Design method and design program
The design method and program efficiently manage different design item contents for design objects with the same specified items by using designation information procedures and overwrite orders, addressing inefficiencies in existing methods.
Patent Information
- Application Number
- JP2024062895
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2025-10-22
- Estimated Expiration
- 2044-04-09
AI Technical Summary
Existing design methods are inefficient when dealing with design objects that require different design items under varying preconditions, such as a building fixture with the same specified items but different requirements depending on the installation location.
A design method and program that utilize first and second designation information creation procedures to overwrite design item contents based on specific items, followed by an overwrite order setting and designated information overwriting procedure to create a design document efficiently under different preconditions.
Enhances design efficiency by allowing different design item contents to be handled effectively even when the design object has the same specified items, ensuring appropriate design outcomes based on varying prerequisites.
Smart Images

Figure 2025159978000001_ABST
Abstract
Description
[Technical Field]
[0001] The present invention relates to a design method and a design program. [Background technology]
[0002] A design method is known for creating a design document that includes a combination of specified items for a design object based on customer requests and the like and design items that are designed based on the contents of the specified items (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 7287910 Summary of the Invention [Problem to be solved by the invention]
[0004] For example, in any design carried out using a computer (regardless of the type of application used), when the design object is a building fixture (such as a door), it may be better to have different design items (such as frame shape) even if the fixture has the same specified items (such as surface finish and sound insulation) under different preconditions (such as the entrance and warehouse, where the fixture will be installed) even if it is the same building. While it is possible to design optimal contents for each design item for each different precondition, there is room for improvement in terms of design efficiency.
[0005] Therefore, an object of the present invention is to provide a design method and a design program that are excellent in design efficiency when the contents of the design items specified in the design document differ under different preconditions even if the design object has the same contents of the design items. [Means for solving the problem]
[0006] One aspect of the present invention is as follows.
[0007] [1] A design method for creating a design document including a content group that is a combination of the contents of various items including items A and B as specified items and item P as a design item for a design object, a first designation information creation procedure for creating first designation information including the expected content of item A and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item A regardless of the content of item B for the content group in which the contents of items A and B in the design document are specified; a second designation information creation procedure for creating second designation information including the expected content of item B and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item B regardless of the content of item A for the content group in which the contents of items A and B in the design document are specified; an overwrite order setting step for setting an overwrite order by the first designation information and the second designation information; and a designated information overwrite procedure for overwriting the content group in which the contents of the items A and B in the design document are specified with the first designated information and the second designated information in the overwrite order set.
[0008] [2] a reference information preparation step of preparing reference information including an expected combination of the contents of the items A and B and an overwrite content of the item P corresponding to the combination of the contents, in order to overwrite the content of the item P according to the combination of the contents of the items A and B for the content group in which the contents of the items A and B in the design document are specified; a reference information overwriting procedure for overwriting the content group in which the contents of the item A and the item B in the design document are specified with the reference information, The design method according to [1], wherein the overwriting by the specified information overwriting procedure is performed after the overwriting by the reference information overwriting procedure.
[0009] [3] The design method according to [2], further comprising a reference information addition step of adding the content group overwritten by the specified information overwriting step in the design document to the reference information.
[0010] [4] The design method according to [3], wherein the reference information adding step associates the content group with price information and adds it to the reference information.
[0011] [5] The design method according to any one of [1] to [4], wherein the object to be designed is a building or its facilities.
[0012] [6] A design program for creating a design document including a content group that is a combination of the contents of various items including items A and B as specified items and item P as a design item for a design object, the program being configured on a computer. a first designation information creation procedure for creating first designation information including the expected content of item A and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item A regardless of the content of item B for the content group in which the contents of items A and B in the design document are specified; a second designation information creation procedure for creating second designation information including the expected content of item B and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item B regardless of the content of item A for the content group in which the contents of items A and B in the design document are specified; an overwrite order setting step for setting an overwrite order by the first designation information and the second designation information; A design program that executes a designated information overwrite procedure that overwrites the content group in which the contents of items A and B in the design document are specified with the first designated information and the second designated information in the overwrite order set. [Effects of the Invention]
[0013] According to the present invention, it is possible to provide a design method and a design program that are excellent in design efficiency when the contents of the design items specified in the design document are different under different preconditions even if the design object has the same contents of the design items. [Brief explanation of the drawings]
[0014] [Figure 1] FIG. 1 is a schematic diagram showing a design document created in a design method according to an embodiment of the present invention. [Figure 2] 2 is a schematic diagram showing first specification information for creating the design document shown in FIG. 1. FIG. [Figure 3] 1. FIG. 4 is a schematic diagram showing second designation information for creating the design document shown in FIG. [Figure 4] FIG. 2 is an explanatory diagram for explaining setting patterns of an overwrite order for creating the design document shown in FIG. [Figure 5] FIG. 2 is a schematic diagram showing reference information for creating the design document shown in FIG. [Figure 6] 2 is a flowchart showing a procedure for creating the design document shown in FIG. 1. [Figure 7] FIG. 10 is a schematic diagram showing a design document created by overwriting in overwrite order setting pattern 1. [Figure 8] FIG. 10 is a schematic diagram showing a design document created by overwriting in overwrite order setting pattern 2. DETAILED DESCRIPTION OF THE INVENTION
[0015] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0016] As shown in FIGS. 1 to 8, in one embodiment of the present invention, the design method is a design method for creating a design document 1 (see FIGS. 1, 7 to 8) including a content group that is a combination of the contents of various items including items A and B as specified items and item P as a design item for a design object, and the design method includes a first specified information creating step (corresponding to the specified information creating step S1 in FIG. 6) for creating first specified information 2 (see FIG. 2) including the expected content of item A and the overwrite content of item P corresponding to the content in order to overwrite the content of item P according to the content of item A regardless of the content of item B for the content group in which the contents of items A and B in the design document 1 are specified; The method includes a second designated information creating procedure (corresponding to the designated information creating procedure S1 in FIG. 6) for creating second designated information 3 (see FIG. 3) including the expected content of item B and the overwrite content of item P corresponding to said content, in order to overwrite the content of item P in accordance with the content of item B for a content group in which item A is specified, regardless of the content of item A; an overwrite order setting procedure S2 (see FIG. 6) for setting the overwrite order by the first designated information 2 and the second designated information 3 (see FIG. 4); and a designated information overwriting procedure S5 (see FIG. 6) for overwriting (see FIGS. 7-8) by the first designated information 2 and the second designated information 3 in the overwrite order set for the content group in which the contents of items A and B in the design document 1 are specified. The designated information creating procedure S1 consists of the first designated information creating procedure and the second designated information creating procedure, and either the first designated information creating procedure or the second designated information creating procedure may be performed first.
[0017] In this embodiment, the design object is a fixture (e.g., a door) as a facility of a building. Note that the design object is not limited to a fixture, but may be, for example, a facility other than a fixture, a building, or something other than a building.
[0018] In this embodiment, the design document 1 targets multiple design objects and includes multiple content groups, but is not limited to this. In the example shown in the figure, the design document 1 targets at least six design objects (objects 1 to 6) and includes at least six content groups (content groups 1 to 6), but the number of design objects and content groups is not particularly limited and may be, for example, several thousand.
[0019] In this embodiment, the specified items for the design object specified by the customer's request or the like include not only items A and B but also other items such as item C, but the configuration may also be such that these other items are not included. Also, in this embodiment, the design items designed based on the contents of the specified items include not only item P but also other items such as item Q, but the configuration may also be such that these other items are not included.
[0020] In this embodiment, the item A included in each of the first designation information 2 and the second designation information 3 is an item that specifies the finishing material, but the target specified by the item A is not limited to finishing materials. Also in this embodiment, the item B included in each of the first designation information 2 and the second designation information 3 is an item that specifies sound insulation, but the target specified by the item B is not limited to sound insulation. Also in this embodiment, the item P included in each of the first designation information 2 and the second designation information 3 is an item that specifies the frame shape, but the target specified by the item P is not limited to the frame shape.
[0021] In this embodiment, the number of expected contents of term A included in first designation information 2 is two (content p1 and content p2), but is not limited to this and may be one or three or more. Also, in this embodiment, the number of contents of term P included in first designation information 2 is two (content p1 and content p2), which corresponds to the number of expected contents of term A.
[0022] In this embodiment, the number of expected contents of item B included in the second designation information 3 is two (content p3 and content p4), but is not limited to this and may be one or three or more. Also, in this embodiment, the number of contents of item P included in the second designation information 3 is two (content p3 and content p4), which corresponds to the number of expected contents of item B.
[0023] As shown in FIG. 2, the expected content of item A included in first designation information 2 includes content a1 and content a2, where content a1 is finishing material 1 (e.g., film) and content a2 is finishing material 2 (e.g., stone). The content of item P included in first designation information 2 includes content p1 and content p2, where content p1 is frame shape 1 as overwrite content and content p2 is frame shape 2 as overwrite content. As shown in FIG. 3, the expected content of item B included in second designation information 3 includes content b1 and content b2, where content b1 is sound insulation 1 (e.g., with sound insulation) and content b2 is sound insulation 2 (e.g., without sound insulation). The content of item P included in second designation information 3 includes content p3 and content p4, where content p3 is frame shape 3 as overwrite content and content p4 is no overwrite content (no overwrite).
[0024] The first specification information 2 includes the expected content of item A and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item A regardless of the content of items B and C for a content group in which the contents of items A, B, and C in the design document 1 are specified. The first specification information 2 includes content q1 and content q2 as the content of item Q corresponding to the expected content of item A, and content q1 and content q2 do not have overwrite content, but is not limited to this, and for example, content q1 and content q2 may have overwrite content.
[0025] The second specification information 3 includes the expected content of item B and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item B regardless of the content of items A and C for a content group in which the contents of items A, B, and C in the design document 1 are specified. The second specification information 3 includes content q3 and content q4 as the content of item Q corresponding to the expected content of item B, and content q3 and content q4 do not have overwrite content, but is not limited to this, and for example, content q3 and content q4 may have overwrite content.
[0026] 4, in overwrite order setting procedure S2, the overwrite order is set to either overwrite order setting pattern 1 or overwrite order setting pattern 2. Overwrite order setting pattern 1 overwrites the first designation information 2, then the second designation information 3. Overwrite order setting pattern 2 overwrites the second designation information 3, then the first designation information 2.
[0027] In the designated information overwrite procedure S5, the first designated information 2 and the second designated information 3 are overwritten in the overwrite order set for the design document 1 shown in FIG. 1. The overwrite using the first designated information 2 is performed sequentially starting from target 1, and among targets 1 to 6, targets 1 to 4, for which content a1 and content a2 are specified in item A, are actually overwritten with P items. The overwrite using the second designated information 3 is performed sequentially starting from target 1, and among targets 1 to 6, targets 1 to 2, for which content b1 is specified in item B, are actually overwritten with P items. At this time, for targets 3 to 6, for which content b2 is specified in item B, content p4, which is the content of the P item corresponding to the content b2 of item B in the second designated information 3, is not overwritten, so the P item is not overwritten. The design document 1 shown in FIG. 1 can be created by overwriting the design document 1 using the first designated information 2 and the second designated information 3.
[0028] The content of the design document 1 created by overwriting will differ depending on the order of overwriting. When overwriting with overwrite order setting pattern 1, the overwritten design document 1 will look like Figure 7, and when overwriting with overwrite order setting pattern 2, the overwritten design document 1 will look like Figure 8. As shown by the circles in Figures 7 and 8, the content of the P items after overwriting will change in targets 1 and 2 depending on the order of overwriting.
[0029] The importance (priority) of the first specified information 2 and the second specified information 3 may differ depending on the prerequisites for the design object (for example, the area where the design object will be installed). For example, if the area where the fixtures as the design object will be installed is an entrance, the first specified information 2 regarding the finishing materials that affect the design will be more important than the second specified information 3 regarding sound insulation. Also, if the area where the fixtures as the design object will be installed is a warehouse, the second specified information 3 regarding sound insulation will be more important than the first specified information 2 regarding the finishing materials that affect the design. The later the overwrite order, the more likely the overwrite content is reflected in the final design document 1. For this reason, by setting the overwrite order according to different priorities depending on the prerequisites, appropriate design documents 1 can be created with the simple task of setting the overwrite order for various prerequisites.
[0030] Therefore, with the above configuration, even if the contents of the items specified in the design document 1 are the same for the object to be designed, the contents of the design items may differ under different preconditions, thereby achieving excellent design efficiency.
[0031] The design method of this embodiment includes a reference information preparation procedure S3 (see FIG. 6) for preparing reference information 4 (see FIG. 5) including an expected combination of contents of items A and B and the overwrite contents of item P corresponding to the combination of contents, in order to overwrite the contents of item P according to the combination of contents of items A and B for a content group in which the contents of items A and B in the design document 1 are specified, and a reference information overwrite procedure S4 (see FIG. 6) for overwriting the contents of item A and B in the design document 1 with the reference information 4, and the overwrite by the specified information overwrite procedure S5 is performed after the overwrite by the reference information overwrite procedure S4.
[0032] In cases where a set of content items, in which a predetermined combination of design item content is determined for a predetermined combination of design item content, exists as proven information from past designs, performing the reference information overwriting procedure S4 described above using one or more such content groups as reference information 4 can reduce unnecessary design work and achieve a high-quality design that is consistent with past performance. In the illustrated example, the reference information preparation procedure S3 is configured to be performed immediately before the reference information overwriting procedure S4 (after the overwriting order setting procedure S2), but this is not a limitation and the reference information overwriting procedure S4 may be performed before the reference information overwriting procedure S4. In the illustrated example, the reference information overwriting procedure S4 is configured to be performed after the designation information creation procedure S1 and the overwriting order setting procedure S2, but this is not a limitation and the reference information overwriting procedure S4 may be performed before the designation information creation procedure S1 and the overwriting order setting procedure S2, for example.
[0033] The design method of this embodiment includes a reference information addition step S6 (see FIG. 6) that adds the content group overwritten by the specified information overwriting step S5 in the design document 1 to the reference information 4. According to the above configuration, a newly designed content group can be accumulated in the reference information 4 as new design results.
[0034] The reference information adding procedure S6 may be configured to associate the content group with price information and add it to the reference information 4. According to the above configuration, when overwriting in the reference information overwriting procedure S4, price information can also be overwritten on the design document 1, so that an estimate corresponding to the design document 1 to be created can be easily created.
[0035] The design document 1, the first specified information 2, the second specified information 3 and the reference information 4 each have a tabular format with m rows and n columns (where m and n are any natural numbers), but are not limited to this.
[0036] The design method of this embodiment is performed using a design system including a computer and a design program. The design program creates a design document 1 containing a set of contents, which are combinations of various items, including A and B items as designated items and P items as design items, for a design object. The design program causes the computer to execute a first designated information creation procedure, a second designated information creation procedure, an overwrite order setting procedure S2, a designated information overwrite procedure S5, a reference information preparation procedure S3, a reference information overwrite procedure S4, and a reference information addition procedure S6. The overwrite in the designated information overwrite procedure S5 is performed after the overwrite in the reference information overwrite procedure S4. The design program runs software such as an application or app. In this embodiment, the first designated information creation procedure involves a person using the design program to input the overwrite content of the P item to create first designated information 2. The second designated information creation procedure involves a person using the design program to input the overwrite content of the P item to create second designated information 3. The overwrite order setting procedure S2 involves a person using the design program to input the overwrite order, thereby setting the overwrite order. Note that the design method of this embodiment is not limited to being performed using a computer.
[0037] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and the above-described embodiments can be modified in various ways without departing from the gist of the present invention. [Explanation of symbols]
[0038] 1 Design document 2 1st designated information 3 Second designated information 4 References S1 Designation information creation procedure S2 Overwrite order setting procedure S3 reference information preparation steps S4 Reference information overwrite procedure S5 Specific information overwrite procedure S6 Add reference information procedure
Claims
1. A design method for creating a design document including a content group that is a combination of the contents of various items including items A and B as specified items and item P as a design item for a design object, a first designation information creation procedure for creating first designation information including the expected content of item A and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item A regardless of the content of item B, for the content group in which the contents of items A and B in the design document are specified; a second designation information creation procedure for creating second designation information including the expected content of item B and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item B regardless of the content of item A, for the content group in which the contents of items A and B in the design document are specified; an overwrite order setting step for setting an overwrite order based on the first designation information and the second designation information; and a designated information overwrite procedure for overwriting the content group in which the contents of items A and B in the design document are specified with the first designated information and the second designated information in the overwrite order set for the group.
2. a reference information preparation step of preparing reference information including an expected combination of the contents of the items A and B and the overwrite contents of the item P corresponding to the combination of the contents, in order to overwrite the contents of the item P according to the combination of the contents of the items A and B for the content group in which the contents of the items A and B in the design document are specified; a reference information overwriting procedure for overwriting the content group in which the contents of the items A and B in the design document are specified with the reference information, The design method according to claim 1 , wherein the overwriting by the specific information overwriting step is performed after the overwriting by the reference information overwriting step.
3. 3. The design method according to claim 2, further comprising a reference information adding step of adding the content group overwritten by the specified information overwriting step in the design document to the reference information.
4. The design method according to claim 3 , wherein the step of adding reference information includes adding the content group to the reference information in association with price information.
5. The design method according to claim 1 , wherein the design object is a building or its facilities.
6. A design program for creating a design document including a content group that is a combination of the contents of various items including items A and B as specified items and item P as a design item for a design object, the program including: a first designation information creation procedure for creating first designation information including the expected content of item A and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item A regardless of the content of item B, for the content group in which the contents of items A and B in the design document are specified; a second designation information creation procedure for creating second designation information including the expected content of item B and the overwrite content of item P corresponding to the expected content, in order to overwrite the content of item P according to the content of item B regardless of the content of item A, for the content group in which the contents of items A and B in the design document are specified; an overwrite order setting step for setting an overwrite order based on the first designation information and the second designation information; A design program that executes a designated information overwrite procedure that overwrites the content group in which the contents of items A and B in the design document are specified with the first designated information and the second designated information in the overwrite order set.
Citation Information
Patent Citations
Method for supporting design and device therefor
JP1998283379A
Product structure design support system
JP2006155601A
System for creating and processing building estimate
JP2007065806A
Building material selection device and program
JP2017084126A
BIM control method
JP2021021974A