Operation platform for concrete pouring in cast-in-place pile full pile casing construction
By designing a steel platform including columns and rectangular steel, the inconvenience and safety problems in drilling pile construction are solved, and a high-altitude operating platform is provided to ensure the safety and reliability of concrete filling and conduit removal.
Patent Information
- Application Number
- CN202420497874.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-14
AI Technical Summary
During the construction of drilled pile concrete, when the pile body passes through the flowing plastic silty clay or silty soil layer, only a guard can be installed at the head of the pile after it is formed, which is prone to collapse and shrinkage, affecting the pile The body bearing capacity and inconvenient operation during concrete pouring, especially in poor geology areas, an operating platform for personnel to go up and down to continuously carry out infusion construction.
A steel platform consisting of five columns and three rectangular steel was designed. The columns form four corner support, and a ladder was set between the middle column and the adjacent column. The rectangular steel serves as a base, a station platform and a reinforced structure, equipped with C20 steel mesh and cover. The plate and ladder are composed of 4m long and 1.2m long steel columns, providing a high-altitude operating platform and solving operational safety problems.
It provides a high-altitude operating platform to ensure that construction personnel can safely pour concrete and dismantle conduits, solves the operational problems when lifting pump pipes and casings during concrete pouring, and improves the safety and reliability of construction.
Smart Images

Figure CN222101387U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an operating platform for pouring concrete in the full casing construction of cast-in-place piles. Background Art
[0002] In the construction of bored cast-in-place pile concrete, the pile body is often designed to pass through the fluidized silty clay or silty soil layer. If only the casing is set at the pile head after the hole is formed, it is easy to cause the hole to collapse or shrink when the pile is formed or the pile body concrete is poured, causing the bored pile to become a Class II pile or Class III pile, affecting the bearing capacity of the pile body and causing rework. For pile foundation construction in areas with poor geology, the full casing method is often used, that is, when the pile driver is rotating to drill a hole, the steel casing is pressed to a certain depth underground, and then the soil is taken from the casing to form a hole; when the concrete is poured, the casing is pulled out as the concrete is poured to ensure that the bottom of the casing is below the concrete liquid level; after the concrete pouring is completed, the casing is completely pulled out. Then in the actual construction of the project, the upward removal of the steel casing by the driving and pulling machine will cause the concrete pouring operation surface to gradually rise, which is inconvenient for personnel to pour concrete and remove the conduit. Therefore, it is necessary to invent an operating platform for personnel to go up and down, so as to continue to pour concrete into the pile hole before the casing and the concrete pouring conduit are pulled out. Utility Model Content
[0003] The utility model aims to address the deficiencies in the prior art and provides an operating platform for pouring concrete in the full casing construction of bored piles, comprising a steel platform, wherein the steel platform comprises columns and rectangular steels, wherein the number of the columns is five, wherein four columns constitute the four corner supports of the steel platform, and another column is arranged between two adjacent columns, and a ladder is arranged between the column and the adjacent columns, wherein the number of the rectangular steels is three, wherein the lowest rectangular steel serves as the base of the steel platform, the highest rectangular steel serves as the external support of the standing platform, and the middle rectangular steel serves as the reinforcement structure of the steel platform, and the bottom of the standing platform is supported by two long channel steels and four short channel steels, and a C20 steel mesh with a spacing of 0.1m is welded on the support beam, a hole is left in the center and a cover plate is arranged.
[0004] Preferably, the ladder includes two 4m long steel columns and two 1.2m long horizontal steels, wherein one end of the steel column is fixedly connected to one end of the horizontal steel, the steel column is arranged above the horizontal steel in an inclined shape, the other end of the steel column is fixedly connected to the top rectangular steel, and the other end of the horizontal steel is fixedly connected to the bottom rectangular steel.
[0005] Preferably, both side surfaces and the rear of the steel platform are provided with inclined channel steels, and both ends of the inclined channel steels are welded and fixed to the columns.
[0006] Preferably, 1.2m high channel steels are welded and installed at the four corners of the top of the steel platform and the ladder opening, C20 steel mesh guardrails are welded between the channel steels, the vertical spacing of the steel mesh guardrails is 0.3m, and two horizontal steel bars are arranged horizontally with a spacing of 0.6m.
[0007] Compared with the prior art, the utility model has the following beneficial effects: the utility model provides a high-altitude foothold for pouring concrete and removing the conduit, and a ladder can be configured for construction workers to go up and down; on the other hand, it can also solve the problem of personnel operation safety and reliability when the concrete pouring pump pipe, conduit and steel casing are lifted synchronously in the full casing construction method of bored piles. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0009] Figure 1 It is a schematic diagram of the structure of the utility model;
[0010] Figure 2 It is the front view and rear view of the utility model;
[0011] Figure 3 It is a left view of the utility model;
[0012] Figure 4 It is a top view of the utility model.
[0013] In the figure: 1-column, 2-rectangular steel, 3-ladder, 4-hole, 5-steel column, 6-horizontal steel, 7-angled channel steel. DETAILED DESCRIPTION
[0014] The technical solution of the utility model is described in detail below with reference to the accompanying drawings, but the protection scope of the utility model is not limited to the embodiments.
[0015] Reference Figures 1 to 4The utility model discloses an operation platform for pouring concrete in the full casing construction of bored piles, comprising a steel platform, the steel platform comprising columns 1 and rectangular steels 2, the number of the columns 1 is five, four of which form the four corner supports of the steel platform, another column 1 is arranged between two adjacent columns 1, a ladder 3 is arranged between the column 1 and the adjacent column 1, the number of the rectangular steels 2 is three, the bottom rectangular steel 2 serves as the base of the steel platform, the top rectangular steel 2 serves as the external support of the standing platform, the middle rectangular steel 2 serves as the reinforcement structure of the steel platform, the bottom of the standing platform is supported by two long channel steels and four short channel steels, a C20 steel mesh with a spacing of 0.1m is welded on the support beam, and a central groove is left The hole 4 is provided with a cover plate, and the ladder 3 includes two 4m long steel columns 5 and two 1.2m long horizontal steels 6, wherein one end of the steel column 5 is fixedly connected to one end of the horizontal steel 6, and the steel column 5 is arranged above the horizontal steel 6 in an inclined shape, and the other end of the steel column 5 is fixedly connected to the uppermost rectangular steel 2, and the other end of the horizontal steel 6 is fixedly connected to the lowermost rectangular steel 2. The two sides and the back of the steel platform are provided with inclined channel steels 7, and the two ends of the inclined channel steels 7 are welded and fixed to the column 1. 1.2m high channel steels are welded and installed at the four corners of the top of the steel platform and the ladder 3, and C20 steel mesh guardrails are welded between the channel steels, and the vertical spacing of the steel mesh guardrails is 0.3m. Two horizontal steel bars 6 are arranged horizontally with a spacing of 0.6m.
[0016] The utility model is a steel operating platform welded from 10# channel steel. The channel steels of the steel platform are all welded to ensure that the welding is stable and reliable. The platform has a length*width*height size of 3m*3m*4m, and the main frame is composed of 5 4m channel steel columns 1 and 3 3m*3m channel steel rectangular structures. The structural design of each view of the device is as follows, and the specific details are shown in the attached drawings.
[0017] The main view design of the device: a 4.2m long and 0.8m wide channel steel ladder 3 is welded. The ladder 3 is connected to the main frame as a whole through two 4m long steel columns 5 and two 1.2m horizontal steels 6. 0.6m high C20 steel handrails are welded on the steel beams on both sides.
[0018] Left view and rear view of the device: A 5m inclined channel steel 7 is welded between the main columns 1 for connection and reinforcement.
[0019] The top view design of the device: the bottom of the standing platform is supported by two 3m long channel steels and four 0.9m short channel steels. C20 steel mesh with a spacing of 0.1m is welded on the support beams. Four 1.2m*1.2m holes are left in the center and a cover plate is provided. 1.2m high channel steels are welded and installed at the four corners of the top of the platform and the three openings of the ladder. C20 steel mesh guardrails are welded between the channel steels. The vertical spacing of the steel mesh is 0.3m. Two horizontal steel bars are set horizontally with a spacing of 0.6m.
[0020] Device hoisting design: At the same time, 4 hooks and 4 4m long 20mm steel ropes are set at the four corners of the main frame of the device for hoisting the steel platform. The hooks and steel ropes must ensure that they are firmly connected to the steel platform.
[0021] When the utility model is used, when constructing a cast-in-place pile according to the full casing method, as the pile foundation concrete is poured to a certain height below the steel casing, the casing is pulled up by a driving and pulling machine. Before the casing is pulled up, the concrete pouring conduit and its construction platform must be lifted up by a crane. When the conduit and the casing are lifted to a height that cannot be operated by personnel, the operating platform designed by the device is used. The main application process is as follows:
[0022] Phase 1: Use a crane to lift the concrete pouring conduit and construction platform to a certain height (slightly higher than the customized operating platform);
[0023] The second stage: Use a puller to lift the casing to the lower edge of the construction platform on the guide tube, so that the construction platform is placed on the top of the casing;
[0024] The third stage: With the casing as the center, use a crane to lift the customized operating platform to the conduit, so that the construction platform on the conduit falls on the reserved hole in the middle of the operating platform;
[0025] Stage 4: Two people stand on the operating platform to hold the pump pipe outlet and continue to pour concrete into the conduit through the funnel until the concrete surface in the casing is slightly higher than a certain value of the designed elevation of the pile top (the amount of concrete required to completely remove the casing is calculated based on the length of the casing buried underground);
[0026] Stage 5: Use a crane to lift the operating platform to the side, then slowly remove the catheter with the crane, and finally use a puller to remove the casing.
[0027] As above, although the utility model has been shown and described with reference to a specific preferred embodiment, it should not be interpreted as limiting the utility model itself. Various changes can be made to it in form and detail without departing from the spirit and scope of the utility model defined in the attached claims.
Claims
1. An operating platform for pouring concrete in the construction of full casing of cast-in-place piles, characterized by: It includes a steel platform, which includes columns and rectangular steels. There are five columns, four of which form the four corner supports of the steel platform, and another column is arranged between two adjacent columns. A ladder is arranged between the column and the adjacent column. There are three rectangular steels, the lowest rectangular steel serving as the base of the steel platform, the highest rectangular steel serving as the external support of the standing platform, and the middle rectangular steel serving as the reinforcement structure of the steel platform. The bottom of the standing platform is supported by two long channel steels and four short channel steels. A C20 steel mesh with a spacing of 0.1m is welded on the support beam, a hole is left in the center and a cover plate is provided.
2. The operating platform for pouring concrete in the full casing construction of cast-in-place piles according to claim 1, characterized in that: The ladder includes two 4m long steel columns and two 1.2m long horizontal steels, wherein one end of the steel column is fixedly connected to one end of the horizontal steel, the steel column is arranged above the horizontal steel in an inclined shape, the other end of the steel column is fixedly connected to the uppermost rectangular steel, and the other end of the horizontal steel is fixedly connected to the lowermost rectangular steel.
3. The operating platform for pouring concrete in the full casing construction of cast-in-place piles according to claim 2, characterized in that: The two sides and the rear of the steel platform are both provided with inclined channel steels, and the two ends of the inclined channel steels are welded and fixed to the columns.
4. The operating platform for pouring concrete in the full casing construction of cast-in-place piles according to claim 3, characterized in that: 1.2m high channel steels are welded and installed at the four corners of the top of the steel platform and the ladder entrance, and C20 steel mesh guardrails are welded between the channel steels. The vertical spacing of the steel mesh guardrails is 0.3m, and two horizontal steel bars are set horizontally with a spacing of 0.6m.