Longitudinal continuous pouring construction system for tunnel secondary lining concrete

By installing anti-air removal pressure sensors on the tunnel arch top, the density between concrete and the initial branch was monitored, and the problem of air removal in early tunnel projects was solved, and the safety and stability of the tunnel was improved.

CN222066770UActive Publication Date: 2024-11-26CHINA RAILWAY 15TH BUREAU GROUP CORPORATION LIMITED +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323635426.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-26
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

In early tunnel projects, the phenomenon of air leakage behind the lining caused by concrete shrinkage and traditional pumped concrete construction is likely to cause tunnel landslide accidents and cause safety hazards.

Method used

Install strip-shaped anti-aircraft pressure sensor on the geotextile on the tunnel arch, and install round cake-shaped anti-aircraft pressure sensor on the waterproof board to monitor the density between the concrete and the initial branch to prevent the occurrence of despair.

Benefits of technology

Effectively monitor and prevent the occurrence of emptying, reduce concrete cracks and tunnel water leakage, and improve tunnel operation safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066770U_ABST
    Figure CN222066770U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel secondary lining concrete longitudinal continuous pouring construction system which comprises a secondary lining trolley, a strip-shaped anti-disengaging pressure sensor installed on geotechnical cloth of a vault and a cake-shaped anti-disengaging pressure sensor installed on a waterproof plate of the vault. A top pouring area is formed in the space between the secondary lining top mold and the inner wall of the tunnel, a top pouring blocking plate used for blocking the front end of the top pouring area is installed on the top of the secondary lining trolley, a pouring opening is formed in the top pouring blocking plate, a blocking mechanism is arranged at the pouring opening, a pouring trolley is installed on the secondary lining trolley, and the pouring trolley is connected with the secondary lining top mold. A pouring gun is connected to the pouring trolley, and the pouring gun sequentially passes through the plugging mechanism and the pouring opening to enter the top pouring area. The device has the advantages that the compactness between the secondary lining arch concrete and the primary support can be effectively monitored, and the void phenomenon is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel secondary linings, in particular to a tunnel secondary lining concrete longitudinal continuous pouring construction system. Background Art

[0002] Tunnel engineering is an important part of highways, high-speed railways, and urban subway projects. Due to the limitations of design and construction technology during the construction period, tunnels built in the early stage have different degrees of defects. Voiding behind the lining is the most typical and common form of disease. Tunnel collapse accidents caused by voiding behind the lining occur from time to time, which is extremely harmful. Voiding is most likely to occur between the secondary lining and the primary support of the tunnel vault. The occurrence of voiding is mainly due to the shrinkage of the concrete itself and the influence of the traditional pumped concrete construction process. Once voiding occurs, the air in the void will expand and contract with heat and cold. In severe cases, it will cause cracks in the concrete, leading to water leakage on the top of the tunnel, which will pose a great safety hazard to the later operation of the tunnel.

[0003] Therefore, a tunnel secondary lining concrete longitudinal continuous pouring construction system that can solve the above problems is needed. Summary of the invention

[0004] The purpose of the utility model is to provide a tunnel secondary lining concrete longitudinal continuous pouring construction system based on the above-mentioned deficiencies in the prior art. By installing a strip-shaped anti-emptying pressure sensor on the geotextile of the arch and a round pancake-shaped anti-emptying pressure sensor on the waterproof board of the arch, the density between the secondary lining arch concrete and the primary support can be effectively monitored to prevent the occurrence of emptying.

[0005] The purpose of this utility model is achieved by the following technical solutions:

[0006] A tunnel secondary lining concrete longitudinal continuous pouring construction system, characterized in that it includes a secondary lining trolley, a strip-shaped anti-emptying pressure sensor installed on the geotextile of the arch, and a pancake-shaped anti-emptying pressure sensor installed on the waterproof board of the arch, the secondary lining trolley is provided with a secondary lining top mold, the space between the secondary lining top mold and the tunnel inner wall forms a top pouring area, the top of the secondary lining trolley is provided with a top pouring plugging plate for blocking the front end of the top pouring area, a pouring port is opened on the top pouring plugging plate, a sealing mechanism is provided at the pouring port, a pouring trolley is installed on the secondary lining trolley, a pouring gun is connected to the pouring trolley, and the pouring gun passes through the sealing mechanism and the pouring port in sequence and enters the top pouring area.

[0007] The strip-shaped anti-emptying pressure sensor is arranged along the longitudinal direction and the circumferential direction of the dome, and the pie-shaped anti-emptying pressure sensor is arranged along the longitudinal direction and the circumferential direction of the dome.

[0008] The sealing mechanism includes a square tube, a sealing plate and a fixing device, the fixing device consists of a fixing block and a fixing plate, the fixing block is fixed to the outside of the square tube bottom plate, the fixing block and the square tube are respectively provided with a sealing plate placement groove along their vertical direction, and the fixing block and the sealing plate are respectively provided with a fixing plate placement groove along their horizontal direction.

[0009] The pouring gun is connected with the pouring trolley through a mortar lubrication pipe.

[0010] A camera is installed on the perfusion gun.

[0011] A vibration opening is provided on the top pouring plugging plate, and a vibrator is arranged in the vibration opening.

[0012] The utility model has the advantages that by installing a strip-shaped anti-emptying pressure sensor on the geotextile of the arch and installing a round cake-shaped anti-emptying pressure sensor on the waterproof board of the arch, the compactness between the secondary lining arch concrete and the primary support can be effectively monitored to prevent the occurrence of emptying. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the vault in the utility model;

[0014] Figure 2 It is a schematic diagram of the second lining trolley in the utility model;

[0015] Figure 3 It is a schematic diagram of the top pouring plugging plate in the utility model;

[0016] Figure 4 It is a schematic diagram of the blocking mechanism in the utility model. DETAILED DESCRIPTION

[0017] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0018] like Figures 1 to 4 As shown, the marks in the figure represent respectively:

[0019] Secondary lining trolley 1, arch 2, geotextile 3, waterproof board 4, top pouring plugging plate 5, pouring trolley 6, pouring gun 7, square tube 8, plugging plate 9, fixing block 10, fixing plate 11, vibrator 12.

[0020] Example: Figures 1 to 4As shown, the present embodiment relates to a tunnel secondary lining concrete longitudinal continuous pouring construction system, which mainly comprises a secondary lining trolley 1, a pouring trolley 6, a strip-shaped anti-de-air pressure sensor and a circular pancake-shaped anti-de-air pressure sensor, a geotextile 3 and a waterproof board 4 are arranged in sequence below the arch 2, the strip-shaped anti-de-air pressure sensor is installed on the lower surface of the geotextile 3 of the arch 2, and the strip-shaped anti-de-air pressure sensor is arranged along the longitudinal direction and circumferential direction of the arch 2, the circular pancake-shaped anti-de-air pressure sensor is installed on the lower surface of the waterproof board 4 of the arch 2, and the circular pancake-shaped anti-de-air pressure sensor is arranged along the longitudinal direction and circumferential direction of the arch 2, the strip-shaped anti-de-air pressure sensor and the circular pancake-shaped anti-de-air pressure sensor can monitor the density between the secondary lining arch concrete and the primary support, and the data collected by the strip-shaped anti-de-air pressure sensor and the circular pancake-shaped anti-de-air pressure sensor can be verified with each other to prevent the occurrence of de-airing.

[0021] like Figures 1 to 4 As shown, a second lining top mold is provided on the second lining trolley 1, and the space between the second lining top mold and the inner wall of the tunnel forms a top pouring area. A top pouring plugging plate 5 for blocking the front end of the top pouring area is installed on the top of the second lining trolley 1, and a pouring port is opened on the top pouring plugging plate 5, and a plugging mechanism is provided at the pouring port. A pouring trolley 6 is installed on the second lining trolley 1, and the pouring trolley 6 is connected to the pouring gun 7 through a mortar lubrication pipe, and the pouring gun 7 can enter the top pouring area through the plugging mechanism and the pouring port in sequence. In this embodiment, the plugging mechanism includes a square tube 8, a plugging plate 9 and a fixing device, and the fixing device is composed of a fixing block 10 and a fixing plate 11. The fixing block 10 is fixed on the outer side of the bottom plate of the square tube 8, and the fixing block 10 and the square tube 8 are respectively provided with a plugging plate placement groove along their vertical direction, and the fixing block 10 and the plugging plate 9 are respectively provided with a fixing plate placement groove along their horizontal direction. When pouring the top pouring area, the top surface of the plugging plate 9 is flush with the top surface of the bottom plate of the square tube 8, and the head of the pouring gun 7 is located in the top pouring area; when the pouring of the top pouring area is completed, the plugging plate 9 is moved upward to close the plugging mechanism, and the plugging plate 9 is completely in the plugging plate placement groove of the square tube 8, and the fixed plate 11 is clamped in the fixed plate placement groove of the fixed block 10 and the fixed plate placement groove of the plugging plate 9, and the head of the pouring gun 7 is located outside the plugging plate 9. In addition, a camera is installed on the pouring gun 7. Before pouring the top pouring area, the pouring gun 7 can be extended into the top pouring area, and the camera can be used to check whether the pouring gun 7 runs smoothly, and the installation of the second lining steel bars and the embedded grooves can be visually checked. A vibration port is opened on the top pouring plugging plate 5, and a vibrator 12 is arranged in the vibration port for vibrating the concrete in the top pouring area.

[0022] The advantage of this embodiment is that by installing a strip-shaped anti-airflow pressure sensor on the geotextile of the arch and a round-shaped anti-airflow pressure sensor on the waterproof board of the arch, the density between the secondary lining arch concrete and the primary support can be effectively monitored to prevent the occurrence of airflow.

[0023] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A tunnel secondary lining concrete longitudinal continuous pouring construction system, characterized by: It includes a second lining trolley, a strip-shaped anti-emptying pressure sensor installed on the geotextile of the arch, and a pancake-shaped anti-emptying pressure sensor installed on the waterproof board of the arch. The second lining trolley is provided with a second lining top mold, and the space between the second lining top mold and the inner wall of the tunnel forms a top pouring area. The top of the second lining trolley is provided with a top pouring plugging plate for blocking the front end of the top pouring area, a pouring port is opened on the top pouring plugging plate, and a sealing mechanism is provided at the pouring port. A pouring trolley is installed on the second lining trolley, and a pouring gun is connected to the pouring trolley, and the pouring gun passes through the sealing mechanism and the pouring port in sequence and enters the top pouring area.

2. A tunnel secondary lining concrete longitudinal continuous pouring construction system as claimed in claim 1, characterized in that: The strip-shaped anti-emptying pressure sensor is arranged along the longitudinal direction and the circumferential direction of the dome, and the pie-shaped anti-emptying pressure sensor is arranged along the longitudinal direction and the circumferential direction of the dome.

3. A tunnel secondary lining concrete longitudinal continuous pouring construction system as claimed in claim 1, characterized in that: The sealing mechanism includes a square tube, a sealing plate and a fixing device, the fixing device consists of a fixing block and a fixing plate, the fixing block is fixed to the outside of the square tube bottom plate, the fixing block and the square tube are respectively provided with a sealing plate placement groove along their vertical direction, and the fixing block and the sealing plate are respectively provided with a fixing plate placement groove along their horizontal direction.

4. A tunnel secondary lining concrete longitudinal continuous pouring construction system as claimed in claim 1, characterized in that: The pouring gun is connected with the pouring trolley through a mortar lubrication pipe.

5. A tunnel secondary lining concrete longitudinal continuous pouring construction system as claimed in claim 1, characterized in that: A camera is installed on the perfusion gun.

6. A tunnel secondary lining concrete longitudinal continuous pouring construction system as claimed in claim 1, characterized in that: A vibration opening is provided on the top pouring plugging plate, and a vibrator is arranged in the vibration opening.

Citation Information

Cited By

  • Tunnel vault void monitoring device and method

    CN119825410A