Network management device, method and program
The network management device automates the prioritization of communication restoration targets by calculating priority scores using weighted policies, addressing the challenge of manual skill requirements in existing systems.
Patent Information
- Application Number
- JP2023526770
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-10
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2041-06-10
AI Technical Summary
Existing technologies require significant time and advanced skills to manually review weights and flags for selecting relief buildings during communication failures, which are infrequent and urgent, making it difficult to quickly prioritize fuel delivery to restore communication services.
A network management device and method that calculates priority scores for building combinations based on weighted policies considering ongoing communication failures, using AI to identify optimal targets for restoration work, thereby automating the decision-making process.
Enables rapid and appropriate identification of recovery targets, minimizing communication outages by prioritizing restoration efforts based on the impact of ongoing failures, even without advanced skills.
Smart Images

Figure 0007568088000001 
Figure 0007568088000002 
Figure 0007568088000003
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a network management apparatus, a method, and a program. [Background technology]
[0002] In a building (hereinafter sometimes referred to as a communications building) that houses communications equipment and provides communications to the outside world, if communications in the building are cut off due to a power supply from a power plant being cut off following a disaster such as an earthquake or typhoon, the power can be restored by operating an emergency power generator that runs on fuel and is installed in the building, and the provision of communications can be resumed.
[0003] If the fuel stored in the building runs out due to the long operation of the emergency generator, the operation of the emergency generator will stop, and the power supply will be cut off again, cutting off communications. Therefore, the telecommunications carrier delivers and supplies fuel to the telecommunications building by vehicle or the like.
[0004] Telecommunications operators need to resume providing communications as soon as possible by delivering fuel to communication buildings before their fuel runs out, and by using fuel delivery vehicles to quickly deliver fuel to communication buildings that have run out of fuel.
[0005] In order to minimize the impact of a communications outage under conditions of limited fuel resources, the telecommunications operator needs to quickly select a relief building to which fuel will be delivered from among the many telecommunications buildings that have lost power and are running out of fuel.
[0006] The rescue building must be selected based on various factors, such as the damaged building, the impact on communication network services that may result from the damaged building, its location, fuel situation, traffic conditions, etc., and manual review of this selection requires a great deal of time and advanced skills (experience).
[0007] Responding to disasters is an emergency, they occur infrequently, and it is difficult to train skilled personnel, so there is a need for technology that can select a relief building based on the situation at the time a disaster occurs and automatically and quickly determine a fuel delivery plan to this building.
[0008] For example, Patent Document 1 discloses a technology for obtaining network configuration information and fault impact information, and based on this fault impact information, the buildings that should be given priority for rescue are evaluated using weights and flags, and the above-mentioned delivery plan can be determined. [Prior art documents] [Patent documents]
[0009] [Patent Document 1] Japanese Patent Publication No. 2020-65202 Summary of the Invention [Problem to be solved by the invention]
[0010] However, in the above-mentioned technology, in order to change the weights and flags depending on the type of disaster, such as heavy rain or earthquake, and the damage situation, manual review is required, which requires a lot of time and high level of skill.
[0011] The present invention has been made in light of the above-mentioned circumstances, and its object is to provide a network management device, method, and program that are capable of appropriately identifying the target for recovery from a communication failure when the failure occurs in a network configuration. [Means for solving the problem]
[0012] A network management device according to one embodiment of the present invention includes a priority calculation unit that, when a communication failure occurs in a plurality of buildings that house communication equipment, and when a condition is applied that assumes that the failure has been restored in a building by restoration work on communication equipment housed in each of a plurality of types of combinations of buildings among the buildings in which the failure occurred, applies a policy in which a weighting is defined according to the situation to the situation of the communication failure that continues to occur in a building among the plurality of buildings that houses communication equipment used to provide a specified type of communication service, and calculates a priority of a candidate combination of buildings that will actually restore the failure among the buildings in which the failure occurred, for each of a plurality of types of combinations.
[0013] A network management method according to one embodiment of the present invention includes, when a communication failure occurs in a plurality of buildings housing communication equipment, and when a condition is applied that assumes that the failure has been restored in a building by restoration work on communication equipment housed in each building related to a combination of multiple types of buildings among the buildings in which the failure occurred, applying a policy in which a weighting is defined according to the situation to the situation of the communication failure that continues to occur in a building among the plurality of buildings housing communication equipment used to provide a predetermined type of communication service, thereby calculating a priority of a candidate combination of buildings that will actually restore the failure among the buildings in which the failure occurred, for each of the multiple types of combinations. Effect of the Invention
[0014] According to the present invention, when a communication failure occurs in a network configuration, a target for recovery from this failure can be appropriately identified. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a diagram showing an application example of a network management device according to an embodiment of the present invention. [Diagram 2]FIG. 2 is a flow chart showing an example of a processing procedure performed by the network management device according to one embodiment of the present invention. [Diagram 3] FIG. 3 is a diagram illustrating an example of the function of the priority calculation unit. [Figure 4] FIG. 4 is a diagram showing an example of types of communication services related to various policies. [Diagram 5] FIG. 5 is a diagram showing an example of a building in which a communication failure occurs. [Figure 6] FIG. 6 is a table showing an example of the number of buildings in which communication failures will continue to occur and the number of users affected by the failure when restoration work is carried out on a combination of buildings that is the target of restoration work. [Figure 7] FIG. 7 is a diagram showing an example of a priority score calculated by application of the first policy under a condition in which restoration work has been carried out on a combination of buildings that is the target of restoration work. [Figure 8] FIG. 8 is a diagram showing an example of weighting determined by application of the first policy under conditions in which restoration work has been carried out on a first combination of buildings that are the targets of restoration work. [Figure 9] FIG. 9 is a diagram showing an example of weighting determined by application of the first policy under a condition in which restoration work is carried out on a second combination of buildings that are the targets of restoration work. [Figure 10] FIG. 10 is a diagram showing an example of the priority score calculated by application of the second policy under a condition in which restoration work has been carried out on a combination of buildings that is the target of restoration work. [Figure 11] FIG. 11 is a diagram showing an example of weighting determined by application of the second policy under conditions in which restoration work has been carried out on a first combination of buildings that are the targets of restoration work. [Figure 12] FIG. 12 is a diagram showing an example of weighting determined by application of the second policy under a condition in which restoration work is carried out on a second combination of buildings that are the targets of restoration work. [Figure 13]FIG. 13 is a diagram showing an example of a priority score calculated by sequentially applying the first policy and the second policy under conditions in which restoration work is carried out on a combination of buildings that are the target of the restoration work. [Figure 14] FIG. 14 is a diagram showing an example of a priority score calculated by sequentially applying the second policy and the first policy under conditions in which restoration work is carried out on a combination of buildings that are the target of the restoration work. [Figure 15] FIG. 15 is a block diagram showing an example of a hardware configuration of a network management device according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a diagram showing an application example of a network management device according to an embodiment of the present invention. As shown in FIG. 1, a network management device 10 according to an embodiment of the present invention includes a user input unit 11, a failure effect calculation unit 12, a priority calculation unit 13, a deployment plan processing unit 14, and a deployment plan output unit 15.
[0017] FIG. 2 is a flowchart showing an example of a processing procedure performed by the network management device according to an embodiment of the present invention. The user input unit 11 inputs fault information indicating a communication fault occurring in one of multiple buildings that house communication equipment and form a network configuration, for example a network redundant configuration, as well as the power supply status related to the recovery from the communication fault that has occurred, and vehicle deployment information related to the recovery work vehicles that will be deployed to recover from the communication fault (S11). The power supply status is, for example, the amount of fuel that needs to be replenished to the emergency generators (described later) stored in each building, the time elapsed since the occurrence of a communication failure in each building, etc. Furthermore, the vehicle deployment information is, for example, the current location of the recovery work vehicles, the number of recovery work vehicles that can be moved to the building, the amount of fuel that can be transported and supplied by each recovery work vehicle, etc.
[0018] Based on the fault information input in S11, the fault impact calculation unit 12 calculates the impact of a communication failure, which is the impact on other buildings in the same network configuration due to a communication failure that occurs due to, for example, the interruption of power supply to communication equipment housed in some buildings in the network configuration (S12).
[0019] The priority calculation unit 13 generates all patterns of combinations of buildings that are targets of relief, i.e., targets of restoration of communication faults, from combinations of buildings in which communication faults have occurred under the conditions indicated by the fault information input in S11 and the calculation results in S12 (S13). These patterns are also called patterns of buildings to be relieved or patterns to be relieved.
[0020] For each of the generated patterns, the priority calculation unit 13 applies the n-th policy according to the type of communication service, here the first policy having the higher application priority among the first policy and the second policy, to the communication failure and its influence that continues to occur in the building that accommodates the communication equipment used to provide a predetermined type of communication service among the buildings where the communication failure occurred, that is, the situation of the continuing communication failure under the assumption that the building has been rescued according to the pattern, for example, that the power supply to the communication equipment accommodated in the building has been restored. By this application, the priority calculation unit 13 calculates a priority score (hereinafter, sometimes simply referred to as priority) according to the weighting according to the continuing communication failure in any of the buildings (S14). The policy to be applied can be arbitrarily set by the user's operation on the user input unit 11.
[0021] When the priority scores are calculated for a plurality of patterns in S14, the priority calculation unit 13 sorts the patterns in ascending order of the calculated priority scores, i.e., in descending order of the likelihood of a communication failure occurring subsequently after the assumed recovery and its impact (S15).
[0022] As a result of sorting in S15, if there are multiple patterns for which the same priority score is calculated, and there is a policy with the next application priority, for example, the second policy, before application (Yes in S16), the priority calculation unit 13 applies the policy with the next application priority to the situation of a communication failure that continues to occur in a building that houses communication equipment used to provide a communication service of the type related to the policy with the next application priority among the buildings in which a communication failure has occurred, under the condition that a relief is assumed to have been given to the building according to the pattern (n=n+1). Then, the process after the calculation of the priority score in S14 is performed. In this case, the priority scores calculated according to the policies applied to the same pattern are added up.
[0023] On the other hand, if the result in S16 is No, and the calculation of the priority score in S14 has not been completed for all patterns (No in S17), the priority calculation unit 13 applies the first policy (n=1) to the situation of a communication failure that continues to occur in a building that houses communication equipment used to provide a communication service of the type corresponding to the first policy among the buildings in which the communication failure occurred, under the condition that a rescue is assumed to have been performed for the building according to the pattern. Then, the process after the calculation of the priority score in S14 is performed for this pattern. Furthermore, when the calculation in S14 has been completed for all patterns (Yes in S17), the priority calculation unit 13 extracts the priority score calculated in S14 for each pattern according to the applied policy, and generates information in which each pattern is sorted in order of lowest extracted priority score, i.e., in order of highest effectiveness when the assumed recovery is actually performed, so that the priority of candidate buildings that are targets for actually recovering from the failure that has occurred is set high (S18).
[0024] The deployment plan processing unit 14 prioritizes patterns with high priority scores among the sorted patterns, and searches for appropriate deployment routes for recovery work vehicles to each building in the pattern according to the priority scores, based on the power supply status and vehicle deployment information input in S11 (S19).
[0025] In response to the processing result in S19, the deployment plan output unit 15 outputs information indicating the name of the building to be rescued and the deployment route of the recovery work vehicle to the relevant building, that is, the movement route (S20). The details of each process will be described below. The user input unit 11 inputs, through input operations by an operator or the like, information relating to each building forming a redundant configuration of a communication network to which communication is provided, such as the connection relationship of each building in the network redundant configuration, the type of emergency power supply in each building, the location of each building, information indicating the impact when a communication failure occurs in a building, and the elapsed time since the communication failure occurred in the building.
[0026] Providing communications in a building means, for example, communications between communications devices within the building and communications between communications devices within the building and external communications devices. The above communication failure may be, for example, a communication interruption caused by a power supply interruption to a communication device in a building, or a communication interruption caused by a failure of communication facilities such as a server, damage to a communication cable, etc. In the following description of this embodiment, a communication interruption caused by a power supply interruption to a communication device in a building will be described as an example.
[0027] The types of emergency power sources in each building include emergency generators that run on fuel and emergency power supply devices that run on rechargeable batteries. The emergency generators are, for example, diesel engines. The building may take other forms as long as it is a facility that provides communications.
[0028] The connection relationships of each of the above buildings may include, for example, information indicating a higher hierarchy (hereinafter sometimes simply referred to as "upper") and a lower hierarchy (hereinafter sometimes simply referred to as "lower") in a network topology.
[0029] Furthermore, the user input unit 11 inputs, by the above-mentioned input operation, the number of vehicles, vehicle type, each vehicle's position information, the amount of fuel each vehicle can supply for an emergency generator, the traffic conditions in the driving area of each vehicle, and the like, related to vehicles (hereinafter sometimes referred to as "restoration vehicles") for restoring communication to a building where a communication failure has occurred. Examples of the traffic conditions include information indicating the traffic volume in the driving area, and information indicating whether roads are passable due to construction or disasters, and the like.
[0030] The types of vehicles include fuel delivery vehicles and power supply vehicles. The fuel delivery truck is a vehicle that carries fuel for the emergency generator when the emergency power source in the building is the emergency generator described above, and has equipment for filling the emergency generator with this fuel. In addition, the above-mentioned power supply vehicle is a vehicle that has a charging function for the above-mentioned storage battery when the emergency power source in the building is the above-mentioned emergency power supply device, or a vehicle that carries a replacement storage battery, i.e., a new, charged storage battery, when the above-mentioned storage battery is replaceable.
[0031] Based on the information input by the user input unit 11, the failure impact calculation unit 12 identifies, as the buildings affected by the failure, multiple lower-level buildings in the network topology that will be affected by a communication failure that has occurred in multiple higher-level buildings in the network topology among the buildings in the network redundant configuration and will result in communication being cut off. The technology for identifying the equipment affected and causing communication to be cut off is a known technology, for example, disclosed in Patent Document 1 mentioned above.
[0032] FIG. 3 is a diagram illustrating an example of the function of the priority calculation unit. The priority calculation unit 13 applies a policy, for example by AI (artificial intelligence), based on various information such as failure information input by the user input unit 11 and each pattern of combinations of buildings that are the targets of recovery from the communication failure generated above, and calculates a priority score for each combination of buildings by weighting according to the communication failure that continues to occur under conditions where it is assumed that relief has been provided.
[0033] FIG. 4 is a diagram showing an example of types of communication services related to various policies. In the example shown in FIG. 4, the types of communication services for which priority scores are to be calculated for a policy with a first application priority, a policy with a second application priority, and a policy with a third application priority are shown.
[0034] In the example shown in Figure 4, when the policy with the first application priority is applied, it is assumed that restoration work has been carried out on the building related to the pattern of the relief destination building of the application source, and the priority score related to the relief destination pattern of the application source is calculated in response to a communication failure that continues to occur in the provision of a communication service of type "Service III."
[0035] In the example shown in Figure 4, when the policy with the second application priority is applied, it is shown that the priority score for the original rescue destination pattern is calculated in response to a communication failure that continues to occur in the provision of a communication service of type "Service II" under the assumption that restoration work has been carried out on the building related to the original rescue destination pattern.
[0036] In the example shown in Figure 4, when the policy with the third application priority is applied, it is assumed that restoration work has been carried out on the building related to the application destination pattern, and the priority score related to the application destination pattern is calculated in response to a communication failure that continues to occur in the provision of a communication service of the type "municipal accommodation."
[0037] For example, if the priority score calculated by applying the policy of the first application order to the situation of the subsequent communication failure related to the first rescue pattern is the same as the priority score calculated by applying the policy of the first application order to the situation of the subsequent communication failure related to the second rescue pattern, the policy of the second application order, which is one step behind in the toughness order, is applied only to these two rescue patterns, and the priority scores are calculated again. If these priority scores are different, the calculation of the priority scores related to these patterns is terminated.
[0038] The communication services related to these policies may be arbitrarily switched depending on, for example, the disaster situation, etc. This allows the application order of the policies to each communication service to be switched, so that the destination of the recovery work can be flexibly set depending on the communication services that can be implemented or should be prioritized in response to, for example, changes in the disaster situation.
[0039] FIG. 5 is a diagram showing an example of a building in which a communication failure occurs. 5, the buildings in which communication failures have occurred are "Building A," "Building B," "Building C," "Building D," "Building E," and "Building F." In this embodiment, combinations of some or all of these buildings are set as targets for communication failure recovery work.
[0040] FIG. 6 is a table showing an example of the number of buildings in which communication failures will continue to occur and the number of users affected by the failures when restoration work is carried out on a combination of buildings that is the target of restoration work. In the example shown in Figure 6, pattern "#1" of rescued buildings, in this case the combination of "Building C" and "Building F," is the pattern targeted for recovery work, and under the assumption that recovery work has been carried out on these buildings, the number of buildings housing relay devices that will continue to be affected by the communications failure among those used to provide a communication service of type "Service I" (hereinafter sometimes simply referred to as "Service I") is one, and the number of users of the above "Service I" that will be affected by the double system outage due to the above failure is 150.
[0041] In the example shown in Figure 6, under the above assumed conditions, the number of buildings housing relay devices that will continue to be affected by the communication failure among those used to provide a communication service of type "Service II" (hereinafter sometimes simply referred to as "Service II") is one, and the number of users of the above "Service II" that will be affected by the disconnection of both systems due to the above failure is 450.
[0042] In the example shown in Figure 6, under the above assumed conditions, the number of buildings housing relay devices that will continue to be affected by the communication failure among those used to provide a communication service of type "Service III" (hereinafter sometimes simply referred to as "Service III") is one, and the number of users of the above "Service III" that will be affected by the disconnection of both systems due to the above failure is 200.
[0043] In the example shown in Figure 6, under the above assumed conditions, the number of buildings housing relay devices used to provide a communication service of type "Service IV" (hereinafter sometimes simply referred to as "Service IV") that will continue to be affected by the communication failure is 0, and the number of users of the above "Service IV" who will be affected by the two-way disconnection due to the above failure is 600.
[0044] With conventional technology, depending on the situation of the communication failure, various factors such as "If Service II is not saved, many customers will be inconvenienced," "How can we set parameters to minimize the impact on Service II while maintaining the provision of Service III?" and "Service III is used in important systems for the local government" are taken into consideration, and a combination of buildings to prioritize recovery work is selected, which requires a large operational load and skill.
[0045] Next, an example of calculation of the priority of buildings to be rescued when "Service III" is provided preferentially will be described. Figure 7 is a diagram showing an example of the priority score calculated by applying the first policy under the condition that restoration work is performed on the combination of buildings that is the target of the restoration work. The priority score for the building to be rescued is calculated for each combination of candidate rescue destination buildings by weighting the situation according to the subsequent communication failure conditions under the assumption that restoration work has been carried out on the rescue destination building for that combination.
[0046] In the example shown in FIG. 7, among the buildings housing relay devices used to provide "Service III" (hereinafter sometimes referred to as "Service III relay buildings"), a weighting rule as a penalty according to the number of buildings that were not rescued under the assumed conditions that restoration work had been performed on the rescue destination building, i.e., the number of buildings in which communication failure continues to occur under the above conditions, and a weighting rule according to the number of users housed in the above unrecovered buildings, i.e., the number of double-disconnected users affected by the above-mentioned continuing communication failure (hereinafter sometimes referred to as "Service III affected user number") are set in advance as a "Service III priority policy" and stored in the storage device of network management device 10. In the example shown in Fig. 7, when the combination of candidate buildings for the rescue destination is Building C and Building F shown in Fig. 6, the identification number is "#1", and under the assumption that restoration work has been performed on the buildings related to this combination, when there is a "Service III relay building" among the buildings shown in Fig. 6 where communication failures related to "Service III" continue to occur, the "Service III priority policy" is applied to this situation (see symbol a in Fig. 7), and a score of "30,000" is calculated to be added per building. Here, the number of "Service III relay buildings" where communication failures continue to occur is "1", so the added score "30,000" related to the number of buildings where communication failures continue to occur is calculated (see symbol b in Fig. 7).
[0047] In addition, under the assumption that restoration work has been carried out on the building related to the combination of identification numbers "#1" above, the "Service III priority policy" is applied to a situation in which a communication failure related to "Service III" continues to occur (see symbol a in Figure 7), and the number of users accommodated in each building shown in Figure 6 who will be affected by the continuing communication failure, in this case the number of users accommodated in the "Service III relay building" where the communication failure occurs ("Number of Service III affected users"), "200", is further calculated as an additional score related to the number of affected users (see symbol b in Figure 7).
[0048] The rescue priority score, which is the priority when the candidate combination of rescue destination buildings is to be the target of the actual recovery work, is the sum of the score calculated as the penalty and the score calculated as the number of affected users of service III. The smaller this priority score is, the higher the priority when the candidate combination of recovery work is to be the target of the actual recovery work. In the example shown in FIG. 7, the sum of the score "30,000" related to the penalty when the candidate combination of recovery work is buildings C and F and the score "200" related to the "number of affected users of service III" is calculated as "30,200" as the priority score when the candidate combination of recovery work is buildings C and F and this combination is to be the target of the actual recovery work (see symbol c in FIG. 7).
[0049] Then, for each of the other candidate combinations of buildings for restoration work, in this case the candidate combinations of buildings for restoration work relating to identification numbers "#2" to "#4", the above-mentioned "Service III priority policy" is applied to the number of buildings in which failures will continue to occur under conditions in which restoration work is carried out on the buildings relating to this combination and the "number of users affected by Service III" to calculate a priority score.
[0050] In the example shown in Figure 7, a priority score of "60,300" is calculated for the identification number "#2" of the candidate building combination for recovery work, a priority score of "30,200" is calculated for the identification number "#3" of the candidate building combination for recovery work, and a priority score of "100" is calculated for the identification number "#4" of the candidate building combination for recovery work (see symbol c in Figure 7).
[0051] Then, each combination is sorted in order of the priority score calculated for that combination, and the combination with the lowest priority score, i.e., the combination with the highest priority for actual recovery work, is identified as having the identification number "#4." The identification numbers of the combinations with the second lowest priority scores are "#1" and "#3," and the identification number of the combination with the highest priority score, i.e., the combination with the highest priority for actual recovery work, is "#4."
[0052] Based on the above, when a communication failure occurs from Building A to Building F shown in Figure 6, the combination of buildings that has the highest priority for actually carrying out restoration work with priority given to "Service III" is the combination of buildings associated with the above identification number "#4."
[0053] FIG. 8 is a diagram showing an example of weighting determined by application of the first policy under conditions in which restoration work has been carried out on a first combination of buildings that are the targets of restoration work. In the example shown in Figure 8, a communication failure occurs in buildings A to F shown in Figure 6, and among these buildings, buildings B and C are "Service III relay buildings" that house relay devices used for "Service III."
[0054] Then, under the assumption that the communication failure related to the buildings has been restored by deploying recovery work vehicles, in this case two power supply vehicles, to Building C and Building F associated with the identification number "#1" of the building combination for recovery work, communication will continue to occur in Building B of the "Service III relay buildings," so the weighting associated with the above identification number "#1" of "30,000" will be set as a penalty.
[0055] FIG. 9 is a diagram showing an example of weighting determined by application of the first policy under a condition in which restoration work is carried out on a second combination of buildings that are the targets of restoration work. In the example shown in FIG. 9, a communication failure occurs in buildings A to F shown in FIG. 6, and among these buildings, buildings B and C are the above-mentioned "Service III relay buildings."
[0056] Then, under the assumption that the communication failure in Buildings D and F associated with the identification number "#2" of the building combination for restoration work has been restored by deploying restoration work vehicles, in this case two power supply vehicles, respectively, it is shown that, since communication failure continues to occur in Buildings B and C of the "Service III relay buildings," a penalty of "60,000," which is the weight associated with the above identification number "#1," is set.
[0057] Next, an example of calculation of the priority of buildings to be rescued when "Service II" is provided preferentially will be described. Figure 10 is a diagram showing an example of the priority score calculated by applying the second policy under the condition that restoration work has been carried out on the combination of buildings that is the target of the restoration work. In the example shown in FIG. 10, among the buildings housing relay devices used to provide "Service II" (hereinafter sometimes referred to as "Service II relay buildings"), a weighting rule is set in advance as a "Service II priority policy" and stored in a storage device of the network management device 10. The weighting rule is a penalty according to the number of buildings that are not rescued under the assumed conditions that restoration work has been performed on the rescued building, i.e., the number of buildings in which communication failure continues to occur under the above conditions, and a weighting rule according to the number of users housed in the above unrecovered buildings, i.e., the number of double-disconnected users affected by the above-mentioned continuing communication failure (hereinafter sometimes referred to as the "number of Service II affected users"). In the example shown in Fig. 10, the identification number is "#1" when the combination of candidate buildings for the rescue destination is Building C and Building F shown in Fig. 6, and under the assumption that restoration work has been performed on the buildings related to this combination, the "Service II priority policy" is applied to the situation where there is a "Service II relay building" among the buildings shown in Fig. 6 where communication failures related to "Service II" continue to occur (see symbol a in Fig. 10), and an additional score of "5,000" per building is calculated. Here, the number of "Service II relay buildings" where communication failures continue to occur is "1", so an additional score of "5,000" related to the number of buildings where communication failures continue to occur is calculated (see symbol b in Fig. 10).
[0058] Furthermore, under the assumption that restoration work has been carried out on the building related to the combination of identification numbers "#1" above, the "Service II priority policy" is applied to a situation in which there exists a "Service II relay building" in which a communication failure related to "Service II" continues to occur (see symbol a in Figure 10), and the number of users accommodated in each building shown in Figure 6 who will be affected by the continuing communication failure, in this case the number of users accommodated in the "Service II relay building" where the communication failure occurs ("number of Service II affected users"), "450", is further calculated as an additional score related to the number of affected users (see symbol b in Figure 10).
[0059] The rescue priority score is the sum of the score calculated as the penalty and the score calculated as the "number of affected users of service II." In the example shown in Fig. 10, the sum of the score "5,000" as the penalty when the candidate combination of recovery work is buildings C and F and the score "450" related to the "number of affected users of service II" is calculated as "5,450" as the priority score when the candidate combination of recovery work is buildings C and F and this combination is the target of the actual recovery work (see symbol c in Fig. 10).
[0060] Then, for each of the other candidate combinations of buildings for restoration work, in this case the candidate combinations of buildings for restoration work relating to identification numbers "#2" to "#4", the above-mentioned "Service II priority policy" is applied to the number of buildings in which failures will continue to occur under conditions in which restoration work is carried out on the buildings relating to this combination and the "number of users affected by Service II", and a priority score is calculated.
[0061] In the example shown in Figure 10, a priority score of "5,030" is calculated for the identification number "#2" of the candidate building combination for restoration work, and a priority score of "10,100" is calculated for the identification numbers "#3" and "#4" of the candidate building combination for restoration work (see symbol c in Figure 10).
[0062] Then, each combination is sorted in order of the priority score calculated for that combination, and the combination with the smallest priority score, i.e., the combination with the highest priority for actual recovery work, is identified as having the identification number "#2." The combination with the second smallest priority score has an identification number of "#1," and the combination with the highest priority score, i.e., the combination with the highest priority for actual recovery work, has identification numbers of "#3" and "#4."
[0063] Based on the above, when a communication failure occurs from Building A to Building F shown in Figure 6, the combination of buildings that has the highest priority as the combination of buildings for which restoration work will actually be carried out with priority given to "Service II" is the combination of buildings associated with the above identification number "#2."
[0064] FIG. 11 is a diagram showing an example of weighting determined by application of the second policy under conditions in which restoration work has been carried out on a first combination of buildings that are the targets of restoration work. In the example shown in Figure 11, a communication failure occurs in buildings A to F shown in Figure 6, and among these buildings, buildings B and F are "Service II relay buildings" that house relay devices for "Service II."
[0065] Then, under the assumption that the communication failure related to Building C and Building F associated with the identification number "#1" of the building combination for restoration work has been restored by deploying restoration work vehicles, in this case two power supply vehicles, to these buildings, communication will continue to occur in Building B of the "Service II relay buildings," so a penalty of "5,000," which is the weight associated with the above identification number "#1," is set.
[0066] FIG. 12 is a diagram showing an example of weighting determined by application of the second policy under a condition in which restoration work is carried out on a second combination of buildings that are the targets of restoration work. In the example shown in FIG. 12, a communication failure occurs in buildings A to F shown in FIG. 6, and among these buildings, buildings B and F are the above-mentioned "service II relay buildings."
[0067] Then, under the assumption that the communication failure related to Building C and Building E associated with the identification number "#3" of the building combination for restoration work has been restored by deploying restoration work vehicles, in this case two power supply vehicles, respectively, a communication failure will continue to occur in both Building B and Building F of the "Service II relay buildings," so the weighting associated with the above identification number "#3," "10,000," will be set as a penalty.
[0068] Next, a description will be given of calculation of the priority score when the weighting policy related to the first type of communication service and the weighting policy related to the second type of communication service are applied in the application order. FIG. 13 is a diagram showing an example of a score calculated by sequentially applying the first policy and the second policy under conditions in which restoration work is carried out on a combination of buildings that are the target of the restoration work. In the example shown in FIG. 13, the "Service III priority policy" described in FIG. 7 is applied as the first application order to a situation where a "Service III relay building" where a communication failure related to "Service III" occurs exists (see symbol a in FIG. 13). Then, when there is a pattern among the combination patterns in which the priority score calculated by applying the above-mentioned "Service III priority policy" is the same, the "Service II priority policy" is applied as the second application order only to this pattern to a situation where a "Service II relay building" where a communication failure related to "Service II" occurs exists (see symbol a in FIG. 13). Then, the priority score calculated by this application is calculated as an additional value of the priority scores related to the corresponding pattern (see symbol b in FIG. 13). This improves the clarity of the priority of the recovery work when each pattern is sorted.
[0069] Specifically, for each of the combinations of rescue destination buildings "#1" and "#4" shown in Figure 7, the "Service III priority policy" is applied as the first application order in a situation where there is a "Service III relay building" where a communication failure related to "Service III" occurs, and a priority score similar to the example shown in Figure 7 above is calculated (see symbols c to f in Figure 13).
[0070] As a result of sorting each combination in order of the priority score calculated for that combination, as shown in FIG. 7, the priority scores calculated by adding up the penalties and scores for both users with outages calculated for each of the combinations of rescue destination buildings "#1" and "#3" are the same "30,200" (see symbols c and e in FIG. 13). Therefore, for each of these combinations "#1" and "#3," the "Service II priority policy" is applied as the second application order in a situation where there is a "Service II relay building" where a communication failure related to "Service II" occurs, and a priority score is calculated.
[0071] As a result of this calculation, as shown in Fig. 13, the sum of the penalty calculated for the combination "#1" of candidate buildings for the rescue destination and the score related to the users with both connections cut off is "5,450" (see symbol c in Fig. 13). Also, the sum of the penalty calculated for the combination "#3" of candidate buildings for the rescue destination and the score related to the users with both connections cut off is "10,100" (see symbol e in Fig. 13).
[0072] As a result of calculating the above-mentioned additional values, the priority score calculated for the candidate combination of rescue buildings "#1" is updated to "35,650" obtained by adding the score "30,200" calculated when the "Service III Priority Policy" is applied as the first application order to the score "5,450" calculated when the "Service II Priority Policy" is applied as the second application order (see symbol c in Figure 13).
[0073] As a result of calculating the above-mentioned additional values, the priority score calculated for the candidate combination of rescue buildings "#3" is updated to "40,300" by adding the score "30,200" calculated when the "Service III Priority Policy" is applied as the first application order to the score "10,150" calculated when the "Service II Priority Policy" is applied as the second application order (see symbol e in Figure 13).
[0074] Then, each combination is sorted again in the order of the priority score calculated for that combination, and the combination with the smallest priority score, i.e., the combination with the highest priority for the actual recovery work, is identified as having the identification number "#4" (see symbol f in Figure 13). In addition, the identification number of the combination with the second smallest priority score is "#1," the identification number of the combination with the third smallest priority score is "#3," and the identification number of the combination with the highest priority score, i.e., the combination with the highest priority for actual recovery work, is "#2" (see symbols c to e in Figure 13).
[0075] As a result of the above, by adding the score calculated by applying the "Service II priority policy" to patterns in which the priority score was the same when only the "Service III priority policy" was applied, it is possible to create a difference in the priority score, thereby making the difference in the priority of the actual recovery work clear and making the priority of the actual recovery work clear.
[0076] FIG. 14 is a diagram showing an example of a priority score calculated by sequentially applying the second policy and the first policy under conditions in which restoration work is carried out on a combination of buildings that are the target of the restoration work. In the example shown in FIG. 14, the application order of multiple types of policies is reversed compared to the example shown in FIG. 13. That is, the "Service II Priority Policy" described in FIG. 7 is applied as the first application order (see symbol a in FIG. 14). Then, when there is a pattern among the combination patterns in which the priority score calculated by applying the above-mentioned "Service II Priority Policy" is the same, the "Service III Priority Policy" is applied as the second application order only for this pattern in a situation in which there is a "Service III Relay Building" in which a communication failure related to "Service III" occurs (see symbol a in FIG. 14). Then, the priority score calculated by this application is calculated as an added value of the priority scores related to the corresponding pattern (see symbol b in FIG. 14). This improves the clarity of the priority of the recovery work when each pattern is sorted.
[0077] Specifically, for each of the combinations of rescue destination buildings “#1” and “#4” shown in FIG. 7, the priority score is calculated by applying the “Service II Priority Policy” as the first application order (see symbols c to f in FIG. 14).
[0078] As a result of sorting each combination in order of the priority score calculated for that combination, as shown in FIG. 7, the priority scores calculated by adding up the penalties and scores for both users with outages calculated for each of the combinations of rescue destination buildings "#3" and "#4" are the same "10,100" (see symbols e and f in FIG. 14). Therefore, for each of these combinations "#3" and "#4," the "Service III priority policy" is applied as the second application order in a situation where a "Service III relay building" exists in which a communication failure related to "Service III" occurs, and a priority score is calculated.
[0079] As a result of this calculation, as shown in Fig. 14, the sum of the penalty calculated for the combination "#3" of candidate buildings for the rescue destination and the score related to the users with both connections cut off is "30,200" (see symbol e in Fig. 14). Also, the sum of the penalty calculated for the combination "#4" of candidate buildings for the rescue destination and the score related to the users with both connections cut off is "100" (see symbol f in Fig. 14).
[0080] As a result of calculating the above-mentioned added values, the priority score calculated for the candidate combination of rescue destination buildings "#3" is updated to "40,300" by adding the score "10,100" calculated when the "Service II priority policy" is applied as the first application order to the score "30,200" calculated when the "Service III priority policy" is applied as the second application order (see symbol e in Figure 14).
[0081] As a result of calculating the above-mentioned added values, the priority score calculated for the candidate combination of rescue destination buildings "#4" is updated to "10,200" by adding the score "10,100" calculated when the "Service II priority policy" is applied as the first application order to the score "100" calculated when the "Service III priority policy" is applied as the second application order (see symbol f in Figure 14).
[0082] Then, each combination is sorted again in order of the priority score calculated for that combination, and the combination with the smallest priority score, i.e., the combination with the highest priority for the actual recovery work, is identified as having the identification number "#2" (see symbol d in Figure 14). In addition, the identification number of the combination with the second smallest priority score is "#1," the identification number of the combination with the third smallest priority score is "#4," and the identification number of the combination with the highest priority score, i.e., the combination with the highest priority for actual recovery work, is "#3" (see symbols c, e, and f in Figure 14).
[0083] As a result of the above, by adding the score calculated by applying the "Service III priority policy" to patterns in which the priority score was the same when only the "Service II priority policy" was applied, it is possible to create a difference in the priority score, thereby making the difference in the priority of the actual recovery work clear and making the priority of the actual recovery work clear.
[0084] As described above, in a network management device of one embodiment of the present invention, when a communication failure occurs in multiple buildings that house communication equipment, and a condition is applied in which it is assumed that the failure that occurred in the buildings has been restored by restoration work on the communication equipment housed in a combination of some of the multiple buildings in which the failure occurred, a policy in which a weighting according to the situation is defined is applied to the situation of the communication failure that continues to occur in a building that houses communication equipment used to provide a specified type of communication service, and a score related to the priority of the candidate building that will actually restore the failure among the buildings in the upper hierarchy in which the failure occurred is calculated for each of a plurality of combinations. This makes it possible, when a communication failure occurs in a network configuration, to appropriately identify the target for recovery from this failure.
[0085] For example, in a typical method, a skilled person artificially assigns priority to buildings to be restored according to the fault conditions that occur in the network based on empirical rules. However, when this method is used, it is difficult to understand the process of the decision regarding the assignment of priority, and it is difficult to understand the basis on which the target of the restoration was specified.
[0086] In contrast, in this embodiment, the priority of the building to be restored is calculated using a policy that defines weighting based on the situation of subsequent failures when restoration of the building is assumed. Therefore, even if the operator does not have a high level of skill, the priority of the buildings to be restored can be appropriately identified by setting the communication services to be provided with priority.
[0087] FIG. 15 is a block diagram showing an example of a hardware configuration of a network management device according to an embodiment of the present invention. 15, the network management device 10 according to the above embodiment is configured, for example, by a server computer or a personal computer, and has a hardware processor 111A such as a CPU. A program memory 111B, a data memory 112, an input / output interface 113, and a communication interface 114 are connected to this hardware processor 111A via a bus 120.
[0088] The communication interface 114 includes, for example, one or more wireless communication interface units, and enables transmission and reception of information to and from the communication network NW. As the wireless interface, for example, an interface that adopts a low-power wireless data communication standard such as a wireless LAN (Local Area Network) is used.
[0089] An input device 30 and an output device 40 that are attached to the network management device 10 and used by a user or the like are connected to the input / output interface 113 . The input / output interface 113 can take in operation data input by a user or the like through an input device 30 such as a keyboard, a touch panel, a touchpad, a mouse, etc., and can also perform processing for outputting and displaying output data to an output device 40 including a display device using liquid crystal or organic EL (Electro Luminescence), etc. Note that the input device 30 and the output device 40 may be devices built into the network management device 10, or may be input devices and output devices of other information terminals that can communicate with the network management device 10 via the network NW.
[0090] The program memory 111B is a non-transient tangible storage medium that is a combination of a non-volatile memory that can be written to and read from at any time, such as a hard disk drive (HDD) or a solid state drive (SSD), and a non-volatile memory such as a read only memory (ROM), and can store programs necessary for executing various control processes, etc. according to one embodiment.
[0091] The data memory 112 is a tangible storage medium, for example, a combination of the above-mentioned nonvolatile memory and a volatile memory such as RAM (Random Access Memory), and can be used to store various data or information acquired and created in the course of various processes.
[0092] A network management device 10 according to one embodiment of the present invention can be configured as a data processing device having a user input unit 11, a failure impact calculation unit 12, a priority calculation unit 13, a deployment plan processing unit 14, and a deployment plan output unit 15 shown in FIG. 1 as software-based processing function units.
[0093] Each information storage unit used as a work memory or the like by each unit of the network management device 10 can be configured by using the data memory 112 shown in Fig. 15. However, these configured storage areas are not essential components within the network management device 10, and may be areas provided in, for example, an external storage medium such as a Universal Serial Bus (USB) memory, or a storage device such as a database server located in the cloud.
[0094] The processing function units in each of the above-mentioned user input unit 11, failure impact calculation unit 12, priority calculation unit 13, deployment plan processing unit 14, and deployment plan output unit 15 can all be realized by reading and executing a program stored in the program memory 111B by the above-mentioned hardware processor 111A. Note that some or all of these processing function units may be realized in various other forms, including integrated circuits such as an application specific integrated circuit (ASIC) or a field-programmable gate array (FPGA).
[0095] The methods described in each embodiment may be stored as a program (software means) that can be executed by a computer on a recording medium such as a magnetic disk (floppy disk, hard disk, etc.), an optical disc (CD-ROM, DVD, MO, etc.), or a semiconductor memory (ROM, RAM, flash memory, etc.), and may be distributed by transmitting the program via a communication medium. The programs stored on the medium include a setting program that configures the software means (including not only execution programs but also tables and data structures) that the computer executes. The computer that realizes the present device reads the program recorded on the recording medium, and in some cases, configures the software means by the setting program, and executes the above-mentioned processing by controlling the operation of the software means. The recording medium in this specification is not limited to a recording medium for distribution, but also includes a storage medium such as a magnetic disk or semiconductor memory provided inside the computer or in a device connected via a network.
[0096] The present invention is not limited to the above-mentioned embodiment, and can be modified in various ways without departing from the gist of the present invention. The embodiments may be combined as appropriate, and in that case, the combined effect can be obtained. Furthermore, the above-mentioned embodiment includes various inventions, and various inventions can be extracted by combinations selected from the multiple components disclosed. For example, if the problem can be solved and the effect can be obtained even if some components are deleted from all the components shown in the embodiment, the configuration from which the components are deleted can be extracted as an invention. [Explanation of symbols]
[0097] 10...Network management device 11...User input section 12…Failure Impact Calculation Section 13…Priority calculation unit 14...Deployment planning processing unit 15...Deployment plan output section
Claims
1. A network management device comprising: a priority calculation unit that calculates, for each of a plurality of combinations of buildings among the buildings where a communication failure occurs, a priority of a candidate combination of buildings that will actually restore the failure among the buildings where the failure occurred by applying a policy in which a weighting is defined according to the situation when a communication failure continues to occur in a building among the plurality of buildings that houses communication equipment used to provide a specified type of communication service, when a condition is applied that assumes that the failure has been restored in the building by restoration work on the communication equipment housed in each of the buildings in a plurality of combinations of buildings among the buildings where the failure occurred.
2. The policy may include: a first policy that defines a weighting according to a state of the subsequent communication failure in a building that houses communication equipment used for providing a first type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied, and a second policy that defines a weighting according to a state of the subsequent communication failure in a building that houses communication equipment used for providing a second type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied, The priority calculation unit calculating, for each of the plurality of types of combinations, a score related to a priority of a candidate building that will actually recover from the failure among the buildings in which the failure has occurred by applying the first policy to a state of the communication failure that continues to occur in a building that houses communication equipment used to provide the first type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied; When the calculated scores for the multiple types of combinations are the same as a result of the calculation, the second policy is applied to the situation of the communication failure that continues to occur in a building that houses communication equipment used to provide the second type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied to these combinations, thereby calculating a score related to the priority of a candidate combination of buildings that will actually restore the failure among the buildings in which the failure has occurred for each of the combinations of types related to the same score among the multiple types, thereby calculating a priority of a candidate combination of buildings that will actually restore the failure among the buildings in which the failure has occurred for each of the multiple types of combinations. The network management device according to claim 1 .
3. The situation of the communication failure occurring continuously in a building in which communication facilities used for providing the predetermined type of communication service are housed is the number of buildings involved in the communication failure that continues to occur when the assumed conditions are applied, and the number of users accommodated in the buildings and using the predetermined type of communication service; The network management device according to claim 1 .
4. and a planning processing unit that plans an actual restoration work for the failure that has occurred based on a condition related to the restoration work for the building corresponding to the priority calculated by the priority calculation unit. The network management device according to claim 1 .
5. The plan processing unit is giving priority to a building having a high priority calculated by the priority calculation unit, planning a vehicle to be actually deployed to the building and a movement route of the vehicle to the building based on information related to the failure in the building and information related to candidates for vehicles to be deployed for a recovery operation of the building from the failure; 5. The network management device according to claim 4.
6. A method performed by a network management device, comprising: A network management method comprising: when a communication failure occurs in a plurality of buildings housing communication equipment, and a condition is applied in which it is assumed that the failure has been restored in a building among the plurality of buildings by restoration work on communication equipment housed in each of the buildings relating to a combination of multiple types of buildings among the buildings in which the failure occurred, and a policy in which a weighting according to the situation is defined to the situation of the communication failure that continues to occur in a building among the plurality of buildings housing communication equipment used to provide a specified type of communication service is calculated for each of the multiple types of combinations of buildings among the buildings in which the failure occurred, by applying a policy in which a weighting according to the situation is defined to the situation.
7. The policy may include: a first policy that defines a weighting according to a state of the subsequent communication failure in a building that houses communication equipment used for providing a first type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied, and a second policy that defines a weighting according to a state of the subsequent communication failure in a building that houses communication equipment used for providing a second type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied, Calculating the priority calculating, for each of the plurality of types of combinations, a score related to a priority of a candidate building that will actually recover from the failure among the buildings in which the failure has occurred by applying the first policy to a state of the communication failure that continues to occur in a building that houses communication equipment used to provide the first type of communication service among the buildings in which the failure has occurred when the assumed conditions are applied; and when the calculated scores for the plurality of types of combinations are the same as a result of the calculation, the second policy is applied to a state of the communication failure that continues to occur in a building that houses communication equipment used for providing the second type of communication service among the buildings in which the failure has occurred when the assumed condition is applied to these combinations, thereby calculating a score relating to a priority of a candidate for a combination of buildings that will actually restore the failure among the buildings in which the failure has occurred, for each of the combinations of types associated with the same score among the plurality of types, thereby calculating a priority of a candidate for a combination of buildings that will actually restore the failure among the buildings in which the failure has occurred, for each of the plurality of types of combinations. The network management method according to claim 6.
8. A network management processing program that causes a processor to function as each of the units of the network management device according to any one of claims 1 to 5.
Citation Information
Patent Citations
Network management device, method, and program
JP2018078523A
Network management apparatus, method and program
JP2020065202A
