Pipeline laying device for power installation

The combined structure of the frame, pipe sleeve, support tile and cover tile solves the problem of easy misalignment of the pipe connection ends, and achieves the stability of the pipe connection and the cable protection effect in power installation.

CN223428076UActive Publication Date: 2025-10-10HEFEI LINENG ELECTRIC POWER TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422672727.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2025-10-10
Estimated Expiration
2034-11-04

AI Technical Summary

Technical Problem

In existing power installations, pipe connection ends are easily misaligned due to bracket offset, resulting in loss of cable protection.

Method used

The frame, pipe sleeve, support tile and cover tile structure are adopted. The pipe connection ends are clamped by the cooperation of screws and pressure strips to ensure the concentricity and collinearity of the pipes. The frame is fixed with lugs and angle plates to form a firm connection structure.

Benefits of technology

It effectively avoids the misalignment of the pipe connection end, ensures the stable protection of the cable, and improves the firmness and stability of the pipe connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223428076U_ABST
    Figure CN223428076U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipeline laying device for electric power installation, which comprises a frame body, pipe sleeves are symmetrically arranged on two sides of the frame body in a penetrating manner, a supporting tile is arranged on the lower side in the frame body, the inner curved surface of the supporting tile is communicated with the pipe sleeves, a screw rod is vertically arranged on the plane of the supporting tile, a cover tile is sleeved on the screw rod, and the cover tile and the supporting tile are matched to press the connecting end of a pipeline. The pipeline is inserted into the pipe sleeve; the cover tile is in compression joint with a pressing strip through a screw rod; the pipe sleeve is simple in structure, reasonable in design and novel and unique in idea, the connecting ends of the pipes are sleeved with the pipe sleeve, the supporting tile and the cover tile are matched with the screw to clamp the connecting ends of the pipes, it is guaranteed that the connecting ends of the two pipes are of an integrated structure, and the connecting ends of the pipes are firmer.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to power installation technical field especially, it is a kind of pipeline laying device for electric power installation. BACKGROUND

[0002] Electric power engineering, namely the engineering related to the production, delivery, distribution of electric energy, also includes the engineering of electric power as power and energy in various fields in a broad sense. At the same time, it can be understood that the extension project of power transmission and transformation, the production of electric energy mainly relies on thermal power plant, hydropower station and nuclear power station.

[0003] In the electric power engineering, pipeline is needed for auxiliary installation, and in the process of cable laying, pipeline is used to protect the cable. The joint of the pipeline needs to be firmly connected. At present, it is usually fixed by a support. If the support is deviated due to accident, the relative misalignment between the pipelines will occur, and the cable at the connecting end of the pipeline will lose protection. Therefore, the present application discloses a pipeline laying device for electric power installation. UTILITY MODEL CONTENT

[0004] The utility model aims at the existing problems, and provides a pipeline laying device for electric power installation.

[0005] The utility model is realized through the following technical scheme: a pipeline laying device for electric power installation, comprising a frame, pipe sleeves are symmetrically and throughly arranged on both sides of the frame, a supporting tile is arranged on the lower side inside the frame, the inner curved surface of the supporting tile is communicated with the pipe sleeve, a screw rod is vertically arranged on the plane of the supporting tile, a cover tile is sleeved on the screw rod, the cover tile is matched with the supporting tile to press the connecting end of the pipeline, the pipeline is inserted into the pipe sleeve, and a pressing strip is pressed on the cover tile through the screw rod.

[0006] As a further improvement of the above scheme, the inner curved surface of the supporting tile is flush with the lower inner wall of the pipe sleeve.

[0007] The pipeline inserted into the inner pipe sleeve is concentric and collinear, and misalignment of the two pipelines is avoided.

[0008] As a further improvement of the above scheme, convex strips are symmetrically arranged on the inner walls of the two sides of the frame, the convex strips are matched with guide grooves, and the guide grooves are arranged at the end of the cover tile.

[0009] The guide groove of the cover tile is sleeved on the convex strip, the inner curved surface of the cover tile is aligned with the inner curved surface of the supporting tile, and the two inner curved surfaces effectively clamp the connecting end of the pipeline.

[0010] As a further improvement of the above scheme, the end of the pressing strip is arranged in a notch, and the notch is arranged in the port of the frame.

[0011] The pressing strip is limited and fixed through the notch, displacement of the pressing strip is avoided, and the stability of the cover tile is ensured.

[0012] As a further improvement to the above solution, hanging ears are symmetrically arranged at the front and rear ends of the frame, and the hanging ears are used to fix the connecting ends of the frame and the pipeline. In addition, angle plates are provided on the hanging ears, and the hanging ears are connected through the angle plates so that the hanging ears are firmly connected to the front and rear ends of the frame.

[0013] Compared with the existing technology, the utility model has the following advantages: simple structure, reasonable design, novel and unique ideas, the connecting end of the pipeline is covered by the pipe sleeve, and the supporting tile and the cover tile are used in conjunction with the screw to clamp the connecting end of the pipeline, so as to ensure that the connecting ends of the two sections of the pipeline form an integrated structure, make the connecting end of the pipeline more firm, avoid dislocation of the connecting end of the pipeline, and effectively protect the cables in the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural diagram of the present utility model.

[0015] Figure 2 This is a schematic diagram of the structure of the pipe inserted into the pipe sleeve.

[0016] Figure 3 This is a schematic diagram of the structure of the tile cover. DETAILED DESCRIPTION

[0017] The present invention will be further described below with reference to the accompanying drawings.

[0018] like Figures 1 to 3 As shown in the figure, a pipe laying device for power installation includes a frame 1, and the frame 1 is symmetrical on both sides and a pipe sleeve 2 is set through it. A support shoe 3 is set on the lower side of the interior of the frame 1, and the inner curved surface of the support shoe 3 is connected with the pipe sleeve 2. A screw rod 8 is vertically set on the plane of the support shoe 3, and a cover tile 4 is mounted on the screw 8. The cover tile 4 and the support shoe 3 cooperate to crimp the connecting end of the pipe 9. The pipe 9 is inserted into the pipe sleeve 2, and the cover tile 4 is crimped with a pressure strip 5 through the screw 8.

[0019] As a further improvement to the above solution, the inner curved surface of the support shoe 3 is flush with the lower inner wall of the sleeve 2;

[0020] Ensure that the pipes 9 inserted into the inner pipe sleeve 2 are concentric and collinear to avoid misalignment of the two pipes 9.

[0021] As a further improvement to the above solution, ridges 11 are symmetrically provided on the inner walls of both sides of the frame 1, the ridges 11 match the guide grooves 12, and the guide grooves 12 are provided at the ends of the cover tiles 4;

[0022] The guide groove 12 of the cover tile 4 is sleeved on the convex strip 11 to ensure that the inner curved surface of the cover tile 4 is aligned with the inner curved surface of the support tile 3, so that the two inner curved surfaces can effectively clamp the connecting end of the pipe 9.

[0023] As a further improvement to the above solution, the end of the pressure strip 5 is arranged in the notch 10, and the notch 10 is arranged in the port of the frame 1;

[0024] The pressure strip 5 is limited and fixed by the notch 10 to prevent the pressure strip 5 from moving and ensure the stability of the cover tile 4.

[0025] As a further improvement to the above scheme, hanging ears are symmetrically arranged at the front and rear ends of the frame 1, and the hanging ears are used to fix the connecting ends of the frame 1 and the pipe 9. In addition, angle plates are provided on the hanging ears, and the hanging ears are connected through the angle plates so that the hanging ears are firmly connected to the front and rear ends of the frame 1.

[0026] As a further improvement to the above solution, the cover tiles 4 are composed of connecting plates 13 between the arc covers.

[0027] The working principle of a pipeline 9 laying device for power installation is as follows: the connecting end of the pipeline 9 is sleeved through the pipe sleeve 2, and the connecting end of the pipeline 9 is clamped by using the support tile 3 and the cover tile 4 in conjunction with the screw 8 to ensure that the connecting ends of the two sections of the pipeline 9 form an integrated structure, making the connecting end of the pipeline 9 more secure.

[0028] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A pipe laying device for power installation, comprising a frame, characterized in that: The frame is symmetrical on both sides and is provided with pipe sleeves running through it. A support shoe is provided on the lower side of the interior of the frame. The inner curved surface of the support shoe is connected to the pipe sleeve. A screw is vertically provided on the plane of the support shoe. A cover shoe is mounted on the screw shoe. The cover shoe and the support shoe cooperate to crimp the connecting end of the pipeline. The pipeline is inserted into the pipe sleeve, and the cover shoe is crimped with a pressure strip through the screw.

2. A pipe laying device for power installation according to claim 1, characterized in that: The inner curved surface of the support shoe is flush with the lower inner wall of the pipe sleeve.

3. A pipe laying device for power installation according to claim 1, characterized in that: The inner walls on both sides of the frame are symmetrically provided with convex strips, the convex strips match the guide grooves, and the guide grooves are provided at the ends of the cover tiles.

4. A pipe laying device for power installation according to claim 1, characterized in that: The end of the pressure strip is arranged in the notch, and the notch is arranged in the port of the frame.