Deviation rectifying device for pipe jacking construction

By designing a deviation correction device for pipe top construction, the combination of rocker and wire rope is used to solve the problem of the deviation of the pipe travel direction during pipe top construction, slight correction of the pipe heading direction and protection of the pipe end are achieved, and the accuracy and efficiency of construction are improved.

CN222798299UActive Publication Date: 2025-04-25余满
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422206156.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2025-04-25
Estimated Expiration
2034-09-10

AI Technical Summary

Technical Problem

During the pipe ejection construction, the direction of the pipeline may be deviated, and the prior art is difficult to effectively correct this deviation.

Method used

A deviation correction device for pipe construction is designed, including pipe sleeve, slide chute, slide block, limit ring, rocker and wire rope. By connecting the top pipe sleeve on the front end pipe construction and setting a shrink groove and wire rope on the outside, the direction of the top pipe is slightly corrected by using the elasticity of the rocker and the tension of the wire rope.

Benefits of technology

Effectively protect the end of the pipe, reduce damage, and slightly correct the pipe heading direction when offset, improving the accuracy and efficiency of construction. The elastic design of the rocker allows it to be reused, avoiding reset problems that affect subsequent construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222798299U_ABST
    Figure CN222798299U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipe-jacking construction, in particular to a deviation rectifying device for pipe-jacking construction, which comprises a pipe-jacking sleeve, a sliding groove is arranged on the inner side of the pipe-jacking sleeve, two sides of the sliding groove are slidably connected with sliding blocks, the inner sides of the sliding blocks are fixedly connected with limiting rings, the outer sides of the sliding blocks are fixedly connected with seesaws, and the seesaws are fixedly connected with the pipe-jacking sleeve. A steel wire rope is fixedly connected to the outer side of the warping plate and penetrates through the limiting ring. Compared with the prior art, the pipe jacking sleeve has the advantages that the pipe jacking sleeve is sleeved on the front-end pipeline for pipe jacking construction, so that the part, in contact with soil, of the end part of the pipeline can be protected, the damage of the end part pipeline in the pipe jacking construction is reduced, and when deviation occurs in the pipe jacking construction, the steel wire ropes on the two sides are pulled; the pipe jacking direction of the pipe jacking sleeve can be slightly corrected when the pipe jacking sleeve and even the pipeline at the foremost end are acted, and the warping plate can be shrunk in the shrinking groove to avoid the influence on normal jacking of the pipeline during pipe jacking construction by forming the shrinking groove in the outer side of the pipe jacking sleeve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipe jacking construction, in particular to a deviation correcting device for pipe jacking construction. Background Art

[0002] Pipe jacking is a trenchless construction method, that is, a pipeline burial construction technology with no excavation or less excavation. Pipe jacking is to use the jacking force generated by the jacking equipment in the working pit to overcome the friction between the pipeline and the surrounding soil, push the pipeline into the soil according to the designed slope, and transport the soil away. The principle is to use the thrust of the main jacking cylinder and the pipeline room, relay room, etc. to push the tool pipe or tunnel boring machine from the working pit through the soil layer to the receiving pit and lift it up. The pipeline follows the tool pipe or tunnel boring machine and is buried between the two pits. During the process of pipe jacking, the direction of the pipeline may deviate, so a device is needed to assist in correcting the deviation of pipe jacking construction. Utility Model Content

[0003] The utility model aims to overcome the shortcomings of the prior art and provide a deviation correction device for pipe jacking construction, which effectively solves the deficiencies of the prior art.

[0004] The purpose of the utility model is achieved through the following technical scheme: a deviation correction device for jacking pipe construction, including a jacking pipe sleeve, a slide groove is opened on the inner side of the jacking pipe sleeve, sliders are slidably connected to both sides of the slide groove, the inner side of the slider is fixedly connected to a limiting ring, the outer side of the slider is fixedly connected to a seesaw, the outer side of the seesaw is fixedly connected to a steel wire rope, and the steel wire rope passes through the limiting ring.

[0005] Optionally, the jacking sleeve is sleeved on the front end of the pipe in the jacking construction, and the inner shape of the jacking sleeve is matched with the end shape of the pipe.

[0006] The above technical solution is adopted: by putting a jacking sleeve on the front end pipe of the jacking construction, the part where the end of the pipe contacts the soil can be protected, reducing the damage of the end pipe during the jacking construction, and when the jacking construction deviates, the steel wire ropes on both sides are pulled to act on the jacking sleeve and even the front end pipe, and its jacking direction can be slightly corrected.

[0007] Optionally, a contraction groove is provided at the front end of the outer side of the top pipe sleeve, the shape of the contraction groove is matched with the shape of the seesaw, and the seesaw is contracted inside the contraction groove.

[0008] The above technical solution is adopted: by setting a shrinkage groove on the outside of the jacking sleeve, the seesaw can be retracted in the shrinkage groove to avoid affecting the normal jacking of the pipeline during the jacking construction. When the jacking direction needs to be corrected, the wire rope in the corresponding direction is pulled, and the seesaw in the corresponding direction is pulled outward to generate a force with the soil layer, so that the jacking direction of the jacking pipe is offset to the other side, so that the tilted seesaw is used to assist in correcting the direction of the jacking pipe.

[0009] Optionally, the seesaw is made of alloy spring steel, and the seesaw is located inside the contraction groove in a normal state.

[0010] The above technical solution is adopted: by setting the seesaw to alloy spring steel so that it has excellent elasticity, after the correction wire rope is released from pulling, the seesaw can be reset and retracted into the shrinkage groove again, so that the seesaw can be reused, avoiding the seesaw being difficult to reset after being pulled, affecting the progress and accuracy of subsequent pipe jacking construction.

[0011] Optionally, a connecting ring is fixedly connected to the bottom between the two sliding blocks, the outer side of the connecting ring is fitted with the inner side of the top pipe sleeve, and the middle part of the connecting ring is fixedly connected to a gravity block.

[0012] The above technical solution is adopted: by arranging a connecting ring between the sliders, the two sliders are connected to each other and are respectively located on both sides of the jacking sleeve, and under the action of the gravity block, the gravity block is located at the bottom of the inner side of the jacking sleeve, and the two sliders are respectively located on both sides of the inner wall of the jacking sleeve. When the jacking pipe and the jacking sleeve rotate during the jacking construction process, the two sliders can remain horizontally located on both sides of the jacking pipe under the action of the gravity block, which is convenient for pulling the wire rope to correct the direction of the jacking pipe when the jacking pipe is offset.

[0013] Optionally, the length of the steel wire rope is greater than the total stroke of the jacking pipe construction, the diameter of the steel wire rope is smaller than the inner diameter of the limiting ring, and the friction coefficient between the steel wire rope and the limiting ring is less than 0.5.

[0014] The above technical solution is adopted: by limiting various parameters of the wire rope, one end of the wire rope can be kept outside the jacking tunnel during the jacking construction process, so that when the jacking construction is offset, the construction personnel can use a machine or manual pulling of the wire rope to correct the direction of the jacking construction by using the pulling force and the force of the raised seesaw on the soil layer.

[0015] The utility model has the following advantages:

[0016] 1. The correction device for pipe jacking construction can protect the part where the end of the pipe contacts the soil by sleeve-fitting the pipe jacking sleeve on the front end pipe of the pipe jacking construction, thereby reducing the damage of the end pipe during the pipe jacking construction. When the pipe jacking construction deviates, the steel wire ropes on both sides can be pulled to slightly correct the pipe jacking direction when the pipe jacking sleeve or even the front end pipe is exerted. By arranging a contraction groove on the outer side of the pipe jacking sleeve, the seesaw can be contracted in the contraction groove during the pipe jacking construction to avoid affecting the normal jacking of the pipe. When it is necessary to correct the direction of the pipe jacking, the steel wire rope in the corresponding direction is pulled, and the seesaw in the corresponding direction is pulled outward to generate a force with the soil layer, so that the jacking direction of the pipe jacking is deviated to the other side, so that the tilted seesaw is used to assist in correcting the direction of the pipe jacking.

[0017] 2. The correction device for pipe jacking construction has excellent elasticity by setting the seesaw plate to alloy spring steel. After the correction wire rope is released from pulling, the seesaw plate can be reset and retracted into the shrinkage groove again, so that the seesaw plate can be reused, avoiding the difficulty of resetting the seesaw plate after being pulled, affecting the progress and accuracy of subsequent pipe jacking construction.

[0018] 3. The correction device for pipe jacking construction has a connecting ring arranged between the sliders so that the two sliders are connected to each other and are respectively located on both sides of the pipe jacking sleeve. Under the action of the gravity block, the gravity block is located at the bottom of the inner side of the pipe jacking sleeve, and the two sliders are respectively located on both sides of the inner wall of the pipe jacking sleeve. When the pipe jacking pipe and the pipe jacking sleeve rotate during the pipe jacking construction process, the two sliders can remain horizontally located on both sides of the pipe jacking under the action of the gravity block, so that when the pipe jacking deviates, the steel wire rope is pulled to correct the deviation of the pipe jacking direction. By limiting various parameters of the steel wire rope, one end of the steel wire rope can be kept outside the pipe jacking tunnel during the pipe jacking construction process, so that when the pipe jacking construction deviates, the construction personnel can use a machine or manually pull the steel wire rope, and use the tension and the force of the tilted seesaw on the soil layer to correct the deviation of the pipe jacking construction direction. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the utility model;

[0020] Figure 2 For this utility model Figure 1 A schematic diagram of the enlarged structure at A in the middle;

[0021] Figure 3 It is a rear view structural schematic diagram of the utility model;

[0022] Figure 4 It is a cross-sectional structural schematic diagram of the utility model;

[0023] Figure 5 For this utility model Figure 4Schematic diagram of the enlarged structure at point B in the middle.

[0024] In the figure: 1-jacking sleeve, 2-slide groove, 3-slider, 4-limiting ring, 5-rocker, 6-wire rope, 7-contraction groove, 8-connecting ring, 9-gravity block. DETAILED DESCRIPTION

[0025] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0026] like Figures 1 to 5 As shown, a deviation correction device for jacking pipe construction includes a jacking pipe sleeve 1, a slide groove 2 is opened on the inner side of the jacking pipe sleeve 1, sliders 3 are slidably connected to both sides of the slide groove 2, the inner side of the slider 3 is fixedly connected to a limit ring 4, the outer side of the slider 3 is fixedly connected to a seesaw 5, the outer side of the seesaw 5 is fixedly connected to a steel wire rope 6, and the steel wire rope 6 passes through the limit ring 4.

[0027] Embodiment 1: A jacking sleeve 1 is sleeved on the front end of the pipe during jacking construction. The inner shape of the jacking sleeve 1 is matched with the end shape of the pipe. By sleeved on the front end pipe during jacking construction, the part where the end of the pipe contacts the soil can be protected, thereby reducing damage to the end pipe during jacking construction. When a deviation occurs in the jacking construction, the steel wire ropes 6 on both sides can be pulled to apply force to the jacking sleeve 1 and even the front end pipe, and the jacking direction can be slightly corrected.

[0028] Embodiment 2: A contraction groove 7 is provided at the front end of the outer side of the jacking sleeve 1, and the shape of the contraction groove 7 is matched with the shape of the seesaw 5. The seesaw 5 is contracted inside the contraction groove 7. By setting the contraction groove 7 on the outer side of the jacking sleeve 1, the seesaw 5 can be contracted in the contraction groove 7 during the jacking construction of the pipeline to avoid affecting the normal jacking of the pipeline. When it is necessary to correct the direction of the jacking, the steel wire rope 6 in the corresponding direction is pulled, and the seesaw 5 in the corresponding direction is pulled outward to generate a force with the soil layer, so that the jacking direction of the jacking is offset to the other side, so that the tilted seesaw 5 is used to assist in correcting the direction of the jacking.

[0029] Embodiment 3: The material of the seesaw 5 is alloy spring steel. The seesaw 5 is located inside the shrinkage groove 7 in the normal state. By setting the seesaw 5 to alloy spring steel, it has excellent elasticity. After the deviation-correcting wire rope 6 is released from pulling, the seesaw 5 can be reset and retracted into the shrinkage groove 7 again, so that the seesaw 5 can be reused, avoiding the difficulty of resetting the seesaw 5 after being pulled, affecting the progress and accuracy of subsequent pipe jacking construction.

[0030] Embodiment 4: A connecting ring 8 is fixedly connected to the bottom between the two sliders 3, and the outer side of the connecting ring 8 fits with the inner side of the jacking sleeve 1. A gravity block 9 is fixedly connected to the middle part of the connecting ring 8. By arranging the connecting ring 8 between the sliders 3, the two sliders 3 are connected to each other and are respectively located on both sides of the jacking sleeve 1, and under the action of the gravity block 9, the gravity block 9 is located at the bottom of the inner side of the jacking sleeve 1, then the two sliders 3 are respectively located on both sides of the inner wall of the jacking sleeve 1, and when the jacking pipe and the jacking sleeve rotate during the jacking construction process, the two sliders 3 can remain horizontally located on both sides of the jacking pipe 1 under the action of the gravity block 9, so that when the jacking pipe is offset, it is convenient to pull the wire rope 6 to correct the direction of the jacking pipe.

[0031] Embodiment 5: The length of the wire rope 6 is greater than the total stroke of the jacking construction, the diameter of the wire rope 6 is smaller than the inner diameter of the limit ring 4, and the friction coefficient between the wire rope 6 and the limit ring 4 is less than 0.5. By limiting various parameters of the wire rope 6, one end of the wire rope 6 can be kept outside the jacking tunnel during the jacking construction process, so that construction personnel can use machines or manual pulling of the wire rope 6 when the jacking construction deviates, and use the pulling force and the force of the raised seesaw 5 on the soil layer to correct the direction of the jacking construction.

[0032] The working principle of the utility model is as follows:

[0033] S1. A jacking sleeve 1 is sleeved on the front end pipe of the jacking construction, which can protect the part of the pipe end in contact with the soil, reduce the damage of the end pipe during the jacking construction, and when the jacking construction deviates, the steel wire ropes 6 on both sides can be pulled to apply force to the jacking sleeve 1 and even the front end pipe, and slightly correct its jacking direction;

[0034] S2. A contraction groove 7 is provided on the outer side of the jacking sleeve 1, so that when the pipeline is in jacking construction, the seesaw 5 can be contracted in the contraction groove 7 to avoid affecting the normal jacking of the pipeline. When it is necessary to correct the direction of the jacking, the steel wire rope 6 in the corresponding direction is pulled, and the seesaw 5 in the corresponding direction is pulled outward to generate a force with the soil layer, so that the jacking direction of the jacking is offset to the other side, so that the tilted seesaw 5 is used to assist in correcting the direction of the jacking.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] 1. The correction device for pipe jacking construction can protect the part where the end of the pipe contacts the soil by sleeve-fitting the pipe jacking sleeve 1 on the front end pipe of the pipe jacking construction, thereby reducing the damage of the end pipe during the pipe jacking construction. When the pipe jacking construction deviates, the steel wire ropes 6 on both sides can be pulled to slightly correct the pipe jacking direction when the pipe jacking sleeve 1 or even the front end pipe is exerted. By arranging a contraction groove 7 on the outer side of the pipe jacking sleeve 1, the seesaw 5 can be contracted in the contraction groove 7 during the pipe jacking construction to avoid affecting the normal jacking of the pipe. When it is necessary to correct the direction of the pipe jacking, the steel wire rope 6 in the corresponding direction is pulled, and the seesaw 5 in the corresponding direction is pulled outward to generate a force with the soil layer, so that the jacking direction of the pipe jacking is deviated to the other side, so that the tilted seesaw 5 is used to assist in correcting the direction of the pipe jacking.

[0037] 2. The correction device for pipe jacking construction has excellent elasticity by setting the seesaw 5 to alloy spring steel. After the correction wire rope 6 is released from pulling, the seesaw 5 can be reset and retracted into the retraction groove 7 again, so that the seesaw 5 can be reused, avoiding the difficulty of resetting the seesaw 5 after being pulled, which affects the progress and accuracy of subsequent pipe jacking construction.

[0038] 3. The correction device for jacking construction is provided with a connecting ring 8 between the sliders 3 so that the two sliders 3 are connected with each other and are respectively located on both sides of the jacking sleeve 1. Under the action of the gravity block 9, the gravity block 9 is located at the bottom of the inner side of the jacking sleeve 1, and the two sliders 3 are respectively located on both sides of the inner wall of the jacking sleeve 1. When the jacking pipe and the jacking sleeve rotate during the jacking construction process, the two sliders 3 can be kept horizontally located on both sides of the jacking pipe 1 under the action of the gravity block 9, so that when the jacking pipe deviates, the steel wire rope 6 is pulled to correct the deviation of the jacking direction. By limiting various parameters of the steel wire rope 6, one end of the steel wire rope 6 can be kept outside the jacking tunnel during the jacking construction process, so that the construction personnel can use a machine or manually pull the steel wire rope 6 when the jacking construction deviates, and use the tension and the force of the tilted seesaw 5 on the soil layer to correct the deviation of the jacking construction direction.

Claims

1. A deviation correction device for pipe jacking construction, characterized in that: The invention comprises a jacking sleeve (1), wherein a slide groove (2) is provided on the inner side of the jacking sleeve (1), slide blocks (3) are slidably connected to both sides of the slide groove (2), the inner side of the slide block (3) is fixedly connected to a limit ring (4), the outer side of the slide block (3) is fixedly connected to a seesaw (5), the outer side of the seesaw (5) is fixedly connected to a steel wire rope (6), and the steel wire rope (6) passes through the limit ring (4).

2. A deviation correction device for pipe jacking construction according to claim 1, characterized in that: The jacking sleeve (1) is sleeved on the front end of the pipe during jacking construction, and the inner shape of the jacking sleeve (1) is adapted to the end shape of the pipe.

3. A deviation correction device for pipe jacking construction according to claim 2, characterized in that: A contraction groove (7) is provided at the front end of the outer side of the jacking sleeve (1); the shape of the contraction groove (7) matches the shape of the seesaw (5); and the seesaw (5) is contracted inside the contraction groove (7).

4. A deviation-correcting device for pipe jacking construction according to claim 3, characterized in that: The seesaw (5) is made of alloy spring steel, and the seesaw (5) is located inside the contraction groove (7) in a normal state.

5. A deviation-correcting device for pipe jacking construction according to claim 4, characterized in that: A connecting ring (8) is fixedly connected to the bottom between the two sliding blocks (3); the outer side of the connecting ring (8) fits the inner side of the jacking sleeve (1); and a gravity block (9) is fixedly connected to the middle of the connecting ring (8).

6. A deviation-correcting device for pipe jacking construction according to claim 5, characterized in that: The length of the steel wire rope (6) is greater than the total stroke of the pipe jacking construction, the diameter of the steel wire rope (6) is smaller than the inner diameter of the limiting ring (4), and the friction coefficient between the steel wire rope (6) and the limiting ring (4) is less than 0.5.