Terminals, base stations, and communication methods

By employing virtual CCs, BWPs, or PRBs for scheduling at a different granularity, the resource allocation overhead in carrier aggregation is reduced, enhancing efficiency in future wireless communication systems.

JP2026083287APending Publication Date: 2026-05-19NTT DOCOMO INC
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
NTT DOCOMO INC
Filing Date
2026-03-04
Publication Date
2026-05-19

AI Technical Summary

Technical Problem

Conventional carrier aggregation functions require scheduling data resources for each component carrier, leading to significant resource allocation overhead, which is inefficient in future systems like NR Release 18 and 6G.

Method used

Implementing a framework that performs scheduling or aggregation at a different granularity than component carriers, using virtual CCs, BWPs, or PRBs, and allowing for discontinuous carrier aggregation and discontinuous scheduling.

Benefits of technology

Reduces resource allocation overhead by enabling more flexible and efficient resource allocation in wireless communication systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2026083287000001_ABST
    Figure 2026083287000001_ABST
Patent Text Reader

Abstract

To reduce resource allocation overhead in wireless communication systems. [Solution] The terminal comprises a communication unit that performs uplink or downlink communication in a frequency band aggregated by carrier aggregation, and a control unit that assumes scheduling defined as non-sequential scheduling when scheduling is performed in units including multiple frequency resources in the aggregated frequency band.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0005] ,

[0001] The present invention relates to a terminal, a base station, and a communication method in a wireless communication system.

Background Art

[0002] In NR (also referred to as "5G"), which is a successor system to LTE (Long Term Evolution), technologies that satisfy requirements such as a large-capacity system, high data transmission speed, low latency, simultaneous connection of a large number of terminals, low cost, and power saving are being studied (for example, Non-Patent Document 1).

[0003] In addition, in NR, the carrier aggregation (CA) function that uses a wideband to secure data resources is being continuously studied following LTE. In the carrier aggregation function, a wideband data resource can be secured by bundling a plurality of component carriers (CCs).

Prior Art Documents

Non-Patent Documents

[0004]

Non-Patent Document 1

Summary of the Invention

Problems to be Solved by the Invention

[0005] In future systems (for example, NR Release 18 and 6G, which is a successor system to NR), more flexible and efficient resource allocation may be required. However, in the conventional carrier aggregation function, it is necessary to schedule data resources for each of the bundled plurality of component carriers, and there is a problem that the overhead of resource allocation is large.

[0006] This invention has been made in view of the above points, and aims to reduce the overhead of resource allocation. [Means for solving the problem]

[0007] According to the disclosed technology, a terminal is provided comprising: a communication unit that performs uplink or downlink communication in a frequency band aggregated by carrier aggregation; and a control unit that assumes scheduling defined as unsequential scheduling when scheduling is performed in units including multiple component carriers in the aggregated frequency band. [Effects of the Invention]

[0008] The disclosed technology provides a mechanism to reduce the overhead of resource allocation. [Brief explanation of the drawing]

[0009] [Figure 1] This figure illustrates a wireless communication system according to an embodiment of the present invention. [Figure 2] This is the first figure showing an example of the configuration of a virtual CC according to an embodiment of the present invention. [Figure 3] This is the second figure, showing an example of the configuration of a virtual CC according to an embodiment of the present invention. [Figure 4] This figure illustrates Option 1 of Embodiment 2 of the present invention. [Figure 5] This figure illustrates option 2 of embodiment 2 of the present invention. [Figure 6] This is the first figure illustrating Option 3 of Embodiment 2 of the present invention. [Figure 7] This is a second figure illustrating Option 3 of Embodiment 2 of the present invention. [Figure 8]This is a diagram for explaining Option 4 of Example 2 of the embodiment of the present invention. [Figure 9] This is a diagram for explaining Option 5 of Example 2 of the embodiment of the present invention. [Figure 10] This is a diagram for explaining Option 6 of Example 2 of the embodiment of the present invention. [Figure 11] This is a diagram for explaining Option 7 of Example 2 of the embodiment of the present invention. [Figure 12] This is a first diagram for explaining Option 8 of Example 2 of the embodiment of the present invention. [Figure 13] This is a second diagram for explaining Option 8 of Example 2 of the embodiment of the present invention. [Figure 14] This is a diagram for explaining Option 9 of Example 2 of the embodiment of the present invention. [Figure 15] This is a diagram for explaining Option 10 of Example 2 of the embodiment of the present invention. [Figure 16] This is a diagram showing an example of the functional configuration of a base station according to an embodiment of the present invention. [Figure 17] This is a diagram showing an example of the functional configuration of a terminal according to an embodiment of the present invention. [Figure 18] This is a diagram showing an example of the hardware configuration of a base station or a terminal according to an embodiment of the present invention. [Figure 19] This is a diagram showing an example of the configuration of a vehicle according to an embodiment of the present invention.

Embodiments for Carrying Out the Invention

[0010] Hereinafter, embodiments of the present invention will be described with reference to the drawings. Note that the embodiments described below are examples, and the embodiments to which the present invention is applied are not limited to the following embodiments.

[0011] In the operation of the wireless communication system according to the embodiment of the present invention, existing technologies are used as appropriate. However, the existing technology is, for example, existing LTE, but is not limited to existing LTE. Further, the term "LTE" used in this specification shall have a broad meaning including LTE-Advanced and subsequent systems (e.g., NR) unless otherwise specified.

[0012] Also, in the embodiments of the present invention described below, terms such as SS (Synchronization signal), PSS (Primary SS), SSS (Secondary SS), PBCH (Physical broadcast channel), PRACH (Physical random access channel), PDCCH (Physical Downlink Control Channel), PDSCH (Physical Downlink Shared Channel), PUCCH (Physical Uplink Control Channel), PUSCH (Physical Uplink Shared Channel), etc., which are used in existing LTE, are used. This is for convenience of description, and signals, functions, etc. similar to these may be called by other names. Also, the above terms in NR correspond to NR-SS, NR-PSS, NR-SSS, NR-PBCH, NR-PRACH, etc. However, even for signals used in NR, the "NR-" is not necessarily specified.

[0013] Also, in the embodiments of the present invention, the duplex mode may be a TDD (Time Division Duplex) mode, an FDD (Frequency Division Duplex) mode, or another mode (e.g., Flexible Duplex, etc.).

[0014] Furthermore, in the embodiments of the present invention, "configuring" wireless parameters may mean that predetermined values ​​are pre-configured, or that wireless parameters notified from the base station 10 or terminal 20 are configured.

[0015] (System Configuration) Figure 1 is a diagram illustrating an embodiment of the wireless communication system according to the present invention. A wireless communication system according to an embodiment of the present invention includes a base station 10 and a terminal 20, as shown in Figure 1. Although Figure 1 shows one base station 10 and one terminal 20, this is an example, and there may be multiple base stations 10 and terminal 20.

[0016] Base station 10 is a communication device that provides one or more cells and performs wireless communication with terminal 20. The physical resources of the wireless signal are defined in the time domain and the frequency domain. The time domain may be defined by the number of OFDM (Orthogonal Frequency Division Multiplexing) symbols, and the frequency domain may be defined by the number of subcarriers or resource blocks. In addition, the TTI (Transmission Time Interval) in the time domain may be a slot, or the TTI may be a subframe.

[0017] The base station 10 transmits synchronization signals and system information to the terminal 20. The synchronization signals are, for example, NR-PSS and NR-SSS. The system information is transmitted, for example, via NR-PBCH and is also called broadcast information. The synchronization signals and system information may also be called SSB (SS / PBCH block). As shown in Figure 1, the base station 10 transmits control signals or data to the terminal 20 via DL (Downlink) and receives control signals or data from the terminal 20 via UL (Uplink). Both the base station 10 and the terminal 20 are capable of transmitting and receiving signals using beamforming. Furthermore, both the base station 10 and the terminal 20 are capable of applying MIMO (Multiple Input Multiple Output) communication to DL or UL. In addition, both the base station 10 and the terminal 20 may communicate via secondary cells (SCell) and primary cells (PCell) using CA (Carrier Aggregation). Furthermore, terminal 20 may communicate via the primary cell of base station 10 and the primary secondary cell group cell (PSCell: Primary SCG Cell) of other base stations 10 using DC (Dual Connectivity).

[0018] Terminal 20 is a communication device equipped with wireless communication capabilities, such as a smartphone, mobile phone, tablet, wearable device, or M2M (Machine-to-Machine) communication module. As shown in Figure 1, Terminal 20 receives control signals or data from the base station 10 via DL and transmits control signals or data to the base station 10 via UL, thereby utilizing various communication services provided by the wireless communication system. Terminal 20 also receives various reference signals transmitted from the base station 10 and performs propagation path quality measurements based on the reception results of these reference signals. Terminal 20 may also be referred to as UE and base station 10 as gNB.

[0019] Furthermore, in NR, the carrier aggregation function, which uses broadband to secure data resources, is being considered, as it was for LTE. The carrier aggregation function allows for the securing of broadband data resources by bundling multiple component carriers.

[0020] (Previous problems) Traditional carrier aggregation functions require scheduling data resources for each of the bundled component carriers, resulting in significant resource allocation overhead.

[0021] Therefore, in order to solve the conventional problems described above, it is conceivable that the terminal allocates resources using scheduling units of a different granularity than those of the component carrier.

[0022] A framework that performs scheduling or aggregation at a different granularity than component carriers is defined as frequency fragmentation.

[0023] Furthermore, in carrier aggregation, performing aggregation (aggregation) at a different granularity than that of component carriers is defined as discontinuous carrier aggregation.

[0024] Furthermore, in carrier aggregation (discontinuous carrier aggregation), discontinuous scheduling is defined as scheduling at a different granularity than that of the component carriers.

[0025] The granularity different from the component carriers mentioned above may be in units of virtual CC (Virtual CC), BWP (Bandwidth Part), PRB (Physical Resource Block), or PRB set.

[0026] Here, a virtual CC is a carrier set that bundles all or part of the frequency resources contained in each of several component carriers.

[0027] For example, a virtual CC can be assumed to be composed of multiple BWPs.

[0028] Figure 2 is the first diagram showing an example of the configuration of a virtual CC according to an embodiment of the present invention. The virtual CC#i shown in Figure 2 is a carrier set formed by bundling BWP#a and BWP#b contained in each component carrier among a plurality of component carriers (CC#0 and CC#1).

[0029] Furthermore, a virtual CC may be assumed to consist of multiple PRBs or sets of PRBs.

[0030] Figure 3 is a second diagram showing an example of the configuration of a virtual CC according to an embodiment of the present invention. The virtual CC#i shown in Figure 3 is a carrier set formed by bundling multiple PRBs contained in each component carrier among multiple component carriers (CC#0 and CC#1). Note that these multiple PRBs or PRB sets may be contained in one or more BWPs.

[0031] In the following, CCs before bundling will be referred to as "actual CCs," and CCs after bundling will be referred to as "virtual CCs" or "nominal CCs." Note that these names are not the only options.

[0032] (Constraints of conventional scheduling) Next, we will explain the constraints on scheduling for conventional control channels or data channels. In NR, it is conventionally assumed that terminal 20 is not subject to out-of-order scheduling. That is, it is assumed that terminal 20 is subject to in-order scheduling, which does not fall under out-of-order scheduling.

[0033] Out-of-order scheduling (OoO) can be as follows:

[0034] In the case of scheduling PDSCHs by PDCCH, if it is scheduled to start receiving the first PDSCH beginning with symbol j by a PDCCH ending with symbol i, terminal 20 assumes that it will not be scheduled to receive a PDSCH that starts earlier than the end of the first PDSCH with a PDCCH ending after symbol i.

[0035] Furthermore, in the case of scheduling PUSCHs by PDCCH, if any two HARQ process IDs within a particular scheduled cell are scheduled to initiate the first PUSCH transmission beginning with symbol j by a PDCCH ending with symbol i, then terminal 20 is not scheduled to transmit a PUSCH that begins before the end of the first PUSCH with a PDCCH ending after symbol i.

[0036] Furthermore, terminal 20 assumes that if another PUSCH is scheduled by a DCI having a CRC scrambled by C-RNTI, CS-RNTI, or MCS-C-RNTI, it will not be scheduled to send that other PUSCH to a given HARQ process with a DCI received before the expected end of transmission of the last PUSCH for that HARQ process.

[0037] Furthermore, in the case of scheduling HARQ-ACKs using PDSCH, it is assumed that in a predetermined scheduled cell, terminal 20 will not receive the first PDSCH and the second PDSCH, which starts after the first PDSCH and is assigned to be sent in a resource that ends before the start of another resource for the HARQ-ACK assigned to be sent by the first PDSCH, and which carries the corresponding HARQ-ACK. Note that these two resources are in different slots for their associated HARQ-ACK transmissions.

[0038] The scheduling that terminal 20 did not anticipate, as described above, is an example of scheduling in no particular order.

[0039] Next, in-order scheduling can be, for example, the following type of scheduling.

[0040] In the case of scheduling PDSCHs by PDCCH, if it is scheduled to start receiving the first PDSCH beginning with symbol j by a PDCCH ending with symbol i, terminal 20 assumes that it will be scheduled to receive PDSCHs that start later than the end of the first PDSCH, which has a PDCCH ending after symbol i.

[0041] Furthermore, in the case of scheduling PUSCHs by PDCCH, if any two HARQ process IDs within a particular scheduled cell are scheduled to initiate the first PUSCH transmission beginning with symbol j by a PDCCH ending with symbol i, then terminal 20 is expected to be scheduled to transmit a PUSCH that begins later than the end of the first PUSCH, which has a PDCCH ending after symbol i.

[0042] Furthermore, terminal 20 assumes that if another PUSCH is scheduled by a DCI having a CRC scrambled by C-RNTI, CS-RNTI, or MCS-C-RNTI, it will not be scheduled to send that other PUSCH to a given HARQ process with a DCI received after the expected end of transmission of the last PUSCH for that HARQ process.

[0043] Furthermore, in the case of scheduling HARQ-ACKs using PDSCH, it is assumed that in a predetermined scheduled cell, terminal 20 will receive a first PDSCH and a second PDSCH that starts after the first PDSCH and is assigned to be transmitted in a resource that ends after the start of another resource for the HARQ-ACK assigned to be transmitted by the first PDSCH, with the corresponding HARQ-ACK. Note that these two resources are in different slots for their associated HARQ-ACK transmissions.

[0044] The scheduling assumed by terminal 20 described above is an example of in-order scheduling.

[0045] In the following description, we will refer to the out-of-order scheduling and in-order scheduling described above, but the time units for scheduling constraints are not limited to those described above (i.e., for each constraint, time units other than symbols / slots may be used).

[0046] (Summary of this embodiment) This embodiment describes the scheduling constraints in frequency fragmentation. Specifically, Examples 1 and 2 are described below.

[0047] (Example 1) This example describes whether or not there are scheduling constraints in frequency fragmentation.

[0048] <Option 1> Terminal 20 may assume that out-of-order scheduling is not supported in the case of virtual CC. If terminal 20 supports virtual CC and / or if virtual CC is configured on terminal 20, terminal 20 may assume in-order scheduling.

[0049] If terminal 20 supports virtual CC, and / or if virtual CC is configured on terminal 20, terminal 20 may be assumed not to be out-of-order.

[0050] Out-of-order scheduling may include out-of-order scheduling between DL control channels (e.g., PDCCH, DCI) and DL or UL data channels (e.g., PDSCH or PUSCH), and between DL channels and feedback channels (e.g., PUCCH, UCI, HARQ-ACK).

[0051] <Option 2> Terminal 20 may be assumed to support out-of-order scheduling. If Terminal 20 supports virtual CC and / or if virtual CC is configured on Terminal 20, Terminal 20 may be assumed to support in-order scheduling.

[0052] Furthermore, if terminal 20 supports virtual CC, and / or if virtual CC is configured on terminal 20, terminal 20 may assume that out-of-order scheduling will occur. Terminal 20 may assume that out-of-order scheduling will be applied only if specified or configured conditions are met, or it may assume that out-of-order scheduling will be applied regardless of the conditions. Specific examples of specified or configured conditions will be described later in Example 2.

[0053] According to this embodiment, appropriate scheduling can be achieved by clarifying whether or not there are scheduling constraints in frequency fragmentation.

[0054] (Example 2) In this embodiment, the conditions for applying out-of-order scheduling are described.

[0055] Terminal 20 may assume that any or a combination of the following conditions are specified for applying out-of-order scheduling. The meanings of the first and second terms will be explained later.

[0056] <Option 1> Figure 4 is a diagram illustrating Option 1 of Embodiment 2 of the present invention. Terminal 20 may assume that the first PDCCH and the first PDSCH / PUSCH, and the second PDCCH and the second PDSCH / PUSCH are scheduled to different actual CC frequency resources, which is a condition for applying out-of-order scheduling.

[0057] <Option 2> Figure 5 is a diagram illustrating Option 2 of Embodiment 2 of the present invention. Terminal 20 may assume that the first PDSCH and the first HARQ-ACK, and the second PDSCH and the second HARQ-ACK are scheduled to different actual CC frequency resources, which is a condition for applying out-of-order scheduling.

[0058] <Option 3> Terminal 20 may assume that the first PDSCH / PUSCH and the second PDSCH / PUSCH are scheduled to different actual CC frequency resources as a condition for applying out-of-order scheduling.

[0059] Figure 6 is a first diagram illustrating Option 3 of Embodiment 2 of the present invention. In the case of scheduling from PDCCH to PDSCH / PUSCH, terminal 20 may assume that the first PDCCH and the second PDCCH partially or completely overlap in the same actual CC in the frequency domain.

[0060] Terminal 20 may assume that the first PDSCH / PUSCH and the second PDSCH / PUSCH do not partially or completely overlap in the same actual CC in the frequency domain.

[0061] Figure 7 is a second diagram illustrating Option 3 of Embodiment 2 of the present invention. In the case of scheduling from PDSCH to HARQ-ACK, terminal 20 may assume that the first HARQ-ACK and the second HARQ-ACK partially or completely overlap in the same actual CC in the frequency domain.

[0062] Terminal 20 may assume that the first PDSCH and the second PDSCH do not partially or completely overlap in the same actual CC in the frequency domain.

[0063] <Option 4> Figure 8 illustrates Option 4 of Embodiment 2 of the present invention. Terminal 20 may assume that the first PDCCH and the second PDCCH are scheduled to different actual CC frequency resources, which is a condition for applying out-of-order scheduling.

[0064] <Option 5> Figure 9 is a diagram illustrating Option 5 of Embodiment 2 of the present invention. Terminal 20 may assume that the first HARQ-ACK and the second HARQ-ACK are scheduled to different actual CC frequency resources, which is a condition for applying out-of-order scheduling.

[0065] <Option 6> Figure 10 is a diagram illustrating Option 6 of Embodiment 2 of the present invention. Terminal 20 may assume that the first PDCCH and the first PDSCH / PUSCH, and the second PDCCH and the second PDSCH / PUSCH are scheduled to different actual CC time resources, which is a condition for applying out-of-order scheduling.

[0066] <Option 7> Figure 11 is a diagram illustrating Option 7 of Embodiment 2 of the present invention. Terminal 20 may assume that the first PDSCH and the first HARQ-ACK, and the second PDSCH and the second HARQ-ACK are scheduled to different actual CC time resources, which is a condition for applying out-of-order scheduling.

[0067] <Option 8> Terminal 20 may assume that the first PDSCH / PUSCH and the second PDSCH / PUSCH are scheduled to different actual CC time resources as a condition for applying out-of-order scheduling.

[0068] Figure 12 is a first diagram illustrating Option 8 of Embodiment 2 of the present invention. In the case of scheduling from PDCCH to PDSCH / PUSCH, terminal 20 may assume that the first PDCCH and the second PDCCH overlap in the time domain with the same time resources such as slots and symbols.

[0069] Terminal 20 may assume that the first PDSCH / PUSCH and the second PDSCH / PUSCH do not overlap in the time domain with the same time resources such as slots or symbols.

[0070] Figure 13 is a second diagram illustrating Option 8 of Embodiment 2 of the present invention. In the case of scheduling from PDSCH to HARQ-ACK, terminal 20 may assume that the first HARQ-ACK and the second HARQ-ACK overlap in the time domain with the same time resource, such as a slot or symbol.

[0071] Terminal 20 may assume that the first PDSCH and the second PDSCH do not overlap in the time domain with the same time resources such as slots or symbols.

[0072] <Option 9> Figure 14 is a diagram illustrating Option 9 of Embodiment 2 of the present invention. Terminal 20 may assume that the first PDCCH and the second PDCCH are scheduled to different actual CC time resources, which is a condition for applying out-of-order scheduling.

[0073] <Option 10> Figure 15 is a diagram illustrating Option 10 of Embodiment 2 of the present invention. Terminal 20 may assume that the first HARQ-ACK and the second HARQ-ACK are scheduled to different actual CC time resources, which is a condition for applying out-of-order scheduling.

[0074] <Option 11> Terminal 20 may assume that the SCS of the actual CCs are the same or different as a condition for applying out-of-order scheduling. The actual CC may mean only the actual CCs on which PDCCH / PDSCH / PUSCH / HARQ-ACK is scheduled, or it may mean all actual CCs that constitute the virtual CC.

[0075] <Option 12> Terminal 20 may assume that the ability information supporting any of the following is defined and reported by Terminal 20 as a condition for applying out-of-order scheduling. • Out-of-order scheduling (including all cases described below, standardized capability information) • Out-of-order scheduling from PDCCH to PDSCH • Out-of-order scheduling from PDCCH to PUSCH • Out-of-order scheduling from PDSCH to HARQ-ACK

[0076] <Option 13> Terminal 20 may assume that one of the following is enabled or disabled in the upper layer parameters. That is, terminal 20 may assume that one of the following is enabled as a condition for applying out-of-order scheduling. • Out-of-order scheduling (including all cases described below, standardized capability information) • Out-of-order scheduling from PDCCH to PDSCH • Out-of-order scheduling from PDCCH to PUSCH • Out-of-order scheduling from PDSCH to HARQ-ACK

[0077] <Option 14> Terminal 20 may assume that the terminal processing capacity of PDSCH / PUSCH is a condition for applying out-of-order scheduling.

[0078] <Option 15> Terminal 20 may assume that the amount of frequency resources for PDCCH / PDSCH / PUSCH / HARQ-ACK (e.g., the number of PRBs) is a condition for applying out-of-order scheduling.

[0079] <Option 16> Terminal 20 may assume that the amount of time resources (e.g., number of symbols) for PDCCH / PDSCH / PUSCH / HARQ-ACK is a condition for applying out-of-order scheduling.

[0080] The following terms may each mean the meanings listed to the right. First PDCCH: A PDCCH scheduled earlier than the second PDCCH. Second PDCCH: A PDCCH scheduled at a later time than the first PDCCH. First PDSCH / PUSCH: In the case of scheduling from PDCCH to PDSCH / PUSCH, this is the PDSCH / PUSCH scheduled by the first PDCCH; in the case of scheduling from PDSCH to HARQ-ACK, this is the PDSCH scheduled earlier than the second PDSCH. Second PDSCH / PUSCH: In the case of scheduling from PDCCH to PDSCH / PUSCH, this is the PDSCH / PUSCH scheduled by the second PDCCH; in the case of scheduling from PDSCH to HARQ-ACK, this is the PDSCH scheduled at a later time than the first PDSCH. First HARQ-ACK: HARQ-ACK corresponding to the first PDSCH Second HARQ-ACK: HARQ-ACK corresponding to the second PDSCH

[0081] (Device configuration) Next, we will describe an example of the functional configuration of the base station 10 and terminal 20 that perform the processes and operations described above.

[0082] <Base station 10> Figure 16 shows an example of the functional configuration of a base station 10. As shown in Figure 16, the base station 10 has a transmitting unit 110, a receiving unit 120, a setting unit 130, and a control unit 140. The functional configuration shown in Figure 16 is merely an example. The names of the functional categories and functional units can be anything as long as they can perform the operations according to the embodiment of the present invention. Also, the transmitting unit 110 and the receiving unit 120 may be collectively referred to as the communication unit.

[0083] The transmitting unit 110 includes the function of generating a signal to be transmitted to the terminal 20 and transmitting the signal wirelessly. The receiving unit 120 includes the function of receiving various signals transmitted from the terminal 20 and obtaining information from the received signals, for example, information from a higher layer. The transmitting unit 110 also has the function of transmitting NR-PSS, NR-SSS, NR-PBCH, DL / UL control signals, DCI via PDCCH, data via PDSCH, etc. to the terminal 20.

[0084] The setting unit 130 stores pre-configured setting information and various setting information to be transmitted to the terminal 20 in a storage device provided by the setting unit 130, and reads it from the storage device as needed.

[0085] The control unit 140 schedules DL reception or UL transmission of terminal 20 via the transmission unit 110. The control unit 140 also includes a function for LBT (Low-Block Transmission). The functions related to signal transmission in the control unit 140 may be included in the transmission unit 110, and the functions related to signal reception in the control unit 140 may be included in the reception unit 120. The transmission unit 110 may also be called a transmitter, and the reception unit 120 may be called a receiver.

[0086] <Terminal 20> Figure 17 shows an example of the functional configuration of terminal 20. As shown in Figure 17, terminal 20 has a transmitting unit 210, a receiving unit 220, a setting unit 230, and a control unit 240. The functional configuration shown in Figure 17 is merely an example. Any functional classification and name of functional unit is acceptable as long as it can perform the operations according to the embodiment of the present invention. The transmitting unit 210 and the receiving unit 220 may be collectively referred to as the communication unit.

[0087] The transmitting unit 210 creates a transmission signal from the transmission data and transmits the transmission signal wirelessly. The receiving unit 220 wirelessly receives various signals and acquires signals from higher layers from the received physical layer signals. The receiving unit 220 also has the function of receiving NR-PSS, NR-SSS, NR-PBCH, DL / UL / SL control signals, DCI via PDCCH, data via PDSCH, etc. transmitted from the base station 10. Alternatively, for example, the transmitting unit 210 may transmit PSCCH (Physical Sidelink Control Channel), PSSCH (Physical Sidelink Shared Channel), PSDCH (Physical Sidelink Discovery Channel), PSBCH (Physical Sidelink Broadcast Channel), etc. to another terminal 20 as D2D communication, and the receiving unit 120 may receive PSCCH, PSSCH, PSDCH or PSBCH, etc. from the other terminal 20.

[0088] The setting unit 230 stores various setting information received from the base station 10 or other terminals by the receiving unit 220 in a storage device provided in the setting unit 230, and reads it from the storage device as needed. The setting unit 230 also stores pre-configured setting information. The control unit 240 controls the terminal 20. The control unit 240 also includes a function to perform LBT (Loop Beta Testing).

[0089] The terminal of this embodiment may be configured as one of the terminals described in the following sections. Furthermore, the following communication methods may be implemented.

[0090] <Configuration of this embodiment> (Section 1) A communication unit that performs uplink or downlink communication in the frequency band aggregated by carrier aggregation, The system includes a control unit that assumes scheduling defined as unsequential scheduling when scheduling is performed in units including multiple component carriers within the aggregated frequency band, Terminal. (Section 2) The control unit assumes the scheduling defined as the non-sequential scheduling when the specified or set conditions are met. The terminal described in paragraph 1. (Section 3) The control unit assumes that when multiple resources related to scheduling have different component carriers in a time resource or frequency resource, the conditions for scheduling defined as unordered scheduling are met. The terminal described in paragraph 2. (Section 4) A communication unit that communicates with the terminal using a frequency band aggregated by carrier aggregation, The system includes a control unit that assumes the terminal will allow scheduling defined as non-sequential scheduling when scheduling is performed in units including multiple component carriers within the aggregated frequency band, Base station. (Section 5) The steps include performing uplink or downlink communication in the frequency band aggregated by carrier aggregation, The method includes the step of assuming a scheduling defined as a non-sequential scheduling when scheduling is performed in a unit that includes multiple component carriers within the aggregated frequency band, The communication method used by the terminal.

[0091] Any of the above configurations provides a technology that enables a reduction in resource allocation overhead. According to paragraph 1, when scheduling is performed in a unit containing multiple component carriers in an aggregated frequency band, scheduling can be assumed to be defined as unsequential scheduling. According to paragraph 2, scheduling can be assumed to be defined as unsequential scheduling when the specified or set conditions are met. According to paragraph 3, when multiple resources related to scheduling are time resources or frequency resources, and the component carriers included in the multiple component carriers are different from each other, the conditions for assuming scheduling as defined as unsequential scheduling can be assumed.

[0092] (Hardware configuration) The block diagrams (Figures 16 and 17) used in the description of the above embodiments show functional units. These functional blocks (components) are realized by any combination of at least one of hardware and software. Furthermore, the method of realizing each functional block is not particularly limited. That is, each functional block may be realized using one device that is physically or logically coupled, or it may be realized using two or more physically or logically separated devices that are directly or indirectly connected (for example, using wired or wireless connections). A functional block may be realized by combining the above one device or the above multiple devices with software.

[0093] Functions include, but are not limited to, judgment, decision, judgment, calculation, calculation, processing, derivation, investigation, exploration, confirmation, reception, transmission, output, access, resolution, selection, selection, establishment, comparison, assumption, expectation, assumption, broadcasting, notifying, communicating, forwarding, configuring, reconfiguring, allocating (mapping), and assigning. For example, a functional block (configuration part) that enables transmission is called a transmitting unit or transmitter. As mentioned above, the method of implementation is not particularly limited.

[0094] For example, the base station 10, terminal 20, etc. in one embodiment of the present disclosure may function as a computer that processes the wireless communication method of the present disclosure. Figure 18 is a diagram showing an example of the hardware configuration of the base station 10 and terminal 20 according to one embodiment of the present disclosure. The above-mentioned base station 10 and terminal 20 may be physically configured as a computer device including a processor 1001, a storage device 1002, an auxiliary storage device 1003, a communication device 1004, an input device 1005, an output device 1006, a bus 1007, etc.

[0095] In the following explanation, the term "device" can be replaced with "circuit," "device," "unit," etc. The hardware configuration of the base station 10 and terminal 20 may include one or more of the devices shown in the figure, or it may be configured without some of the devices.

[0096] Each function in the base station 10 and terminal 20 is realized by loading predetermined software (programs) onto hardware such as the processor 1001 and storage device 1002, which allows the processor 1001 to perform calculations, control communication by the communication device 1004, and control at least one of the reading and writing of data in the storage device 1002 and auxiliary storage device 1003.

[0097] The processor 1001 controls the entire computer, for example, by running an operating system. The processor 1001 may consist of a central processing unit (CPU) that includes interfaces with peripheral devices, control devices, arithmetic units, registers, etc. For example, the control unit 140, control unit 240, etc., described above may be implemented by the processor 1001.

[0098] Furthermore, the processor 1001 reads programs (program code), software modules, or data from at least one of the auxiliary storage device 1003 and the communication device 1004 into the storage device 1002, and executes various processes accordingly. The program used is one that causes a computer to execute at least a part of the operations described in the above embodiment. For example, the control unit 140 of the base station 10 shown in Figure 16 may be implemented by a control program stored in the storage device 1002 and operated by the processor 1001. Also, for example, the control unit 240 of the terminal 20 shown in Figure 17 may be implemented by a control program stored in the storage device 1002 and operated by the processor 1001. Although the above processes have been described as being executed by one processor 1001, they may be executed simultaneously or sequentially by two or more processors 1001. The processor 1001 may be implemented by one or more chips. The program may be transmitted from the network via a telecommunications line.

[0099] The storage device 1002 is a computer-readable recording medium and may consist of at least one of the following: ROM (Read Only Memory), EPROM (Erasable Programmable ROM), EEPROM (Electrically Erasable Programmable ROM), RAM (Random Access Memory), etc. The storage device 1002 may also be called a register, cache, main memory, etc. The storage device 1002 can store executable programs (program code), software modules, etc., for implementing a communication method according to one embodiment of this disclosure.

[0100] The auxiliary storage device 1003 is a computer-readable recording medium and may consist of at least one of the following: an optical disc such as a CD-ROM (Compact Disc ROM), a hard disk drive, a flexible disk, a magneto-optical disk (e.g., a compact disc, a digital multipurpose disc, a Blu-ray® disc), a smart card, flash memory (e.g., a card, a stick, a key drive), a floppy® disk, a magnetic strip, etc. The above-mentioned storage medium may also be a database, server, or other suitable medium that includes at least one of the storage device 1002 and the auxiliary storage device 1003.

[0101] The communication device 1004 is hardware (transceiver / receiver device) for communicating between computers via at least one of a wired network and a wireless network, and is also referred to as a network device, network controller, network card, communication module, etc. The communication device 1004 may include high-frequency switches, duplexers, filters, frequency synthesizers, etc., to implement at least one of frequency division duplex (FDD) and time division duplex (TDD). For example, the transmit / receive antenna, amplifier section, transmit / receive section, transmission path interface, etc., may be implemented by the communication device 1004. The transmit / receive section may be implemented with physically or logically separated transmitting and receiving sections.

[0102] The input device 1005 is an input device that accepts input from an external source (e.g., a keyboard, mouse, microphone, switch, button, sensor, etc.). The output device 1006 is an output device that outputs to an external source (e.g., a display, speaker, LED lamp, etc.). The input device 1005 and the output device 1006 may be configured as an integrated unit (e.g., a touch panel).

[0103] Furthermore, each device, such as the processor 1001 and the storage device 1002, is connected by a bus 1007 for communicating information. The bus 1007 may be configured using a single bus, or different buses may be configured for each device.

[0104] Furthermore, the base station 10 and terminal 20 may be configured to include hardware such as a microprocessor, a digital signal processor (DSP), an ASIC (Application Specific Integrated Circuit), a PLD (Programmable Logic Device), and an FPGA (Field Programmable Gate Array), and some or all of each functional block may be realized by such hardware. For example, the processor 1001 may be implemented using at least one of these hardware components.

[0105] Figure 19 shows an example of the configuration of vehicle 2001. As shown in Figure 19, vehicle 2001 comprises a drive unit 2002, a steering unit 2003, an accelerator pedal 2004, a brake pedal 2005, a shift lever 2006, front wheels 2007, rear wheels 2008, an axle 2009, an electronic control unit 2010, various sensors 2021-2029, an information service unit 2012, and a communication module 2013. Each aspect / embodiment described in this disclosure may be applied to a communication device mounted on vehicle 2001, for example, to the communication module 2013.

[0106] The drive unit 2002 consists of, for example, an engine, a motor, or a hybrid of an engine and a motor. The steering unit 2003 includes at least a steering wheel (also called a handle) and is configured to steer at least one of the front wheels and the rear wheels based on the operation of the steering wheel, which is operated by the user.

[0107] The electronic control unit 2010 consists of a microprocessor 2031, memory (ROM, RAM) 2032, and communication ports (IO ports) 2033. Signals from various sensors 2021 to 2029 installed in the vehicle 2001 are input to the electronic control unit 2010. The electronic control unit 2010 may also be called an ECU (Electronic Control Unit).

[0108] Signals from various sensors 2021-2029 include current signals from current sensor 2021 which senses motor current, front and rear wheel rotation speed signals obtained by rotation speed sensor 2022, front and rear wheel air pressure signals obtained by air pressure sensor 2023, vehicle speed signals obtained by vehicle speed sensor 2024, acceleration signals obtained by acceleration sensor 2025, accelerator pedal depression signals obtained by accelerator pedal sensor 2029, brake pedal depression signals obtained by brake pedal sensor 2026, shift lever operation signals obtained by shift lever sensor 2027, and detection signals obtained by object detection sensor 2028 for detecting obstacles, vehicles, pedestrians, etc.

[0109] The Information Services Unit 2012 consists of various devices for providing (outputting) various types of information such as driving information, traffic information, and entertainment information, including a car navigation system, audio system, speakers, television, and radio, and one or more ECUs that control these devices. The Information Services Unit 2012 uses information acquired from external devices via a communication module 2013, etc., to provide various multimedia information and multimedia services to the occupants of the vehicle 2001.

[0110] Information Services Section 2012 may include input devices that accept input from external sources (e.g., keyboards, mice, microphones, switches, buttons, sensors, touch panels, etc.) and output devices that perform output to external sources (e.g., displays, speakers, LED lamps, touch panels, etc.).

[0111] The driver assistance system unit 2030 consists of various devices that provide functions to prevent accidents or reduce the driver's workload, such as millimeter-wave radar, LiDAR (Light Detection and Ranging), cameras, positioning locators (e.g., GNSS), map information (e.g., high-definition (HD) maps, autonomous vehicle (AV) maps, etc.), gyro systems (e.g., IMU (Inertial Measurement Unit), INS (Inertial Navigation System), etc.), AI (Artificial Intelligence) chips, and AI processors, as well as one or more ECUs that control these devices. The driver assistance system unit 2030 also sends and receives various information via the communication module 2013 to realize driver assistance functions or autonomous driving functions.

[0112] The communication module 2013 can communicate with the microprocessor 2031 and components of the vehicle 2001 via its communication port. For example, the communication module 2013 sends and receives data via its communication port 2033 to the drive unit 2002, steering unit 2003, accelerator pedal 2004, brake pedal 2005, shift lever 2006, front wheels 2007, rear wheels 2008, axle 2009, the microprocessor 2031 and memory (ROM, RAM) 2032 in the electronic control unit 2010, and sensors 2021-29 provided in the vehicle 2001.

[0113] The communication module 2013 is a communication device that can be controlled by the microprocessor 2031 of the electronic control unit 2010 and can communicate with external devices. For example, it can send and receive various types of information to and from external devices via wireless communication. The communication module 2013 may be located either inside or outside the electronic control unit 2010. The external device may be, for example, a base station or a mobile station.

[0114] The communication module 2013 may transmit at least one of the following to an external device via wireless communication: signals from the various sensors 2021-2029 input to the electronic control unit 2010, information obtained based on said signals, and information based on input from an external source (user) obtained via the information service unit 2012. The electronic control unit 2010, the various sensors 2021-2029, the information service unit 2012, etc., may also be called input units that accept input. For example, the PUSCH transmitted by the communication module 2013 may include information based on the above input.

[0115] The communication module 2013 receives various information (traffic information, signal information, vehicle-to-vehicle information, etc.) transmitted from an external device and displays it on the information service unit 2012 installed in the vehicle 2001. The information service unit 2012 may also be called an output unit, which outputs information (for example, it outputs information to devices such as displays and speakers based on the PDSCH (or data / information decoded from the PDSCH) received by the communication module 2013).

[0116] Furthermore, the communication module 2013 stores various information received from external devices in memory 2032, which is available to the microprocessor 2031. Based on the information stored in memory 2032, the microprocessor 2031 may control the drive unit 2002, steering unit 2003, accelerator pedal 2004, brake pedal 2005, shift lever 2006, front wheels 2007, rear wheels 2008, axles 2009, sensors 2021-2029, etc., which are provided in the vehicle 2001.

[0117] (Supplement to the embodiment) While embodiments of the present invention have been described above, the disclosed invention is not limited to such embodiments, and those skilled in the art will understand various modifications, alterations, alternatives, substitutions, etc. Specific numerical examples have been used to facilitate understanding of the invention, but unless otherwise specified, these numerical values ​​are merely examples, and any appropriate values ​​may be used. The division of items in the above description is not essential to the present invention, and matters described in two or more items may be combined as needed, and matters described in one item may be applied to matters described in another item (as long as they do not contradict each other). The boundaries of functional units or processing units in the functional block diagram do not necessarily correspond to the boundaries of physical parts. The operation of multiple functional units may be physically performed by one part, or the operation of one functional unit may be physically performed by multiple parts. Regarding the processing procedures described in the embodiments, the order of processing may be changed as long as it does not contradict each other. For the convenience of explaining the processing, the base station 10 and terminal 20 have been described using functional block diagrams, but such devices may be implemented in hardware, software, or a combination thereof. The software operated by the processor of the base station 10 according to an embodiment of the present invention and the software operated by the processor of the terminal 20 according to an embodiment of the present invention may be stored in random access memory (RAM), flash memory, read-only memory (ROM), EPROM, EEPROM, registers, hard disk (HDD), removable disk, CD-ROM, database, server, or any other suitable storage medium.

[0118] Furthermore, the notification of information is not limited to the embodiments / models described herein and may be carried out by other methods. For example, the notification of information may be carried out by physical layer signaling (e.g., DCI (Downlink Control Information), UCI (Uplink Control Information)), upper layer signaling (e.g., RRC (Radio Resource Control) signaling, MAC (Medium Access Control) signaling), broadcast information (MIB (Master Information Block), SIB (System Information Block)), other signals, or combinations thereof. Also, RRC signaling may be called RRC messages, and may be, for example, RRC Connection Setup messages, RRC Connection Reconfiguration messages, etc.

[0119] Each aspect / embodiment described in this disclosure includes LTE (Long Term Evolution), LTE-A (LTE-Advanced), SUPER 3G, IMT-Advanced, 4G (4th generation mobile communication system), 5G (5th generation mobile communication system), 6th generation mobile communication system (6G), xth generation mobile communication system (xG) (xG (where x is, for example, an integer or decimal)), FRA (Future Radio Access), NR (new Radio), New radio access (NX), Future generation radio access (FX), W-CDMA (registered trademark), GSM (registered trademark), CDMA2000, UMB (Ultra Mobile Broadband), IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)), and IEEE This may apply to at least one system utilizing 802.20, UWB (Ultra-WideBand), Bluetooth®, or other appropriate systems, and to next-generation systems extended, modified, created, or defined based thereon. It may also apply to a combination of multiple systems (for example, a combination of at least one of LTE and LTE-A with 5G).

[0120] The processing procedures, sequences, flowcharts, etc., of each aspect / embodiment described herein may be reordered, provided they are consistent with each other. For example, the methods described herein present various step elements in an exemplary order and are not limited to that specific order.

[0121] In this specification, specific operations performed by the base station 10 may, in some cases, be performed by its upper node. In a network consisting of one or more network nodes having a base station 10, it is clear that various operations performed for communication with the terminal 20 can be performed by the base station 10 and at least one of the other network nodes (for example, an MME or S-GW, but not limited to these). Although the above example illustrates the case where there is one other network node besides the base station 10, the other network node may be a combination of multiple other network nodes (for example, an MME and an S-GW).

[0122] The information or signals described in this disclosure may be output from a higher layer (or lower layer) to a lower layer (or higher layer). They may also be input and output via multiple network nodes.

[0123] Input and output information may be stored in a specific location (e.g., memory) or managed using a management table. Input and output information may be overwritten, updated, or appended to. Output information may be deleted. Input information may be transmitted to other devices.

[0124] The determination in this disclosure may be made by a value represented by one bit (0 or 1), by a boolean value (true or false), or by a numerical comparison (for example, a comparison with a predetermined value).

[0125] Software should be broadly interpreted to mean instructions, instruction sets, code, code segments, program code, programs, subprograms, software modules, applications, software applications, software packages, routines, subroutines, objects, executable files, execution threads, procedures, functions, and so on, whether they are called software, firmware, middleware, microcode, hardware description languages, or by any other name.

[0126] Furthermore, software, instructions, information, etc., may be transmitted and received via a transmission medium. For example, if software is transmitted from a website, server, or other remote source using at least one of wired technology (such as coaxial cable, fiber optic cable, twisted pair, or digital subscriber line (DSL)) and wireless technology (such as infrared or microwave), then at least one of these wired and wireless technologies is included in the definition of a transmission medium.

[0127] The information, signals, etc. described in this disclosure may be represented using any of the various different techniques. For example, the data, instructions, commands, information, signals, bits, symbols, chips, etc. that may be referred to throughout the above description may be represented by voltage, current, electromagnetic waves, magnetic fields or magnetic particles, optical fields or photons, or any combination thereof.

[0128] In addition, terms used in this disclosure and terms necessary for understanding this disclosure may be replaced with terms having the same or similar meanings. For example, at least one of the channel and symbol may be a signal (signaling). Also, a signal may be a message. Furthermore, a component carrier (CC) may be called a carrier frequency, cell, frequency carrier, etc.

[0129] The terms “system” and “network” as used in this disclosure are interchangeable.

[0130] Furthermore, the information, parameters, etc., described in this disclosure may be expressed using absolute values, relative values ​​from a given value, or other corresponding information. For example, wireless resources may be indicated by an index.

[0131] The names used for the parameters described above are not restrictive in any way. Furthermore, the formulas and other expressions using these parameters may differ from those expressly disclosed in this disclosure. Various channels (e.g., PUCCH, PDCCH, etc.) and information elements can be identified by any suitable name, and therefore, the various names assigned to these various channels and information elements are not restrictive in any way.

[0132] In this disclosure, terms such as "Base Station (BS)", "wireless base station", "base station", "fixed station", "NodeB", "eNodeB (eNB)", "gNodeB (gNB)", "access point", "transmission point", "reception point", "transmission / reception point", "cell", "sector", "cell group", "carrier", and "component carrier" may be used interchangeably. Base stations may also be referred to by terms such as macrocell, small cell, femtocell, and picocell.

[0133] A base station can house one or more (e.g., three) cells. If a base station houses multiple cells, the entire coverage area of ​​the base station can be divided into several smaller areas, each of which may also be provided with communication services by a base station subsystem (e.g., a Remote Radio Head (RRH)). The terms “cell” or “sector” refer to part or all of the coverage area of ​​at least one of the base station and / or base station subsystems that provide communication services in that coverage.

[0134] In this disclosure, the transmission of information by a base station to a terminal may be interpreted as the base station instructing the terminal to perform information-based control or operation.

[0135] In this disclosure, terms such as "Mobile Station (MS)," "user terminal," "User Equipment (UE)," and "terminal" may be used interchangeably.

[0136] A mobile station may also be referred to by those skilled in the art as a subscriber station, mobile unit, subscriber unit, wireless unit, remote unit, mobile device, wireless device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, wireless terminal, remote terminal, handset, user agent, mobile client, client, or several other appropriate terms.

[0137] At least one of the base station and the mobile station may be called a transmitting device, a receiving device, a communication device, etc. At least one of the base station and the mobile station may also be a device mounted on a mobile body, the mobile body itself, etc. The mobile body refers to a movable object, and its speed of movement is arbitrary. This also includes the case when the mobile body is stationary. The mobile body includes, but is not limited to, vehicles, transport vehicles, automobiles, motorcycles, bicycles, connected cars, excavators, bulldozers, wheel loaders, dump trucks, forklifts, trains, buses, handcarts, rickshaws, ships and other watercraft, airplanes, rockets, satellites, drones (registered trademark), multicopters, quadcopters, balloons, and items mounted on them. The mobile body may also be a mobile body that moves autonomously based on operation commands. It may be a vehicle (e.g., a car, an airplane, etc.), an unmanned mobile body (e.g., a drone, an autonomous vehicle, etc.), or a robot (manned or unmanned). Furthermore, at least one of the base station and the mobile station may include devices that do not necessarily move during communication operations. For example, at least one of the base station and the mobile station may be an IoT (Internet of Things) device such as a sensor.

[0138] Furthermore, the term "base station" in this disclosure may be interpreted as "user terminal." For example, the various aspects / embodiments of this disclosure may be applied to a configuration in which communication between a base station and a user terminal is replaced with communication between multiple terminals 20 (which may be called, for example, D2D (Device-to-Device), V2X (Vehicle-to-Everything), etc.). In this case, the terminals 20 may have the functions that the base station 10 has. Also, terms such as "uplink" and "downlink" may be interpreted as terms corresponding to terminal-to-terminal communication (for example, "side"). For example, uplink channel, downlink channel, etc., may be interpreted as side channel.

[0139] Similarly, the term "user terminal" in this disclosure may be replaced with "base station." In this case, the base station may be configured to have the same functions as the user terminal described above.

[0140] As used in this disclosure, the terms “determining” and “determining” may encompass a wide variety of actions. “Determining” may include, for example, judging, calculating, computing, processing, deriving, investigating, looking up, searching, inquiry (e.g., searching in a table, database, or other data structure), and ascertaining. “Determining” may also include, for example, receiving (e.g., receiving information), transmitting (e.g., sending information), input, output, and accessing (e.g., accessing data in memory). Furthermore, "judgment" and "decision" can include considering something as having been "judged" or "decided" after resolving, selecting, choosing, establishing, comparing, etc. In other words, "judgment" and "decision" can include considering something as having been "judged" or "decided" after some action. Also, "judgment (decision)" can be reinterpreted as "assuming," "expecting," or "considering."

[0141] The terms “connected,” “coupled,” or any variation thereof, mean any direct or indirect connection or coupling between two or more elements, and may include the presence of one or more intermediate elements between two elements that are “connected” or “coupled” with each other. The coupling or connection between elements may be physical, logical, or a combination thereof. For example, “connection” may be reinterpreted as “access.” As used in this disclosure, two elements may be considered to be “connected” or “coupled” with each other using at least one of one or more wires, cables, and printed electrical connections, and, in some non-limiting and non-exclusive examples, electromagnetic energy having wavelengths in the radio frequency domain, microwave domain, and optical (both visible and invisible) domain.

[0142] The reference signal can also be abbreviated as RS (Reference Signal), and may be called a pilot depending on the applicable standard.

[0143] In this disclosure, the phrase "based on" does not mean "based solely on" unless otherwise specified. In other words, the phrase "based on" means both "based solely on" and "based at least on."

[0144] Any reference to elements using the designations “first,” “second,” etc., as used in this disclosure does not generally limit the quantity or order of those elements. These designations may be used in this disclosure as a convenient way to distinguish between two or more elements. Accordingly, references to the first and second elements do not imply that only two elements may be employed, or that the first element must precede the second element in any way.

[0145] In the configuration of each of the above devices, "means" may be replaced with "part," "circuit," "device," etc.

[0146] Where the terms “include,” “including,” and variations thereof are used in this disclosure, these terms are intended to be inclusive, as is the term “comprising.” Furthermore, the term “or” as used in this disclosure is not intended to mean exclusive OR.

[0147] A wireless frame may consist of one or more frames in the time domain. Each of these frames in the time domain may be called a subframe. A subframe may further consist of one or more slots in the time domain. A subframe may have a fixed time length (e.g., 1 ms) that is independent of numerology.

[0148] Numerical logic may be communication parameters applied to at least one of the transmission and reception of a signal or channel. Numerical logic may include, for example, at least one of the following: subcarrier spacing (SCS), bandwidth, symbol length, cyclic prefix length, transmission time interval (TTI), number of symbols per TTI, radio frame configuration, specific filtering processes performed by the transceiver in the frequency domain, and specific windowing processes performed by the transceiver in the time domain.

[0149] A slot may consist of one or more symbols in the time domain (such as OFDM (Orthogonal Frequency Division Multiplexing) symbols, SC-FDMA (Single Carrier Frequency Division Multiple Access) symbols, etc.). A slot may also be a time unit based on neurology.

[0150] A slot may include multiple minislots. Each minislot may consist of one or more symbols in the time domain. Minislots may also be called subslots. Minislots may consist of fewer symbols than a slot. A PDSCH (or PUSCH) transmitted in a time unit larger than a minislot may be called PDSCH (or PUSCH) mapping type A. A PDSCH (or PUSCH) transmitted using a minislot may be called PDSCH (or PUSCH) mapping type B.

[0151] Wireless frames, subframes, slots, minislots, and symbols all represent units of time when transmitting a signal. Different names may be used for each of these terms.

[0152] For example, one subframe may be called a Transmission Time Interval (TTI), multiple consecutive subframes may be called a TTI, or one slot or one mini-slot may be called a TTI. In other words, at least one of a subframe and a TTI may be a subframe (1 ms) in existing LTE, a period shorter than 1 ms (e.g., 1-13 symbols), or a period longer than 1 ms. Note that the unit representing the TTI may be called a slot, mini-slot, etc., instead of a subframe.

[0153] Here, TTI refers to, for example, the smallest unit of time for scheduling in wireless communication. For example, in an LTE system, the base station schedules each terminal 20 to allocate wireless resources (such as the frequency bandwidth and transmission power available to each terminal 20) in TTI units. However, the definition of TTI is not limited to this.

[0154] TTI may be a transmission time unit for channel-encoded data packets (transport blocks), code blocks, code words, etc., or it may be a processing unit for scheduling, link adaptation, etc. Given a TTI, the actual time interval (e.g., number of symbols) to which the transport block, code block, code word, etc. are mapped may be shorter than the given TTI.

[0155] Furthermore, if one slot or one mini-slot is referred to as TTI, then one or more TTIs (i.e., one or more slots or one or more mini-slots) may constitute the minimum time unit of scheduling. In addition, the number of slots (number of mini-slots) that constitute the minimum time unit of scheduling may be controlled.

[0156] A TTI with a time length of 1ms may also be called a normal TTI, long TTI, normal subframe, long subframe, slot, etc. A TTI shorter than a normal TTI may also be called a shortened TTI, short TTI, partial or fractional TTI, shortened subframe, short subframe, mini slot, sub slot, slot, etc.

[0157] Furthermore, long TTIs (e.g., normal TTIs, subframes, etc.) may be interpreted as TTIs with a time length exceeding 1 ms, and short TTIs (e.g., shortened TTIs, etc.) may be interpreted as TTIs with a TTI length less than that of a long TTI but 1 ms or more.

[0158] A resource block (RB) is a resource allocation unit in the time domain and frequency domain, and in the frequency domain, it may contain one or more consecutive subcarriers. The number of subcarriers in an RB may be the same regardless of the neurology, for example, 12. The number of subcarriers in an RB may be determined based on the neurology.

[0159] Furthermore, the time domain of the RB may contain one or more symbols and may be the length of one slot, one minislot, one subframe, or one TTI. Each TTI, subframe, etc., may consist of one or more resource blocks.

[0160] One or more RBs may also be called a Physical RB (PRB), Sub-Carrier Group (SCG), Resource Element Group (REG), PRB pair, RB pair, etc.

[0161] Furthermore, a resource block may consist of one or more resource elements (REs). For example, one RE may be a radio resource area comprising one subcarrier and one symbol.

[0162] A Bandwidth Part (BWP), also known as a partial bandwidth, may represent a subset of consecutive common resource blocks (RBs) for a particular neurology system in a given carrier. These common RBs may be identified by an index of the RBs relative to a common reference point of the carrier. A Bandwidth Part (PRB) may be defined and numbered within a given BWP.

[0163] A BWP may include a BWP for UL (Ultraviolet Link) and a BWP for DL ​​(Download Link). One or more BWPs may be set for a terminal 20 within a single carrier.

[0164] At least one of the configured BWPs may be active, and terminal 20 does not need to be expected to send or receive a predetermined signal / channel outside of the active BWP. In this disclosure, terms such as "cell" and "carrier" may be read as "BWP".

[0165] The structures described above, such as wireless frames, subframes, slots, minislots, and symbols, are merely illustrative. For example, the number of subframes included in a wireless frame, the number of slots per subframe or wireless frame, the number of minislots included in a slot, the number of symbols and RBs included in a slot or minislot, the number of subcarriers included in an RB, and the number of symbols, symbol length, and cyclic prefix (CP) length within a TTI can be varied in various ways.

[0166] In this disclosure, if articles are added through translation, such as a, an, and the in English, this disclosure may include the fact that the noun following these articles is plural.

[0167] In this disclosure, the term "A and B are different" may mean "A and B are different from each other." The term may also mean "A and B are each different from C." Terms such as "separate" and "combine" may be interpreted similarly to "different."

[0168] Each aspect / embodiment described herein may be used individually, in combination, or switched between as needed during implementation. Furthermore, notification of specific information (e.g., notification that "X is") is not limited to explicit notification, but may also be implicit (e.g., by not providing such notification).

[0169] Although the present disclosure has been described in detail above, it will be clear to those skilled in the art that the present disclosure is not limited to the embodiments described herein. The present disclosure can be implemented in modified and altered forms without departing from the intent and scope of the present disclosure as defined by the claims. Therefore, the descriptions in the present disclosure are illustrative and not intended to be restrictive in any way. [Explanation of symbols]

[0170] 10 base station 110 Transmitter 120 Receiver 130 Setting section 140 Control Unit 20 devices 210 Transmitter 220 Receiver 230 Setting section 240 Control Unit 1001 Processor 1002 Storage device 1003 Auxiliary storage device 1004 Communication device 1005 Input device 1006 Output device 2001 Vehicle 2002 Drive Unit 2003 Steering Department 2004 Accelerator pedal 2005 Brake pedal 2006 Shift Lever 2007 Front Wheel 2008 Rear wheel 2009 Axle 2010 Electronic Control Unit 2012 Information Services Department 2013 Communication Module 2021 Current Sensor 2022 Rotation speed sensor 2023 Pneumatic Sensor 2024 Vehicle Speed ​​Sensor 2025 Accelerometer 2026 Brake Pedal Sensor 2027 Shift lever sensor 2028 Object Detection Sensor 2029 Accelerator pedal sensor 2030 Driver Support Systems Department 2031 Microprocessor 2032 memory (ROM, RAM) 2033 Communication port (I / O port)

Claims

1. A communication unit that performs uplink or downlink communication in the frequency band aggregated by carrier aggregation, The system includes a control unit that assumes scheduling defined as non-sequential scheduling when scheduling is performed in a unit containing multiple frequency resources within the aggregated frequency band, Terminal.

2. The control unit assumes the scheduling defined as the non-sequential scheduling when the specified or set conditions are met. The terminal according to claim 1.

3. The control unit assumes that when multiple resources related to scheduling have different frequency resources included in each other in terms of time resources or frequency resources, the conditions for scheduling defined as unordered scheduling are met. The terminal according to claim 2.

4. A communication unit that communicates with the terminal using a frequency band aggregated by carrier aggregation, The system includes a control unit that assumes the terminal will allow scheduling defined as non-sequential scheduling when scheduling is performed in units including multiple frequency resources within the aggregated frequency band, Base station.

5. The steps include performing uplink or downlink communication in the frequency band aggregated by carrier aggregation, The method includes the step of assuming a scheduling defined as a non-sequential scheduling when scheduling is performed in a unit that includes multiple frequency resources within the aggregated frequency band, The communication method used by the terminal.