Device for preparing heated urea solution using boiler exhaust water
By adding an inverted U-shaped elbow and a hot water utilization branch pipe between the boiler continuous blowdown system and the fixed blowdown expansion tank, the urea solution is heated by the continuous blowdown hot water, which solves the problems of high energy consumption of electric heating and wastewater waste, and realizes the recycling of resources.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- ZHUHAI XINHUAN ENVIRONMENTAL PROTECTION CO LTD
- Filing Date
- 2025-07-24
- Publication Date
- 2026-07-24
AI Technical Summary
The existing urea preparation system uses electric heating, which results in high energy consumption, and the continuous discharge of wastewater from the boiler leads to a waste of heat and water resources.
An inverted U-shaped elbow pipe is added between the boiler continuous blowdown system and the fixed blowdown expansion tank, and connected to the urea preparation tank through a hot water branch pipe. The continuous blowdown hot water replaces electric heating, and automatic control is achieved by combining a level gauge and a solenoid valve.
It reduces electricity consumption, realizes the recycling of heat and water resources, solves the problem of heat and water waste caused by continuous sewage discharge, and improves resource utilization.
Smart Images

Figure CN224551520U_ABST