Graphical User Interface for Multi-Timescale Operation Planning Display System of Cascade Hydropower Stations for Electronic Equipment

CN309927719SActive Publication Date: 2026-04-17CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
CHINA YANGTZE POWER
Filing Date
2025-07-29
Publication Date
2026-04-17

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface for Displaying Multi-Time-Scale Operation Plans of Cascade Hydropower Stations for Electronic Equipment. 2. Purpose of this design: An electronic device. 3. The key design feature of this product is its graphical user interface. 4. The image or photograph that best illustrates the design's key features: the front view. 5. Uses of the graphical user interface: Customizable display function for operation plans of cascade hydropower stations at multiple time scales, etc. 6. Human-computer interaction method of graphical user interface: The main view displays the annual operation plan of the cascade hydropower station, and the year and hydropower station to be displayed can be customized. Clicking on "Monthly Plan" in the upper left corner of the main view will take you to the interface change status diagram 1. This interface is used to display the execution status of the monthly operation plan of the cascade hydropower station. You can customize the month and hydropower station to be displayed. Clicking on "7-Day Plan" in the upper left corner of Interface Change Status Figure 1 will take you to Interface Change Status Figure 2. This interface displays the historical operation status of cascade hydropower stations over the past 7 days and the planned operation status for the next 7 days. You can customize the hydropower stations to be displayed and the forecast deadline. Clicking on "2-Day Plan" in the upper left corner of Interface Change Status Diagram 2 will take you to Interface Change Status Diagram 3, which displays the execution status of the 2-day operation plan for the cascade hydropower station. Clicking on "Cumulative" in the upper left corner of the interface change status diagram 3 will take you to the interface change status diagram 4, which displays the cumulative power generation and water inflow information of the cascade hydropower station for a custom year. In the interface, "XXX" represents text, numbers, letters, or symbols.
Need to check novelty before this filing date? Find Prior Art