Movable construction platform with cable penetrating function

Through the designable cable mobile construction platform, the sliding plug -in and fixed pulley traction cable system is used to solve the problem of high construction costs and cumbersome mechanical operations during the replacement of the cable cable cable cable for the cable cable cable cable. The efficient crossing of Laoso reduces construction costs and human resources consumption.

CN222390243UActive Publication Date: 2025-01-24SUNTECH CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420419757.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2025-01-24
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

During the replacement of cable-stayed cables of cable-stayed bridges, the construction cost is high, the mechanical operation is cumbersome, and the labor cost is high, which seriously hinders the construction progress.

Method used

Design a mobile construction platform that can pass through the cable through the sliding latch device and use the fixed pulley and traction cable system to reduce human resources, reduce construction operation costs, and shorten construction time.

Benefits of technology

It achieves rapid movement of the construction platform and efficient crossing of cable stays, reducing construction costs, reducing the consumption of human resources, and shortening construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390243U_ABST
    Figure CN222390243U_ABST
Patent Text Reader

Abstract

The movable construction platform comprises a first frame body and a second frame body, the side, close to the second frame body, of the first frame body protrudes outwards to form a plurality of first protruding parts, and intervals are formed between the first protruding parts; the side, close to the first frame body, of the second frame body protrudes outwards to form a second protruding part matched with the first protruding part, a connecting sleeve is detachably arranged between the first protruding part and the second protruding part in a sleeving mode, and the first frame body is fixed to the second frame body through the connecting sleeve; a moving device is arranged at the bottom of the first frame body, and winches are arranged on the first frame body and the second frame body. The stay cable can penetrate through the stay cable by sliding the slidable plug pin device, and the tedious steps of multiple times of mounting and multiple times of dismounting are avoided; when the tool is used, forward traction force can be provided for the tool through the power system fixed to the tool and the fixed pulley installed on the bridge floor, consumption of manpower resources is reduced, construction operation cost is reduced, and construction operation time is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a cable-threadable mobile construction platform. Background Art

[0002] A cable-stayed bridge is a complex spatial hyperstatic structural system composed of three basic elements: cables, beams, and towers. Due to the immature design, construction, technology, and materials of the cable-stayed bridges built in the early stage, coupled with the poor maintenance management of the maintenance department during the operation stage, the existing cable-stayed bridges have been affected by human factors, environmental factors, and internal factors of structural materials. The main load-bearing materials of the existing cable-stayed bridges have aged and the structural bearing capacity has decreased. In particular, the cable components of the cable-stayed bridges are the most seriously damaged. When the cables are damaged, the bearing capacity of the cable-stayed bridge will be reduced. Therefore, replacing the cable has become a common method to extend the life of the cable-stayed bridge.

[0003] During the replacement of the inclined cables, it is often necessary to carry out construction work at the bottom of the beam. The project often uses a bridge inspection vehicle or makes fixed temporary tooling to carry out construction work at the bottom of the bridge. Since the cable replacement process takes a relatively long time, the use of a bridge inspection vehicle will incur a large construction cost. When a fixed temporary work platform is used for construction work, a crane is required to assist in lifting. At the same time, due to the obstruction of the inclined cables on the bridge deck, each time a cable is replaced, it is often necessary to use a crane to lift the entire cable to the next cable to be replaced. The construction process is mechanically cumbersome and requires a large number of workers, which brings great inconvenience to the construction work and seriously hinders the construction progress. Utility Model Content

[0004] The purpose of the utility model is to solve the problems of the above-mentioned background technology and to provide a mobile construction platform capable of being threaded with ropes.

[0005] The purpose of the utility model can be achieved through the following technical solutions:

[0006] A mobile construction platform capable of being threaded through a cable comprises a first frame and a second frame, wherein a side of the first frame close to the second frame protrudes outwardly with a plurality of first protrusions, and intervals are formed between the plurality of first protrusions; a side of the second frame close to the first frame protrudes outwardly with a second protrusion that cooperates with the first protrusion, a detachable connecting sleeve is provided between the first protrusion and the second protrusion, and the first frame is fixed to the second frame through the connecting sleeve;

[0007] A moving device is arranged at the bottom of the first frame, and winches are arranged on the first frame and the second frame, and corresponding traction ropes are respectively wound around the two winches.

[0008] As a further solution of the utility model: the connecting sleeve is provided with a hole, the first protrusion and the second protrusion are both vertically provided with holes, the connecting sleeve is provided with insertion holes corresponding to the holes, and pins are vertically inserted in the insertion holes and the holes.

[0009] As a further solution of the utility model: a counterweight block is arranged in the first frame.

[0010] As a further solution of the utility model: a pulley and a single pulley are also provided on the second frame.

[0011] As a further solution of the utility model: a pin hole having a diameter equal to that of the hole is provided on the first protrusion near the hole.

[0012] As a further solution of the utility model: fixed pulleys are arranged at both ends of the bridge, and traction ropes are sleeved on the two fixed pulleys.

[0013] The beneficial effects of the utility model are as follows: the utility model can pass the inclined cable through the sliding pin device, thereby avoiding the tedious steps of multiple installations and removals; the utility model can provide forward traction for the tooling through a power system fixed on the tooling and utilizing a fixed pulley installed on the bridge deck, thereby reducing the consumption of human resources, reducing construction operation costs, and shortening construction operation time. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The utility model is further described below in conjunction with the accompanying drawings.

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 yes Figure 1 A magnified view of location A;

[0017] Figure 3 This is a schematic diagram of the utility model after the connecting sleeve slides;

[0018] Figure 4 This is a schematic diagram of the position of the fixed pulley and traction cable on the bridge.

[0019] In the figure: 1, mobile frame; 101, first frame; 102, second frame; 2, counterweight; 3, winch; 4, latch hole; 5, pulley; 6, single pulley; 7, connecting sleeve; 8, latch; 9, inclined cable; 10, traction rope; 11, fixed pulley; 12, bridge. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] For example, see Figure 1-4 As shown, the utility model is a kind of mobile construction platform capable of threading cables, comprising a first frame body 101 and a second frame body 102, wherein a counterweight block 2 is arranged in the first frame body 101, and a plurality of first protrusions are protruded outwardly from a side of the first frame body 101 close to the second frame body 102, and intervals are formed between the plurality of first protrusions; a second protrusion cooperating with the first protrusion is protruded outwardly from a side of the second frame body 102 close to the first frame body 101, and a connecting sleeve 7 is detachably provided between the first protrusion and the second protrusion, and the first frame body 101 is fixed to the second frame body 102 through the connecting sleeve 7, and a hole is provided on the connecting sleeve 7, and holes are vertically provided on both the first protrusion and the second protrusion, and insertion holes corresponding to the holes are provided on the connecting sleeve 7, and latches 8 are vertically inserted in the insertion holes and the holes;

[0022] It should be noted that the first frame 101 and the second frame 102 are combined to form a mobile frame 1 .

[0023] A moving device is disposed at the bottom of the first frame 101 , and winches 3 are disposed on both the first frame 101 and the second frame 102 . Corresponding traction ropes 10 are respectively wound around the two winches 3 .

[0024] The second frame 102 is also provided with a pulley 5 and a single pulley 6 .

[0025] A pin hole 4 having a diameter equal to that of the hole is provided on the first protruding portion near the hole.

[0026] Fixed pulleys 11 are provided at both ends of the bridge 12 , and traction ropes 10 are sleeved on the two fixed pulleys 11 .

[0027] Embodiment 2, a slidable bolt device of a mobile construction platform capable of being threaded through a cable is in a sliding state, such as Figure 3 As shown, at this time, the latch device has completely slid toward the counterweight part and is engaged with the latch hole 4 at that part, and the originally connected part already has a gap, which can pass through the inclined cable 9 that has an obstructive effect on the bridge deck.

[0028] A practical application of a mobile construction platform that can be worn through a cable, such as Figure 4As shown in the figure, the temporary tooling has been welded and spliced, and can provide a bridge bottom construction platform for construction workers;

[0029] After the construction is completed, there is no need to dismantle the temporary tooling. Relying on the traction provided by the winch 3, the movable pulley 5 and the single pulley 6, and the movable wheels are also arranged under the first frame 101, the movable wheels can also support the first frame 101 to move, so that the temporary tooling can move forward along the bridge deck; during the movement, the inclined cable 9 of the bridge deck will hinder the movement of the temporary tooling. At this time, the pin 8 of the slidable latch device can be pulled out, and the connecting sleeve 7 is pushed toward the counterweight block 2. Then, the pin 8 is installed back into the slidable latch device and fixed with the pin hole 4 at that part. The gap at the original connection will be exposed, and the temporary tooling continues to move forward to allow the inclined cable 9 to pass through the gap. Then, the slidable connecting sleeve 7 is returned to the gap, and the inclined cable 9 can pass through. The subsequent slidable latch device repeats this step, and finally the inclined cable 9 can pass through all the first protrusions and the second protrusions, and then continues to move along the bridge deck to the next bridge bottom construction site.

[0030] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the claims of the utility model.

Claims

1. A mobile construction platform capable of being threaded through a cable, characterized in that: The invention comprises a first frame (101) and a second frame (102); a side of the first frame (101) close to the second frame (102) has a plurality of first protrusions protruding outwards, and a gap is formed between the plurality of first protrusions; a side of the second frame (102) close to the first frame (101) has a second protrusion protruding outwards, which cooperates with the first protrusion; a detachable connecting sleeve (7) is provided between the first protrusion and the second protrusion; the first frame (101) is fixed to the second frame (102) via the connecting sleeve (7); A moving device is provided at the bottom of the first frame (101), and winches (3) are provided on both the first frame (101) and the second frame (102), and corresponding traction ropes (10) are respectively wound around the two winches (3).

2. A mobile construction platform capable of being threaded through a cable according to claim 1, characterized in that: The connecting sleeve (7) is provided with a hole, the first protruding portion and the second protruding portion are both provided with holes vertically, the connecting sleeve (7) is provided with insertion holes corresponding to the holes, and a latch (8) is vertically inserted into the insertion holes and the holes.

3. The mobile construction platform capable of being threaded through a cable according to claim 1, characterized in that: A counterweight (2) is arranged inside the first frame (101).

4. The mobile construction platform capable of being threaded through a cable according to claim 1, characterized in that: The second frame (102) is also provided with a pulley (5) and a single pulley (6).

5. The mobile construction platform capable of being threaded through a cable according to claim 2, characterized in that: A pin hole (4) having a diameter equal to that of the hole is also provided on the first protruding portion near the hole.

6. A mobile construction platform capable of being threaded through a cable according to any one of claims 1 to 5, characterized in that: Fixed pulleys (11) are provided at both ends of the bridge (12), and traction ropes (10) are sleeved on the two fixed pulleys (11).