Cooling tower noise reduction optimization method based on physical model

The cooling tower noise reduction method employs BIM technology and physical simulation to optimize silencing structures, addressing the limitations of existing methods by enhancing noise reduction efficiency and cost-effectiveness.

JP2024169389AActive Publication Date: 2024-12-05CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2024083987
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-25
Filing Date
2024-05-23
Publication Date
2024-12-05
Estimated Expiration
2044-05-23

AI Technical Summary

Technical Problem

Existing cooling tower noise reduction methods are inadequate, failing to meet environmental standards and lacking real-time optimization capabilities, relying on empirical formulas and two-dimensional layouts that are labor-intensive and prone to errors.

Method used

A cooling tower noise reduction method utilizing BIM technology to build a graphical model, simulating noise sources and propagation paths, and applying physical simulation to optimize silencing structures while minimizing economic costs through target optimization algorithms.

Benefits of technology

Enables intuitive, real-time three-dimensional noise reduction design, providing an optimal structural design scheme that balances noise reduction effectiveness with construction costs, improving the efficiency and reliability of cooling tower noise management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024169389000001_ABST
    Figure 2024169389000001_ABST
Patent Text Reader

Abstract

To provide a cooling tower noise reduction optimization method based on a physical model, the method belonging to a technical field of a noise reduction design.SOLUTION: Using BIM technique, the present invention constructs a graphical model; provides a noise reduction design scheme in real time intuitively and three-dimensionally on the basis of physical simulation of the graphical model; can achieve improvement of a noise reduction structure easily and accurately by further constructing data simulation of a function model; and acquires a noise reduction structure design plan at an optimum construction cost by establishing a target optimization model of an economical cost. The present invention improves cooling tower noise reduction design efficiency effectively, and automatically balances a cooling tower noise reduction countermeasure effect with a construction execution cost, thereby enhancing reliability and economical efficiency of the noise reduction structure design.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the technical field of noise reduction design, and in particular to a cooling tower noise reduction optimization method based on a physical model. [Background technology]

[0002] As people's demands for quality of life improve, the requirements for noise control in buildings are becoming more and more stringent. The noise of electromechanical systems is an important aspect that affects noise control in buildings, and outdoor cooling towers, which are one of the main noise sources of electromechanical systems, are prone to causing acoustic pollution to the surrounding environment because the noise generated by their operation will diffuse into the air.

[0003] At present, the noise control capabilities of cooling tower manufacturers are weak, and many products have not been equipped with additional noise reduction measures. In actual operation, they do not meet the Chinese secondary environmental protection standards of GB55016-2021 and GB3096-2008, that is, they do not meet the requirement of night noise ≦45~50dB(A). Only a few low-ton ultra-low noise model cooling towers can meet the requirements of night noise standards in a few regions.

[0004] The traditional cooling tower noise reduction design method uses two-dimensional layout to comprehensively consider the topographical map provided by the design institution, the detailed layout drawing of the cooling tower and piping, the design explanation, and the detailed equipment drawing provided by the cooling tower manufacturer. In the layout process, empirical formulas are used to carry out theoretical noise reduction calculations and structural design. This method is not intuitive, prone to leakage, time-consuming and labor-consuming, and cannot be adjusted in real time, and cannot achieve the purpose of automatically optimizing the noise reduction structure according to needs.

[0005] In recent years, BIM technology and target optimization algorithms have been upgraded and gradually applied to the field of noise management. BIM technology can determine the need for sound deadening measures for the noise impact range through physical simulation based on graphical models, and the target algorithm can improve the sound deadening structure and optimize construction costs by building data simulation of function models. The combination of the two can form a cooling tower noise reduction method to solve the existing problems. Summary of the Invention [Problem to be solved by the invention]

[0006] Considering the deficiencies of existing technology, the present invention provides a noise reduction optimization method for cooling towers based on physical models, and uses BIM technology to construct a graphical model. Based on the physical simulation of the graphical model, the noise reduction additional measures are simulated for the influence range of the noise source and propagation path of the cooling tower, and a data simulation of a function model is constructed to improve the noise reduction structural design, and the economic cost target optimization is carried out, and a cooling tower noise reduction structural design scheme with the most economical noise reduction equipment is obtained. [Means for solving the problem]

[0007] The present invention achieves the above technical object by the following technical means. A cooling tower noise reduction optimization method based on a physical model, comprising the steps of: Step 1: Determine the noise reduction objectives within the functional areas and noise impact zones of the acoustic environment in which the cooling tower is installed. Step 2: Build a high-precision model of the cooling tower body, a high-precision model of the system piping, and a high-precision model of the auxiliary components. Step 3: Based on the model constructed in step 2, continue to construct an engineering model including the terrain, buildings, supporting structures, roadways, shafts, and passageways of the cooling tower placement area to form a constraining model. Step 4: Based on the constraint model, continue to build an engineering model including cooling tower equipment, system piping, pipe parts, valves, shock absorbers, and distribution boxes to form a functional model. Step 5, based on the feature model, build a model of the surrounding building, and mark the locations of noise reduction targets in the sensitive areas of the building to build a target model. Step 6: Based on the target model, layout the cooling tower equipment in a modular form and install the inspection door at the same time. Step 7: Calculate the overlapping noise amount of all cooling tower module groups after the modular combination processing in step 6. Step 8: Calculate the amount of noise to be treated that is transmitted to each sensitive point by the superimposed noise from the intake side, shroud side and exhaust side of the cooling tower. Step 9: Based on the amount of noise to be processed, a sound-absorbing structure is set for each cooling tower of the target model after the modularized combination processing in step 6. Step 10: In order to optimize the noise structure designed in step 9, a function model is constructed and data simulation is performed. Step 11: Construct a cooling tower noise reduction equipment economic cost optimization model aimed at minimizing the economic cost of constructing cooling tower noise reduction equipment, and solve the model to obtain a cooling tower noise reduction structural design scheme that optimizes the economy of the noise reduction equipment.

[0008] Furthermore, in step 9 above, the sound deadening structure is set as follows: A sound-absorbing louver with a built-in sound-absorbing insert is installed on the inlet side of the cooling tower, the length of the sound-absorbing louver is long enough to cover the length of the cooling tower inlet, the height is high enough to cover the height of the cooling tower inlet, the total area meets the cooling tower inlet requirements, and the remaining part is a sound-absorbing barrier. A completely sealed sound-absorbing barrier is used on the side plate side of the cooling tower, the sound-absorbing barrier covers the cooling tower arrangement area, the top is flush with the cooling tower exhaust port, an openable inspection door is reserved in advance, and an inspection ladder is installed according to the restriction model. A silencer with a built-in sound-absorbing insert is installed on the exhaust side of the cooling tower, and a gentle air flow area is ensured between the silencer and the cooling tower exhaust port, and a guide plate is installed.

[0009] Furthermore, the specific process of the above step 10 is as follows: Step 10.1: Using equations (1) to (4), calculate the target noise level L for the sound-reducing louver. A T , the amount of noise to be treated by the silencer L E T , Intake coefficient I of sound-absorbing louver A , exhaust coefficient I E are calculated respectively.

[0010]

number

[0011]

number

[0012]

number

[0013]

number

[0014] In equation (1), a0 is the normal incidence sound absorption coefficient of the sound absorbing material, Φ(a0) is the sound absorption coefficient related to the normal incidence sound absorption coefficient of the sound absorbing material, and L A is the effective sound-absorbing length of the sound-absorbing insert of the sound-absorbing louver, and L d is the spacing between the sound-absorbing inserts of the sound-absorbing louver, and in equation (2), L E is the effective silencing length of the silencer's silencer insert, and M d is the spacing between the sound absorbing inserts of the silencer, and in equation (3), L1 is the length of the sound absorbing louver, and L i is the number of sound-absorbing inserts in the sound-absorbing louver, A1 is the length of the cooling tower inlet, and A d is the width of the cooling tower inlet, and A iis the number of inlets of each cooling tower, W is the number of cooling towers, K is the cooling tower inlet coefficient, and in equation (4), M1 is the length of the muffler, M i is the number of silencer silencer inserts, and E d is the diameter of the cooling tower outlet, and E i is the number of exhaust ports of each cooling tower, and the average inlet air velocity V A and average exhaust wind speed V E Calculate each of them.

[0015]

number

[0016]

number

[0017] In equations (5) and (6), Q is the air volume of one cooling tower, and using equations (7) and (8), the pressure loss of the silencer louver H A and the pressure loss of the silencer H E Calculate each of them.

[0018]

number

[0019]

number

[0020] In equations (7) and (8), ξ1 and ξ2 are both local resistance coefficients, ρ is the air density, and using equations (9) and (10), the regeneration noise L that needs to be considered at the cooling tower exhaust outlet is calculated. W , exhaust air flow area S E Calculate.

[0021]

number

[0022]

number

[0023] In equation (9), a is the regeneration coefficient.

[0024] Step 10.2, utilizing equations (1), (3), (5) and (7), establish an inter-control relationship between the effective sound-absorbing length and spacing of the sound-absorbing inserts of the sound-absorbing louvers that meets the noise target limits shown below.

[0025]

number

[0026] Equations (2), (4), (6), (8), (9) and (10) are utilized to establish an inter-control relationship between the effective silencing length and spacing of the silencing inserts of a muffler that meets the noise target limits shown below.

[0027]

number

[0028] Step 10.3, the mutual control relationship is taken as a mathematical model, and on the premise of meeting the noise reduction target limit value, L A and L d and L E and M. d The value trends are balanced and adjusted to achieve the optimization of the noise reduction structure.

[0029] Furthermore, the specific process of the above step 11 is as follows: Using the following equations (11), (12), and (13), the economic cost of constructing the silencer on the intake side, the economic cost of constructing the silencer on the exhaust side, and the economic cost of constructing the cooling tower noise reduction equipment are calculated, respectively.

[0030]

number

[0031]

number

[0032]

number

[0033] In formula (11), L A Pi is the noise level of the i-th sound-reducing louver, and in equation (12), L E P is the superimposed noise of the silencer, and L E Pi is the noise amount of the ith silencer, N is the number of sound sources in each group of cooling tower modules, D is the number of levels of noise energy increase when multiple cooling tower module groups work simultaneously, and in equation (13), M is the economic cost of construction, X is the economic cost coefficient of construction, and d A is the thickness of the sound-absorbing insert of the sound-absorbing louver, and d E is the thickness of the sound-absorbing insert of the sound-absorbing louver, Therefore, the economic cost optimization model of the cooling tower noise reduction equipment, which was developed with the aim of minimizing the economic costs of constructing the cooling tower noise reduction equipment, is shown in the following equation (14).

[0034]

number

[0035] The decision variables in the economic cost optimization model of the cooling tower noise reduction equipment include the effective silencing length of the silencing louvers, the spacing between the silencing inserts of the silencing louvers, the effective silencing length of the muffler, and the spacing between the silencing inserts of the muffler.

[0036] Then, based on the Gurobi optimization solver under the Python platform, the economic cost optimization model of the cooling tower noise reduction equipment is solved, and the cooling tower noise reduction structural design scheme with the most economical and optimal noise reduction equipment is output.

[0037] Furthermore, the superimposed noise level L P‘ is calculated using the following formula:

[0038]

number

[0039] In the formula, N is the number of sound sources in each group of cooling tower modules, D is the number of noise energy levels that increase when multiple cooling tower module groups are operated simultaneously, and L Pi is the i-th noise level.

[0040] Furthermore, the amount of noise to be processed in step 8 is calculated by the following formula:

[0041]

number

[0042]

number

[0043] In the formula, L P‘ are the superimposed noise levels of the cooling tower module group, and L eq is the prescribed noise limit value, ΔL is the noise attenuation, r1 is the distance from sound receiving point 1 to the sound source, and r2 is the distance from sound receiving point 2 to the sound source.

[0044] In addition, the above sound insulation barrier adopts a 100mm-thick modular sound screen panel with a sound insulation capacity of more than 24dB, the perforated plate adopts a 0.8mm perforated aluminum plate, the sound-absorbing material adopts a 100mm-thick anti-corrosive, hydrophobic and non-flammable sound-absorbing cotton with a high sound absorption coefficient, a 2mm-thick damping layer is adopted between the sound screen panel and the outer layer of galvanized steel plate, the inner frame of the sound-absorbing louver adopts a hot-dip galvanized structure, and triangular flow guide plates are adopted on both ends of the silencer. Effect of the Invention

[0045] The present invention has the following beneficial effects: Compared with the existing cooling tower noise reduction methods, the cooling tower noise reduction optimization method based on the physical model of the present invention provides an intuitive and three-dimensional real-time noise reduction design scheme by establishing a physical simulation of a graphic model, and establishes a data simulation of a function model to conveniently and accurately realize the improvement of the sound absorbing structure. The economic cost target optimization is performed, and the optimal structural design scheme according to the construction cost is automatically provided. The present invention can effectively improve the efficiency of cooling tower noise reduction design, automatically balance the effect of cooling tower noise reduction measures and the construction implementation cost, and improve the reliability and economy of noise reduction structural design. [Brief description of the drawings]

[0046] [Figure 1] FIG. 2 is a three-dimensional schematic diagram of a cooling tower model. [Diagram 2] FIG. 2 is a schematic plan view of a restriction model. [Diagram 3] FIG. 2 is a three-dimensional schematic diagram of a functional model. [Figure 4] FIG. 2 is a three-dimensional schematic diagram of a target model. [Diagram 5] FIG. 2 is a three-dimensional schematic diagram of the arrangement of the sound absorbing structure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0047] The present invention will now be further described with reference to the drawings and specific examples, but the scope of protection of the present invention is not limited thereto.

[0048] The cooling tower noise reduction optimization method based on the physical model of the present invention includes the following processes. Step 1: In accordance with the provisions of GB-55016-2021 "General Specifications for Building Environment (General Standards for Building Environment)" and GB-3096-2008 "Sound Environment Quality Standard (Sound Environment Quality Standard)", determine the functional area of ​​the acoustic environment where the cooling tower 1 is installed and the noise reduction targets within the noise influence range. In this embodiment, the two types of acoustic environment functional areas in Table 1 below where the cooling tower 1 is located (i.e., daytime (06:00 to 22:00) ≦ 60 dB (A), nighttime (22:00 to 6:00 the next day) ≦ 50 dB (A)) are taken as examples to explain the solution.

[0049] [Table 1]

[0050] In the absence of other noise sources, select points in each sensitive area, one meter away from the building entrances and windows, and use the noise-sensitive building inspection method to measure the steady noise 1-minute equivalent sound pressure level L eq must be tested and must not exceed the specified limits.

[0051] Step 2, based on the matching sample of the cooling tower equipment manufacturer, the required size, specifications, model and other parameter information were extracted, and based on BIM technology, a high-precision model of the cooling tower body shown in Figure 1 was built in Revit software using the sample file of the metric conventional family based on the surface.

[0052] Step 3, extract the necessary parameter information such as material, specification, series, pipe outer diameter, pipe inner diameter from GBT3091-2015 "welded steel pipe for low-pressure fluid transportation", and based on the BIM technology, in Revit software, based on the high-precision model of the cooling tower body established in step 2, a high-precision model of the system piping was established using the sample file of the metric conventional family based on the line.

[0053] Step 4: Extract the required specifications, model, series, dimensions, materials and other parameter information from the manufacturer atlas of GBT12459-2005 "Steel Butt Welded Seamless Pipe Parts", the valve manufacturer sample "Guanlong Valve" and accessories such as distribution box. Based on the high-precision model of the system piping established in step 3, in Revit software, using the sample file of the metric traditional family, establish the pipe fitting models such as elbow, reducer, tee, etc. At the same time, the high-precision models of valves such as butterfly valves, electric butterfly valves, water distribution devices, and accessories such as shock absorbers, distribution boxes, ladders, etc. are also established.

[0054] Step 5: Based on the design drawings around the cooling tower 1 placement area and the recorded materials surveyed and drawn on the construction site, based on BIM technology, in the Revit software, using the sample file of the new project, a one-to-one engineering model of the terrain, facilities, boundaries and signs of the cooling tower 1 placement area, including the building 5, supporting structure 6, roadway 2, shaft 4, passageway 3, etc., was established, that is, the construction of the limit model shown in Figure 2 was completed.

[0055] Step 6: Combine the cooling tower layout design drawing and engineering detailed design technology, and based on BIM technology, take the coordinate and axis grid as the positioning basis, and continue to establish a one-to-one engineering model based on the limited model constructed in step 5, including the cooling tower equipment, system piping 7, pipe parts 8, valves 9, shock absorbers, distribution boxes 10 and other accessories, that is, complete the construction of the functional model shown in Figure 3.

[0056] Step 7: Based on the design documents, urban construction planning drawings and the records of the survey and drawing of the construction site, based on BIM technology, in Revit software, using coordinates, axis grids and elevation as the layout basis, continue to establish the model of 11 surrounding buildings based on the functional model constructed in step 6, identify the main influencing facilities of the noise propagation range, and then mark the noise reduction target positions of sensitive areas such as building entrances and windows, that is, complete the construction of the target model shown in Figure 4.

[0057] Step 8: Adopt the equipment combination mode of three machines in one group and two machines in one group, and arrange the number of groups to meet the demand according to the refrigeration tonnage design. Based on the target model constructed in step 7, the cooling tower equipment is laid out in a modularized form. At the same time, an inspection door that penetrates the equipment is installed, and the functional realization of cooling tower 1 and the internal inspection requirements of the equipment are also taken into consideration.

[0058] Step 9: After processing in step 8, the noise generated at the inlet side, side panel side and exhaust side of each cooling tower 1 in the target model is superimposed and analyzed to determine the superimposed noise of the cooling tower module group. When multiple cooling tower module groups are operating simultaneously, the noise energy will increase by level D, and the superimposed noise of all cooling tower module groups after the modularized combination will be as follows:

[0059]

number

[0060] L Pi is the i-th noise level.

[0061] Step 10: Using the following formula, calculate the amount of noise to be treated that is transmitted to each sensitive point by the superimposed noise from the intake side, shroud side and exhaust side of the cooling tower 1 (i.e., the part where the noise is transmitted to the sensitive point and exceeds the specified limit value even after attenuation is completed).

[0062]

number

[0063]

number

[0064] In the formula, L T is the noise level to be processed, and L eqis the prescribed noise limit value, ΔL is the noise attenuation, r1 is the distance from sound receiving point 1 to the sound source, and r2 is the distance from sound receiving point 2 to the sound source.

[0065] The sensitive point refers to the most undesirable impact point that would cause serious inconvenience to nearby apartments, hotels, houses, commercial buildings, office buildings, etc. if the cooling tower 1 were not subjected to noise reduction treatment.

[0066] Step 11: Based on the noise amount data to be processed calculated in step 10, install a sound-absorbing louver with a sound-absorbing insert on the inlet side (usually on both sides facing each other) of each cooling tower 1 in the target model after processing in step 8, the length of the sound-absorbing louver is a length that can cover the length of the inlet of the cooling tower 1, the height is a height that can cover the height of the inlet of the cooling tower 1, the total area meets the inlet requirements of the cooling tower 1, and the remaining part is a sound-insulating barrier; A completely sealed sound barrier is used on the side plate side (usually on both sides facing each other) of the cooling tower 1, the sound barrier covers the cooling tower 1 placement area, the top is flush with the cooling tower 1 exhaust port, an openable inspection door is secured in advance, and an inspection ladder is installed according to the restriction model to facilitate subsequent maintenance; A silencer with a built-in silencer insert is installed on the exhaust side of the cooling tower 1, and a gentle air flow area is secured between the silencer and the exhaust port of the cooling tower 1. A guide plate is installed to ensure that the exhaust airflow does not overflow to the intake side of the cooling tower 1 but flows directly to the silencer. The materials for the sound insulation barrier (composed of galvanized steel plate, sound absorbing material, and perforated plate), sound absorbing louver (composed of galvanized steel plate, sound absorbing material, and perforated plate), sound absorbing device (composed of perforated plate, sound absorbing material, and perforated plate), cushion, structural frame, beam, etc. can be selected according to the actual situation of the project. The materials selected in this embodiment are: The sound insulation barrier adopts a 100mm thick modular sound screen panel with a sound insulation of more than 24dB(A), which effectively shortens the production and construction cycle and facilitates maintenance; the perforated plate adopts 0.8mm perforated aluminum plate, and the perforation rate meets the design requirements; the sound absorption material adopts 100mm thick anti-corrosive, hydrophobic and non-flammable sound absorption cotton with high sound absorption coefficient; between the sound screen panel and the outer layer of galvanized steel plate, a 2mm thick damping layer is adopted to reduce low-frequency noise; the steel structural frame vertical columns adopt a 125×125H-shaped steel welded main frame, the beams adopt a 100×50×3mm steel welded subframe; the inner frame of the sound insulation louver adopts a hot-dip galvanized structure; and triangular flow guide plates are adopted at both ends of the silencer to reduce air flow resistance.

[0067] Step 12: In order to optimize the sound deadening structure designed in step 11 and confirm the noise reduction effect, a function model was constructed and a data simulation was performed.

[0068] Step 12.1: Using equations (1) to (4), calculate the target noise level L A T , the amount of noise to be treated by the silencer L E T , Intake coefficient I of sound-absorbing louver A , exhaust coefficient I E were calculated respectively.

[0069]

number

[0070]

number

[0071]

number

[0072]

number

[0073] In equation (1), a0 is the normal incidence sound absorption coefficient of the sound absorbing material, Φ(a0) is the sound absorption coefficient related to the normal incidence sound absorption coefficient of the sound absorbing material, and L A is the effective sound-absorbing length of the sound-absorbing insert of the sound-absorbing louver, and L d is the spacing between the sound-absorbing inserts of the sound-absorbing louver, and in equation (2), L E is the effective silencing length of the silencer's silencer insert, and M d is the spacing between the sound absorbing inserts of the silencer, and in equation (3), L1 is the length of the sound absorbing louver, and L i is the number of sound-absorbing inserts in the sound-absorbing louver, A1 is the length of the inlet of cooling tower 1, and A d is the width of the inlet of cooling tower 1, and A i is the number of air inlets of each cooling tower 1, W is the number of cooling towers 1, K is the air inlet coefficient of the cooling tower 1, and in equation (4), M1 is the length of the muffler, M i is the number of silencer silencer inserts, and E d is the diameter of the cooling tower 1 exhaust port, E i is the number of exhaust ports for each cooling tower, and according to the equipment manufacturer's data, I A , I E ≧1.5 indicates good heat dissipation, and the lower limits of the values ​​taken by equations (3) and (4) are both 1.5. Using the following equations (5) and (6), the average inlet air velocity V A and average exhaust wind speed V E were calculated respectively.

[0074]

number

[0075]

number

[0076] In formulas (5) and (6), Q is the air volume of one cooling tower. According to the equipment manufacturer's information, an air duct flow velocity of ≦8m / s indicates good air circulation, so the upper limit of the values ​​that formulas (5) and (6) can take is 8. Using the following formulas (7) and (8), the pressure loss of the sound-absorbing louver H A and the pressure loss of the silencer H E were calculated respectively.

[0077]

number

[0078]

number

[0079] In equations (7) and (8), ξ1 and ξ2 are both local resistance coefficients, and ρ is the air density. According to the equipment manufacturer's information, pressure loss ≦ 100 Pa means that the pressure loss is acceptable. Therefore, the upper limit of the values ​​that equations (7) and (8) can take is both 100. Using the following equations (9) and (10), the regenerative noise L that needs to be considered at the cooling tower exhaust outlet is calculated. W , exhaust air flow area S E was calculated.

[0080]

number

[0081]

number

[0082] In equation (9), a is the regeneration coefficient, and its value was obtained with reference to the Practical Heating and Air Conditioning Design Manual (Practical Heat Supply Air Conditioning Design Manual [M], by Lu Yaoqing, published by China Construction Industry Press, 2008).

[0083] Step 12.2: Using equations (1), (3), (5), and (7), determine the relationship between the effective sound-absorbing length and the spacing (i.e., L A and L d A mutual control relationship between them was established.

[0084]

number

[0085] Using equations (2), (4), (6), (8), (9), and (10), the relationship between the effective silencing length and spacing of the silencing inserts of a silencer (i.e., L E and M. d A mutual control relationship between them was established.

[0086]

number

[0087] Step 12.3: Using the two mutual control relationship equations obtained in step 12.2 as a mathematical model, L is adjusted according to the optimization needs, on the premise of meeting the noise reduction target limit. A and L d and L E and M. d By balancing and adjusting the value trends of , it is possible to realize optimization of the noise reduction structure (i.e., the sound deadening structure shown in FIG. 5).

[0088] For example, to ensure an economical design of sound-absorbing structures, L A Make L smaller. d Increase the size and L E Make M smaller. d Conversely, to ensure the effectiveness of the design of the sound-absorbing structure, L A Increase the size and L d Make L smaller. E Increase M d Reduces.

[0089] Step 13: A cooling tower noise reduction equipment economic cost optimization model is constructed, aiming at minimizing the economic cost of the construction of the cooling tower 1 noise reduction equipment, and the model is solved to obtain a cooling tower 1 noise reduction structure design scheme that optimizes the economy of the noise reduction equipment.

[0090] The economic cost of constructing the cooling tower 1 noise reduction equipment is directly related to the effective silencing length and noise reduction area, and the economic cost of constructing the silencing louvers on the intake side, the economic cost of constructing the muffler on the exhaust side, and the economic cost of constructing the cooling tower 1 noise reduction equipment were calculated using the following formulas (11), (12), and (13), respectively.

[0091]

number

[0092]

number

[0093]

number

[0094] In formula (11), L A Pi is the noise level of the i-th sound-reducing louver, and in equation (12), L E P is the superimposed noise of the silencer, and L E Pi is the noise amount of the ith silencer, N is the number of sound sources in each group of cooling tower modules, D is the number of levels of noise energy increase when multiple cooling tower module groups work simultaneously, and in equation (13), M is the economic cost of construction, X is the economic cost coefficient of construction, and d A is the thickness of the sound-absorbing insert of the sound-absorbing louver, and d E is the thickness of the sound-absorbing insert of the sound-absorbing louver, Therefore, the economic cost optimization model of the cooling tower noise reduction equipment, which was developed with the aim of minimizing the economic cost of constructing the cooling tower noise reduction equipment, is shown in the following equation (14).

[0095]

number

[0096] The decision variables in the economic cost optimization model of the cooling tower noise abatement equipment include the effective silencing length of the silencing louvers, the spacing between the silencing inserts of the silencing louvers, the effective silencing length of the muffler, and the spacing between the silencing inserts of the muffler.

[0097] Then, based on the Gurobi optimization solver under the Python platform, the economic cost optimization model of the cooling tower noise reduction equipment is solved, and the cooling tower 1 noise reduction structure design scheme with the most economical and optimal noise reduction equipment is output, and the function model file and the optimization scheme code program file are saved for later use.

[0098] The noise-sensitive building inspection method is a method that has been conventionally used in the art, and detailed description thereof will be omitted in this embodiment. The embodiment described in this specification is a preferred embodiment of the present invention, but the present invention is not limited to the above embodiment, and obvious improvements, substitutions, and modifications that can be made by a person skilled in the art without departing from the essence of the present invention are within the protection scope of the present invention. [Explanation of symbols]

[0099] 1 cooling tower 2 roadways 3 Passage 4 Shaft 5 Building 6 support structure 7 System Piping 8 Pipe parts 9 Valve 10 Distribution Box 11 Surrounding buildings

Claims

1. Step 1 of determining noise reduction targets within the functional areas and noise impact zones of the acoustic environment in which the cooling tower (1) is installed; Step 2: constructing a high-precision model of the cooling tower (1), a high-precision model of the system piping, and a high-precision model of the auxiliary components; Step 3: Based on the model constructed in step 2, continue to construct an engineering model including the terrain of the cooling tower (1) placement area, buildings (5), support structures (6), roadways (2), shafts (4), and passageways (3) to form a constraint model; Step 4: continuing to construct an engineering model including cooling tower (1) equipment, system piping (7), pipe parts (8), valves (9), shock absorbers and switch boxes (10) based on the constraint model to form a functional model; Step 5: building a model of the surrounding building (11) based on the functional model and marking the locations of noise reduction targets in sensitive areas of the building to build a target model; Step 6: based on the target model, lay out the cooling tower equipment in a modular form and install an inspection door at the same time; Step 7: Calculate the amount of superimposed noise of all cooling tower (1) module groups after the modular combination process of step 6; Step 8: Calculating the amount of noise to be processed that is transmitted to each sensitive point by the superimposed noise of the intake side, the shroud side and the exhaust side of the cooling tower (1); Step 9: setting a sound-absorbing structure for each cooling tower (1) of the target model after the modularized combination processing of step 6 based on the amount of noise to be processed; Step 10 of constructing a function model and performing data simulation to optimize the noise structure designed in step 9; A cooling tower noise reduction optimization method based on a physical model, comprising: a step 10 of constructing a cooling tower noise reduction equipment economic cost optimization model for minimizing the economic cost of constructing a cooling tower (1) noise reduction equipment; and solving the model to obtain a cooling tower (1) noise reduction structural design scheme that optimizes the economy of the noise reduction equipment.

2. In step 9, the sound deadening structure is set as follows:

2. The noise reduction optimization method for a cooling tower based on a physical model according to claim 1, characterized in that: a sound-absorbing louver with a built-in sound-absorbing insert is installed on the inlet side of the cooling tower (1), the length of the sound-absorbing louver is long enough to cover the length of the inlet of the cooling tower (1), the height is high enough to cover the height of the inlet of the cooling tower (1), the total area meets the inlet requirements of the cooling tower (1), and the remaining part is a sound-insulating barrier; a completely sealed sound-insulating barrier is used on the side plate side of the cooling tower (1), the sound-insulating barrier covers the cooling tower (1) arrangement area, the top is flush with the exhaust port of the cooling tower (1), an openable and closable inspection door is reserved in advance, an inspection ladder is installed according to the restriction model; a muffler with a built-in sound-insulating insert is installed on the exhaust side of the cooling tower (1), a gentle air flow area is ensured between the muffler and the exhaust port of the cooling tower (1), and a guide plate is installed.

3. The specific process of step 10 is as follows: Step 10.1: Using equations (1) to (4), the noise volume L to be processed by the sound-reducing louver is calculated. A T , the amount of noise to be treated by the silencer L E T , the intake coefficient I of the sound-absorbing louver A , exhaust coefficient I E Calculate each of them, [0010] [0025] [0030] [0045] In formula (1), a 0 is the normal incidence sound absorption coefficient of the sound absorbing material, and Φ(a 0 ) is the sound absorption coefficient related to the normal incidence sound absorption coefficient of the sound absorbing material, and L A is the effective sound-absorbing length of the sound-absorbing insert of the sound-absorbing louver, and L d is the spacing between the sound-absorbing inserts of the sound-absorbing louvers, and in equation (2), L E is the effective silencing length of the silencing insert of the silencer, M d is the spacing between the sound-absorbing inserts of the muffler, and in equation (3), L 1 is the length of the sound-absorbing louver, and L i is the number of sound-absorbing inserts in the sound-absorbing louver, and A 1 is the length of the inlet of the cooling tower (1), and A d is the width of the inlet of the cooling tower (1), and A i is the number of air inlets of each cooling tower (1), W is the number of cooling towers (1), K is the air inlet coefficient of the cooling tower (1), and in equation (4), M 1 is the length of the muffler, and M i is the number of silencer silencer inserts, E d is the diameter of the cooling tower (1) exhaust port, E i is the number of exhaust ports of each cooling tower (1), Using equations (5) and (6), the average inlet air speed V A and average exhaust wind speed V E Calculate each of them, [0050] [006] In equations (5) and (6), Q is the air volume of one cooling tower (1), and using equations (7) and (8), the pressure loss of the sound-absorbing louver H A and the pressure loss of the silencer H E Calculate each of them, [0070] [0080] In equations (7) and (8), ξ 1 and ξ 2 are both local resistance coefficients, ρ is air density, and using equations (9) and (10), the regeneration noise L that needs to be considered at the exhaust outlet of the cooling tower (1) is W , exhaust air flow area S E Calculate, [0090] [0089] In equation (9), a is the regeneration coefficient, Step 10.2, establishing an inter-control relationship between the effective sound-absorbing length and spacing of the sound-absorbing inserts of the sound-absorbing louvers that meets the noise target limits as follows: ##EQU00011## Establishing an inter-control relationship between the effective silencing length and spacing of the silencing inserts of a silencer that satisfies the noise target limits set forth below; ##EQU00012## Step 10.3: The mutual control relationship is taken as a mathematical model, and on the premise of meeting the noise reduction target limit value, L A and L d and L E and M. d The noise reduction optimization method for a cooling tower based on a physical model as claimed in claim 2, characterized in that the optimization of the noise reduction structure is realized by balancing and adjusting the value trends of the above.

4. The specific process of step 11 is as follows: Using the following formulas (11), (12), and (13), the economic cost of constructing the sound-absorbing louver on the intake side, the economic cost of constructing the muffler on the exhaust side, and the economic cost of constructing the noise reduction equipment for the cooling tower (1) are calculated, respectively. ##EQU00013## ##EQU00014## ##EQU00015## In formula (11), L A Pi is the noise level of the i-th sound-absorbing louver, and in equation (12), L E P is the superimposed noise of the muffler, and L E Pi is the noise amount of the i-th silencer, N is the number of sound sources included in each group of cooling tower modules, D is the number of levels of noise energy increase when multiple cooling tower module groups are operated simultaneously. In equation (13), M is the economic cost of construction, X is the economic cost coefficient of construction, and d A is the thickness of the sound-absorbing insert of the sound-absorbing louver, and d E is the thickness of the sound-absorbing insert of the sound-absorbing louver, Therefore, the economic cost optimization model of the cooling tower noise reduction equipment, which was constructed with the aim of minimizing the economic cost of constructing the cooling tower (1) noise reduction equipment, is as shown in the following equation (14): ##EQU00016## The decision variables in the economic cost optimization model of the cooling tower noise reduction equipment include the effective silencing length of the silencing louvers, the spacing between the silencing inserts of the silencing louvers, the effective silencing length of the muffler and the spacing between the silencing inserts of the muffler; The cooling tower noise reduction optimization method based on a physical model as claimed in claim 3, characterized in that the cooling tower noise reduction optimization method then solves the economic cost optimization model of the cooling tower noise reduction equipment based on the Gurobii optimization solver under the Python platform, and outputs a cooling tower noise reduction structural design scheme with the most economical and optimal noise reduction equipment.

5. The amount of superimposed noise L P‘ is calculated by the following formula: ##EQU00017## where N is the number of sound sources in each group of cooling tower modules, D is the number of noise energy levels that increase when multiple cooling tower module groups are operated simultaneously, and L Pi The noise reduction optimization method for a cooling tower based on a physical model according to claim 1, characterized in that i-th noise amount is i-th noise amount.

6. The amount of noise to be processed in step 8 is calculated by the following formula: [0018] [0019] Here, L P‘ are the superimposed noise levels of the cooling tower module group, and L eq is the prescribed noise limit value, ΔL is the noise attenuation, and r 1 is the distance from the receiving point 1 to the sound source, and r 2 The noise reduction optimization method for a cooling tower based on a physical model according to claim 1, characterized in that:

7. 3. The noise reduction optimization method for a cooling tower based on a physical model as claimed in claim 2, characterized in that: the sound insulation barrier adopts a 100mm-thick modular sound screen panel with a sound insulation capacity of not less than 24dB, the perforated plate adopts a 0.8mm perforated aluminum plate, the sound absorption material adopts a 100mm-thick anti-corrosive, hydrophobic and non-flammable sound absorption cotton with a high sound absorption coefficient, a 2mm-thick damping layer is adopted between the sound screen panel and the outer layer of galvanized steel plate, the inner frame of the sound absorption louver adopts a hot-dip galvanized structure, and both ends of the silencer adopt triangular flow guide plates.

Citation Information

Patent Citations

  • Noise control method for cooling tower

    CN104315879A

  • Cooling tower noise optimization analysis method based on noise rule and test

    CN114861560A

  • Ventilation and noise reduction system for centralized cooling tower

    JP2017172955A