Stand column and decompression dewatering well structure
By adopting a column and reduced pressure precipitation well structure in foundation pit engineering and using well pipes and fill structures for support and stopping water, the problems of separate design and installation of precipitation wells and columns in the prior art are solved, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202420609062.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In existing foundation pit projects, the precipitation wells and columns need to be designed and installed separately, resulting in large project volume, large investment in equipment and materials, long construction period, high cost, and the columns are prone to deformation, affecting construction safety.
The column and reduced pressure precipitation well structure is adopted, and a filling structure is provided between the well pipe and the well hole wall, including a filter material layer, a clay ball layer and a grouting layer to achieve water stop and reinforcement, avoid deformation and leakage.
Effectively realize precipitation and support functions, improve construction safety, reduce project volume and construction period, reduce construction costs, and inhibit column uplifts.