Secondary lining construction trolley
By designing an adjustable arc frame on the second lining construction trolley, the problem of the inability to flexibly adjust the installation angle of the prefabricated membrane shell in the prior art is solved, efficient and flexible installation in different construction environments is achieved, and construction efficiency is improved and quality.
Patent Information
- Application Number
- CN202420648045.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-01
AI Technical Summary
The existing two-lined construction trolley cannot flexibly adjust the installation angle of the prefabricated membrane shell according to the construction environment, resulting in the difficulty of the construction efficiency and quality in a narrow space to meet the requirements.
A two-lined construction trolley including a gantry assembly, a fastening assembly and a hoisting assembly is designed to adjust the height and angle of the arc frame through the adjustment parts to achieve flexible installation of the prefabricated membrane shell. The fastening assembly is used to fix the rectangular prefabricated membrane shell, and the hoisting assembly includes a first sub-assembly and a second sub-assembly of a split body, respectively, and the adjusting member is connected by hinges to allow the arc frame to be Height and angle adjustment.
It realizes flexible adjustment of the installation height and angle of the prefabricated membrane shell according to the construction environment, meets different construction needs, and improves construction efficiency and quality.
Smart Images

Figure CN222084523U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of lining construction equipment, in particular to a secondary lining construction trolley. Background Art
[0002] With the development of rail transit, the quality, safety and environmental protection requirements of various pits and tunnels are constantly improving. The problems of high energy consumption, high pollution, high risk and low efficiency in underground projects constrained by narrow space are becoming increasingly prominent. In concealed fortifications and special projects with short construction period, fast construction speed and high process requirements, the secondary lining concrete in the composite lining structure often has quality defects such as gaps, falling off, water leakage and serious longitudinal cracking of the lining.
[0003] The combination of prefabricated membrane shell and cast-in-place concrete can effectively improve the safety and durability of secondary lining. However, due to the mining process, the number and weight of prefabricated parts, the difficulty in matching prefabricated membrane shells and assembled lining machinery has become the main factor restricting the mechanized construction and industrialized construction of tunnels and tunnels. In the existing technology, construction trolleys are usually used to complete the secondary lining work. However, the jacking components of the existing secondary lining construction trolleys are generally integrated, and there is a technical problem that the installation angle of the prefabricated membrane shell cannot be flexibly adjusted according to the construction environment. Utility Model Content
[0004] In view of the above analysis, an embodiment of the utility model aims to provide a secondary lining construction trolley to solve the technical problem in the prior art that the installation angle of the prefabricated membrane shell cannot be flexibly adjusted according to the construction environment.
[0005] The purpose of the utility model is achieved in this way:
[0006] On the one hand, a secondary lining construction trolley is provided, comprising:
[0007] A portal frame assembly, comprising a first portal frame and a second portal frame;
[0008] A fastening assembly, provided on both sides of the first portal frame and the second portal frame, for fixing the rectangular prefabricated membrane shell;
[0009] A lifting assembly is arranged on the top of the gantry assembly and is used to support the arc-shaped prefabricated membrane shell. The lifting assembly includes a first subassembly and a second subassembly. The first subassembly and the second subassembly are separated and arranged opposite to each other.
[0010] The first subassembly and the second subassembly each include at least two tripod groups, an arc frame and an adjusting member, which are respectively arranged on the first portal frame and the second portal frame; the two ends of the adjusting member are respectively hinged to the tripod group and the arc frame, so as to adjust the height and angle of the arc frame.
[0011] Further, the tripod group includes a first tripod and a second tripod, and is provided with a first connecting tube, a second connecting tube and a third connecting tube; one end of the adjusting member is hinged to the first connecting tube through a connecting member, and the other end is hinged to one end of the arc frame; the other end of the arc frame is hinged to the tripod group through the second connecting tube; the third connecting tube is used to connect the first tripod with the second tripod.
[0012] Furthermore, it also includes a moving assembly, including a moving mechanism and a moving matching piece, the moving mechanism is arranged at the bottom of the first portal frame and the second portal frame; the moving mechanism is rollingly connected to the moving matching piece.
[0013] Furthermore, the first portal frame and the second portal frame are connected via a horizontal double-layer frame and a single-frame frame.
[0014] Furthermore, two adjacent tripod sets are detachably connected via a connecting circular tube.
[0015] Furthermore, the arc frame includes a first arc tube, a second arc tube and a third arc tube, the first arc tube, the second arc tube and the third arc tube meet at one point at one end away from the tripod group, and are spatially distributed in a triangle shape near the other end of the tripod group.
[0016] Furthermore, one end of the second arc tube and the third arc tube close to the tripod assembly is connected via a fourth connecting tube, and one end of the first arc tube close to the tripod assembly is connected to the fourth connecting tube via an inclined connecting tube.
[0017] Furthermore, the fourth connecting tube is coaxially arranged with the second connecting tube so that the arc frame is hinged to the tripod assembly.
[0018] Furthermore, the midpoint of the first arc tube is hinged to the trisection points of the second arc tube and the third arc tube respectively through circular tubes.
[0019] Furthermore, the surface of the first arc-shaped tube is covered with a protective layer, and the material of the protective layer includes synthetic rubber such as thermoplastic polyurethane rubber, chlorinated polyethylene or styrene-butadiene rubber.
[0020] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:
[0021] The secondary lining construction trolley provided by the utility model respectively installs and supports the prefabricated membrane shell through the fastening assembly and the jacking assembly, and adjusts the height and angle of the arc frame of the jacking assembly through the adjusting part to install the prefabricated membrane shell in the specified position, which can meet different construction requirements and realize the flexible adjustment of the installation height and angle of the prefabricated membrane shell according to the construction environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the embodiments of this specification. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0023] Figure 1 A schematic diagram of the structure of the secondary lining construction trolley provided in Example 1;
[0024] Figure 2 A schematic structural diagram of a jacking assembly of a secondary lining construction trolley provided in Example 1;
[0025] Figure 3 A schematic structural diagram of a tripod assembly of a secondary lining construction trolley provided in Example 1;
[0026] Figure 4 A schematic structural diagram of the arc frame of the secondary lining construction trolley provided in Example 1;
[0027] Figure 5 A side view of the jacking assembly of the secondary lining construction trolley provided in Example 1;
[0028] Figure 6 A side view of the jacking assembly of the secondary lining construction trolley provided in Example 2;
[0029] Figure 7 A side view of the jacking assembly of the secondary lining construction trolley provided in Example 3.
[0030] Reference numerals:
[0031] 1-gantry assembly; 10-first gantry frame; 11-second gantry frame; 12-horizontal double-layer frame; 13-single-frame frame; 2-fastening assembly; 3-lifting assembly; 30-first subassembly; 300-tripod group; 300.1-first tripod; 300.2-second tripod; 300.3-first connecting tube; 300.4-second connecting tube; 300.5-third connecting tube; 301-arc frame; 301.1-first arc tube; 301.2-second arc tube; 301.3-third arc tube; 301.4-inclined connecting tube; 301.5-fourth connecting tube; 302-adjusting member; 302.1-connecting member; 303-connecting circular tube; 304-first connecting transverse tube; 305-second connecting transverse tube; 31-second subassembly; 4-moving assembly; 40-moving mechanism; 41-moving matching member. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. It should be noted that, in the absence of conflict, the embodiments and features in the embodiments disclosed in this disclosure can be combined, separated, interchanged and / or rearranged with each other. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0033] In the accompanying drawings, the size and relative size of components may be exaggerated for clarity and / or descriptive purposes. When the exemplary embodiments may be implemented differently, a specific process sequence may be performed in a different order than described. For example, two successively described processes may be performed substantially simultaneously or in an order opposite to the order described. In addition, the same reference numerals represent the same components.
[0034] Example 1
[0035] A specific embodiment of the utility model is as follows Figure 1-5 As shown, a secondary lining construction trolley is disclosed, comprising:
[0036] The door frame assembly 1 comprises a first door frame 10 and a second door frame 11;
[0037] A fastening assembly 2, provided on both sides of the first portal frame 10 and the second portal frame 11, for fixing the rectangular prefabricated membrane shell;
[0038] A lifting assembly 3 is arranged on the top of the gantry assembly 1 and is used to support the arc-shaped prefabricated membrane shell. The lifting assembly 3 includes a first subassembly 30 and a second subassembly 31. The first subassembly 30 and the second subassembly 31 are separated and arranged opposite to each other.
[0039] The first subassembly 30 and the second subassembly 31 each include at least two tripod sets 300, an arc frame 301 and an adjusting member 302, which are respectively arranged on the first portal frame 10 and the second portal frame 11; the two ends of the adjusting member 302 are respectively hinged to the tripod set 300 and the arc frame 301, so as to adjust the height and angle of the arc frame 301.
[0040] During implementation, first, the rectangular prefabricated membrane shell and the arc-shaped prefabricated membrane shell are installed on the fastening component 2 and the lifting component 3 respectively. When the arc-shaped prefabricated membrane shell is installed, the length of the arc surface of the membrane shell exceeding the fixed point on the lifting component 3 is 1 / 5 to 1 / 4 of the total length of the membrane shell; then the construction trolley is moved to the construction position, and after the height and angle of the arc frame 301 are adjusted by the adjustment part 302, the rectangular prefabricated membrane shell and the arc-shaped prefabricated membrane shell are installed at the designated position; then concrete is poured into the prefabricated membrane shell, and after the concrete solidifies, the fastening component 2 is removed, and the arc frame 301 is retracted, and the execution is repeated until the construction is completed.
[0041] Compared with the prior art, the secondary lining construction trolley provided in this embodiment installs and supports the prefabricated membrane shell through a fastening assembly and a lifting assembly respectively, and adjusts the height and angle of the arc frame of the lifting assembly through an adjusting part to install the prefabricated membrane shell in a designated position, which can meet different construction requirements and realize flexible adjustment of the installation height and angle of the prefabricated membrane shell according to the construction environment.
[0042] In this embodiment, the tripod assembly 300 includes a first tripod 300.1 and a second tripod 300.2, and is provided with a first connecting tube 300.3, a second connecting tube 300.4 and a third connecting tube 300.5; one end of the adjusting member 302 is hinged to the first connecting tube 300.3 through a connecting member 302.1, and the other end is hinged to one end of the arc frame 301; the other end of the arc frame 301 is hinged to the tripod assembly 300 through the second connecting tube 300.4; the third connecting tube 300.5 is used to connect the first tripod 300.1 and the second tripod 300.2.
[0043] Specifically, the arc frame 301 is hinged to the liftable adjustment member 302 at one end and to the tripod assembly 300 at the other end to adjust the height and angle of the arc frame 301 and further adjust the installation height and angle of the arc prefabricated membrane shell supported by the arc frame 301 .
[0044] In this embodiment, a moving assembly 4 is also included, including a moving mechanism 40 and a moving matching piece 41. The moving mechanism 40 is arranged at the bottom of the first portal frame 10 and the second portal frame 11; the moving mechanism 40 is rollingly connected to the moving matching piece 41.
[0045] Exemplarily, the moving mechanism 40 includes at least four roller structures installed on both sides of the bottom of the first portal frame 10 and the second portal frame 11, and the moving matching component 41 includes a track or crawler compatible with the roller structure; the moving mechanism 40 and the moving matching component 41 cooperate to move the construction trolley to the construction position.
[0046] In this embodiment, the first portal frame 10 and the second portal frame 11 are connected via a horizontal double-layer frame 12 and a single-frame frame 13 .
[0047] Specifically, the horizontal double-layer frame 12 is arranged perpendicular to the ground between the ends of the first portal frame 10 and the second portal frame 11 away from the ground, and the single-frame frame 13 is arranged parallel to the ground between the ends of the first portal frame 10 and the second portal frame 11 close to the ground, so as to assist the first portal frame 10 and the second portal frame 11 in bearing the vertical and lateral loads generated by various components, prefabricated membrane shells and concrete.
[0048] Optionally, the fastening assembly 2 includes a vacuum suction cup and a lifting bolt, which are evenly arranged along the height direction of both sides of the first portal frame 10 and the second portal frame 11, and are configured to position and fix the rectangular prefabricated membrane shell.
[0049] In this embodiment, two adjacent tripod sets 300 are detachably connected via a connecting circular tube 303 .
[0050] Specifically, two adjacent tripod sets 300 belonging to the same assembly are detachably connected via the connecting circular tube 303, or detachably connected via a retractable connecting rod, so as to facilitate installation and removal of the lifting assembly and installation of membrane shells of different lengths.
[0051] In this embodiment, the arc frame 301 includes a first arc tube 301.1, a second arc tube 301.2 and a third arc tube 301.3, and the first arc tube 301.1, the second arc tube 301.2 and the third arc tube 301.3 are intersected at one point at one end away from the tripod assembly 300, and the spatial distribution of the other end close to the tripod assembly 300 is triangular. The second arc tube 301.2 and the third arc tube 301.3 are connected at one end close to the tripod assembly 300 through a fourth connecting tube 301.5, and the first arc tube 301.1 is connected to the fourth connecting tube 301.5 at one end close to the tripod assembly 300 through an inclined connecting tube 301.4.
[0052] Specifically, one end of the first arc tube 301.1, the second arc tube 301.2 and the third arc tube 301.3 are intersected at one point, the other ends of the second arc tube 301.2 and the third arc tube 301.3 are connected through a fourth connecting tube 301.5, and the other end of the first arc tube 301.1 is connected to the fourth connecting tube 301.5 through the inclined connecting tube, so that the arc frame 301 is in the shape of a triangular pyramid, making the overall structure stable.
[0053] In this embodiment, the fourth connecting tube 301 . 5 is coaxially arranged with the second connecting tube 300 . 4 , so that the arc frame 301 and the tripod assembly 300 are hingedly connected.
[0054] Specifically, the diameter of the fourth connecting tube 301.5 is slightly larger than the diameter of the second connecting tube 300.4 and the length is slightly smaller. By sleeved the fourth connecting tube 301.5 on the second connecting tube 300.4, the arc frame 301 is hinged to the tripod assembly 300.
[0055] In this embodiment, the midpoint of the first arc tube 301.1 is connected to the third points of the second arc tube 301.2 and the third arc tube 301.3 respectively through circular tubes.
[0056] Specifically, the midpoint of the first arc tube 301.1 is connected to the trisection points of the second arc tube 301.2 and the third arc tube 301.3 through a circular tube, so that a triangular structure is formed between the first arc tube 301.1, the second arc tube and the third arc tube, thereby improving the stability and bearing capacity of the arc frame 301.
[0057] In this embodiment, the surface of the first arc tube 301.1 is covered with a protective layer, and the material of the protective layer includes synthetic rubber such as thermoplastic polyurethane rubber, chlorinated polyethylene or styrene-butadiene rubber.
[0058] Specifically, the protective layer is made of wear-resistant and corrosion-resistant materials. By covering the surface of the first arc tube 301.1 with the protective layer, it can prevent the prefabricated membrane shell from directly contacting the first arc tube 301.1 and causing wear. While protecting the prefabricated membrane shell, it can extend the service life of the arc frame 301.
[0059] In this embodiment, one end of the adjusting member 302 connected to the arc frame 301 is connected to the second arc tube 301.2 and the third arc tube 301.3 respectively.
[0060] Exemplarily, each arc frame 301 is used in conjunction with two adjusting members 302, one end of which is hinged to the first connecting tube 300.3, and the other end is respectively connected to the second arc tube 301.2 and the third arc tube 301.3, thereby providing a more stable supporting force for the arc frame 301.
[0061] In this embodiment, the adjusting member 302 includes a lifting device such as a hydraulic cylinder or a hydraulic oil cylinder, and is configured to provide lifting support for the arc frame 301 to adjust the height and angle of the arc frame 301 .
[0062] Exemplarily, the adjusting member 302 may be any device with a lifting function, such as a hydraulic cylinder, a hydraulic oil cylinder, a screw rod, etc. The height and angle of the arc frame 301 can be adjusted by lifting the adjusting member 302 to adapt to the diversity of construction conditions.
[0063] In this embodiment, the connecting member 302.1 has two circular holes with different diameters, which are used to penetrate the adjusting member 302 and the first connecting tube 300.3 respectively, so that the adjusting member 302 is hinged to the first connecting tube 300.3.
[0064] Specifically, the connecting member 302.1 is used to cooperate with the adjusting member 302, so that the first connecting tube 300.3 and the adjusting member 302 are respectively inserted into two circular holes of different diameters, so that the adjusting member 302 and the first connecting tube 300.3 form a hinged connection relationship to adjust the height and angle of the arc frame 301.
[0065] In this embodiment, the arc frame 301 of the first subassembly 30 and the arc frame 301 of the second subassembly 31 have the same size, and the first arc tube 301.1, the second arc tube 301.2 and the third arc tube 301.3 of two adjacent arc frames 301 belonging to the first subassembly 30 or the second subassembly 31 are connected at the intersection by a first connecting transverse tube 304, and the other ends of the first arc tubes 301.1 are connected by a second connecting transverse tube 305.
[0066] Specifically, the lifting assembly of the second lining construction trolley provided in this embodiment is suitable for installing a large arc The arc-shaped prefabricated membrane shell has a relatively long arc length of 5m to 5.5m and a relatively small width of 1.5m to 2m. Its working principle is: the arc-shaped prefabricated membrane shell is installed on the first connecting transverse tube 304 and the second connecting transverse tube 305 in a direction perpendicular to the radial direction of the jacking component; after the construction trolley moves to the designated position, the first subassembly 30 and the second subassembly 31 are lifted to adjust the arc-shaped prefabricated membrane shell to an appropriate height and angle, and then installed at the designated position.
[0067] Example 2
[0068] Another specific embodiment of the present utility model is as follows Figure 6 As shown, the difference from Example 1 is that the arc frames 301 of the first subassembly 30 and the second subassembly 31 are arranged alternately, and the first connecting cross tube 304 is arranged between the midpoints of the first arc tubes 301.1 of two adjacent arc frames 301 of the same assembly.
[0069] Specifically, the lifting assembly of the second lining construction trolley provided in this embodiment is suitable for installing a small arc An arc-shaped prefabricated membrane shell with a shorter arc length of 2m to 2.5m and a larger width of 5m to 6m is prepared by installing the arc frame 301 of the first subassembly 30 and the second subassembly 31 at different positions of the tripod assembly 300 so that the arc frames 301 of the two assemblies are staggered at a certain interval in the radial direction of the lifting assembly, thereby avoiding collision when the arc frames 301 are lifted and lowered at the same time; its working principle is: installing the arc-shaped prefabricated membrane shell on the first arc tube 301.1 of the first subassembly 30 and the second subassembly 31 in a direction parallel to the radial direction of the lifting assembly; after the construction trolley moves to the designated position, the first subassembly 30 and the second subassembly 31 are lifted to adjust the arc-shaped prefabricated membrane shell to an appropriate height and angle, and install it at the designated position.
[0070] Example 3
[0071] Another specific embodiment of the present utility model is as follows Figure 7 As shown, the difference from Example 2 is that the sizes of the two arc frames 301 of different sub-assemblies are set to be large and small, and the first connecting transverse tube 304 and the second connecting transverse tube 305 are not provided.
[0072] Specifically, the lifting assembly of the second lining construction trolley provided in this embodiment is suitable for installing a small arc An arc-shaped prefabricated membrane shell with a shorter arc length of 1.5m to 2m and a larger width of 5m to 6m; considering that the arc length of the arc-shaped prefabricated membrane shell of this embodiment is smaller than that of the prefabricated membrane shell of Example 2, its own gravity is smaller, and the longitudinal width along the cross section is larger, it is suitable for being fixed on the first arc-shaped tube 301.1 of the arc frame, and therefore does not require auxiliary support from the first connecting transverse tube 304 and the second connecting transverse tube 305; its working principle is similar to the working principle of the lifting assembly provided in Example 2, and will not be elaborated here.
[0073] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.
Claims
1. A secondary lining construction trolley, characterized in that: include: A door frame assembly (1) comprises a first door frame (10) and a second door frame (11); A fastening assembly (2), arranged on both sides of the first portal frame (10) and the second portal frame (11), and used for fixing the rectangular prefabricated membrane shell; A lifting assembly (3) is arranged on the top of the gantry assembly (1) and is used to support the arc-shaped prefabricated membrane shell. The lifting assembly (3) comprises a first subassembly (30) and a second subassembly (31). The first subassembly (30) and the second subassembly (31) are separate and arranged relative to each other. The first subassembly (30) and the second subassembly (31) each comprise at least two tripod groups (300), an arc frame (301) and an adjusting member (302) respectively arranged on the first portal frame (10) and the second portal frame (11); two ends of the adjusting member (302) are respectively hinged to the tripod group (300) and the arc frame (301) for adjusting the height and angle of the arc frame (301).
2. The secondary lining construction trolley according to claim 1, characterized in that: The tripod assembly (300) comprises a first tripod (300.1) and a second tripod (300.2), and is provided with a first connecting tube (300.3), a second connecting tube (300.4) and a third connecting tube (300.5); one end of the adjusting member (302) is hinged to the first connecting tube (300.3) through a connecting member (302.1), and the other end is hinged to one end of the arc frame (301); the other end of the arc frame (301) is hinged to the tripod assembly (300) through the second connecting tube (300.4); and the third connecting tube (300.5) is used to connect the first tripod (300.1) and the second tripod (300.2).
3. The secondary lining construction trolley according to claim 1, characterized in that: It also comprises a moving assembly (4), comprising a moving mechanism (40) and a moving matching piece (41); the moving mechanism (40) is arranged at the bottom of the first portal frame (10) and the second portal frame (11); the moving mechanism (40) is rollingly connected to the moving matching piece (41).
4. The secondary lining construction trolley according to claim 1, characterized in that: The first portal frame (10) and the second portal frame (11) are connected via a horizontal double-layer frame (12) and a single-frame frame (13).
5. The secondary lining construction trolley according to claim 1, characterized in that: Two adjacent tripod sets (300) are detachably connected via a connecting circular tube (303).
6. The secondary lining construction trolley according to claim 2, characterized in that: The arc frame (301) comprises a first arc tube (301.1), a second arc tube (301.2) and a third arc tube (301.3); the first arc tube (301.1), the second arc tube (301.2) and the third arc tube (301.3) meet at one point at one end away from the tripod frame group (300), and are spatially distributed in a triangular shape at the other end close to the tripod frame group (300).
7. The secondary lining construction trolley according to claim 6, characterized in that: One end of the second arc tube (301.2) and the third arc tube (301.3) close to the tripod assembly (300) is connected via a fourth connecting tube (301.5), and one end of the first arc tube (301.1) close to the tripod assembly (300) is connected to the fourth connecting tube (301.5) via an inclined connecting tube (301.4).
8. The secondary lining construction trolley according to claim 7, characterized in that: The fourth connecting tube (301.5) is coaxially arranged with the second connecting tube (300.4) so that the arc frame (301) and the tripod assembly (300) are hingedly connected.
9. The secondary lining construction trolley according to claim 8, characterized in that: The midpoint of the first arc-shaped tube (301.1) is hinged to the trisection points of the second arc-shaped tube (301.2) and the third arc-shaped tube (301.3) through circular tubes.
10. The secondary lining construction trolley according to claim 6, characterized in that: The surface of the first arc-shaped tube (301.1) is covered with a protective layer, and the material of the protective layer includes thermoplastic polyurethane rubber, chlorinated polyethylene or styrene-butadiene rubber synthetic rubber.