Graphical user interface for the charging station warning center for electronic equipment
CN309485372SActive Publication Date: 2025-09-09SICHUAN HONGHE COMM CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430479409.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2025-09-09
- Estimated Expiration
- 2039-07-30
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product of this design: Graphical user interface for an energy station warning center for electronic equipment. 2. Purpose of this design product: an electronic device. 3. The key design point of this design product lies in the graphical user interface on the screen. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. The design for which protection is sought includes color. 6. If there are no design points, omit the remaining views. 7. Designate Design 1 as the base design. 8. Purpose of the graphical user interface: The graphical user interface of this application serves as the interface of the energy station software. 9. Graphical user interface areas in the product: The gray areas in each view are variable content screens. 10. Description of the changing states of the graphical user interface: The main view of Design 1 is the main interface of the energy station software. Slide down the interface of Design 1 main view to enter the Design 1 changing state diagram 1. Slide down the interface of Design 1 changing state diagram 1 to enter the Design 1 changing state diagram 2. Slide down the interface of Design 1 changing state diagram 2 to enter the Design 1 changing state diagram 3. Slide down the interface of Design 1 changing state diagram 3 to enter the Design 1 changing state diagram 4. Slide down the interface of Design 1 changing state diagram 4 to enter the Design 1 changing state diagram 5. Click the warning center button in Design 1 changing state diagram 5 to enter the Design 1 changing state diagram Figure 6, pull down the interface of Design 1 Change State Figure 6 to enter Design 1 Change State Figure 7, click the subordinate unit warning button in Design 1 Change State Figure 7 to enter Design 1 Change State Figure 8, pull down the interface of Design 1 Change State Figure 8 to enter Design 1 Change State Figure 9; Design 2 Main View is the main interface of the energy station software, slide down the interface of Design 2 Main View to enter Design 2 Change State Figure 1, slide down the interface of Design 2 Change State Figure 1 to enter Design 2 Change State Figure 2, slide down the interface of Design 2 Change State Figure 2 to enter Design 2 Change State Figure 3, slide down the interface of Design 2 Change State Figure 3 Enter the Design 2 Change State Diagram 4, slide down the interface of Design 2 Change State Diagram 4 to enter the Design 2 Change State Diagram 5, click the Warning Center button in Design 2 Change State Diagram 5 to enter the Design 2 Change State Diagram 6, click the Go to Process button in Design 2 Change State Diagram 6 to enter the Design 2 Change State Diagram 7, click the Contact Site button in Design 2 Change State Diagram 7 to enter the Design 2 Change State Diagram 8; the Design 3 main view is the main interface of the energy station software, slide down the interface of the Design 3 main view to enter the Design 3 Change State Diagram 1, slide down the interface of the Design 3 Change State Diagram 1 to enter the Design 3 Change State Diagram 2. Slide and drop down the interface of Design 3 Change State Diagram 2 to enter Design 3 Change State Diagram 3. Slide and drop down the interface of Design 3 Change State Diagram 3 to enter Design 3 Change State Diagram 4. Slide and drop down the interface of Design 3 Change State Diagram 4 to enter Design 3 Change State Diagram 5. Click the Early Warning Center button in Design 3 Change State Diagram 5 to enter Design 3 Change State Diagram 6. Pull down the interface of Design 3 Change State Diagram 6 to enter Design 3 Change State Diagram 7. Click the Go to Evaluation button in Design 3 Change State Diagram 7 to enter Design 3 Change State Diagram 8. Pull down the interface of Design 3 Change State Diagram 8 to enter Design 3 Change State Diagram 9.
Need to check novelty before this filing date? Find Prior Art