Pipe roofing method construction system
By combining inertial measurement and steering devices in the pipe curtain method construction system, precise pipe curtain operations under complex geological conditions are achieved, which solves the uncontrollable problem of pipe curtain equipment under complex geological conditions in the existing technology and improves efficiency. Construction safety and precision.
Patent Information
- Application Number
- CN202420464031.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-11
AI Technical Summary
Existing pipe curtain equipment is difficult to achieve precise control under complex geological conditions. Especially in strata rich in groundwater, the drilling distance is short and the direction is uncontrollable. It is easy to miss the target and cause construction hazards.
A pipe curtain method construction system including an excavation device, a slag conveying device, a guiding device and a control device is adopted. Inertial measurement technology is used to accurately measure the position and attitude, and the direction of travel is adjusted through the steering device to form a rigid curtain structure to avoid impact on surrounding buildings. Structure impact.
It achieves precise measurement and direction adjustment of pipe curtain construction, is suitable for long-distance jacking, corrects offsets, reduces ground settlement and uplift, and improves construction safety and accuracy.
Smart Images

Figure CN221920973U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel and underground engineering reinforcement operations, in particular to a pipe curtain method construction system. Background Art
[0002] The pipe curtain construction technology is an advanced technology used in tunnel construction. It creates a soil layer by setting up a pipe curtain to ensure safety and stability during the construction process. It uses a pipe jacking machine to build a large-section underground space. Through the jacking method, the pipe segments are pushed into the tunnel by the jacking machine while the tunnel is being excavated underground, and the pipe segments are staggered and interlocked to form the structural support of the entire tunnel. The pipe curtain method is widely used in engineering fields such as subways, railways, tunnels, and underground integrated pipe galleries. For example, in the construction of Beijing Metro Line 13, the pipe curtain method was used for construction, and a large-section tunnel was successfully excavated.
[0003] However, in the existing technology, the pipe curtain equipment has poor geological adaptability. It is difficult to make or build a pipe curtain under complex geological conditions. For example, it has poor adaptability to strata with abundant groundwater. In addition, the drilling distance of the existing pipe curtain equipment is short, the disturbance to the strata is large, the drilling progress is low, and the direction is completely uncontrollable most of the time. Moreover, the position and attitude measurement of the existing pipe curtain equipment mostly uses a laser theodolite, which is extremely easy to miss the target. After missing the target, the direction of the steel pipe is completely uncontrollable. Sometimes it will deviate by several meters within a very short distance, and some even rush out of the strata, causing great construction hazards.
[0004] Therefore, providing a pipe curtain construction system that can achieve precise and controllable pipe curtain operations has become an issue that urgently needs to be solved in the industry. Utility Model Content
[0005] In view of the above-mentioned problems, one of the purposes of the present utility model is to provide a pipe curtain construction system, which can construct partial or full-circle steel pipe enclosures around the space within the stratum to form a rigid curtain structure to ensure the safety of construction work and operation in the space within the stratum, isolate the geotechnical connection between the space within the stratum and the surrounding area, and avoid or reduce the impact on surrounding buildings and structures.
[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: The utility model provides a pipe curtain method construction system, including: a tunneling device, a slag conveying device, a direction adjustment device, a guide device and a control device, wherein:
[0007] The excavation device is used to excavate the stratum and drive the steel pipe into the stratum;
[0008] The slag conveying device is used to convey the slag produced by the excavation of the excavation device to the ground;
[0009] The guiding device measures the position, posture and forward trend of the excavation device by an inertial measurement method to obtain excavation information of the excavation device. The guiding device is connected to the control device for communication to transmit the excavation information to the control device.
[0010] The direction adjustment device is arranged at the excavation device, is in communication connection with the control device, and is used to receive control instructions issued by the control device and adjust the travel direction of the excavation device;
[0011] The control device is communicatively connected with the guide device and the steering device, and is used to preset the excavation information of the excavation device, and compare it with the excavation information transmitted by the guide device, and control the steering device to adjust the walking direction of the excavation device.
[0012] Therefore, the guiding device of the utility model uses inertial measurement technology to accurately measure the position, posture, forward trend, etc. of the tunneling device, and then uses the steering device to make it move in the designed direction, thereby pulling the steel pipe behind the tunneling device into the formation. Finally, the tunneling device, the slag conveying device, the guiding device and the steering device withdraw from the steel pipe, and the steel pipe remains in the formation and operates in sequence, thereby forming a curtain structure or support structure to realize subsequent excavation and support, and avoid affecting surrounding buildings.
[0013] In some embodiments, the excavation device includes: a main machine, a base, a bridge and pipelines, wherein the base is arranged at the pipe curtain opening, the front end of the base is connected to the rear end of the bridge, the front end of the bridge is connected to the main machine, the main machine and the bridge are placed in a steel pipe, the pipeline is placed on the bridge, and the main machine extends to the pipe curtain opening through the bridge.
[0014] In some embodiments, the main machine includes a cutter disc disposed at the front end and a driving mechanism connected to the cutter disc, wherein the driving mechanism is connected to the steering device for adjusting the posture and position of the cutter disc under the action of the steering device.
[0015] The driving mechanism includes a motor and a main shaft connected to the motor.
[0016] In some embodiments, the cutter disc is detachably mounted on the main machine, so that a cutter disc with linearly adjustable rotation speed can be replaced to cope with various formations, and the formation can be excavated using a rotatable cutter disc.
[0017] In some embodiments, the excavation diameter of the cutter head is larger than the outer diameter of the steel pipe to facilitate the jacking of the steel pipe into the formation.
[0018] In some embodiments, the cutter head has foldable or retractable cutters so that they can be withdrawn from the steel pipe to the outside of the pipe.
[0019] In some embodiments, the base includes: a support, a height adjuster arranged at the bottom of the support, a slide rail arranged on the upper surface of the support, a cylinder arranged on the slide rail, a main push plate fixed at the front end of the cylinder, and a cylinder support plate arranged at the rear end of the cylinder, wherein the main push plate is used to push the steel pipe and the bridge frame under the action of the cylinder.
[0020] Therefore, in the starting space, the rear of the steel pipe is used as a jacking device through the base, and the steel pipe is accurately pushed into the formation using the oil cylinder and the slide rail. A reaction frame or reaction wall is set behind the jacking device to transmit the propulsion force to the formation.
[0021] In some embodiments, the bridge is a semicircular steel pipe of a certain length, and ribs are respectively provided at the front and rear ends of the steel pipe. The bridge is placed in the steel pipe to transmit thrust, and the steel pipe is pushed to the designed position and then dragged back to the main machine.
[0022] In some embodiments, the pipeline includes an electric wire and cable pipeline and a hydraulic pipeline, wherein the electric wire and cable pipeline and the hydraulic pipeline are respectively connected to the host to provide power for the host and control transmission data.
[0023] In some embodiments, an anti-rolling mechanism is provided between the excavation device and the steel pipe to prevent excessive rolling of the main machine.
[0024] Therefore, the main machine is the main component of the tunneling device, and its main functions include tunneling, guiding, and traction.
[0025] In some embodiments, the slag conveying device includes: a mud and water tank arranged inside the main engine, a mud pipeline arranged in the main engine and the bridge, a mud bypass valve group and a sensor arranged on the mud pipeline, and a mud pump connected to the mud pipeline.
[0026] In some embodiments, the slag conveying device includes: a mud and water bin arranged inside the main engine, a mud inlet pipeline and a slurry discharge pipeline arranged in the main engine and the bridge, a slurry inlet gate valve, a slurry inlet flowmeter and a slurry inlet pressure sensor arranged on the slurry inlet pipeline, a slurry discharge gate valve, a slurry discharge flowmeter, a slurry discharge pressure sensor and a four-way valve group arranged on the slurry discharge pipeline, a slurry inlet pump connected to the slurry inlet pipeline, and a slurry discharge pump connected to the slurry discharge pipeline.
[0027] In some embodiments, the mud and water bin is a space formed by the rear of the cutter disc, the main machine and the surrounding soil.
[0028] In some embodiments, muddy water is used as the slag carrying medium, and the slag conveying device arranged in the main engine allows high-pressure muddy water to enter a closed mud and water bin through a mud pipeline, i.e., a mud inlet pipeline, a mud discharge pipeline, and a mud bypass valve group, i.e., an on-off and bypass gate valve (four-way valve). The slurry discharge pump pumps the muddy water mixed with slag out of the mud and water bin and conveys it to a mud and water treatment system for environmental protection treatment, wherein the mud and water treatment system can be set on the ground or at the edge of a pipe curtain hole.
[0029] In some embodiments, at least two slurry discharge pumps are provided, wherein at least one slurry discharge pump is provided behind the main engine, and at least one slurry discharge pump is provided outside the steel pipe.
[0030] In some embodiments, a special slurry pump is installed in a steel pipe close to the main machine to achieve better soil transportation.
[0031] In some embodiments, the steering device is arranged on the main machine, and the steering device includes a steering shell and a steering cylinder mechanism arranged in the steering shell, wherein the steering shell is a hinged mechanism, and the steering cylinder mechanism includes three cylinders evenly distributed around the circumference, and the angle deviation between the front and rear of the main machine is achieved by the extension and retraction of the three cylinders, thereby achieving steering.
[0032] In some embodiments, the articulated mechanism includes an articulated shield front section, an articulated shield rear section, and an articulated sealing ring sleeved on the outside of the articulated shield front section and the articulated shield rear section.
[0033] In some embodiments, when the direction-adjusting device is adjusting the direction, the front section of the articulated shield and the rear section of the articulated shield are movable to form an angle.
[0034] In some embodiments, sealing mechanisms are designed on the outside of the articulated mechanism and the main body of the tunneling device to prevent water in the formation from entering the main body and the steel pipe.
[0035] In some embodiments, the direction-adjusting device is provided with a mechanical hydraulic steering mechanism, so that the direction of the machine head can be adjusted to drive the steel pipe to turn and move forward along the designed axis.
[0036] In some embodiments, the guide device includes: a guide sensor disposed in the host, a cable passed through the steel pipe, a control box disposed outside the steel pipe, and a computer communicatively connected to the guide sensor.
[0037] Therefore, since the sensor of the guide device is placed inside the main unit, the position, posture, trend, etc. of the main unit can be measured, and the cable extending through the steel pipe extends to the pipe curtain hole at the rear and is connected to the computer located in the operating room.
[0038] In some embodiments, the cable in the guide device is configured as a communication cable.
[0039] In some embodiments, the control device includes: a PLC controller, a touch screen computer electrically connected to the PLC controller, and an operating console electrically connected to the touch screen computer.
[0040] In some embodiments, the control device further includes sensors respectively arranged on the excavation device, the slag conveying device, the direction adjustment device and the guide device.
[0041] In some embodiments, the sensor of the control device includes a pressure sensor, a flow sensor, and a temperature sensor.
[0042] In some embodiments, a communication cable is used in the control device to achieve electrical connection.
[0043] In some embodiments, the communication cable used in the control device is different from the communication cable used in the guide device, that is, different communication protocols are used.
[0044] In some embodiments, a plurality of button switches are provided on the operating console of the control device to control various parameters.
[0045] It can be seen that the control device is used for data acquisition and control of this system. The signal and status of the sensor are collected through the PLC controller, and then displayed on the touch screen computer. Through buttons and operations, the instructions are transmitted to each device for execution.
[0046] By adopting the above technical scheme, the present invention at least achieves the following technical effects: (1) By using inertial measurement technology, no other reference or communication is required, that is, a mechanical method is adopted, and at the same time an electronic method is used to accurately measure the position, posture, and forward trend of the main machine, and then a direction adjustment device is used to make it move in the designed direction, thereby pulling the steel pipe behind the machine head into the formation, and the main machine can retreat, thereby achieving accurate measurement and accurate direction adjustment of the pipe curtain construction; (2) It is suitable for long-distance jacking of small-diameter steel pipes. The current controllable length of pipe curtain construction in China is about 70 meters, and the system of the present invention can achieve a maximum distance of more than 100 meters; (3) When a large offset occurs in the excavation device, it can still correct the regression in time and perform accurate measurement; (4) During the excavation process, the water pressure of the water pumped into the pipe curtain hole is used to maintain the water and soil balance, thereby achieving the effect of eliminating the settlement and uplift of the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 The structure diagram of the pipe curtain method construction system provided by the utility model is shown;
[0048] Figure 2 The schematic diagram of the structure of the excavation device, the slag conveying device and the direction adjustment device provided by the utility model is shown;
[0049] Figure 3 The schematic diagram of the structure of the base provided by the utility model is shown;
[0050] Figure 4 The schematic diagram of the structure of the bridge provided by the utility model is shown. DETAILED DESCRIPTION
[0051] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0052] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "positive", "negative", "front", "back", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the system or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc., are used to define components, only for the convenience of distinguishing the above components, and unless otherwise stated, the above terms have no special meaning and cannot be understood as indicating or implying relative importance.
[0053] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0054] As a non-limiting embodiment, Figure 1 As shown, the pipe curtain construction system provided by the utility model comprises: a tunneling device 1, a slag conveying device 2, a direction adjustment device 3, a guide device 4 and a control device 5. The tunneling device 1 is used to excavate the stratum and drive the steel pipe into the stratum.
[0055] The excavation device 1 of the utility model is used to excavate the stratum and drive the steel pipe into the stratum. In this non-limiting embodiment, the excavation device 1 includes: a main machine, a base, a bridge and a pipeline. Among them, the base is arranged at the opening of the pipe curtain, the front end of the base is connected to the rear end of the bridge, the front end of the bridge is connected to the main machine, the main machine and the bridge are placed in the steel pipe, the pipeline is placed on the bridge, and the main machine extends to the opening of the pipe curtain through the bridge.
[0056] Specifically, the main machine is the main component of the tunneling device, which mainly performs the functions of tunneling, guiding, and traction. Figure 2 As shown, the main machine includes a cutter disc 11 arranged at the front end and a driving mechanism 12 connected to the cutter disc, wherein the driving mechanism 12 is connected to the steering device 3 for adjusting the posture and position of the cutter disc under the action of the steering device 3.
[0057] In this non-limiting embodiment, Figure 3 As shown, the base includes: a support 14, a height adjuster 15 arranged at the bottom of the support 14, a slide rail 16 arranged on the upper surface of the support 14, a cylinder 17 arranged on the slide rail 16, a main push plate 18 fixed to the front end of the cylinder 17 and a cylinder support plate 19 arranged at the rear end of the cylinder 17, wherein the main push plate 18 is used to push the steel pipe and the bridge frame under the action of the cylinder 17.
[0058] Therefore, in the starting space, the rear of the steel pipe is used as a jacking device through the base, and the steel pipe is accurately pushed into the formation using the oil cylinder 17 and the slide rail 16. A reaction frame or reaction wall is set behind the jacking device to transmit the propulsion force to the formation. During the pushing process, the pushing action program will be pre-set and the operation will be performed by the hydraulic system.
[0059] In this non-limiting embodiment, Figure 4 As shown in the figure, the bridge is a semicircular steel pipe of a certain length, with ribs at the front and rear ends of the steel pipe. The bridge is placed inside the steel pipe to transmit thrust, push the steel pipe to the designed position and then drag it back to the main machine. The pipeline includes wire and cable pipelines and hydraulic pipelines, among which the wire and cable pipelines and hydraulic pipelines are respectively connected to the main machine to provide power for the main machine and control transmission data.
[0060] The slag conveying device 2 is used to convey the slag produced by the excavation device to the ground. Specifically, the slag conveying device includes: a mud and water bin arranged inside the main machine, a mud pipeline arranged in the mud and water bin, a mud bypass valve group and a sensor arranged on the mud pipeline, and a slurry discharge pump connected to the mud pipeline. Thus, mud and water are used as the slag carrying medium, and the slag conveying device arranged in the main machine passes through the mud pipeline, i.e., the mud inlet and mud discharge pipelines and the mud bypass valve group, i.e., the on-off and bypass gate valves (four-way valves), so that high-pressure mud and water enter the closed mud and water bin, and the slurry discharge pump draws the mud and water mixed with the slag out of the mud and water bin and transports it to the mud and water treatment system for environmental protection treatment, wherein the mud and water treatment system can be arranged on the ground or at the edge of the pipe curtain hole.
[0061] The guide device 3 measures the position, posture and forward trend of the excavation device through the inertial measurement method, obtains the excavation information of the excavation device, and the guide device 3 is connected to the control device 5 for communication, thereby transmitting the excavation information to the control device. Specifically, the guide device 3 includes: a guide sensor arranged in the host, a cable inserted in the steel pipe, a control box arranged outside the steel pipe, and a computer connected to the guide sensor for communication. Since the sensor of the guide device 3 is placed in the host, the position, posture, trend, etc. of the host can be measured, and the cable extending through the steel pipe to the rear pipe curtain hole is connected to the computer arranged in the operation room.
[0062] The direction adjustment device 4 is arranged at the excavation device, and is connected to the control device for communication, and is used to receive control instructions issued by the control device and adjust the travel direction of the excavation device. Figure 2 As shown, the steering device 4 is arranged on the main machine, where the front section of the articulated shield is connected to the rear section of the articulated shield. The steering device 4 includes three oil cylinders evenly distributed around the circumference. The angle deviation between the front and rear of the main machine is achieved through the extension and contraction of the three oil cylinders, thereby achieving steering. In addition, the steering device 4 is equipped with a mechanical hydraulic steering mechanism, so that the direction of the machine head can be adjusted, driving the steel pipe to turn and move forward along the designed axis.
[0063] The control device 5 is connected in communication with the guide device 3 and the direction-adjusting device 4, and is used to preset the excavation information of the excavation device 1, and compare it with the excavation information transmitted by the guide device 3, and control the direction-adjusting device 4 to adjust the travel direction of the excavation device 1. Specifically, the control device includes: a PLC controller, a touch screen computer electrically connected to the PLC controller, and an operating console electrically connected to the touch screen computer. The control device uses a communication cable to achieve electrical connection, and the communication cable used in the control device is different from the communication cable used in the guide device, that is, different communication protocols are used. A number of button switches are provided on the operating console of the control device to control various parameters.
[0064] It can be seen that the control device is used for data acquisition and control of this system. The signal and status of the sensor are collected through the PLC controller, and then displayed on the touch screen computer, and the instructions are sent to each device for execution through buttons and operations. Therefore, the guide device of the utility model uses inertial measurement technology to accurately measure the position, posture, forward trend, etc. of the tunneling device, and then uses the turning device to make it move in the designed direction, thereby pulling the steel pipe behind the tunneling device into the formation, and finally the tunneling device, the slag conveying device, the guide device and the turning device withdraw from the steel pipe, and the steel pipe remains in the formation and operates in sequence, thereby forming a curtain structure or support structure, so as to realize subsequent excavation and support, and avoid affecting the surrounding structures.
[0065] As another non-limiting embodiment, the control device further includes sensors respectively arranged on the excavation device, the slag conveying device, the direction adjustment device and the guide device, and the sensors of the control device include a pressure sensor, a flow sensor and a temperature sensor. It can be seen that the control device is used for data acquisition and control of the system, collects the signals and states of the sensors through the PLC controller, and then displays them on the touch screen computer, and transmits the instructions to each device for execution through buttons and operations.
[0066] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.
Claims
1. A pipe curtain construction system, characterized in that: include: Excavation device, soil conveying device, direction adjustment device, guiding device and control device, wherein: The excavation device is used to excavate the stratum and drive the steel pipe into the stratum; The slag conveying device is used to convey the slag produced by the excavation of the excavation device to the ground; The guiding device measures the position, posture and forward trend of the excavation device by an inertial measurement method to obtain excavation information of the excavation device. The guiding device is connected to the control device for communication to transmit the excavation information to the control device. The direction adjustment device is arranged at the excavation device, is in communication connection with the control device, and is used to receive control instructions issued by the control device and adjust the travel direction of the excavation device; The control device is communicatively connected with the guide device and the steering device, and is used to preset the excavation information of the excavation device, and compare it with the excavation information transmitted by the guide device, and control the steering device to adjust the walking direction of the excavation device.
2. The pipe curtain construction system according to claim 1, characterized in that: The excavation device includes: a main machine, a base, a bridge and pipelines, wherein the base is arranged at the pipe curtain hole, the front end of the base is connected to the rear end of the bridge, the front end of the bridge is connected to the main machine, the main machine and the bridge are placed in a steel pipe, the pipeline is placed on the bridge, and the main machine extends to the pipe curtain hole through the bridge.
3. The pipe curtain construction system according to claim 2, characterized in that: The main machine includes a cutter disc arranged at the front end and a driving mechanism connected to the cutter disc, wherein the driving mechanism is connected to the direction adjustment device and is used to adjust the posture and position of the cutter disc under the action of the direction adjustment device.
4. The pipe curtain construction system according to claim 2 or 3, characterized in that: The base includes: a support, a height adjuster arranged at the bottom of the support, a slide rail arranged on the upper surface of the support, a cylinder arranged on the slide rail, a main push plate fixed to the front end of the cylinder, and a cylinder support plate arranged at the rear end of the cylinder, wherein the main push plate is used to push the steel pipe and the bridge frame under the action of the cylinder.
5. The pipe-roof construction system according to claim 4, characterized in that: The bridge is a semicircular steel pipe of a certain length. Ribs are provided at the front and rear ends of the steel pipe respectively. The bridge is placed in the steel pipe to transmit thrust, push the steel pipe to the designed position and then drag it back to the main engine.
6. The pipe-roof construction system according to claim 5, characterized in that: The pipelines include electric wire and cable pipelines and hydraulic pipelines, wherein the electric wire and cable pipelines and the hydraulic pipelines are respectively connected to the host machine for providing power and controlling transmission data for the host machine.
7. The pipe-roof construction system according to claim 3, characterized in that: The slag conveying device comprises: a mud and water bin arranged inside the main machine, a mud pipeline arranged inside the main machine and the bridge, a mud bypass valve group and a sensor arranged on the mud pipeline, and a mud pump connected to the mud pipeline.
8. The pipe-roof construction system according to claim 3, characterized in that: The steering device is arranged on the main machine, and the steering device includes a steering shell and a steering cylinder mechanism arranged in the steering shell, wherein the steering shell is a hinged mechanism, and the steering cylinder mechanism includes three cylinders evenly distributed around the circumference, and the angle deviation between the front and rear of the main machine is achieved by the extension and retraction of the three cylinders, thereby achieving steering.
9. The pipe-roof construction system according to claim 3, characterized in that: The guiding device comprises: a guiding sensor arranged in the host, a cable passed through the steel pipe, a control box arranged outside the steel pipe, and a computer connected to the guiding sensor for communication.
10. The pipe-roof construction system according to claim 1, characterized in that: The control device comprises: a PLC controller, a touch screen computer electrically connected to the PLC controller, and an operation console electrically connected to the touch screen computer.