Graphical user interface for the technical error prevention management system of electronic equipment operation tickets

CN309462622SActive Publication Date: 2025-08-26THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430518343.1
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2025-08-26
Estimated Expiration
2039-08-15

Smart Images

  • Figure 000002_ABST
    Figure 000002_ABST
Patent Text Reader

Abstract

1. The name of this design product: Graphical user interface for a technical error-proof management system for electronic equipment operation tickets. 2. Purpose of this design product: for use in an electronic device. 3. The key design point of this design product lies in the displayed graphical user interface. 4. The picture or photo that best illustrates the design points: Interface change state diagram 1. 5. Purpose of the graphical user interface: used to create and edit work tickets, manage work tickets, and issue orders for specified work tickets. 6. Description of the changing status of the graphical user interface: The main view is the login interface of the technical error prevention management system. Enter the account and password and click the login button in the main view to enter the interface change status diagram 1. Click the add button with "+" at the lower left of the interface change status diagram 1 to enter the interface change status diagram 2. Fill in the corresponding plant and station information in the interface change status diagram 2 and click "OK" to enter the interface change status diagram 3. Click the add button with "+" at the lower left of the interface change status diagram 3 to enter the interface change status diagram 4. Fill in the corresponding operation type information in the interface change status diagram 4 and click "OK" to enter the interface change status diagram 5. Click the add button with "+" at the lower left of the interface change status diagram 5 to enter the interface change status diagram 6. Fill in the corresponding operation task information in the interface state change diagram 6 and click "OK" to enter the interface change status diagram 7. Click the work ticket that needs to be edited in the third row of the directory tree on the left of the interface change status diagram 7 to enter the interface change status diagram 8. Click on the upper left of the interface change status diagram 8 Click "Add Step" to enter the interface change state diagram 9. Click "Unordered 1" in the middle of interface change state diagram 9 to enter interface change state diagram 10. Enter the corresponding content in the edit box on the right side of interface change state diagram 10, select the order below the edit box, click the "+" add button in the lower right corner to enter interface change state diagram 11. Enter the logic point in the middle edit box "Please enter the logic name or..." on the right side of interface change state diagram 11 to enter interface change state diagram 12. Select the specified logic point in the drop-down box in interface change state diagram 12 to enter interface change state diagram 13. Click the "Search" icon behind the edit box in interface change state diagram 13 to enter interface change state diagram 14. Click the second node "Xiangjiaba" in interface change state diagram 14 to expand the subnode and enter interface change state diagram 15. Click "OK" in interface change state diagram 15 to enter interface change state diagram 16. Click "OK" at the bottom right of interface change state diagram 16 to enter interface change state diagram 17.
Need to check novelty before this filing date? Find Prior Art