Tin powder preheating device for preparing nano tin oxide
By adopting multi-layer buffer structure and magnetic pole adjustment technology in the nano-tin oxide preparation device, the problem of insufficient vibration transmission and buffering capacity in the traditional device is solved, and more stable preheating bed shaking and higher preparation effect are achieved.
Patent Information
- Application Number
- CN202420336948.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-23
AI Technical Summary
In the traditional tin powder preheating device for the preparation of nano-tin oxide, vibration is easily transmitted to the device shell, and the spring stroke is short, which affects the buffering capacity of the preheating bed board, thereby affecting the preparation effect of nano-tin oxide.
A tin powder preheating device for the preparation of nano-tin oxide is designed, which uses multiple guide rods to connect with the vibration mechanism, provides buffering through the second spring and the first spring, uses an electromagnet to adjust the spring length to enhance the buffering capacity, and uses a sliding The rollers and rotating shaft guide the lifting and lowering of the preheating bed, reducing the impact of vibration on the device shell.
Through the multi-layer buffer structure and magnetic pole adjustment, it provides more stable shaking and larger buffer space, improves the buffering capacity of the preheated bed board, thereby improving the preparation effect of nano-tin oxide.
Smart Images

Figure CN221789251U_ABST
Abstract
Description
Technical Field
[0001] The utility model mainly relates to the technical field of tin oxide preparation, in particular to a tin powder preheating device for preparing nano tin oxide. Background Art
[0002] At present, in the processing of nano-tin oxide, in order to facilitate the subsequent treatment of nano-tin oxide, it is often necessary to preheat the raw materials before treatment.
[0003] Traditional tin powder preheating devices for preparing nano-tin oxide often use springs to provide cushioning and support for the preheating bed. In this way, vibration is easily transmitted to the device housing, and the spring stroke is short, which affects the cushioning capacity of the preheating bed and further affects the preparation effect of nano-tin oxide. Utility Model Content
[0004] The utility model mainly provides a tin powder preheating device for preparing nano tin oxide to solve the technical problems raised in the above background technology.
[0005] The technical solution adopted by the utility model to solve the above technical problems is:
[0006] A tin powder preheating device for preparing nano-tin oxide comprises a device housing, a plurality of guide rods are inserted at the bottom end of the device housing, a preheating bed plate is connected to the top end of the guide rods, and the bottom ends of the plurality of guide rods are connected to a vibration mechanism;
[0007] The vibration mechanism includes a vibration plate connected to the bottom ends of the plurality of guide rods, and a vibration motor connected to the bottom end of the vibration plate;
[0008] The guide rod is a hollow structure, with an insertion rod inserted at the bottom end of the guide rod, a first spring sleeved on the outside of the insertion rod, one end of the first spring abutting against the lower surface of the guide rod, the other end of the first spring abutting against the upper surface of the bottom plate, and the bottom end of the bottom plate abutting against the ground.
[0009] Furthermore, the top end of the insertion rod is abutted against a second spring, and the top end of the second spring is abutted against the bottom end of the preheating bed board.
[0010] Furthermore, grooves are provided on both sides of the vibration plate, and a sliding roller is rotatably connected in the groove body through a rotating shaft.
[0011] Furthermore, the sliding roller is rotatably connected to the groove body of the groove via a rotating shaft.
[0012] Furthermore, the top end of the insertion rod is connected to a first electromagnet, the top end of the first electromagnet is provided with a first permanent magnet, and the first permanent magnet is provided at the bottom end of the second spring.
[0013] Furthermore, a second electromagnet is sleeved on the bottom end of the outer surface of the insertion rod, a second permanent magnet is disposed on the top end of the second electromagnet, and the top end of the second permanent magnet abuts against the bottom end of the first spring.
[0014] Furthermore, a gap is provided between the bottom end of the device shell and the upper surface of the bottom plate.
[0015] Compared with the prior art, the beneficial effects of the utility model are:
[0016] When the preheating bed board of the utility model falls, the preheating bed board compresses the second spring, and the second spring provides buffering for the preheating bed board. In this process, further buffering is provided by the first spring at the bottom of the guide rod. In this way, sufficient buffering space and buffering capacity are provided for the preheating bed board, so that the shaking of the preheating bed board is more stable.
[0017] The present invention will be explained in detail below with reference to the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 It is a broken view of the cross-sectional view of the housing of the device of the utility model;
[0020] Figure 3 for Figure 2 Enlarged view of the structure of area A in the middle.
[0021] In the figure: 10, device housing; 20, guide rod; 30, preheating bed board; 40, vibration mechanism; 41, vibration plate; 42, vibration motor; 43, insertion rod; 431, first electromagnet; 432, first permanent magnet; 433, second electromagnet; 434, second permanent magnet; 44, first spring; 45, bottom plate; 46, second spring. DETAILED DESCRIPTION
[0022] In order to facilitate the understanding of the present invention, the present invention will be described in more detail below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings, but the present invention can be implemented in different forms and is not limited to the embodiments described in the text. On the contrary, these embodiments are provided to make the content disclosed in the present invention more thorough and comprehensive.
[0023] It should be noted that when an element is referred to as being "fixed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this article are for illustrative purposes only.
[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0025] For examples, please refer to the attached Figure 1-3 The tin powder preheating device for preparing nano-tin oxide comprises a device housing 10, a plurality of guide rods 20 are inserted at the bottom end of the device housing 10, a preheating bed plate 30 is connected to the top end of the guide rods 20, and the bottom ends of the plurality of guide rods 20 are connected to a vibration mechanism 40;
[0026] The vibration mechanism 40 includes a vibration plate 41 connected to the bottom ends of the plurality of guide rods 20, and a vibration motor 42 connected to the bottom ends of the vibration plate 41;
[0027] The guide rod 20 is a hollow structure, and an insertion rod 43 is inserted at the bottom end of the guide rod 20. A first spring 44 is sleeved on the outside of the insertion rod 43. One end of the first spring 44 abuts against the lower surface of the guide rod 20, and the other end of the first spring 44 abuts against the upper surface of the bottom plate 45. The bottom end of the bottom plate 45 abuts against the ground.
[0028] For details, please refer to the attached Figure 2 and 3 The top end of the insertion rod 43 abuts against a second spring 46, and the top end of the second spring 46 abuts against the bottom end of the preheating bed plate 30;
[0029] Grooves 411 are provided on both sides of the vibration plate 41, and a sliding roller 412 is rotatably connected to the groove body of the groove 411 via a rotating shaft;
[0030] The sliding roller 412 is rotatably connected to the groove body of the groove 411 via a rotating shaft 413;
[0031] It should be noted that, in this embodiment, the second spring 46 is used to provide buffering for the preheating bed plate 30 to assist the buffering capacity of the first spring 44;
[0032] Furthermore, the groove 411 accommodates the sliding roller 412, and the sliding roller 412 slides with the inner wall of the device housing 10 to guide the lifting of the preheating bed plate 30 through the device housing 10;
[0033] Furthermore, the sliding roller 412 is supported by the rotating shaft 413 , and the sliding roller 412 rotates with the rotating shaft 413 as the rotation center.
[0034] For details, please refer to the attached Figure 2 and 3 The top end of the plug rod 43 is connected to a first electromagnet 431, the top end of the first electromagnet 431 is provided with a first permanent magnet 432, and the first permanent magnet 432 is provided at the bottom end of the second spring 46;
[0035] A second electromagnet 433 is sleeved on the bottom end of the outer surface of the insertion rod 43, a second permanent magnet 434 is disposed on the top end of the second electromagnet 433, and the top end of the second permanent magnet 434 abuts against the bottom end of the first spring 44;
[0036] A gap is provided between the bottom end of the device housing 10 and the upper surface of the bottom plate 45;
[0037] It should be noted that, in this embodiment, the first electromagnet 431 is able to push the first permanent magnet 432 by repelling the magnetic poles of the first electromagnet 431 and the first permanent magnet 432. Since the first permanent magnet 432 is connected to the second spring 46, the length of the second spring 46 is adjusted, thereby adjusting the buffering capacity of the preheating bed board 30.
[0038] Furthermore, the second electromagnet 433 and the second permanent magnet 434 are repelled by the magnetic poles, so that the second electromagnet 433 can push the second permanent magnet 434. Since the second permanent magnet 434 is connected to the first spring 44, the length of the first spring 44 is adjusted, and the buffering capacity of the preheating bed board 30 is adjusted.
[0039] Furthermore, the gap between the bottom plate 45 and the housing 10 reduces the influence of the vibration of the bottom plate 45 on the device housing 10 .
[0040] The specific operation mode of the utility model is as follows:
[0041] During the preheating process of the tin powder, the guide rod 20 provides support for the preheating bed plate 30, the insertion rod 43 guides the sliding of the guide rod 20 on the rod body, the vibration motor 42 drives the vibration plate 41, and the vibration plate 41 drives the guide rod 20, so that the preheating bed plate 30 on the guide rod 20 vibrates;
[0042] When the preheating bed board 30 falls, the preheating bed board 30 compresses the second spring 46, and the second spring 46 provides a buffer for the preheating bed board 30. In this process, the first spring 44 at the bottom end of the guide rod 20 further provides a buffer.
[0043] The above description of the utility model in combination with the accompanying drawings is an exemplary description. Obviously, the specific implementation of the utility model is not limited to the above-mentioned method. As long as the non-substantial improvements are made by adopting the method concept and technical solution of the utility model, or the concept and technical solution of the utility model are directly applied to other occasions without improvement, they are all within the protection scope of the utility model.
Claims
1. A tin powder preheating device for preparing nano-tin oxide, comprising a device housing (10), characterized in that: A plurality of guide rods (20) are inserted into the bottom end of the device housing (10), the top ends of the guide rods (20) are connected to a preheating bed plate (30), and the bottom ends of the plurality of guide rods (20) are connected to a vibration mechanism (40); The vibration mechanism (40) comprises a vibration plate (41) connected to the bottom ends of the plurality of guide rods (20), and a vibration motor (42) connected to the bottom end of the vibration plate (41); The guide rod (20) is a hollow structure, and an insertion rod (43) is inserted into the bottom end of the guide rod (20). A first spring (44) is sleeved on the outside of the insertion rod (43), and one end of the first spring (44) abuts against the lower surface of the guide rod (20), and the other end of the first spring (44) abuts against the upper surface of the bottom plate (45), and the bottom end of the bottom plate (45) abuts against the ground.
2. The tin powder preheating device for preparing nano-tin oxide according to claim 1, characterized in that: The top end of the insertion rod (43) is in contact with a second spring (46), and the top end of the second spring (46) is in contact with the bottom end of the preheating bed plate (30).
3. The tin powder preheating device for preparing nano-tin oxide according to claim 1, characterized in that: Grooves (411) are provided on both sides of the vibration plate (41), and a sliding roller (412) is rotatably connected in the groove body of the groove (411) via a rotating shaft.
4. The tin powder preheating device for preparing nano-tin oxide according to claim 3, characterized in that: The sliding roller (412) is rotatably connected to the groove body of the groove (411) via a rotating shaft (413).
5. The tin powder preheating device for preparing nano-tin oxide according to claim 1, characterized in that: The top end of the insertion rod (43) is connected to a first electromagnet (431), the top end of the first electromagnet (431) is provided with a first permanent magnet (432), and the first permanent magnet (432) is provided at the bottom end of the second spring (46).
6. The tin powder preheating device for preparing nano-tin oxide according to claim 1, characterized in that: A second electromagnet (433) is sleeved on the bottom end of the outer surface of the insertion rod (43), a second permanent magnet (434) is provided on the top end of the second electromagnet (433), and the top end of the second permanent magnet (434) abuts against the bottom end of the first spring (44).
7. The tin powder preheating device for preparing nano-tin oxide according to claim 1, characterized in that: A gap is provided between the bottom end of the device housing (10) and the upper surface of the bottom plate (45).