Information configuration display graphical user interface for electronic device
CN309675605SActive Publication Date: 2025-12-16CHANGSHA SHETONG INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430836542.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2039-12-30
Smart Images

Figure 000001_ABST
Abstract
1. The name of the design product: information configuration display graphical user interface of electronic device. 2. The use of the design product: an electronic device. 3. The design points of the design product: the interface content of the graphical user interface in the screen. 4. The picture or photo that best indicates the design points: front view. 5. Omit rear view, left view, right view, top view, bottom view. 6. The use of the graphical user interface: the graphical user interface is used for the management, control and operation of the information configuration and display of the clinical subject fission system. The main view is the display interface of the home page, click the "new project" option in the upper right corner of the main view, enter the interface change state diagram 1; after filling in the information in the pop-up window in the interface change state diagram 1, click the "create new project" option below the pop-up window, enter the interface change state diagram 2; after filling in the information in the "basic information" area at the top of the interface change state diagram 2, click the "save" option below the "basic information" area, and slide down the interface change state diagram 2, enter the interface change state diagram 3; after filling in the information in the "study drug" area at the top of the interface change state diagram 3, slide down the interface change state diagram 3, enter the interface change state diagram 4; after filling in the information in the "research institution" area at the top of the interface change state diagram 4, click the "save" option below the "research institution" area, and slide down the interface change state diagram 4, enter the interface change state diagram 5; after filling in the information in the "recruitment condition" area at the top of the interface change state diagram 5, click the "save" option below the "recruitment condition" area, and slide down the interface change state diagram 5, enter the interface change state diagram 6; after filling in the information in the "recruitment cycle" area at the top of the interface change state diagram 6, click the "save" option below the "recruitment cycle" area, and slide down the interface change state diagram 6, enter the interface change state diagram 7; after filling in the information in the "poster information" area at the top of the interface change state diagram 7, click the "save" option below the "poster information" area, and slide down the interface change state diagram 7, enter the interface change state diagram 8; after filling in the information in the "entry and exit standard" area at the top of the interface change state diagram 8, click the "save" option below the "entry and exit standard" area, and slide down the interface change state diagram 8, enter the interface change state diagram 9; after filling in the information in the "project introduction" area at the top of the interface change state diagram 9, click the "save" option below the "project introduction" area, and slide down the interface change state diagram 9, enter the interface change state diagram 10; after filling in the information in the "registration condition" area at the top of the interface change state diagram 10, click the "save" option below the "registration condition" area, and slide down the interface change state diagram 10, enter the interface change state diagram 11; after filling in the information in the "trial benefit" area in the middle of the interface change state diagram 11, click the "save" option below the "trial benefit" area, and click the "all projects" option in the upper left corner of the interface change state diagram 11, enter the interface change state diagram 12.
Need to check novelty before this filing date? Find Prior Art