Miniature steel pipe pile tower foundation

By setting an overflow port and a prestressing mechanism at the bottom of the micro steel pipe pile tower foundation, an enlarged pile end is formed, which solves the problem of the risk of pullout or overturning under loads such as strong winds, and improves the overall performance and construction efficiency of the foundation.

CN221878156UActive Publication Date: 2024-10-22SOUTHWEAT UNIV OF SCI & TECH
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323499673.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-10-22
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

The existing micro-steel pile tower foundations are at risk of being pulled out or overturned under loads such as strong winds, resulting in insufficient load-bearing performance and threatening the safety and stability of transmission line foundation projects.

Method used

Multiple overflow ports are provided at the bottom of the micro-steel pipe, and the hinged extrusion mechanism is used to increase the horizontal bearing capacity through a prestressed application mechanism to form an enlarged pile end to enhance the pull-out bearing capacity.

Benefits of technology

It improves the comprehensive performance of the micro steel pipe pile tower foundation, improves construction efficiency, and reduces labor intensity and operation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878156U_ABST
    Figure CN221878156U_ABST
Patent Text Reader

Abstract

The utility model discloses a miniature steel pipe pile tower foundation which comprises a miniature steel pipe arranged in a pile hole, the miniature steel pipe is filled with cement mortar, the top of the miniature steel pipe is connected with a ground bearing platform, and a plurality of overflow ports are symmetrically formed in the bottom of the miniature steel pipe. Extrusion mechanisms for forming pile end expanded heads are hinged to the interiors of the multiple overflow ports; and the bottom of the prestress applying mechanism is in transmission connection with the multiple extrusion mechanisms, and the top of the prestress applying mechanism is fixedly connected with the ground bearing platform. According to the utility model, the horizontal bearing capacity is improved through the prestress applying mechanism, and the cement mortar integrally forms an expanded head at the bottom of the miniature steel pipe through the extrusion of the extrusion mechanism, so that the uplift bearing capacity is improved, and the comprehensive performance of the miniature steel pipe pile tower foundation is improved; the method has the beneficial effects of improving the construction efficiency, reducing the labor intensity and reducing the operation risk.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pole tower foundations, and more specifically, to a micro steel pipe pile pole tower foundation. Background Art

[0002] Micro steel pipe pile tower foundation is a new type of foundation developed from rock anchor foundation and micro concrete pile foundation, which has the advantages of both and has wider applicability. Compared with ordinary rock anchor foundation, steel pipe pile has a larger bonding surface and better bonding performance. The steel pipe can also withstand greater horizontal force and has the characteristics of "small diameter and high strength".

[0003] For the high-altitude wiring areas, the extreme climate such as strong winds and snow all year round and the tension of wires will make the micro steel pipe pile tower foundation bear compression / pulling alternating loads and horizontal loads. Under the action of strong winds and other loads, the transmission line tower foundation on the windward side needs to bear a large upward pull load and a certain proportion of horizontal load at the same time. However, the existing micro steel pipe pile tower foundation is fixed by filling cement mortar between the micro steel pipe and the pile hole. Under the action of strong winds and other loads, there is a risk of the micro steel pipe being pulled out or overturned in the pile hole, resulting in the existing micro steel pipe pile tower foundation not having the bearing performance under strong winds and other loads, which seriously threatens the safety and stability of the transmission line foundation project, and thus requires the improvement of the comprehensive performance of the micro steel pipe pile tower foundation.

[0004] Therefore, how to improve the comprehensive performance of micro steel pipe pile tower foundation is an urgent problem to be solved by personnel in this technical field. Utility Model Content

[0005] An object of the present invention is to solve at least the above problems and / or disadvantages and to provide at least the advantages to be described below.

[0006] In order to achieve these purposes and other advantages according to the utility model, a micro steel pipe pile tower foundation is provided, comprising a micro steel pipe arranged in a pile hole, the micro steel pipe is filled with cement mortar, and the top of the micro steel pipe is connected to a ground cap;

[0007] The bottom of the micro steel pipe is symmetrically provided with a plurality of overflow ports, and each of the plurality of overflow ports is hinged with an extrusion mechanism for forming a pile end enlarged head;

[0008] The prestressing mechanism has a bottom which is transmission-connected to the plurality of extrusion mechanisms, and a top which is fixedly connected to the ground support platform.

[0009] Preferably, the extrusion mechanism includes a valve, the top end of the valve is hinged to the micro steel pipe through a rotating shaft, and the valve is located in the overflow port, the inner side of the valve is integrally formed with a triangular inner wedge, and the triangular inner wedge is transmission-connected to the prestressing mechanism, and the outer side of the valve is also integrally formed with an outer wedge protruding from the outer side for wedging into the soil.

[0010] Preferably, the prestressing mechanism comprises:

[0011] Prestressed steel bars are inserted into the micro steel pipes, and the tops of the prestressed steel bars pass through the ground cap;

[0012] A pushing component is arranged at the bottom of the prestressed steel bar, and the pushing component abuts against the plurality of extrusion mechanisms respectively;

[0013] An anchoring assembly is arranged on the top of the prestressed steel bar, and the anchoring assembly is against the ground pedestal.

[0014] Preferably, the push component includes:

[0015] An anchor plug in the shape of a cone barrel is inserted into the prestressed steel bar, and the outer sides of the anchor plug are respectively against the plurality of extrusion mechanisms;

[0016] An anchor plate is fixedly connected to the bottom end of the prestressed steel bar, and the anchor plate abuts against the inner bottom end of the anchor plug.

[0017] Preferably, the anchoring assembly includes a pressure plate, which is passed through the prestressed steel bar, and the bottom end of the pressure plate abuts against the ground pedestal, and the top end of the pressure plate is connected to the prestressed steel bar through an anchor.

[0018] Preferably, the bottom end of the micro steel tube is symmetrically integrally formed with a plurality of legs.

[0019] Preferably, two grouting pipes are fixedly connected to the outer wall of the micro steel pipe, and one end of the two grouting pipes is located in the middle position of the bottom end of the micro steel pipe, and the other end of the two grouting pipes passes through the ground support platform.

[0020] Preferably, the top end of the micro steel tube is also integrally formed with a protruding flange for connecting to an extended steel tube, and a plurality of ribs are symmetrically connected between the flange and the outer wall of the micro steel tube.

[0021] The utility model at least has the following beneficial effects:

[0022] The utility model improves the horizontal bearing capacity through the prestressing mechanism, and through the extrusion of the extrusion mechanism, the cement mortar is integrally formed into an enlarged head at the bottom of the micro steel pipe, thereby improving the pull-out bearing capacity, achieving the improvement of the comprehensive performance of the micro steel pipe pile tower foundation, and has the beneficial effects of improving construction efficiency, reducing labor intensity, and reducing operation risks.

[0023] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of the present invention.

[0025] Figure 2 It is a schematic diagram of the connection of the micro steel pipe of the present invention.

[0026] Figure 3 It is a schematic diagram of the structure of the extrusion mechanism of the present invention.

[0027] Figure 4 This is a schematic diagram of the connection of the push component of the present invention.

[0028] Figure 5 It is a schematic diagram of the connection of the anchoring assembly of the present invention.

[0029] Figure 6 It is a schematic diagram of the flange connection of the present invention. DETAILED DESCRIPTION

[0030] The present invention will be described in further detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0031] It should be understood that terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.

[0032] It should be noted that in the description of the present invention, the orientation or position relationship indicated by the term is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0033] In the description of the present utility model, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "sleeved / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to specific circumstances.

[0034] In addition, in the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0035] Figure 1 An implementation form of the utility model is shown, which includes a micro steel pipe 2 arranged in a pile hole 1, the micro steel pipe 2 is filled with cement mortar 3, and the top of the micro steel pipe 2 is connected to a ground cap 4;

[0036] The bottom of the micro steel tube 2 is symmetrically provided with a plurality of overflow ports 21, and each of the plurality of overflow ports 21 is hinged with an extrusion mechanism 5 for forming a pile end enlarged head 7;

[0037] The prestressing mechanism 6 has a bottom which is transmission-connected to the plurality of extrusion mechanisms 5 , and a top which is fixedly connected to the ground support platform 4 .

[0038] The diameter of the micro steel tube 2 is not greater than 400 mm, and the wall thickness is 4-25 mm.

[0039] The surface of the micro steel tube 2 is coated with anti-corrosion material to prevent the micro steel tube 2 from rusting.

[0040] Working principle: During the construction of the pole tower foundation, after drilling the pile hole 1 at the designed position, the micro steel pipe 2 is placed in the pile hole 1, and the cement mortar 3 is filled into the micro steel pipe 2. The cement mortar 3 flows from the bottom of the micro steel pipe 2 into the gap between the micro steel pipe 2 and the pile hole 1 to form cement mortar 3 outside the pipe. Then, the extrusion mechanism 5 is driven by the prestressing mechanism 6, so that the extrusion mechanism 5 continuously squeezes the soil outward, and presses part of the cement mortar 3 outside the pipe into the surrounding soil. The cement mortar 3 in the micro steel pipe 2 enters the squeezed soil to form a pile end expansion head 7. Then, a ground pedestal 4 is constructed around the top of the micro steel pipe 2, and the top of the prestressing mechanism 6 is connected to the ground pedestal 4 to apply prestress. In this technical solution, the horizontal bearing capacity is improved by the prestressing mechanism 6, and the cement mortar 3 is extruded by the extrusion mechanism 5 to form an enlarged head 7 at the bottom of the micro steel pipe, thereby improving the pull-out bearing capacity and improving the comprehensive performance of the micro steel pipe 2 pile tower foundation, which has the beneficial effects of improving construction efficiency, reducing labor intensity, and reducing operation risks.

[0041] As in the above scheme, the extrusion mechanism 5 includes a valve 51, the top end of the valve 51 is hinged to the micro steel pipe 2 through a rotating shaft, and the valve 51 is located in the overflow port 21, the inner side of the valve 51 is integrally formed with a triangular inner wedge 52, and the triangular inner wedge 52 is transmission-connected to the prestressing mechanism 6, and the outer side of the valve 51 is also integrally formed with an outer wedge 53 protruding into the soil.

[0042] Working principle: When the prestressing mechanism 6 is lifted, the prestressing mechanism 6 comes into contact with the triangular inner wedge 52. As the prestressing mechanism 6 moves upward, the triangular inner wedge 52 pushes the valve 51 to be squeezed outward, and the outer wedge 53 is wedged into the soil. As the valve 51 continuously squeezes the soil outward, the cement mortar 3 in the micro steel pipe 2 enters the squeezed soil to form a pile end enlarged head 7.

[0043] As in the above solution, the prestressing mechanism 6 comprises:

[0044] Prestressed steel bars 61 are inserted into the micro steel tubes 2, and the tops of the prestressed steel bars 61 are disposed through the ground cap 4;

[0045] A pushing component 62, which is arranged at the bottom of the prestressed steel bar 61, and the pushing component 62 abuts against the plurality of extrusion mechanisms 5 respectively;

[0046] The anchor assembly 63 is arranged on the top of the prestressed steel bar 61 , and the anchor assembly 63 abuts against the ground pedestal 4 .

[0047] Working principle: After the inside of the micro steel pipe 2 is filled with cement mortar 3, the upper end of the prestressed steel bar 61 is lifted, so that the prestressed steel bar 61 drives the pushing component 62 to move upward. After the pushing component 62 contacts the triangular inner wedge 52, the pushing valve 51 is squeezed outward, and the outer wedge 53 is wedged into the soil. The cement mortar 3 in the micro steel pipe 2 enters the squeezed soil to form an enlarged head 7 at the pile end; after the ground pedestal 4 is constructed around the top of the micro steel pipe 2, the prestressed steel bar 61 is connected to the ground pedestal 4 through the anchoring component 63 to apply prestress.

[0048] As in the above solution, the push component 62 includes:

[0049] An anchor plug 621 in a cone barrel shape is inserted into the prestressed steel bar 61, and the outer sides of the anchor plug 621 are respectively in contact with the plurality of extrusion mechanisms 5;

[0050] The anchor plate 622 is fixedly connected to the bottom end of the prestressed steel bar 61 , and the anchor plate 622 abuts against the inner bottom end of the anchor plug 621 .

[0051] Working principle: After the cement mortar 3 is filled inside the micro steel pipe 2, the upper end of the prestressed steel bar 61 is lifted, so that the anchor plate 622 abuts against the inner bottom end of the anchor plug 621, and the anchor plug 621 is driven to move upward through the anchor plate 622. After the cone-shaped anchor plug 621 contacts the triangular inner wedge 52, the valve 51 is pushed outward to squeeze it, thereby pushing the valve 51.

[0052] As in the above scheme, the anchoring assembly 63 includes a pressure plate 631, which is passed through the prestressed steel bar 61, and the bottom end of the pressure plate 631 abuts against the ground platform 4, and the top end of the pressure plate 631 is connected to the prestressed steel bar 61 through an anchor 632.

[0053] Working principle: After constructing the ground pedestal 4 around the top of the micro steel pipe 2, the pressure plate 631 is passed through the prestressed steel bar 61, and the pressure plate 631 is connected to the prestressed steel bar 61 through the anchor 632, so as to apply prestress to the prestressed steel bar 61, so that the pressure plate 631 applies the prestress to the ground pedestal 4.

[0054] As in the above scheme, the bottom end of the micro steel tube 2 is symmetrically integrally formed with a plurality of legs 23. The plurality of legs 23 provided at the bottom end of the micro steel tube 2 prevent the bottom end of the micro steel tube 2 from being sealed after being placed in the pile hole 1, thereby ensuring that the cement mortar 3 in the micro steel tube 2 can flow from the bottom of the micro steel tube 2 into the gap between the micro steel tube 2 and the pile hole 1 to form cement mortar 3 outside the tube.

[0055] As in the above scheme, the outer wall of the micro steel pipe 2 is also fixedly connected with two grouting pipes 22, and one end of the two grouting pipes 22 is located in the middle position of the bottom end of the micro steel pipe 2, and the other end of the two grouting pipes 22 passes through the ground support platform 4.

[0056] The grouting pipe 22 is a steel pipe with a diameter of 25 to 38 mm and a wall thickness of not less than 2.8 mm.

[0057] Working principle: After prestressing the prestressed steel bar 61, cement slurry is pressed into the two grouting pipes 22 through ground grouting equipment. The cement slurry squeezes the soil layer at the pile end, and part of the cement slurry penetrates into the cracks to form slurry veins 8, thereby reducing the porosity ratio and improving the compressive bearing capacity of the pile end.

[0058] As in the above solution, the top end of the micro steel tube 2 is also integrally formed with a protruding flange 24 for connecting to an extended steel tube, and a plurality of ribs 25 are symmetrically connected between the flange 24 and the outer wall of the micro steel tube 2 .

[0059] Working principle: When the length of the micro steel pipe 2 cannot meet the construction requirements, the flange 24 integrally formed and protruding from the top of the micro steel pipe 2 is connected to the lengthened steel pipe, thereby extending the length of the micro steel pipe 2 to meet different pile length requirements, and the structural strength of the flange 24 is ensured by multiple ribs 25.

[0060] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A micro steel pipe pile tower foundation, comprising a micro steel pipe arranged in a pile hole, the micro steel pipe is filled with cement mortar, the top of the micro steel pipe is connected to a ground cap, Features: The bottom of the micro steel pipe is symmetrically provided with a plurality of overflow ports, and each of the plurality of overflow ports is hinged with an extrusion mechanism for forming a pile end enlarged head; The prestressing mechanism has a bottom which is transmission-connected to the plurality of extrusion mechanisms, and a top which is fixedly connected to the ground support platform.

2. The micro steel pipe pile tower foundation according to claim 1, It is characterized in that The extrusion mechanism includes a valve, the top end of which is hinged to the micro steel pipe through a rotating shaft, and the valve is located in the overflow port. The inner side of the valve is integrally formed with a triangular inner wedge, and the triangular inner wedge is transmission-connected to the prestressing mechanism. The outer side of the valve is also integrally formed with an outer wedge for wedging into the soil.

3. The micro steel pipe pile tower foundation according to claim 1, It is characterized in that The prestressing mechanism comprises: Prestressed steel bars are inserted into the micro steel pipes, and the tops of the prestressed steel bars pass through the ground cap; A pushing component is arranged at the bottom of the prestressed steel bar, and the pushing component abuts against the plurality of extrusion mechanisms respectively; An anchoring assembly is arranged on the top of the prestressed steel bar, and the anchoring assembly is against the ground pedestal.

4. The micro steel pipe pile tower foundation according to claim 3, It is characterized in that The push component includes: An anchor plug in the shape of a cone barrel is inserted into the prestressed steel bar, and the outer sides of the anchor plug are respectively against the plurality of extrusion mechanisms; An anchor plate is fixedly connected to the bottom end of the prestressed steel bar, and the anchor plate abuts against the inner bottom end of the anchor plug.

5. The micro steel pipe pile tower foundation according to claim 3, It is characterized in that The anchoring assembly includes a pressure plate, which is passed through the prestressed steel bar, and the bottom end of the pressure plate abuts against the ground pedestal, and the top end of the pressure plate is connected to the prestressed steel bar through an anchor.

6. The micro steel pipe pile tower foundation according to claim 1, It is characterized in that The bottom end of the miniature steel tube is symmetrically integrally formed with a plurality of legs.

7. The micro steel pipe pile tower foundation according to claim 1, It is characterized in that Two grouting pipes are also fixedly connected to the outer wall of the micro steel pipe, and one end of the two grouting pipes is located in the middle position of the bottom end of the micro steel pipe, and the other end of the two grouting pipes passes through the ground support platform.

8. The micro steel pipe pile tower foundation according to claim 1, It is characterized in that The top end of the micro steel pipe is also integrally formed with a flange protruding therefrom for connecting to the lengthened steel pipe, and a plurality of ribs are symmetrically connected between the flange and the outer wall of the micro steel pipe.

Citation Information

Cited By

  • Miniature steel pipe pile tower foundation and construction method thereof

    CN117513403A

  • A miniature steel pipe pile tower foundation and its construction method

    CN117513403B