How to install an anchor system
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- REFLEX MARINE LTD
- Filing Date
- 2023-07-17
- Publication Date
- 2026-06-16
AI Technical Summary
Conventional anchor systems for offshore wind projects are limited by their suitability to specific seabed conditions, are costly, time-consuming, and prone to tether damage and failure due to high horizontal loads, making them unreliable and expensive for site-wide use.
A method involving a stepped borehole with varying cross-sectional dimensions and a horizontal load dissipating member, secured with a fixing medium, to anchor piles and mooring tethers, ensuring stable and efficient load distribution.
The solution provides a reliable and cost-effective anchoring system capable of withstanding high loads, reducing tether damage and failure, and adapting to varied seabed conditions, thus enhancing the durability and efficiency of offshore wind projects.
Smart Images

Figure 00000000_0000_ABST