Information processing device, information processing method, and program
The information processing device addresses the burden of verifying construction management plan consistency by visually distinguishing and allowing comment exchange on contractor and client specifications, improving efficiency and reducing verification workload.
JP2026105691APending Publication Date: 2026-06-26CONSTR SYST CO LTD
Patent Information
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- CONSTR SYST CO LTD
- Filing Date
- 2024-12-16
- Publication Date
- 2026-06-26
AI Technical Summary
Technical Problem
The burden of visually checking consistency between contractor and client standard values in construction management plans is significant, necessitating a reduction in verification workload.
Method used
An information processing device that compares contractor and client standard values, creating work type list screens where differing values are visually distinguishable, allowing for comment exchange and adjustment, thereby reducing verification burden.
Benefits of technology
Efficiently identifies and adjusts discrepancies between contractor and client specifications, enhancing work efficiency by reducing verification workload and facilitating specification alignment.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure 2026105691000001_ABST
Abstract
To facilitate the confirmation of details regarding construction management plans in civil engineering works between the client and the contractor. [Solution] The information processing device for supporting construction management related to civil engineering works includes a control unit that acquires client standard values required by the client for civil engineering works to the contractor for civil engineering works as inspection standards for the object of civil engineering works, and contractor standard values shown by the contractor to the client as inspection standards for the object of civil engineering works, compares the acquired contractor standard values with the acquired client standard values, and creates work type list screen data which constitutes at least a part of the construction management plan created by the contractor and includes at least a list of work types related to the civil engineering works and items showing the contractor standard values for each work type, and visually distinguishes items showing contractor standard values different from the client standard values from other items.
Need to check novelty before this filing date? Find Prior Art