Cancellation processing device, cancellation processing method and cancellation processing program

The offset processing device facilitates efficient offsetting of construction work and advance expenses by managing data and payment schedules, enhancing business efficiency and supporting sustainable development goals.

JP2024154997AActive Publication Date: 2024-10-31OBIC CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023069311
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-10-31
Estimated Expiration
2043-04-20

AI Technical Summary

Technical Problem

Existing systems fail to efficiently offset the progress of construction work and advance expenses between ordering and outsourcing companies with a low workload.

Method used

An offset processing device and method that includes a control unit to manage order and expense data, linking construction work with payment schedules, allowing for easy offsetting of completed work and advance costs through data input, linkage, and journal creation.

Benefits of technology

Enables easy and efficient offsetting of construction work completion and advance expenses with reduced workload, improving business efficiency and contributing to sustainable development goals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024154997000001_ABST
    Figure 2024154997000001_ABST
Patent Text Reader

Abstract

To provide a cancellation processing device, cancellation processing method, and cancellation processing program that can cancel the turnout and the reimbursed amount such as expenses of a construction with a simple and low workload when an order source places an order of the construction to a subcontractor.SOLUTION: A cancellation processing device according to this embodiment includes purchase input means which creates purchase data that includes the purchase number, purchase date, order number, handling business operator, order date, prime cost subject, order amount, current month purchase amount specified by an operator, and liability subject on the basis of order data, refers to associated data, retrieves expense payment schedule data of the expense number associated with the order number of the purchase data as a cancellation candidate against the current month purchase amount of the purchase data, determines the payment schedule data of the expense number specified by the operator as a cancellation target, and creates reimbursed purchase data that includes the purchase number, purchase date, reimbursement destination, order number, reimbursement subject, and reimbursement amount for the determined cancellation target.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an offset processing device, an offset processing method, and an offset processing program. [Background technology]

[0002] For example, in the construction industry, when an ordering party orders a construction project from an outsourced contractor, the ordering party often advances the cost of materials and expenses for the construction project. Conventionally, a system for processing construction costs is disclosed in, for example, Patent Document 1. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-91279 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the above-mentioned Patent Document 1 does not state anything about how, when an ordering party places an order with a subcontractor, the amount of work completed and the advance payment for expenses and the like can be offset simply and with a low workload.

[0005] The present invention has been made in consideration of the above, and aims to provide an offsetting device, an offsetting method, and an offsetting program that, when an ordering party orders construction work from an outsourced contractor, can offset the amount of construction work completed and the advance payments for expenses, etc., simply and with little workload. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, the present invention provides an offsetting processing device equipped with a control unit, the control unit comprising: order input means for creating and registering in a memory area order data including order number, subcontractor, order subject, cost item, order date, order period, order amount, and debt item when ordering construction work to a subcontractor; expense import means for creating and registering in the memory area expense payment schedule data including expense number, date of occurrence, trading company, expense item, amount, and debt item for unpaid invoices and advance vouchers for the construction work, and linking data linking expense numbers and order numbers, and registering in the memory area; and expense import means for importing and registering in the memory area purchase number, purchase date, order number, handling company, order date, cost item, order amount, and debt item specified by an operator based on the order data registered in the memory area. the purchase input means creates purchase data including the purchase amount and payable item for the current month to be set, refers to the linking data registered in the memory area, reads out from the memory area scheduled expense payment data for the expense number linked to the order number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data, determines the scheduled payment data for the expense number specified by the operator as the offset target, creates advance payment data for the determined offset target including the purchase number, purchase date, advance payment destination, order number, advance payment item, and advance payment amount, and creates scheduled payment data including the payment number, scheduled payment date, payee vendor, and scheduled payment amount based on the purchase data and the advance payment data.

[0007] According to another aspect of the present invention, the purchase input means may be configured to be able to designate one or more of the offset candidates as targets for offsetting with the purchase amount in the following month or later.

[0008] In addition, according to one aspect of the present invention, the control unit is configured to be able to access an item setting master in which expense items are registered in association with cost items that serve as debit items in journal entries, and the expense import means may refer to the item setting master based on the expense payment schedule data to create journal entry data including journal entry number, accounting date, business partner, debit item, debit amount, credit item, and credit amount.

[0009] In addition, according to one aspect of the present invention, the purchase input means may create journal data including a journal number, accounting date, customer, debit item, debit amount, credit item, and credit amount based on the purchase data and the advance purchase data.

[0010] In addition, according to one aspect of the present invention, the control unit may further include a payment statement management means for creating and outputting a payment statement based on the purchase data, the advance purchase data, and the payment schedule data.

[0011] In order to solve the above-mentioned problems and achieve the object, the present invention provides an offset processing method executed by an information processing device equipped with a control unit, which includes an order input process executed by the control unit for creating and registering in a storage area order data including an order number, subcontractor, order subject, cost item, order date, order construction period, order amount, and debt item when ordering construction work to an outsourcer; an expense import process for creating and registering in the storage area expense payment schedule data including an expense number, occurrence date, trading company, expense item, amount, and debt item for unpaid invoices and advance invoices for the construction work, and linking data linking the expense number and the order number; and an expense import process for inputting and registering in the storage area purchase numbers, purchase dates, order numbers, handling companies, and other related information based on the order data registered in the storage area. a purchase input process for creating purchase data including an order date, an order amount, a purchase amount for the current month specified by an operator, and a payable item, referring to the linking data registered in the memory area, reading out from the memory area scheduled expense payment data for the expense number linked to the order number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data, determining the scheduled payment data for the expense number specified by the operator as the offset target, creating advance payment data for the determined offset target including the purchase number, purchase date, advance payment destination, order number, advance payment item, and advance payment amount, and creating scheduled payment data including a payment number, scheduled payment date, payee vendor, and scheduled payment amount based on the purchase data and the advance payment data.

[0012] In order to solve the above-mentioned problems and achieve the object, the present invention provides an offsetting processing program to be executed by an information processing device having a control unit, the offsetting processing program including: an order input process for creating order data including an order number, a subcontractor, an order subject, a cost item, an order date, an order period, an order amount, and a debt item, and registering the order data in a storage area when placing an order for construction work with a subcontractor; an expense import process for creating and registering in the storage area expense payment schedule data including expense number, date of occurrence, business operator, expense item, amount, and debt item for unpaid slips and advance slips for construction work, and linking data linking the expense number and purchase order number, and registering the same in the storage area; and a process for creating purchase data including purchase number, purchase date, purchase order number, handling business operator, purchase date, cost item, purchase amount, purchase amount for the current month designated by an operator, and debt item based on the purchase data registered in the storage area, and registering the purchase order number of the purchase data by referring to the linking data registered in the storage area. and a purchase input process of reading out from the memory area the scheduled expense payment data of the expense number linked to the purchase number as a candidate for offsetting with the current month's purchase amount of the purchase data, determining the scheduled payment data of the expense number specified by the operator as the offset target, creating advance purchase data for the determined offset target, including the purchase number, purchase date, advance payment destination, order number, advance payment item, and advance payment amount, and creating payment schedule data including the payment schedule number, scheduled payment date, payee vendor, and scheduled payment amount based on the purchase data and the advance purchase data. Effect of the Invention

[0013] According to the present invention, when an ordering party orders construction work from an outsourcing company, it is possible to offset the amount of construction work completed and the amount of expenses and other expenses paid in advance simply and with a low workload. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a block diagram showing an example of the configuration of the offset processing device according to this embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of the configuration of the subject setting master. [Diagram 3] FIG. 3 is a diagram showing a flow for explaining an outline of the overall processing of the control unit of the offsetting processing device according to this embodiment. [Figure 4] FIG. 4 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Diagram 5] FIG. 5 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 6] FIG. 6 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 7] FIG. 7 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 8] FIG. 8 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 9] FIG. 9 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 10] FIG. 10 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 11] FIG. 11 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 12] FIG. 12 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. [Figure 13] FIG. 13 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to this embodiment. [Figure 14] FIG. 14 is a diagram for explaining a specific example of the process of the control unit of the offset processing device according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. However, the present invention is not limited to the embodiment.

[0016] [1: Overview] For example, in the construction industry, when a client places an order with a subcontractor under an outsourcing contract, a large amount of material costs and expenses are paid in advance to the subcontractor.

[0017] However, in the past, when offsetting the amount of work completed by a subcontractor with unpaid invoices from multiple contractors for materials and expenses, it was difficult to link them to the subcontract contracts that were the subject of the offset. In addition, multiple processes had to be carried out, such as unpaid invoices for materials and expenses incurred on behalf of contractors and invoices on behalf of subcontractors. It was not possible to manage which contracts and invoices were to be paid on behalf of contractors in the system. Therefore, for example, when a payment statement was used, it was difficult to recognize how much was offset against which contract.

[0018] Therefore, in this embodiment, a system is provided that, when construction work is ordered from an outsourced contractor, makes it possible to offset the amount of construction work completed and the amount of expenses and other expenses paid in advance, simply and with a low workload.

[0019] Specifically, the offset processing device of this embodiment provides the following functions. (1) It makes it possible to simultaneously generate unpaid invoices and advance invoices for multiple contractors, and to link them to the contract numbers of outsourced construction work that are subject to offsetting when importing expenses. (2) Unpaid invoices from multiple contractors, such as for parking fees and waste disposal fees, can be offset as advance payments when recording the progress of outsourced work. (3) In relation to (2), it will be possible to pool the amount of unpaid invoices that have already been generated and that are to be offset, and to offset it when recording the volume of the following month or later, rather than the volume of the current month.

[0020] The offset processing device of the present invention is widely applicable to industries such as the construction industry (for example, general contractors, large-scale building and condominium construction companies, etc.).

[0021] [2. Configuration] An example of the configuration of the offset processing device according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of the offset processing device.

[0022] The offset processing device 100 is a commercially available desktop personal computer. The offset processing device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.

[0023] The offset processing device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the offset processing device 100 is connected to be able to communicate with each other via an arbitrary communication path.

[0024] The communication interface unit 104 communicably connects the offset processing device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via a communication line. Here, the network 300 has a function of connecting the offset processing device 100 and the server 200 to each other so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

[0025] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

[0026] The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106. The storage unit 106 also stores a subject setting master 106a, order data, expense payment schedule data, linking data, journal data, purchase data, advance purchase data, payment schedule data, and the like. FIG. 2 is a diagram showing an example of the configuration of the subject setting master 106a.

[0027] The item setting master 106a can be configured as a table or the like in which expense items and cost items that are debited when an accounting entry occurs are associated and registered, as shown in FIG.

[0028] The order data may include order number, subcontractor, order subject, cost item, order date, order period, order amount, and debt item.

[0029] Expense payment schedule data may include expense number, date of occurrence, supplier, expense item, amount, debt item, and external receipt number.

[0030] The linking data may include an expense number, an order number, and a flag that specifies whether or not to offset with the current month's output ("1" for offset, "0" for no offset).

[0031] Journal entry data may include journal entry number, accounting date, customer, debit item, debit amount, credit item, credit amount, and summary.

[0032] The purchase data may include purchase number, purchase date, trading company, order number, order date, cost item, order amount, current month purchase amount, and debt item.

[0033] The advance purchase data may include purchase number, purchase date, advance recipient, order number, advance item, and advance amount.

[0034] The payment schedule data may include a payment schedule number, a payment schedule date, a payee company, and a payment schedule amount.

[0035] Returning to Fig. 1, the control unit 102 is a CPU or the like that comprehensively controls the offsetting processing device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, and required data, and executes various information processing based on these stored programs.

[0036] The control unit 102 is configured to be able to access the subject setting master 106a, order data, expense payment schedule data, linking data, journal data, purchase data, advance purchase data, payment schedule data, etc. stored in the memory unit 106. Note that the subject setting master 106a, order data, expense payment schedule data, linking data, journal data, purchase data, advance purchase data, payment schedule data, etc. may be provided in another location (e.g., server 200) as long as the control unit 102 is able to access them.

[0037] The control unit 102 conceptually includes, in terms of functions, an order input unit 102a, an expense capture unit 102b, a purchase input unit 102c, a payment record management unit 102d, a master maintenance unit 102e, and a screen display control unit 102f.

[0038] When placing an order for construction work with a subcontractor, the order input unit 102a inputs order data including the order number, subcontractor, order subject, cost item, order date, order period, order amount, and debt item in response to operations by an operator or the like on an order input screen (not shown) displayed on the monitor 114, and registers the data in the memory unit 106.

[0039] The expense capture unit 102b, for example, in response to operations by an operator or the like on an expense capture screen (not shown) displayed on the monitor 114, creates expense payment schedule data for unpaid construction vouchers and advance vouchers, including expense number, date of occurrence, trading company, expense item, amount, and debt item, and registers this in the memory unit 106, and also creates linking data that links the expense number and order number, and registers this in the memory unit 106.

[0040] In addition, the expense import unit 102b creates accounting data including the accounting number, accounting date, business partner, debit account, debit amount, credit account, and credit amount based on the expense payment schedule data registered in the memory unit 106, and registers the data in the memory unit 106 by referring to the item setting master 106a.

[0041] The purchase input unit 102c, for example, in response to an operation by an operator or the like on a purchase input screen displayed on the monitor 114, creates purchase data based on the order data registered in the memory unit 106, including the purchase number, purchase date, order number, handling business operator, order date, cost item, order amount, purchase amount for the current month designated by the operator, and debt item; refers to the linking data registered in the memory unit 106, reads out from the memory unit 106 the scheduled expense payment data of the expense number linked to the order number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data; determines the scheduled payment data of the expense number designated by the operator as the offset target; creates advance payment data for the determined offset target, including the purchase number, purchase date, advance payment destination, order number, advance payment item, and advance payment amount; creates scheduled payment data including the payment number, scheduled payment date, payee vendor, and scheduled payment amount based on the purchase data and the advance payment data; and registers these created data in the memory unit 106.

[0042] The purchase input unit 102c may be configured to allow one or more of the offset candidates to be designated as an offset target with the purchase amount in the following month or later.

[0043] The purchase input unit 102c may create journal data including a journal number, a posting date, a business partner, a debit item, a debit amount, a credit item, and a credit amount based on the purchase data and the advance purchase data, and register the data in the memory unit 106.

[0044] The payment statement management unit 102d may, for example, create and output (display and / or print) a payment statement based on purchase data, advance purchase data, and payment schedule data in response to operator operations on a payment statement management screen (not shown) displayed on the monitor 114.

[0045] The master maintenance unit 102e performs settings such as inputting, adding, changing, and updating data in the subject setting master 106a in response to an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114, for example.

[0046] The screen display control unit 102f controls, for example, the display of various screens (eg, an order input screen, an expense import screen, a purchase input screen, a payment statement operation screen, a master maintenance screen, etc.) displayed on the monitor 114 and the acceptance of the inputs.

[0047] [3. Specific Examples] A specific example of the process of the control unit 102 of the offset processing device 100 in this embodiment will be described with reference to FIGS.

[0048] (3-1. Overall processing) FIG. 3 is a diagram showing a flow (flow of amount of work calculation) for explaining an outline of the overall processing of the control unit 102 of the offset processing device 100 in this embodiment.

[0049] With reference to Fig. 3, an outline of the overall processing of the control unit 102 of the offset processing device 100 in this embodiment will be described. In Fig. 3, the order input unit 102a executes the order input process (step S1). In the order input process, an order for construction is placed with a subcontractor. Specifically, in the order input process, when placing an order for construction with a subcontractor, the order input unit 102a inputs order data including the order number, subcontractor, order subject, cost item, order date, order construction period, order amount, and debt item in response to an operation by an operator or the like on the order input screen displayed on the monitor 114, and stores the data in the memory unit 106.

[0050] The expense import unit 102b executes an expense import process (step S2). In the expense import process, expense payment schedule data linked to an order is generated. Specifically, in the expense import process, the expense import unit 102b creates and registers in the storage unit 106 expense payment schedule data including the expense number, occurrence date, business operator, expense item, amount, and debt item for unpaid slips and advance slips for construction work in response to an operation by an operator or the like on an expense input screen displayed on the monitor 114, and also creates and registers in the storage unit 106 linking data linking the expense number and the order number.

[0051] The purchase input unit 102c executes the purchase input process (step S3). In the purchase input process, the progress report is received from the subcontractor, and the amount of the "progress" payment for the current month is recognized. Based on the invoices for materials and expenses used in the construction work, etc., which are imported as expenses, unpaid slips and advance payment slips are registered. In addition, the information required for creating the progress report and payment report is registered on the purchase input screen, and the expense payment schedule data linked at the time of recording is obtained and advance purchase data is generated.

[0052] Specifically, in the purchase input process, the purchase input unit 102c creates purchase data including purchase number, purchase date, order number, handling business operator, order date, cost item, order amount, purchase amount for the current month specified by the operator, and debt item based on the order data registered in the memory unit 106, refers to the linking data registered in the memory unit 106, reads out from the memory unit 106 the expense payment schedule data of the expense number linked to the order number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data, determines the payment schedule data of the expense number specified by the operator as the offset target, creates advance payment data including purchase number, purchase date, advance payment destination, order number, advance payment item, and advance payment amount for the determined offset target, creates payment schedule data including payment schedule number, scheduled payment date, payee company, and scheduled payment amount based on the purchase data and advance payment data, and registers these created data in the memory unit 106.

[0053] The payment statement operation unit 102d executes the payment statement operation process (step S4). Specifically, in the payment statement operation process, the payment statement operation unit 102d creates and outputs (displays and / or prints) a payment statement based on purchase data, advance purchase data, and payment schedule data in response to an operator's operation on a payment statement operation screen (not shown) displayed on the monitor 114. This payment statement is sent to the subcontractor.

[0054] (3-2. Sample data) 4 to 14 are diagrams showing sample data for explaining a specific example of the processing of the control unit 102 of the offsetting processing device 100 in this embodiment. A specific example of the processing of the control unit 102 of the offsetting processing device 100 in this embodiment will be explained with reference to Figs. 4 to 14. In the following explanation, the unit of monetary amount is always "yen", and the notation thereof will be omitted.

[0055] 1. Explain the background information. (S1: Order entry process) The order input process will be described in detail with reference to Fig. 4. The order input process registers the order form information for the subcontracted work. When placing an order for the work with the subcontractor, the order input unit 102a inputs order data including the order number, the subcontractor, the order subject, the cost item, the order date, the order construction period, the order amount, and the debt item in response to the operation of an operator or the like on the order input screen (not shown) displayed on the monitor 114, and registers the data in the storage unit 106.

[0056] FIG. 4 is a diagram showing an example of order data. The order data includes the following items: order number, subcontractor, order subject, cost item, order date, order construction period, order amount, and debt item. In the example shown in the figure, the order number is "HAC0001", the subcontractor is "XX Formwork Industry", the order subject is "XX Building Formwork Construction", the cost item is "Uncompleted Construction Expenditures (Outsourcing)", the order date is "2022 / 3 / 19", the order construction period is "2022 / 4 / 1~2024 / 3 / 31", the order amount is "10,000,000", and the debt item is "Construction Accounts Payable".

[0057] Figure 5 is a diagram for explaining the outline of the offsetting case described below. The amount of work completed for the outsourced work is recorded to the subcontractor "XX Formwork Industry". In June 2022, a purchase of 6,000,000 is made against the contract amount of 10,000,000. In addition, invoices for each unpaid invoice for expenses and materials used in this work were received from multiple contractors (XX Recycle, XX Trading, XX Heavy Machinery, XX Crane). In addition, the office department received a detailed statement of the amount paid in advance to the subcontractor (XX Formwork Industry) from the site work manager (total of 1,000,000). The unpaid invoices of XX Recycle, XX Heavy Machinery, and XX Crane are offset against the June amount of work completed by XX Formwork Industry. Of the unpaid invoices of XX Trading, the portion to be offset against the payment to XX Formwork Industry will be offset when the amount of work completed is recorded the following month of July.

[0058] 2. Use the expense import function to simultaneously create unpaid information and information on planned offsets. (S2: Expense import processing) The expense input process will be specifically described with reference to Figs. 6 to 8. In the expense input process, unpaid and offset slips are registered based on invoices for expenses and materials used in the outsourced construction. The expense import unit 102b creates and registers in the storage unit 106 expense payment schedule data including expense number, date of occurrence, business partner, expense item, amount, and debt item for unpaid slips and advance slips for the construction in response to an operation by an operator or the like on an expense input screen (not shown) displayed on the monitor 114, and also creates and registers in the storage unit 106 linking data linking the expense number and the order number. In addition, the expense import unit 102b may create and register in the storage unit 106 journal data including journal number, posting date, business partner, debit item, debit amount, credit item, and credit amount based on the expense payment schedule data registered in the storage unit 106, with reference to the item setting master 106a.

[0059] Fig. 6(A) is a diagram showing an example of the configuration of the item setting master 106a. The item setting master 106a has items for expense items and cost items that are debited when accounting occurs. In the example shown in the figure, for "expense items" such as garbage transportation and disposal expenses, miscellaneous metal items, heavy construction machinery, and mobile cranes, "uncompleted construction expenditures" are set as the "cost item." In addition, for "expense items" such as advance expense items, "subcontractor provisional payments" are set as the "cost item."

[0060] FIG. 6(B) shows an example of an offset schedule received from the site foreman, showing details of payments made in advance.

[0061] First, based on the unpaid information (not shown) and the offset schedule of the unpaid information (not shown in Figure 6 (B)), an expense import format (e.g., an Excel format) is created in response to the operator's operations on an expense import screen (not shown).

[0062] FIG. 7(A) shows an example of data in the expense import format. The expense import format has fields for provisional invoice number, date of occurrence, vendor, expense item, amount, debt item, and order number. The debt item is set to "unpaid construction costs." In the example shown in the figure, lines 1 to 4 are data on unpaid information. Lines 5 to 8 are data on the offset schedule, which is information on the offset schedule in FIG. 6(B). The "order number" is left unset for unpaid information and set for offsetting plans.

[0063] In the example shown in the figure, the first line has the provisional slip number "KAR0001," the date of occurrence "2022 / 6 / 10," the business operator "XX Recycling," the expense item "Garbage transportation and disposal fee," the amount "80,000," and the debt item "Construction unpaid." The fifth line has the provisional slip number "KAR0005," the date of occurrence "2022 / 6 / 30," the business operator "XX Recycling," the expense item "Advance payment item," the amount "20,000," and the debt item "Construction unpaid."

[0064] Create expense payment schedule data (unpaid vouchers, advance vouchers) based on the expense import format you created.

[0065] 7B is a diagram showing an example of expense payment schedule data. Expense payment schedule data includes the following fields: expense number, date of occurrence, supplier, expense item, amount, debt item, and external receipt number. The "provisional voucher number" in the expense import format is stored as the "external receipt number."

[0066] In the example shown in the figure, the first line has the slip number "KEI0001", the date of occurrence "2022 / 6 / 10", the business operator "○○Recycle", the expense item "Garbage transportation and disposal expenses", the amount "80,000", the debt item "Construction unpaid", and the external receipt number "KAR0001". The fifth line has the expense number "KEI0005", the date of occurrence "2022 / 6 / 30", the business operator "○○Recycle", the expense item "Expense for advance payment", the amount "20,000", the debt item "Construction unpaid", and the external receipt number "KAR0001".

[0067] Fig. 7(C) is a diagram showing an example of the linking data. The linking data has items for expense number, order number, and a flag that specifies whether or not to offset with the current month's output ("1" for offset, "0" for no offset). In the expense import format, by specifying the "order number" to be offset with the current month's output, the "expense number" linked to the "external receipt number" which is the "provisional voucher number" linked to the "order number" is obtained in the expense payment schedule data, and linking data is created for the obtained "expense number" and the specified "order number". The "flag" is set to "0" as the initial value.

[0068] Journal entry data is created based on the expense payment schedule data of Fig. 7(B) and the item setting master 106a of Fig. 6(A). Fig. 8 is a diagram showing an example of the journal entry data created. The journal entry data has the following items: journal entry number, posting date, business partner, debit item, debit amount, credit item, credit amount, and summary. For "debit item", a cost item obtained from the item setting master 106a is set using the expense item of the expense payment schedule data as a key. In this example, for the expense item "advance expense item", a debit item "subcontractor advance payment" is set. For "credit item", a payable item of the expense payment schedule data is set. For "summary", the expense number of the expense payment schedule data is set.

[0069] In the example shown in the figure, the first line has the journal entry number "SIW0001", the date of occurrence "2022 / 6 / 10", the business operator "○○ Recycling", the debt item "Uncompleted construction expenditure (expenses)", the debit amount "80,000", the credit item "Construction accounts payable", the credit amount "80,000", and the summary number "KEI0001". The fifth line has the journal entry number "SIW0005", the date of occurrence "2022 / 6 / 30", the business operator "○○ Formwork Industry", the debt item "Subcontractor advance payment", the debit amount "20,000", the credit item "Construction accounts payable", the credit amount "20,000", and the summary number "KEI0005".

[0070] 3. Recognize the offsetting amount when recording volume. (S3: Purchase input processing) The purchase input process will be specifically described with reference to Figures 9 to 13. The purchase input unit 102c creates purchase data including a purchase number, purchase date, order number, handling business operator, order date, cost item, order amount, purchase amount for the current month designated by the operator, and debt item based on the order data registered in the storage unit 106 in response to the operation of the operator or the like on the purchase input screen displayed on the monitor 114, reads out from the storage unit 106 the expense payment schedule data of the expense number linked to the order number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data by referring to the linking data registered in the storage unit 106, determines the payment schedule data of the expense number designated by the operator as the offset target, creates advance payment data including a purchase number, purchase date, advance payment destination, order number, advance payment item, and advance payment amount for the determined offset target, creates payment schedule data including a payment schedule number, expected payment date, payee company, and expected payment amount based on the purchase data and advance payment data, and registers the created data in the storage unit 106. In this case, one or more of the offset candidates may be designated as the target of offset with the purchase amount in the following month or later (see FIG. 13). The purchase input unit 102c may create journal data including the journal number, accounting date, business partner, debit item, debit amount, credit item, and credit amount based on the purchase data and the advance purchase data, and register the journal data in the storage unit 106.

[0071] Here, based on the volume report for the current month, select the relevant purchase order number from the purchase entry screen and enter the purchase details. Here, we will explain the case where a purchase of 6,000,000 yen will be made in June 2022 through purchase entry.

[0072] 9 is a diagram showing a display example of a purchase input screen 400. The purchase input screen 400 has a header area 401 for specifying the purchase date, purchase order number, order subject, subcontractor, and debt item, and a details area 402 for displaying purchase details or advance details according to a switching button.

[0073] In the details area 402, when purchase details are selected with the switch button, purchase information (items for row No., cost item, order amount, current month purchase amount, and remaining order amount) and the total purchase amount are displayed (see FIG. 9). When advance details are selected with the switch button, the order amount, current month's output amount, advance information (row No., expense No., business operator, expense item, advance amount, and a field for specifying whether or not to offset), the total offset amount, and the scheduled payment amount (= total purchase amount - total offset amount) are displayed (see FIG. 10(C)). In the purchase input screen 400, hatched cells cannot be entered by the operator (automatic input / display), and non-hatched cells can be entered by the operator.

[0074] In the header area 401, the operator specifies the purchase date and purchase order number. Using the specified purchase order number as a key, the order subject, subcontractor, and debt item are read from the order data and automatically displayed. In the example shown in the figure, the purchase date "2023 / 6 / 30" and purchase order number "HAC0001" are specified, and the order subject "XX Building Formwork Work", subcontractor "XX Formwork Industry", and debt item "Construction Accounts Payable" are automatically displayed.

[0075] Also, when purchase details are selected in the details area 402, the specified purchase order number is used as a key to read out the cost item and purchase amount from the purchase data and automatically display them in the purchase information. The operator inputs the "purchase amount for this month" in the purchase information. The order remaining amount is automatically calculated by subtracting the purchase amount for this month from the order amount, and is automatically displayed.

[0076] In the example shown in the figure, the cost item "Uncompleted Construction Expenditures (Outsourced)" and the order amount "10,000,000" are automatically displayed, and when the operator specifies the purchase amount for this month "6,000,000", the order balance amount "4,000,000 (=10,000,000-6,000,000)" is automatically displayed. Also, the total purchase amount "6,000,000" is automatically displayed.

[0077] Also, as shown in FIG. 10(C), when an advance payment detail is selected in the detail area 402, the order amount and the current month's purchase amount of the purchase detail are automatically displayed in the order amount and the current month's output amount. For the advance payment information, the expense number of the linked data in FIG. 10(A) is obtained using the specified order number as a key, and the offset candidate is read from the expense payment data shown in FIG. 10(B) using the obtained expense number as a key, and the expense number, the business operator, the expense item, and the advance payment amount of the advance payment information are automatically displayed. The operator sets the offset target by specifying (checking) whether or not each expense number is subject to offset. In the example shown in the figure, the details of expense numbers "PJ0005", "PJ0007", and "PJ0008" are specified as offset targets, and the detail of "XX Trading Co., Ltd. Miscellaneous Hardware" of expense number "PJ0006" is not set as an offset target so as not to offset it from the current month's output amount. The total offset amount "1,000,000" and the scheduled payment amount "5,000,000 (=6,000,000 - 1,000,000)" will be automatically displayed.

[0078] For the expense numbers designated as offset targets, the linking data flag is updated to "1" as shown in Figure 11. Expenses with a flag of "0" can be offset when recording the amount of work from the following month onwards.

[0079] When a registration button (not shown) is pressed, purchase data and advance payment purchase data are created according to the input contents on the purchase input screen 400, and are registered in the storage unit 106. Furthermore, payment schedule data and journal data are created based on the purchase data and advance payment purchase data, and are registered in the storage unit 106. In the case of the input contents shown in the examples of Figures 10 and 11, the data shown in Figure 12 is registered.

[0080] FIG. 12(A) is a diagram showing an example of purchase data. The purchase data includes the following items: purchase number, purchase date, trading company, order number, order date, cost item, order amount, purchase amount for the current month, and debt item. In the example shown in the figure, the purchase number is "SIR0001", the purchase date is "2022 / 6 / 30", the trading company is "○○ Formwork Industry", the order number is "HAC0001", the order date is "2022 / 3 / 19", the cost item is "uncompleted construction expenditure (outsourcing)", the order amount is "10,000,000", the purchase amount for the current month is "6,000,000", and the debt item is "construction unpaid".

[0081] Fig. 12(B) is a diagram showing an example of advance purchase data. Advance purchase data includes the following fields: purchase number, purchase date, advance recipient, order number, advance item, and advance amount. In the example shown in the figure, the first line contains purchase number "TSI001", purchase date "2022 / 6 / 30", advance recipient "○○ Formwork Industry", order number "HAC0001", advance item "Subcontractor advance payment", and advance amount "20,000".

[0082] FIG. 12(C) is a diagram showing an example of payment schedule data. The payment schedule data includes fields for payment schedule number, scheduled payment date, payment destination company, and scheduled payment amount. In the example shown in the figure, the first line is a payment schedule generated from purchase data, and the second to fourth lines are payment schedules generated from advance purchase data. The first line has the payment schedule number "SIH0001", the scheduled payment date "2022 / 8 / 31", the payment destination company "○○ Formwork Industry", and the scheduled payment amount "6,000,000", and the second line has the payment schedule number "SIH0002", the scheduled payment date "2022 / 8 / 31", the payment destination company "○○ Formwork Industry", and the scheduled payment amount "-20,000".

[0083] FIG. 12(D) is a diagram showing an example of journal entry data. Journal entry data includes the following items: journal entry number, accounting date, business partner, debit item, debit amount, credit item, and credit amount. In the example shown in the figure, the first line is a journal entry generated from purchase data, and the second to fourth lines are journal entries generated from advance purchase data. In the example shown in the figure, the first line has journal entry number "SIW0009", occurrence date "2022 / 6 / 30", trading company "○○ Formwork Industry", debt item "Uncompleted construction expenditure (expenses)", debit amount "6,000,000", credit item "Construction accounts payable", and credit amount "6,000,000". The second line has the journal entry number "SIW0010", the date of occurrence "2022 / 6 / 30", the trading company "○○ Formwork Industry", the liability item "Unpaid construction costs", the debit amount "20,000", the credit item "Subcontractor advance payment", and the credit amount "20,000".

[0084] (Supplementary Note 1) FIG. 13 is a diagram showing an example of a disbursement detail when the amount of work is recorded in July 2022 from the purchase input. Here, a case where the amount of work in July is 3,000,000 will be described. In FIG. 13, the order amount "10,000" and the amount of work done this month "3,000,000" are displayed in the detail area 402 of the purchase input screen 400. In the disbursement information, the expense number "PJ0006", the trading company "XX Trading", the expense item "Miscellaneous metal items", and the disbursement amount "100,000" are displayed as offset candidates. The operator specifies (checks) the offset target for the expense number "PJ0006" and sets it as the offset target. The total offset amount "100,000" and the expected payment amount "2,900,000 (=3,000,000-1000,000)" are automatically displayed.

[0085] (Supplementary Note 2) When a payment statement is used, it is also possible to utilize the purchase data, advance purchase data, and scheduled payment data processed in 2. The payment statement operation unit 102d creates and outputs (displays and / or prints) a payment statement based on the purchase data, advance purchase data, and scheduled payment data, for example, in response to an operator's operation on a payment statement operation screen (not shown) displayed on the monitor 114. Figure 14 is a diagram showing an example of a payment statement. The payment statement is sent to the subcontractor "XX Formwork Industry".

[0086] As described above, according to this embodiment, there is provided an order input unit 102a which, when placing an order for construction work with an outsourcer, creates order data including order number, outsourcer, order subject, cost item, order date, ordered construction period, order amount, and debt item, and registers this in the storage unit 106; an expense import unit 102b which creates expense payment schedule data including expense number, date of occurrence, business partner, expense item, amount, and debt item for unpaid invoices and advance vouchers for the construction work, and registers this in the storage unit 106, as well as creates linking data linking the expense number and order number, and registers this in the storage area; and a purchase data including purchase number, purchase date, order number, handling business operator, order date, cost item, order amount, purchase amount for the current month designated by the operator, and stores this in the storage unit 106 based on the order data registered in the storage unit 106. and a purchase input unit 102c which refers to the linking data registered in unit 106, reads out from the memory area the scheduled expense payment data of the expense number linked to the purchase order number of the purchase data in question as a candidate for offset with the current month's purchase amount of the purchase data in question, determines the scheduled payment data of the expense number specified by the operator as the object of offset, creates advance purchase data for the determined object of offset including the purchase number, purchase date, advance payment destination, purchase order number, advance payment item, and advance payment amount, and creates payment schedule data including the payment schedule number, scheduled payment date, payee contractor, and scheduled payment amount based on the purchase data and the advance purchase data, thereby making it possible for an orderer to offset the progress of the work and the advance payment amount for an outsourced contractor easily and with little workload.

[0087] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0088] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.

[0089] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0090] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0091] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0092] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0093] Moreover, with regard to the offset processing device 100, the components shown in the figures are merely functional concepts, and the device does not necessarily have to be physically configured as shown in the figures.

[0094] For example, the processing functions of the offsetting processing device 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium that includes programmed instructions for causing the information processing device to execute the processing described in this embodiment, and is mechanically read by the offsetting processing device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form a control unit.

[0095] In addition, this computer program may be stored in an application program server connected to the offset processing device 100 via any network, and it is also possible to download all or a part of it as necessary.

[0096] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0097] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0098] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0099] The offsetting device 100 may be configured as an information processing device such as a known personal computer or a workstation, or may be configured as the information processing device to which any peripheral device is connected. The offsetting device 100 may be realized by implementing software (including programs or data, etc.) that causes the device to realize the processing described in this embodiment.

[0100] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Explanation of symbols]

[0101] 100 Offsetting device 102 Control section 102a Order input section 102b Expense Collection Department 102c Purchase Input Section 102d Payment Records Operation Department 102e Master Maintenance Department 102f Screen display control unit 104 Communication interface section 106 Storage section 106a Subject Setting Master 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network

Claims

1. An offsetting device having a control unit, The control unit is an order input means for creating order data including an order number, a subcontractor, an order subject, a cost item, an order date, an order construction period, an order amount, and a debt item when placing an order for construction with a subcontractor, and registering the data in a storage area; an expense import means for creating and registering in said storage area expense payment schedule data including expense numbers, dates of occurrence, business operators, expense items, amounts, and debt items for unpaid invoices and advance invoices for construction work, and for creating and registering in said storage area linking data linking expense numbers and order numbers; a purchase input means for creating purchase data including a purchase number, a purchase date, a purchase number, a handling business, a purchase date, a cost item, a purchase amount, a purchase amount for the current month designated by an operator, and a debt item based on the purchase data registered in the storage area, reading out from the storage area the expense payment schedule data of the expense number linked to the purchase number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data by referring to the linking data registered in the storage area, determining the payment schedule data of the expense number designated by the operator as the offset target, creating advance payment purchase data including the purchase number, purchase date, advance payment destination, purchase number, advance payment item, and advance payment amount for the determined offset target, and creating payment schedule data including a payment schedule number, payment schedule date, payment destination business, and payment schedule amount based on the purchase data and the advance payment purchase data; An offsetting device comprising:

2. 2. The offset processing device according to claim 1, wherein said purchase input means is configured to be capable of designating one or more of said offset candidates as targets for offsetting with purchase amounts in the following month and thereafter.

3. The control unit is It is configured to be accessible to the item setting master that associates and registers the expense item with the cost item that is the debit item of the journal entry, The offsetting processing device described in claim 1 or 2, characterized in that the expense import means creates accounting data including a journal entry number, a posting date, a business partner, a debit account, a debit amount, a credit account, and a credit amount based on the expense payment schedule data, by referring to the item setting master.

4. The offsetting processing device according to claim 1 or 2, characterized in that the purchase input means creates journal data including a journal number, a recording date, a business partner, a debit item, a debit amount, a credit item, and a credit amount based on the purchase data and the advance purchase data.

5. The control unit further includes:

3. The offset processing device according to claim 1, further comprising a payment statement management means for creating and outputting a payment statement based on said purchase data, said advance purchase data, and said payment schedule data.

6. An offset processing method executed by an information processing device having a control unit, Executed in the control unit: an order input process for creating and registering order data including an order number, a subcontractor, an order subject, a cost item, an order date, an order construction period, an order amount, and a debt item in a storage area when placing an order for construction work with a subcontractor; an expense import process for creating and registering in the storage area expense payment schedule data including expense numbers, dates of occurrence, vendors, expense items, amounts, and debt items for unpaid invoices and advance invoices for construction projects, and for creating and registering in the storage area linking data linking expense numbers and order numbers; a purchase input process for creating purchase data including a purchase number, purchase date, purchase number, handling business operator, order date, cost item, order amount, purchase amount for the current month designated by an operator, and payable item based on the purchase data registered in the storage area, reading out from the storage area expense payment schedule data of an expense number linked to the purchase number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data by referring to the linking data registered in the storage area, determining the payment schedule data of the expense number designated by the operator as an offset target, creating advance payment purchase data including a purchase number, purchase date, advance payment destination, purchase number, advance payment item, and advance payment amount for the determined offset target, and creating payment schedule data including a payment schedule number, payment schedule date, payee vendor, and payment schedule amount based on the purchase data and the advance payment purchase data; A method for offsetting comprising the steps of:

7. An offset processing program to be executed by an information processing device having a control unit, In the control unit, an order input process for creating and registering order data including an order number, a subcontractor, an order subject, a cost item, an order date, an order construction period, an order amount, and a debt item in a storage area when placing an order for construction work with a subcontractor; an expense import process for creating and registering in the storage area expense payment schedule data including expense numbers, dates of occurrence, vendors, expense items, amounts, and debt items for unpaid invoices and advance invoices for construction projects, and for creating and registering in the storage area linking data linking expense numbers and order numbers; a purchase input process for creating purchase data including a purchase number, purchase date, purchase number, handling business operator, order date, cost item, order amount, purchase amount for the current month designated by an operator, and payable item based on the purchase data registered in the storage area, reading out from the storage area expense payment schedule data of an expense number linked to the purchase number of the purchase data as a candidate for offset with the purchase amount for the current month of the purchase data by referring to the linking data registered in the storage area, determining the payment schedule data of the expense number designated by the operator as an offset target, creating advance payment purchase data including a purchase number, purchase date, advance payment destination, purchase number, advance payment item, and advance payment amount for the determined offset target, and creating payment schedule data including a payment schedule number, payment schedule date, payee vendor, and payment schedule amount based on the purchase data and the advance payment purchase data; An offsetting program to carry out the above.

Citation Information

Patent Citations

  • Compound electronic selling system, subsystem, selling method and program

    JP2003141374A

  • Construction work management device and method

    JP2003186950A

  • Server device, deletion method, and program

    JP2013065177A

  • Counterbalance journal entry recording device, counterbalance journal entry recording method, and counterbalance journal entry recording program

    JP2017182765A

  • Deposit processing apparatus, deposit processing method, and deposit processing program

    JP2023015921A