationship" refers to the logical relationship between different risk events, that is, the occurrence of one event may lead to or affect the occurrence of another event.
[0027] "Preset initial risk value" refers to the risk level or value pre-set for each identified risk event. "Cumulative risk index" is an indicator that comprehensively assesses the severity of the entire risk chain by calculating the risk values of multiple causally related risk events.
[0028] In one embodiment, it is first necessary to acquire rule information defining the operational status of the transportation route, environmental condition information of the storage area, and real-time status information of the materials in transit. The rule information can be acquired in various ways. Environmental condition information of the storage area can be acquired through various environmental sensors deployed in the storage area. For example, rain gauges can be installed to monitor rainfall, and temperature and humidity sensors can be installed to monitor temperature and humidity. These sensors transmit the collected data to the data processing platform in real time. Real-time status information of the materials in transit can be acquired by installing GPS trackers, speed sensors, and other devices on the transportation vehicle. These devices can transmit data such as the geographical location and speed of the materials in real time. Furthermore, more comprehensive information about the materials in transit can be obtained through data integration with the carrier's transportation management system. After acquiring the above information, this application will identify time deviation events during the material transportation process based on the rule information and real-time status information. The system can calculate the estimated arrival time based on the real-time location, destination, and latest speed limit information of the materials in transit using a preset algorithm model. Subsequently, the estimated arrival time is compared with the preset arrival time in the rule information, and the absolute value of the time difference between the two is calculated. If the absolute value of the time exceeds a preset time threshold (e.g., more than 2 hours), the system will identify a time deviation event. This identification method can promptly detect anomalies in the transportation process, providing a basis for subsequent risk assessment. Furthermore, this application will identify temporary storage events based on time deviation events and real-time status information. Upon identifying a time deviation event, the system will obtain the real-time occupancy rate of port berths during the deviation period. For example, if a coal train is expected to arrive at the port late, the system will query the occupancy status of the berths originally scheduled to berth during the delay. If the port berth occupancy rate exceeds a preset occupancy threshold (e.g., more than 90%), indicating a shortage of port berth resources and the inability to arrange unloading in a timely manner, the system will identify a temporary storage event. This indicates that the material may need to be temporarily unloaded into the port yard for waiting. After identifying a temporary storage event, the system will determine the start and end times and specific location of the temporary storage event. Subsequently, the system will obtain rainfall data corresponding to the start and end times and location of the temporary storage event based on environmental condition information. For example, if rainfall in a port yard exceeds a pre-set rainfall threshold (e.g., 20 mm / day) while coal is temporarily stored there, the system identifies a quality impairment risk event. This indicates that the temporarily stored coal has a high risk of quality degradation due to moisture absorption. Subsequently, this application establishes a causal link between the time deviation event, the temporary storage event, and the quality impairment risk event, assigns a pre-set initial risk value to each causally linked risk event, and calculates a cumulative risk index based on these pre-set initial risk values to reflect the severity of the entire risk chain from initial physical changes to final quality impairment.Finally, the system can set a threshold for a cumulative risk index. When the calculated cumulative risk index exceeds this threshold, the system will automatically trigger an early warning mechanism. Warnings can be issued in various forms, such as sending SMS or email notifications to relevant personnel, or displaying prominent alert information on the operations management interface. This allows operations managers to be aware of potential risks in a timely manner and take appropriate intervention measures.
[0029] In some embodiments of this application, the identification of time deviation events during material transportation based on rule information and real-time status information can be performed in the following ways. Specifically, identifying time deviation events during material transportation includes: Based on real-time status information, obtain real-time location, destination, and latest speed limit information; The estimated arrival time is calculated based on real-time location, destination, and the latest speed limit information. Calculate the absolute value of the estimated arrival time and the arrival time in the rule information, compare the absolute value of the time with a preset time threshold, and identify time deviation events in the material transportation process.
[0030] Real-time status information can be understood as dynamic data of materials in transit during transportation. For example, it can be collected in real-time via GPS positioning systems, vehicle sensors, or IoT devices, including the material's geographic coordinates, current speed, and direction of travel. The destination refers to the final location the material is planned to reach, such as a specific port, warehouse, or transfer station. The latest speed limit information refers to the latest speed limit applicable to the material's current transportation route, which can be dynamically updated based on road type, traffic conditions, weather conditions, or the characteristics of the transportation vehicle. Further, the estimated arrival time is calculated from the real-time location, destination, and latest speed limit information. This can be achieved by using a route planning algorithm or time estimation model based on the real-time location and latest speed limit information, combined with the remaining distance of the transportation route and possible traffic forecast data. The arrival time in the rule information refers to the planned or standard time for the material to travel from the origin to the destination under normal or ideal transportation conditions, which is usually preset in the transportation contract or logistics plan. The absolute time value is the non-negative time difference between the estimated arrival time and the arrival time in the rule information, used to quantify the deviation between actual and planned transportation. A preset time threshold is a configurable parameter that defines an acceptable range of time deviation. A time deviation event is considered to have occurred when the absolute value of the time exceeds this threshold. This threshold can be flexibly set according to material type, transportation distance, transportation mode, or business needs. For example, for time-sensitive materials, the threshold can be set smaller to achieve more refined risk management. The solution in this application first obtains the real-time location, destination, and latest speed limit information of the materials, enabling dynamic monitoring of the current transportation status. Based on this real-time data, the system can accurately calculate the estimated arrival time of the materials, thus providing a future arrival prediction based on the current situation. Subsequently, by comparing this estimated arrival time with the arrival time in the preset rule information and calculating its absolute value, the deviation between actual and planned transportation can be quantified. Finally, by comparing this absolute value with the preset time threshold, the system can objectively and accurately determine whether there is a time deviation exceeding the acceptable range, thereby identifying time deviation events in the material transportation process. This refined identification process makes the judgment of time deviation events more scientific and well-founded.
[0031] Specifically, the steps for identifying temporary storage events based on time deviation events and real-time status information include: The deviation time is obtained from the time deviation event; The port berth occupancy rate within the deviation time is obtained based on real-time status information; By comparing the port berth occupancy rate with the preset occupancy rate, temporary storage events can be identified.
[0032] The process of obtaining deviation time based on time deviation events refers to the system's ability to accurately obtain the specific time point or time period of deviation when an event occurs during material transportation where the actual time deviates from the preset time. This deviation time is a key input for subsequent judgment on whether a temporary storage event has occurred. Furthermore, obtaining the port berth occupancy rate within the deviation time period based on real-time status information means that after identifying a time deviation in material transportation, the system will query and obtain the port berth usage status corresponding to the deviation time period in real time. Port berth occupancy rate is an important indicator of port busyness, directly affecting whether materials can be unloaded or transferred as planned. Real-time status information can come from port management systems, IoT sensor data, etc. Specifically, identifying temporary storage events by comparing the port berth occupancy rate with the preset occupancy rate involves comparing the obtained port berth occupancy rate with a pre-set threshold (i.e., the preset occupancy rate). If the real-time occupancy rate exceeds the preset occupancy rate, it indicates that port berth resources are scarce, and materials may not be able to enter the port or be unloaded in a timely manner, resulting in temporary storage of materials near the port or in waiting areas. The preset occupancy rate can be set based on historical data, port capacity, operational strategies, and other factors.
[0033] In one embodiment, the present application's solution achieves accurate identification of temporary storage events by closely linking time deviation events with port berth occupancy rates. When a time deviation occurs in material transportation, its original port berth schedule may be affected. At this time, by obtaining the real-time port berth occupancy status during the deviation period and comparing it with a preset occupancy rate threshold, it is possible to effectively determine whether the port has sufficient resources to accommodate delayed materials. If the port berth occupancy rate is too high, it means that the materials are likely to need to wait, thus triggering the identification of a temporary storage event. This mechanism ensures that the identification of temporary storage events is based on a comprehensive consideration of actual transportation delays and port resource conditions.
[0034] In this regard, this application further proposes the following steps for identifying quality impairment risk events based on temporary storage events and environmental conditions: The start and end times and location of the temporary storage event are obtained based on the temporary storage event. Based on environmental condition information, obtain and temporarily store the rainfall corresponding to the start and end times and location of the event; By comparing the rainfall amount with the first preset rainfall amount, quality damage risk events are identified.
[0035] Specifically, the start and end times and location of a temporary storage event refer to the start time, end time, and specific geographical coordinates of materials temporarily stored at a specific location (e.g., a port yard) due to transportation delays or other reasons. This information can be obtained from supply chain management systems, logistics tracking data, or port scheduling records. Environmental information can be understood as various environmental data related to the material storage area, such as real-time or historical weather data provided by weather stations, including temperature, humidity, wind speed, and rainfall (the focus of this application). In practical applications, obtaining the rainfall corresponding to the start and end times and location of the temporary storage event refers to acquiring the actual rainfall data for the area within the specific time period and geographical location of the temporary storage of the material through a meteorological data interface or sensor network. The first preset rainfall threshold is a rainfall threshold pre-set based on the characteristics of the material (e.g., a specific type of coal), storage conditions, and tolerance for quality damage. This threshold can be determined based on historical data analysis, expert experience, or industry standards, and its purpose is to define the level of rainfall that may lead to material quality damage. By comparing the actual rainfall with the first preset rainfall threshold, the potential impact of rainfall on material quality can be quantitatively assessed, thereby identifying specific quality damage risk events. This application's solution addresses the issue of insufficient environmental factor consideration in traditional methods by introducing monitoring and assessment of specific rainfall during temporary storage events. When a material is temporarily stored, its start and end times and location are precisely determined, providing a foundation for subsequent environmental data matching. The system can then accurately extract rainfall data from environmental information for that specific time period and geographical location. By comparing the actual rainfall with a preset first rainfall threshold, it can directly determine whether the material has been exposed to a humid environment that could potentially damage its quality. For example, for coal, prolonged or high-intensity rainfall can increase its moisture content, reduce its calorific value, cause coal deterioration, or even trigger spontaneous combustion. Therefore, this judgment mechanism based on specific rainfall thresholds can more accurately and specifically identify quality damage risk events caused by environmental factors, avoiding misjudgments or omissions that may occur based solely on general environmental information.
[0036] In some embodiments, suppose a batch of coal transported from a mining area to a power plant or steel mill was temporarily stored for three days at a port yard due to railway scheduling issues. According to the temporary storage event record, the temporary storage event lasted from 10:00 AM on a certain date to 10:00 AM on another date, and the storage location was yard number 2 at port A. The system, through an environmental information interface, obtained that the cumulative rainfall in yard number 2 of port A during these three days was 50 mm. Simultaneously, based on the characteristics of this batch of coal (e.g., easily damp lignite or excessively fine coal), a pre-set first preset rainfall threshold of 30 mm was established. The system compared the actual cumulative rainfall of 50 mm with the first preset rainfall threshold of 30 mm and found that 50 mm exceeded 30 mm. Therefore, the system identified a quality damage risk event during the temporary storage event and can further assess the severity of this risk. Without this refined rainfall comparison mechanism, judgments might be made based solely on the vague information of "rain," making it impossible to accurately distinguish the differences in the impact of light rain and heavy rain on coal quality, which could lead to inaccurate risk assessments.
[0037] In response, this application further proposes the following steps for calculating a cumulative risk index based on a preset initial risk value, reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment: Based on the causal relationships and transmission effects between risk events, the preset initial risk value is adjusted to obtain the target risk value; The cumulative risk index is calculated based on the target risk value, reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment.
[0038] Specifically, causal relationships between risk events refer to the direct or indirect consequences of one risk event leading to or exacerbating another. For example, a time deviation event may lead to a temporary storage event, which in turn may result in a quality impairment risk event under specific environmental conditions. The transmission effect refers to the step-by-step impact and amplification of this causal relationship within the risk chain. After identifying these causal relationships and transmission effects, the initially assigned preset risk values can be dynamically adjusted. The process of adjusting the preset initial risk values aims to make the risk values more accurately reflect the actual risk contribution and potential impact of the event within a specific causal chain. For example, if a temporary storage event is caused by a severe time deviation event, the risk value of that temporary storage event may be increased to reflect the degree to which it is exacerbated by the preceding event. Through this adjustment, a more dynamic and context-adaptive target risk value can be obtained. The target risk value is a quantitative indicator of the risk event after adjustment for causal relationships and transmission effects. After obtaining the target risk values for each risk event, a cumulative risk index reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment is calculated based on these target risk values. This calculation process can employ weighted summation, product, or other composite calculation models to comprehensively consider the adjusted risk values of each risk event and its importance in the risk chain. Through the above technical solution, this application can more accurately assess the cumulative risk in the coal supply chain. Because it considers the causal relationships and transmission effects between risk events, the resulting cumulative risk index can more realistically reflect the dynamic evolution and mutual influence of risks in the supply chain, avoiding potential underestimation or misjudgment of risk due to static assessments. This makes risk warnings more timely and accurate, providing decision-makers with more insightful risk information, thereby enabling the formulation of more effective risk response strategies, reducing the risk of coal quality damage, and ensuring the stable operation of the supply chain.
[0039] In this regard, this application further proposes the following steps for adjusting the preset initial risk value to obtain the target risk value based on the causal relationship and transmission effect between risk events: When a temporary storage event occurs due to a time deviation event, the preset initial risk value of the temporary storage event is increased to obtain the target risk value of the temporary storage event; If the rainfall during a temporary storage event exceeds the second preset rainfall, the preset initial risk value of the quality damage risk event is increased to obtain the target risk value of the quality damage risk event.
[0040] Specifically, when a time deviation event is identified during material transportation, and this event directly leads to temporary storage of materials at a port or transshipment station, it indicates that the temporary storage event was not planned but triggered by an upstream time deviation. Such temporary storage, caused by a causal chain, typically carries higher potential risks and uncertainties than planned storage. Therefore, increasing the preset initial risk value for temporary storage events can more accurately reflect their actual risk weight within the entire risk chain. Furthermore, if environmental conditions in the storage area indicate rainfall exceeding a second preset rainfall amount during temporary storage, the risk of quality damage to the materials will significantly increase. For example, when coal is stored in the open, prolonged or intense rainfall can cause it to become damp, overheat, deteriorate, or even spontaneously combust, affecting its calorific value and quality. Therefore, in this specific environment, increasing the preset initial risk value for quality damage risk events can more accurately quantify the quality damage risk exacerbated by environmental factors. This application's solution, by introducing a dynamic risk value adjustment mechanism based on specific causal relationships, addresses the problem of insufficient consideration of risk transmission effects in traditional risk assessments. Specifically, when a time deviation event directly leads to a temporary storage event, the system can identify this causal relationship and proactively increase the risk weight of the temporary storage event. This reflects the higher risk sensitivity of downstream events caused by upstream anomalies. Simultaneously, when a temporary storage event is superimposed with adverse environmental factors (such as excessive rainfall), the system further identifies this compound risk scenario and increases the risk weight of the quality impairment risk event. This mechanism makes risk assessment no longer static, but dynamically adjusted according to the actual causal chain between risk events and changes in the external environment, thus more accurately reflecting the cumulative and amplified effects of risk. It is precisely because of this refined adjustment of risk values that the subsequent cumulative risk index can more accurately characterize the severity of the entire risk chain from the source physical change to the final quality impairment.
[0041] In one embodiment, suppose a batch of coal is transported from a mining area to a port, originally scheduled to arrive within three days. However, due to a road collapse during transport, the transport vehicle is delayed by one day, resulting in a time deviation event. Because of this delay, when the coal arrives at the port, the berth originally designated for this batch of coal is already occupied by other vessels, forcing the coal to be stored in a temporary yard near the port, resulting in a temporary storage event. In this situation, the system recognizes that the time deviation event directly caused the temporary storage event. Therefore, according to the scheme of this application, the preset initial risk value of the temporary storage event will be increased to reflect its higher risk triggered by upstream anomalies. Further, suppose that during the temporary storage period, the storage area experiences continuous heavy rain, and rainfall monitoring data shows that it exceeds a second preset rainfall amount. At this time, the system will recognize the superposition of temporary storage and adverse environmental factors (excessive rainfall), which significantly increases the risk of coal becoming damp and its quality being damaged. Therefore, the preset initial risk value of the quality damage risk event will also be increased. Through this dynamic adjustment, the final calculated cumulative risk index will more accurately reflect the real and aggravated risks faced by this batch of coal due to the combined effects of transportation delays, temporary storage, and severe weather. This will enable timely warnings and prompt operators to take corresponding countermeasures, such as allocating spare coal or taking rain protection measures.
[0042] Specifically, the above calculations based on the target risk value yield a cumulative risk index reflecting the severity of the entire risk chain, from initial physical changes to final quality impairment, including: The preset weights of the target risk value are dynamically adjusted based on the causal relationship between risk events to obtain the adjusted weights. The stronger the causal relationship between risk events, the larger the target risk value and the preset weights. The cumulative risk index, which reflects the severity of the entire risk chain from the initial physical change to the final quality impairment, is calculated based on the adjusted weights and target risk values.
[0043] The "causal relationship between risk events" refers to the degree and direction of mutual influence among time deviation events, temporary storage events, and quality impairment risk events. A time deviation event may directly lead to a temporary storage event, and a temporary storage event may, under specific environmental conditions, trigger a quality impairment risk event. The strength of this relationship is not fixed but changes dynamically with the specific context and data analysis results. "Dynamically adjusting the preset weight of the target risk value" refers to the real-time adjustment of the proportion of the target risk value of each risk event in the calculation of the cumulative risk index based on the strength of these causal relationships. Specifically, the stronger the causal relationship between a risk event and subsequent risk events, the greater the weight of the target risk value of that risk event in the calculation of the cumulative risk index. For example, if the correlation between a time deviation event and a temporary storage event is very high, then the target risk value of the time deviation event will be given a higher weight when calculating the cumulative risk index. The "adjusted weight" is a dynamically adjusted weight value that more accurately reflects the importance of the risk event in the entire risk chain. The statement that "the stronger the causal relationship between risk events, the greater the target risk value and the pre-set weight" means that if a risk event has a greater impact on subsequent risk events, or if its probability of occurrence and scope of impact are wider, then its corresponding target risk value and weight in the calculation of the cumulative risk index should be increased accordingly to highlight its key role in the risk chain. Through the above technical solution, this application overcomes the limitation of traditional methods in failing to fully consider the strength of the causal relationship between risk events when calculating the cumulative risk index. By dynamically adjusting the pre-set weight of the target risk value according to the causal relationship between risk events, the calculation result of the cumulative risk index can more accurately reflect the actual severity of the risk chain. This not only improves the accuracy of risk assessment but also enables decision-makers to more clearly identify key links and high-risk events in the risk chain, thereby enabling them to formulate more targeted and effective risk response strategies and significantly improve the operational efficiency and risk resistance of the coal supply chain.
[0044] In this regard, this application further proposes that after the warning is triggered, it also includes: Obtain the current risk scenario corresponding to the cumulative risk index; Based on the current risk scenario, multiple intervention measures are simulated and the simulation results of different intervention measures are provided. The simulation results are used to assist decision-makers in selecting response strategies.
[0045] Specifically, acquiring the current risk scenario means that after the cumulative risk index reaches a preset risk index and triggers an early warning, the system immediately collects and integrates all information related to the warning, including but not limited to specific risk events that cause the cumulative risk index to rise (such as time deviation events, temporary storage events, and quality damage risk events), detailed parameters of these events (such as deviation time, port berth occupancy rate, rainfall, etc.), and the causal chain between these events. The current risk scenario is a comprehensive and real-time snapshot of the current supply chain status and risk situation, aiming to provide sufficient data support for subsequent decision-making. Simulating multiple intervention measures based on the current risk scenario and providing simulation results for different intervention measures can be understood as the system virtually executing and predicting the effects of various possible countermeasures based on a preset intervention strategy library and supply chain model after clarifying the current risk scenario. Intervention measures may include, but are not limited to, adjusting transportation plans, reallocating port berths, activating backup storage areas, adjusting material ratios, and initiating emergency procurement or sales. The simulation results will quantitatively demonstrate the potential impact of each intervention measure in different scenarios, such as the degree of improvement or deterioration of key indicators such as cost, time, quality, and resource occupancy rate. These simulation results aim to provide decision-makers with an intuitive, data-driven basis for decision-making, helping them evaluate the advantages and disadvantages of different strategies. The simulation results assist decision-makers in selecting response strategies, meaning the system does not directly provide a single solution, but rather offers a decision support tool. Decision-makers can weigh the pros and cons of different intervention measures based on the simulation results, combined with actual operational priorities, resource constraints, and risk preferences, thereby selecting the most suitable response strategy for the current risk situation. For example, when facing the risk of quality impairment, simulation results may show that activating backup storage areas can effectively reduce the degree of quality impairment, but will increase transportation costs; or adjusting transportation routes can avoid severe weather, but will prolong arrival time. Decision-makers can make the optimal choice based on this information. This application effectively solves the problem that traditional early warning mechanisms lack specific response strategy guidance for decision-makers after triggering an early warning. By obtaining the current risk situation, decision-makers can clearly understand the root cause and scope of the risk; by simulating multiple intervention measures and providing simulation results, decision-makers can anticipate the potential effects of different strategies before actual action, thereby making more scientific and efficient decisions. This not only significantly improves risk management in the coal supply chain, reducing economic losses and quality damage caused by risk events, but also optimizes resource allocation and enhances the overall operational efficiency and market competitiveness of the supply chain. This solution elevates risk management from simply "identifying problems" to "solving problems," providing a strong guarantee for the stable operation of the supply chain.
[0046] Based on the current risk scenario, the above simulates various intervention measures and provides simulation results for different intervention measures, including: Based on the current risk scenario, we will continuously monitor and update the occupancy and availability of key resources, including port berths, loading and unloading equipment, alternative transportation vehicles, and spare coal reserves. Based on the occupancy and availability of key resources, various intervention measures are simulated, and simulation results for different intervention measures are provided. Specifically, continuously monitoring and updating the occupancy and availability of key resources refers to the system acquiring and maintaining the status information of core resources related to the operation of the coal supply chain in real time. Key resources can be understood as indispensable physical or service assets in the process of coal transportation, storage, and transshipment. For example, port berths refer to wharf areas used for ship berthing and loading / unloading operations, and their occupancy directly affects ship berthing efficiency; loading / unloading equipment refers to mechanical equipment used for coal loading and unloading, such as grab buckets and belt conveyors, and its availability determines the speed of loading and unloading operations; alternative transportation means refer to other transportation modes available when the main transportation mode is disrupted, such as vehicles or vessels for rail, road, or inland waterway transport, and their availability affects emergency transshipment capacity; reserve coal inventory refers to coal reserves reserved to cope with emergencies, and its quantity and location affect the resilience of the supply chain. This resource occupancy and availability data, such as the real-time occupancy rate of port berths, the operating status and maintenance plans of loading / unloading equipment, the scheduling information of alternative transportation means, and the real-time inventory data of reserve inventory, are all continuously collected, processed, and updated. The purpose is to provide accurate and real-time resource constraints for subsequent intervention simulations. Based on the occupancy and availability of key resources, the system simulates multiple intervention measures and provides simulation results for different measures. This means that after acquiring real-time resource status, the system uses this information as input parameters to construct multiple possible intervention schemes. For example, when port berth shortages are identified, the system can simulate intervention measures such as "adjusting vessel berthing order," "activating backup berths," or "diverting vessels to nearby ports." During the simulation, the impact of each intervention measure on key resources is considered; for example, activating backup berths increases their occupancy rate, and diverting vessels to nearby ports affects the availability of alternative transportation. By predicting and evaluating the effects of these intervention measures under different resource constraints, the system can generate a series of simulation results with different costs, times, and risks. These simulation results are clearly presented to decision-makers, for example, in the form of charts or reports, aiming to assist decision-makers in selecting the optimal response strategy based on a full understanding of resource constraints and potential consequences. This application can significantly improve the practicality and effectiveness of risk response strategies. Compared to theoretical simulations based solely on risk scenarios, this application incorporates continuous monitoring and updating of the real-time occupancy and availability of key resources, making the generated simulation results of intervention measures closer to the actual operating environment. This not only avoids the risk of intervention measures being unable to be implemented due to resource constraints, but also helps decision-makers quickly identify the optimal response strategy under current resource conditions from multiple feasible options, thereby improving the accuracy and efficiency of decision-making. As a result, the resilience of the coal supply chain is enhanced, enabling it to respond more effectively to emergencies, minimize potential losses, and ensure the stable operation of the supply chain.
[0047] In some embodiments, assuming that during a coal transport operation, ship delays are caused by severe weather, the system identifies a time deviation event and further identifies a potential temporary storage event due to high port berth occupancy rates, as well as a quality damage risk event due to heavy rainfall during temporary storage. When the cumulative risk index reaches a preset risk index, the system triggers an early warning. At this point, the system obtains the current risk scenario, for example, a batch of coal is expected to remain near the port for an extended period and is at risk of moisture absorption. To assist decision-makers in selecting response strategies, the system first continuously monitors and updates the occupancy and availability of key resources. Specifically, the system obtains in real time: berth occupancy at port A is 95%, with only one small berth available; two of port A's loading and unloading equipment are under maintenance, while the rest are operating normally; berth occupancy at nearby port B is 60%, with sufficient loading and unloading equipment; there are five available alternative transport vehicles (such as railway freight trains), but applications must be submitted 24 hours in advance; and there is sufficient spare coal inventory, but it is far from port A. Based on this real-time key resource information, the system simulates various intervention measures and provides different simulation results. Option 1: Wait for port A berth. Simulation results show that the waiting time is expected to exceed 72 hours, with an extremely high risk of coal quality damage and high demurrage fees. Option Two: Use the only remaining small berth at Port A. Simulation results show that this berth cannot accommodate large coal carriers, and loading and unloading efficiency is low, requiring a considerable amount of time, with a high risk of quality damage. Option Three: Divert to nearby Port B. Simulation results show that Port B has sufficient berths and loading / unloading equipment, and unloading is expected to be completed within 24 hours, significantly reducing the risk of quality damage, but increasing transshipment costs and rail transport application time. Option Four: Activate reserve coal inventory for emergency alternative supply. Simulation results show that downstream demand can be met immediately, but inventory allocation costs and transportation time will increase, and the fundamental problem of delayed coal at the port cannot be solved. By providing these simulation results based on real-time resource conditions, decision-makers can clearly see the advantages, disadvantages, costs, and risks of different strategies, enabling them to choose the response strategy that best suits the current situation and corporate objectives. For example, choosing Option Three, diverting ships to Port B, can minimize the risk of quality damage and demurrage costs.
[0048] See Figure 2 , Figure 2 This is a schematic diagram of a coal supply chain operation system based on a big data value chain, provided as an embodiment of this application. The coal supply chain operation system 200 based on a big data value chain includes: The acquisition module 210 is used to acquire rule information defining the operation status of the transportation route, environmental condition information of the storage area, and real-time status information of the materials in transit. The first identification module 220 is used to identify time deviation events in the material transportation process based on rule information and real-time status information. Time deviation events represent events in which the actual time and the preset time deviate during the material transportation process. The second identification module 230 is used to identify temporary storage events based on time deviation events and real-time status information. Temporary storage events characterize events caused by port berth occupancy rates when time deviation events occur. The third identification module 240 is used to identify quality damage risk events based on temporary storage events and environmental conditions information. Quality damage risk events characterize events caused by environmental factors when temporary storage events occur. The calculation module 250 is used to establish a causal relationship between time deviation events, temporary storage events, and quality damage risk events, assign a preset initial risk value to each causally related risk event, and calculate a cumulative risk index based on the preset initial risk value to obtain the severity of the entire risk chain from the source physical change to the final quality damage. The early warning module 260 is used to trigger an early warning when the accumulated risk index reaches the preset risk index.
[0049] It should be noted that the information interaction and execution process between the above modules are based on the same concept as the method embodiments of this application. For details on their specific functions and technical effects, please refer to the method embodiments section, which will not be repeated here.
[0050] It will be understood by those skilled in the art that all or some of the steps and systems in the methods disclosed above can be implemented as software, firmware, hardware, and suitable combinations thereof. Some or all of the physical components can be implemented as software executed by a processor, such as a central processing unit, digital signal processor, or microprocessor, or as hardware, or as an integrated circuit, such as an application-specific integrated circuit. Such software can be distributed on a computer-readable medium, which can include computer storage media (or non-transitory media) and communication media (or transient media). As is known to those skilled in the art, the term computer storage media includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technologies, CD-ROM, digital versatile disc (DVD) or other optical disc storage, magnetic cartridges, magnetic tape, disk storage or other magnetic storage devices, or any other medium that can be used to store desired information and is accessible to a computer. Furthermore, as is known to those skilled in the art, communication media typically include computer-readable instructions, data structures, program modules, or other data in modulated data signals such as carrier waves or other transmission mechanisms, and may include any information delivery medium.
[0051] The foregoing has provided a detailed description of the preferred embodiments of this application. However, this application is not limited to the above-described embodiments. Those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of this application. All such equivalent modifications or substitutions are included within the scope defined in this application.
Claims
1. A coal supply chain operation method based on big data value chain, characterized in that, include: Obtain rule information defining the operational status of the transportation route, environmental conditions of the storage area, and real-time status information of materials in transit; Based on the rule information and the real-time status information, time deviation events in the material transportation process are identified. These time deviation events characterize events in which there is a deviation between the actual time and the preset time during the material transportation process. Based on the time deviation event and the real-time status information, a temporary storage event is identified, wherein the temporary storage event characterizes the event caused by the port berth occupancy rate when the time deviation event occurs; Based on the temporary storage event and the environmental condition information, identify quality damage risk events, wherein the quality damage risk events characterize events caused by environmental factors at the time the temporary storage event occurs; The time deviation event, the temporary storage event, and the quality damage risk event are causally correlated. A preset initial risk value is assigned to each causally correlated risk event. Based on the preset initial risk value, a cumulative risk index is calculated to reflect the severity of the entire risk chain from the source physical change to the final quality damage. An early warning is triggered when the cumulative risk index reaches a preset risk index.
2. The method according to claim 1, characterized in that, The step of identifying time deviation events during material transportation based on the rule information and the real-time status information includes: Based on the real-time status information, the real-time location, destination, and latest speed limit information are obtained; The estimated arrival time is calculated based on the real-time location, the destination, and the latest speed limit information; Calculate the absolute value of the estimated arrival time and the arrival time in the rule information, compare the absolute value of the time with a preset time threshold, and identify time deviation events in the material transportation process.
3. The method according to claim 1, characterized in that, The step of identifying temporary storage events based on the time deviation event and the real-time status information includes: The deviation time is obtained based on the described time deviation event; The port berth occupancy rate within the deviation time period is obtained based on the real-time status information. Temporary storage events are identified by comparing the port berth occupancy rate with the preset occupancy rate.
4. The method according to claim 1, characterized in that, The step of identifying quality impairment risk events based on the temporary storage event and the environmental condition information includes: The start and end times and location of the temporary storage event are obtained based on the temporary storage event. Based on the environmental condition information, obtain the rainfall corresponding to the start and end times and location of the temporary storage event; By comparing the rainfall amount with the first preset rainfall amount, quality damage risk events are identified.
5. The method according to claim 1, characterized in that, The cumulative risk index, calculated based on the preset initial risk value, reflects the severity of the entire risk chain from the initial physical change to the final quality impairment, and includes: Based on the causal relationships and transmission effects among the risk events, the preset initial risk value is adjusted to obtain the target risk value; The cumulative risk index is calculated based on the target risk value, reflecting the severity of the entire risk chain from the initial physical change to the final quality impairment.
6. The method according to claim 5, characterized in that, The step of adjusting the preset initial risk value based on the causal relationship and transmission effect between the risk events to obtain the target risk value includes: When the temporary storage event is caused by the time deviation event, the preset initial risk value of the temporary storage event is increased to obtain the target risk value of the temporary storage event; If the rainfall during the temporary storage event exceeds a second preset rainfall amount, the preset initial risk value of the quality damage risk event is increased to obtain the target risk value of the quality damage risk event.
7. The method according to claim 5, characterized in that, The cumulative risk index, calculated based on the target risk value, reflects the severity of the entire risk chain from the initial physical change to the final quality impairment, and includes: The preset weight of the target risk value is dynamically adjusted based on the causal relationship between the risk events to obtain the adjusted weight. The stronger the causal relationship between the risk events, the larger the target risk value and the preset weight. The cumulative risk index, which reflects the severity of the entire risk chain from the initial physical change to the final quality impairment, is calculated based on the adjusted weights and the target risk value.
8. The method according to claim 1, characterized in that, After the warning is triggered, it also includes: Obtain the current risk scenario corresponding to the cumulative risk index; Based on the current risk scenario, multiple intervention measures are simulated and simulation results for different intervention measures are provided. The simulation results are used to assist decision-makers in selecting response strategies.
9. The method according to claim 8, characterized in that, The step of simulating multiple intervention measures based on the current risk scenario and providing simulation results for different intervention measures includes: Based on the current risk scenario, continuously monitor and update the occupancy and availability of key resources, including port berths, loading and unloading equipment, alternative transportation vehicles, and spare coal reserves. Based on the occupancy and availability of the key resources, various intervention measures are simulated and simulation results for different intervention measures are provided.
10. A coal supply chain operation system based on big data value chain, characterized in that, include: The acquisition module is used to acquire rule information defining the operation status of the transportation route, environmental condition information of the storage area, and real-time status information of materials in transit. The first identification module is used to identify time deviation events in the material transportation process based on the rule information and the real-time status information. The time deviation events represent events in which there is a deviation between the actual time and the preset time in the material transportation process. The second identification module is used to identify a temporary storage event based on the time deviation event and the real-time status information, wherein the temporary storage event represents an event caused by the port berth occupancy rate when the time deviation event occurs. The third identification module is used to identify quality damage risk events based on the temporary storage event and the environmental condition information, wherein the quality damage risk event characterizes an event caused by environmental factors when the temporary storage event occurs; The calculation module is used to establish a causal relationship between the time deviation event, the temporary storage event, and the quality damage risk event, assign a preset initial risk value to each causally related risk event, and calculate a cumulative risk index based on the preset initial risk value to obtain a risk index that reflects the severity of the entire risk chain from the source physical change to the final quality damage. The early warning module is used to trigger an early warning when the cumulative risk index reaches a preset risk index.