Hole hanging device for steel bar truss floor support plate

By using adjustable hanging hole devices in the construction of steel bar truss floor bearing plates, the problem of quality control and untight combination of traditional hanging hole methods is solved, efficient and compact hanging hole construction is achieved, and construction quality and efficiency are improved.

CN222121051UActive Publication Date: 2024-12-06JINAN SIJIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421173035.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2024-12-06
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

During the construction of steel bar truss bearing plates, the traditional hanging hole method has problems such as difficult to control the quality, the untight combination of the hanging hole formwork and the structure, leakage and rust, especially due to the difficulty of combining the galvanized steel leather at the bottom and the wooden formwork. , resulting in poor construction quality.

Method used

The rebar truss floor bearing plate hoisting device including installation rods, horizontal adjustment parts, connecting sleeves, sealing plates and height adjustment devices is adopted. Through the limiting device, sliding sleeves and adjustment bolts, the flexibility of the hoisting hole template is achieved. Adjust and tightly fix to avoid concrete leakage.

Benefits of technology

It realizes flexible adaptation of holes with different sizes, improves construction quality and improves construction efficiency, and does not need to dismantle the entire set of equipment and integrates the structure, ensuring construction quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121051U_ABST
    Figure CN222121051U_ABST
Patent Text Reader

Abstract

In order to solve the problems of inconvenience in construction, poor construction quality and the like of a floor support plate hanging hole template, the utility model provides a steel bar truss floor support plate hanging hole device, which comprises a mounting rod, a steel bar truss, a hanging hole template and a hanging hole template, the horizontal adjusting piece is connected to the mounting rod in a position adjustable mode in the length direction of the mounting rod; the connecting sleeve is fixedly connected below the horizontal adjusting piece; the plugging plate is connected below the sleeve; the height adjusting device is connected between the connecting sleeve and the plugging plate and used for adjusting the height distance between the connecting sleeve and the plugging plate, the device can meet secondary hole lifting construction of holes of different sizes, the size is convenient to adjust, the whole set of equipment does not need to be disassembled after hole lifting, the whole set of equipment is integrated with an original structure, and the construction efficiency and quality are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a steel bar truss floor deck hanging hole device. Background Art

[0002] At present, with the large-scale promotion of prefabricated buildings, especially steel structure buildings, steel truss floor decking (hereinafter referred to as "floor decking") is widely used in the field of public buildings. Compared with cast-in-place floor slabs and composite slabs, floor decking has better integrity and easier construction.

[0003] During the construction of the main structure, there are often reserved holes for temporary construction facilities such as water and fire protection pipe holes and temporary power cable holes. There are secondary hanging hole construction tasks in each structural layer. The traditional hanging hole method uses iron wire to fix the wooden formwork through the steel bars placed horizontally at the hole, which has the following problems:

[0004] 1. The quality of the entire construction is determined by the workers' proficiency level, and the quality is difficult to control;

[0005] 2. The wire hanging hole cannot be removed after completion, forming a leakage point and easy to rust;

[0006] 3. The combination of the hanging hole template and the original structure is not tight, which is easy to leak slurry, resulting in the loose combination of the hanging hole structure and the original main structure, and the poor quality of the edge appearance;

[0007] The above problems become more prominent due to the high degree of customization of the floor decking, the composite truss steel bars and the M-shaped galvanized steel skin at the bottom, which makes it more difficult to combine with the wooden formwork. Utility Model Content

[0008] In order to solve the problems of inconvenience in construction of floor decking hanging hole templates and poor construction quality, the utility model provides a steel bar truss floor decking hanging hole device, and the technical solution adopted is as follows:

[0009] A steel bar truss floor deck hanging hole device, characterized by comprising:

[0010] A mounting rod, used for fixed connection with the steel truss;

[0011] A horizontal adjustment member connected to the mounting rod in an adjustable position along the length direction of the mounting rod;

[0012] A connecting sleeve, wherein the connecting sleeve is fixedly connected below the horizontal adjustment member;

[0013] A plugging plate connected to the lower side of the sleeve;

[0014] And a height adjustment device, which is connected between the connecting sleeve and the blocking plate and is used to adjust the height distance between the two.

[0015] Furthermore, a limiting device is provided between the horizontal adjustment member and the mounting rod.

[0016] Furthermore, the horizontal adjustment piece is sleeved on the mounting rod, and the limiting device includes a limiting tooth arranged on the surface of the mounting rod, and a connecting tooth arranged on the inner wall of the horizontal adjustment piece and engaged with the limiting tooth, and when the connecting tooth and the limiting tooth are engaged with each other, a gap is distributed between the outer wall of the mounting rod axially symmetrically distributed with the limiting tooth and the inner wall of the horizontal adjustment piece axially symmetrically distributed with the connecting tooth.

[0017] Furthermore, the height adjustment device includes an adjusting bolt, the connecting sleeve is provided with internal threads distributed along the height direction and threadedly connected to the adjusting bolt, and the blocking plate is provided with a mounting hole for the adjusting bolt to pass through.

[0018] Furthermore, a sliding sleeve is slidably connected to the bottom of the connecting sleeve along the vertical direction.

[0019] Furthermore, the sliding sleeve is made of a transparent material.

[0020] Furthermore, at least two groups of mounting holes are arranged on the blocking plate along the length direction of the mounting rod.

[0021] The beneficial effects of the utility model are:

[0022] 1. The horizontal adjustment piece can be slidably connected to the mounting rod. The bottom of the horizontal adjustment piece is connected to the blocking plate through a connecting sleeve, and a limit device is arranged between the mounting rod and the horizontal adjustment piece. The arrangement of this structure can meet the requirements of secondary hanging hole construction for holes of different sizes;

[0023] 2. A height adjustment device is provided between the connecting sleeve and the blocking plate, which can adjust the distance between the mounting rod and the blocking plate in the height direction to adapt to different construction environments;

[0024] 3. A sliding sleeve is slidably connected below the connecting sleeve to protect the lower opening of the connecting sleeve and the height adjustment device, so as to prevent concrete from entering during the pouring of the floor deck, causing difficulties in subsequent construction;

[0025] 4. After the secondary hanging hole construction is carried out using this device, the whole set of equipment does not need to be disassembled, it is integrated with the original structure, and the size adjustment is convenient, which effectively improves the construction efficiency and quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is the main view of the structure of the utility model

[0027] Figure 2 This is a top view of the structure of the utility model

[0028] Figure 3 for Figure 2 Middle AA section view

[0029] Figure 4 for Figure 3 Schematic diagram of the local enlarged structure at B in the middle

[0030] Figure 5 Top view of the blocking plate

[0031] Figure 6 This is a schematic diagram of the installation state structure of the utility model

[0032] Figure 7 This is a schematic diagram of the utility model after installation and pouring

[0033] Among them, 1-mounting rod, 2-horizontal adjustment part, 3-connecting sleeve, 4-adjusting bolt, 5-sealing plate, 6-limiting tooth, 7-connecting tooth, 8-mounting hole, 9-upper chord steel bar, 10-lower chord steel bar, 11-web bar steel bar, 12-bottom formwork steel plate, 13-sliding sleeve, 14-reserved opening. DETAILED DESCRIPTION

[0034] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0035] In the description of the utility model, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the viewing direction or position relationship, and are only for the convenience of describing the utility model, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.

[0036] like Figure 1-Figure 2 The steel bar truss floor deck hanging hole device shown in the figure comprises a mounting rod 1, a horizontal adjustment member 2, a connecting sleeve 3 and a blocking plate 5. The mounting rod 1 is arranged along the horizontal adjustment member 2, a connecting sleeve 3 and a blocking plate 5. Figure 1The directions shown are distributed on the top of the blocking plate 5 on the left and right sides. The mounting rod 1 is provided with scale markings in the length direction. Two groups of mounting rods 1 are provided and are respectively located on the front two sides of the blocking plate 5. A horizontal adjustment piece 2 is provided on each group of mounting rods 1. The horizontal adjustment piece 2 is sleeved on the outside of the mounting rod 1 and can slide along the length direction of the mounting rod 1. A limiting device is provided between the horizontal adjustment piece 2 and the mounting rod 1 for fixing the position of the horizontal adjustment piece 2 in the length direction of the mounting rod 1. The connecting sleeve 3 is fixedly connected to the bottom of the horizontal adjustment piece 2. A height adjustment device is provided between the connecting sleeve 3 and the blocking plate 5 for adjusting the height spacing between the blocking plate 5 and the connecting sleeve 3.

[0037] Specifically, Figure 3 and Figure 4 As shown, the limiting device includes a limiting tooth 6 and a connecting tooth 7 that are engaged with each other. The limiting tooth 6 is arranged at the upper end of the outer wall of the mounting rod 1 and is distributed along the length direction of the mounting rod 1. The lower end surface of the mounting rod 1 is a smooth surface. The horizontal adjustment member 2 is a cylindrical shell with openings at both ends. The connecting tooth 7 is arranged at the upper end of the inner wall of the horizontal adjustment member 2. The lower end of the inner wall of the horizontal adjustment member 2 is a smooth surface. When the mounting rod 1 and the horizontal adjustment member 2 are engaged with the limiting tooth 6 and the connecting tooth 7, as shown in FIG. Figure 4 As shown, a gap is provided between the lower end surface of the inner wall of the mounting rod 1 and the lower end surface of the inner wall of the horizontal adjustment member 2, and the gap is larger than the tooth height of the limiting tooth 6. By setting the gap, the horizontal adjustment member 2 can be lifted upward, thereby separating the limiting tooth 6 and the connecting tooth 7, so as to realize the adjustment of the position of the horizontal adjustment member 2 in the length direction of the mounting rod 1.

[0038] like Figure 3 As shown, the height adjustment device includes an adjustment screw 4 and a sliding sleeve 13. The connecting sleeve 3 is hollow inside, open at the lower end, and the inner wall is provided with internal threads distributed along the height direction. The sliding sleeve 13 is slidably connected to the lower side of the connecting sleeve 3, as shown in FIG. Figure 5 As shown, two groups of installation positions with different positions are provided on the blocking plate 5, and each group includes four installation holes 8 with installation positions distributed in a rectangular shape. By setting two groups of installation positions, it can be used to connect blocking plates 5 of different sizes, so as to adapt to the blocking of reserved holes 14 of different sizes. The end of the screw rod away from the head of the adjusting bolt 4 passes through the blocking plate 5 from bottom to top and is threadedly connected with the connecting sleeve 3, and the blocking plate 5 is provided with a mounting hole 8, and the diameter of the mounting hole 8 is larger than the outer diameter of the screw rod of the adjusting bolt 4 and smaller than the outer diameter of the head of the adjusting bolt 4; by adjusting the threaded connection between the screw 4 and the connecting sleeve 3, the distance between the blocking plate 5 and the mounting rod 1 in the height direction can be adjusted, as shown in FIG. Figure 6 and Figure 7As shown, the sliding sleeve 13 is slidably connected up and down at the position below the connecting sleeve 3. Through the setting of the sliding sleeve 13, the distance between the bottom mold steel plate 12 and the upper chord steel bar 9 of different heights can be adaptively adjusted, thereby ensuring that the lower end of the sliding sleeve 13 is in close contact with the bottom mold steel plate 12, thereby protecting the lower end opening of the connecting sleeve 3 and the adjusting bolt 4 and its mounting hole, avoiding the problem of concrete entering the connecting sleeve 3 or causing the adjusting bolt 4 to be unable to connect with the connecting sleeve 3 during floor pouring. In addition, the sliding sleeve 13 is made of transparent material, which can facilitate observation of whether concrete or other impurities have entered the interior.

[0039] Before pouring the floor slab concrete, after determining the location and size of the reserved opening 14, prepare two installation rods 1, and each installation rod 1 is provided with a set of horizontal adjustment parts 2 at both ends. The installation rod 1 is horizontally arranged and tied above the upper chord steel bar 9 of the floor slab truss steel bar, and the lower end of the sliding sleeve 13 contacts the upper end surface of the bottom mold steel plate 12, and then the concrete is poured; before the secondary hanging hole, first find the position of the sliding sleeve 13 and the connecting sleeve 3, clean the concrete around the reserved opening 14 and roughen the reserved opening 14, and adjust the bolt 4 from bottom to top through the sealing plate 5, the bottom mold steel plate 12, and the sliding sleeve 13, and then screw it into the connecting sleeve 3, so that the sealing steel plate 5 is tightly fitted with the lower end of the reserved opening 14, and the original concrete around the reserved opening 14 is moistened before pouring. After the pouring is completed, the entire set of equipment does not need to be dismantled.

[0040] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements can be made without departing from the principle of the present invention, and these improvements should also be regarded as the protection scope of the present invention.

Claims

1. A steel bar truss floor deck hanging hole device, characterized in that: include: A mounting rod, used for fixed connection with the steel truss; A horizontal adjustment member connected to the mounting rod in an adjustable position along the length direction of the mounting rod; A connecting sleeve, wherein the connecting sleeve is fixedly connected below the horizontal adjustment member; A plugging plate connected to the lower side of the sleeve; And a height adjustment device, which is connected between the connecting sleeve and the blocking plate and is used to adjust the height distance between the two.

2. The steel bar truss floor deck hanging hole device according to claim 1 is characterized in that: A limiting device is arranged between the horizontal adjustment member and the mounting rod.

3. The steel bar truss floor deck hanging hole device according to claim 2 is characterized in that: The horizontal adjustment piece is sleeved on the mounting rod, and the limiting device includes limiting teeth arranged on the surface of the mounting rod, connecting teeth arranged on the inner wall of the horizontal adjustment piece and engaged with the limiting teeth, and when the connecting teeth are engaged with the limiting teeth, a gap is distributed between the outer wall of the mounting rod axially symmetrically distributed with the limiting teeth and the inner wall of the horizontal adjustment piece axially symmetrically distributed with the connecting teeth.

4. The steel bar truss floor deck hanging hole device according to claim 1, characterized in that: The height adjustment device comprises an adjusting bolt, the connection sleeve is provided with internal threads distributed along the height direction and threadedly connected to the adjusting bolt, and the blocking plate is provided with a mounting hole for the adjusting bolt to pass through.

5. The steel bar truss floor deck hanging hole device according to claim 4 is characterized in that: A sliding sleeve is slidably connected to the lower side of the connecting sleeve along the vertical direction.

6. The steel bar truss floor deck hanging hole device according to claim 5, characterized in that: The sliding sleeve is made of transparent material.

7. The steel bar truss floor deck hanging hole device according to claim 4, characterized in that: At least two groups of mounting holes are arranged on the blocking plate along the length direction of the mounting rod.