A segmented scaffold integrated attachment platform for a ship

By pre-assembling miniaturized scaffolding modules and fixing them between flat plates, combined with auxiliary and support mechanisms, the problem of large workload in scaffolding construction in existing technologies is solved, enabling rapid construction and convenient transportation.

CN224466086UActive Publication Date: 2026-07-07NANTONG SHENGTAI MARINE EQUIPMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
NANTONG SHENGTAI MARINE EQUIPMENT CO LTD
Filing Date
2025-08-27
Publication Date
2026-07-07

AI Technical Summary

Technical Problem

Under current technology, scaffolding erection requires the sequential connection of multiple pipes and connectors, resulting in a large workload at higher heights and hindering rapid construction operations.

Method used

An integrated attachment platform for marine segmented scaffolding is provided. It forms a miniaturized module by pre-assembling connecting pipes and scaffolding connectors and fixing it between the first and second flat plates. Subsequently, it can be stacked and assembled according to the required height. The stability is improved by using auxiliary and support mechanisms.

Benefits of technology

It significantly reduces the amount of setup work, enables rapid construction operations, and makes modular transportation and handling more convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224466086U_ABST
    Figure CN224466086U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of marine auxiliary device, concretely relates to a kind of marine segmented scaffold integrated attachment platform;Including segmented scaffold main body and auxiliary mechanism, auxiliary mechanism includes first flat plate, second flat plate, the connecting plate, connecting piece, U-shaped slot block and connecting locking device, when using, can be directly overlapped and assembled and used according to the height of need through connecting plate, first flat plate, second flat plate and connecting piece, because the small-sized scaffold module between first flat plate and second flat plate has been pre-assembled, compared with the traditional connection in turn builds, workload will significantly reduce, and then the scaffold building under prior art can be mostly built in the field from bottom to top in turn, by connecting and assembling multiple pipes in turn to form scaffold structure, but, this kind of mode is high in height, connects multiple pipes and scaffold connecting piece in turn, workload is big, not conducive to the problem of rapid construction operation.
Need to check novelty before this filing date? Find Prior Art