Wireless communication node
The wireless communication node balances MT and DU transmission power through power control and timing adjustments, resolving power conflicts in IAB to enable simultaneous and effective wireless communication.
Patent Information
- Application Number
- JP2022545205
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-08-28
- Publication Date
- 2024-11-07
- Estimated Expiration
- 2040-08-28
AI Technical Summary
Simultaneous transmission of Mobile Termination (MT) and Distributed Unit (DU) in Integrated Access and Backhaul (IAB) leads to conflicts in transmission power, restricting effective wireless signal transmission.
A wireless communication node with a control unit that manages transmission power by considering downlink and uplink power control, allowing simultaneous transmission to both upper and lower nodes, using methods such as adjusting power control parameters and timing to balance power distribution.
Enables normal simultaneous transmission by balancing transmission power between MT and DU, overcoming power conflicts and ensuring effective wireless communication.
Smart Images

Figure 0007579346000012 
Figure 0007579346000013 
Figure 0007579346000014
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a wireless communication node for configuring wireless access and wireless backhaul. [Background technology]
[0002] The 3rd Generation Partnership Project (3GPP) has established specifications for Long Term Evolution (LTE), and is also establishing specifications for successor systems to LTE, such as LTE-Advanced (hereinafter, LTE-Advanced will be referred to as LTE) with the aim of further increasing speeds, as well as 5G New Radio (NR) or Next Generation (NG).
[0003] For example, in the NR radio access network (RAN), Integrated Access and Backhaul (IAB) is being considered, which integrates wireless access to terminals (User Equipment, UE) and wireless backhaul between wireless communication nodes such as radio base stations (gNBs) (see Non-Patent Document 1).
[0004] In the IAB, an IAB node has a Mobile Termination (MT), which is a function for connecting to a parent node (which may be called an IAB donor), and a Distributed Unit (DU), which is a function for connecting to a child node or UE.
[0005] In 3GPP Release 16, half-duplex communication and time division multiplexing (TDM) are assumed for wireless access and wireless backhaul. In addition, in Release 17, the application of frequency division multiplexing (FDM), space division multiplexing (SDM), and full-duplex communication is being considered (Non-Patent Document 2). In other words, simultaneous operation of MT and DU, or more specifically, simultaneous transmission, is being considered. [Prior art documents] [Non-patent literature]
[0006] [Non-Patent Document 1] 3GPP TR 38.874 V16.0.0, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Study on Integrated Access and Backhaul; (Release 16), 3GPP, December 2018 [Non-Patent Document 2] "New WID on Enhancements to Integrated Access and Backhaul", RP-192521, 3GPP TSG RAN Meeting #86, 3GPP, December 2019 Summary of the Invention
[0007] However, simultaneous transmission by the MT and DU has the following problems: Specifically, when the MT and DU transmit radio signals simultaneously, the transmission power of the radio signal transmitted by the DU and the transmission power of the radio signal transmitted by the MT may compete with each other, and problems such as the inability to transmit radio signals normally occur if there is a restriction such as an upper limit on the transmission power.
[0008] Therefore, the following disclosure has been made in consideration of the above circumstances, and aims to provide a wireless communication node that can transmit wireless signals normally even when a Mobile Termination (MT) and a Distributed Unit (DU) transmit simultaneously in an Integrated Access and Backhaul (IAB).
[0009] One aspect of the present disclosure is a wireless communication node (e.g., wireless communication node 100B) that includes a connection unit (connection unit 160) used for connecting to an upper node (e.g., wireless communication node 100A) and for connecting to a lower node (e.g., UE 200), and a control unit (control unit 170) that, in controlling the transmission power of an uplink to the upper node, estimates the transmission power of a downlink to the lower node that can share the transmission power when simultaneous transmission is performed to the upper node and the lower node.
[0010] One aspect of the present disclosure is a wireless communication node (e.g., wireless communication node 100B) including a connection unit (connection unit 160) used for connecting to an upper node (e.g., wireless communication node 100A) and for connecting to a lower node (e.g., UE 200), and a control unit (control unit 170) that assumes a transmission power control of the uplink to the upper node that differs when simultaneous transmission to the upper node and the lower node is performed compared to when the simultaneous transmission is not performed, in the transmission power control of the uplink to the upper node. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram showing an overall schematic configuration of a wireless communication system 10. As shown in FIG. [Diagram 2] FIG. 2 is a diagram showing an example of a basic configuration of the IAB. [Diagram 3] FIG. 3 is a functional block diagram of the wireless communication node 100A. [Figure 4] FIG. 4 is a functional block diagram of the wireless communication node 100B. [Diagram 5] FIG. 5 is a functional block diagram of the UE 200 constituting the child node. [Figure 6] FIG. 6 is a diagram showing an example in which new power control parameters are set in PUSCH-ConfigCommon. [Figure 7] FIG. 7 is a diagram showing an example in which new power control parameters are set in the P0-PUSCH-AlphaSet. [Figure 8]FIG. 8 is a diagram showing an example in which new power control parameters are set in P0-PUSCH-Set-r16. [Figure 9] FIG. 9 is a diagram showing an example in which new power control parameters are set in PUCCH-ConfigCommon, and is a diagram showing an example in which new power control parameters are set in P0-PUCCH. [Figure 10] FIG. 10 is a diagram showing an example in which new power control parameters are set in P0-PUCCH. [Figure 11] FIG. 11 is a diagram showing an example in which new power control parameters are set in the SRS-ResourceSet. [Figure 12] FIG. 12 is a diagram illustrating an example of a hardware configuration of the CU 50, the wireless communication nodes 100A to 100C, and the UE 200. As shown in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, the embodiments will be described based on the drawings. The same or similar symbols are used for the same functions and configurations, and their descriptions will be omitted as appropriate. This application is incorporated by reference to International Application No. PCT / JP2019 / 051029, filed on December 25, 2019.
[0013] (1) Overall configuration of wireless communication system 1 is a schematic diagram of an overall configuration of a wireless communication system 10 according to the present embodiment. The wireless communication system 10 is a wireless communication system conforming to 5G New Radio (NR), and is composed of a plurality of wireless communication nodes and terminals.
[0014] Specifically, the wireless communication system 10 includes wireless communication nodes 100A, 100B, and 100C, and a terminal 200 (hereinafter, referred to as User Equipment (UE) 200).
[0015] The wireless communication nodes 100A, 100B, and 100C can set up wireless access with the UE 200 and a wireless backhaul (BH) between the wireless communication nodes. Specifically, a backhaul (transmission path) by a wireless link is set between the wireless communication node 100A and the wireless communication node 100B, and between the wireless communication node 100A and the wireless communication node 100C.
[0016] Such a configuration in which the wireless access to the UE 200 and the wireless backhaul between the wireless communication nodes are integrated is called Integrated Access and Backhaul (IAB).
[0017] The IAB reuses existing functions and interfaces defined for radio access, in particular Mobile-Termination (MT), gNB-DU (Distributed Unit), gNB-CU (Central Unit), User Plane Function (UPF), Access and Mobility Management Function (AMF) and Session Management Function (SMF), as well as the corresponding interfaces, e.g. NR Uu (MT to gNB / DU), F1, NG, X2 and N4, are used as the baseline.
[0018] The wireless communication node 100A is connected to an NR radio access network (NG-RAN) and a core network (Next Generation Core (NGC) or 5GC) via a wired transmission path such as fiber transport. The NG-RAN / NGC includes a Central Unit 50 (hereinafter, CU50), which is a communication node. The NG-RAN, NGC, and the like may be simply referred to as a "network."
[0019] The CU 50 may be configured by any one or a combination of the UPF, AMF, and SMF described above, or may be a gNB-CU as described above.
[0020] Fig. 2 is a diagram showing a basic configuration example of an IAB. As shown in Fig. 2, in this embodiment, the wireless communication node 100A constitutes a parent node in the IAB, and the wireless communication node 100B (and the wireless communication node 100C) constitutes an IAB node in the IAB. The parent node may be called an IAB donor.
[0021] A child node in the IAB is configured by another wireless communication node not shown in Fig. 1. Alternatively, the UE 200 may configure a child node.
[0022] A wireless link is set between the parent node and the IAB node. Specifically, a wireless link called Link_parent is set.
[0023] A wireless link is set between the IAB node and the child node. Specifically, a wireless link called Link_child is set.
[0024] Such a wireless link established between wireless communication nodes is called a wireless backhaul link. Link_parent is composed of a DL Parent BH in the downlink (DL) direction and a UL Parent BH in the uplink (UL) direction. Link_child is composed of a DL Child BH in the DL direction and a UL Child BH in the UL direction.
[0025] That is, in IAB, the direction from a parent node to a child node (including UE 200) is the DL direction, and the direction from a child node to a parent node is the UL direction.
[0026] The radio link established between the UE 200 and the IAB node or the parent node is called a radio access link. Specifically, the radio link is configured by a DL Access in the DL direction and a UL Access in the UL direction.
[0027] The IAB node has a Mobile Termination (MT) that is a function for connecting to a parent node, and a Distributed Unit (DU) that is a function for connecting to a child node (or UE 200). Note that the child node may be called a lower node.
[0028] Similarly, the parent node has an MT for connecting to a higher-level node and a DU for connecting to a lower-level node such as an IAB node. Note that the parent node may have a CU (Central Unit) instead of an MT.
[0029] Similarly to the IAB node and parent node, the child node also has an MT for connecting to a higher-level node such as the IAB node, and a DU for connecting to a lower-level node such as the UE 200.
[0030] From the DU's point of view, the radio resources used by the DU, DL, UL and flexible time-resource (D / U / F) are classified into one of the types: hardware, software or not available (H / S / NA). Also, within the software (S), available or not available is specified.
[0031] Although the IAB configuration example shown in Fig. 2 uses CU / DU division, the IAB configuration is not necessarily limited to this configuration. For example, the IAB may be configured by tunneling using GPRS Tunneling Protocol (GTP)-U / User Datagram Protocol (UDP) / Internet Protocol (IP) in the wireless backhaul.
[0032] The main advantage of such an IAB is that it allows flexible and dense deployment of NR cells without densifying the transport network. IAB can be applied to various scenarios, such as outdoor small cell deployment, indoor, and even mobile relay (e.g., in buses and trains).
[0033] The IAB may also support NR-only standalone (SA) deployments, as shown in Figures 1 and 2, or non-standalone (NSA) deployments that include other RATs (such as LTE).
[0034] In this embodiment, the wireless access and wireless backhaul can operate as half-duplex or full-duplex.
[0035] In addition, the multiplexing method can be time division multiplexing (TDM), frequency division multiplexing (FDM), and space division multiplexing (SDM). That is, in this embodiment, FDM / SDM is used to realize simultaneous operation of the DU and MT of the IAB node.
[0036] In addition to the above-mentioned IAB, the wireless communication nodes 100A to 100C, CU 50 and UE 200 can support Massive MIMO, which generates more directional beams by controlling radio signals transmitted from multiple antenna elements, Carrier Aggregation (CA), which bundles and uses multiple component carriers (CCs), and Dual Connectivity (DC), which simultaneously communicates between the UE and each of multiple NG-RAN nodes.
[0037] Channels used in wireless communication include control channels and data channels. The control channels include a PDCCH (Physical Downlink Control Channel), a PUCCH (Physical Uplink Control Channel), a RACH (Random Access Channel, Downlink Control Information (DCI) including a Random Access Radio Network Temporary Identifier (RA-RNTI)), and a Physical Broadcast Channel (PBCH).
[0038] Reference signals that may be included in the control channel may include a Channel State Information-Reference Signal (CSI-RS), a Sounding Reference Signal (SRS), and a Positioning Reference Signal (PRS) for position information. Data channels include a Physical Downlink Shared Channel (PDSCH) and a Physical Uplink Shared Channel (PUSCH), etc. Data may refer to data transmitted via a data channel.
[0039] (2) Functional block configuration of wireless communication system Next, the functional block configurations of the wireless communication node 100A, the wireless communication node 100B, and the UE 200 that configure the wireless communication system 10 will be described.
[0040] (2.1) Wireless communication node 100A 3 is a functional block diagram of a wireless communication node 100A constituting a parent node. As shown in FIG. 3, the wireless communication node 100A includes a wireless transmitting unit 110, a wireless receiving unit 120, a NW IF unit 130, a transmission related information receiving unit 140, and a control unit 150.
[0041] The wireless transmission unit 110 transmits a wireless signal conforming to the 5G specification. Also, the wireless reception unit 120 transmits a wireless signal conforming to the 5G specification. In this embodiment, the wireless transmission unit 110 and the wireless reception unit 120 perform wireless communication with the wireless communication node 100B constituting the IAB node.
[0042] In this embodiment, the wireless communication node 100A has the functions of MT and DU, and the wireless transmitting unit 110 and the wireless receiving unit 120 also transmit and receive wireless signals in accordance with MT / DU.
[0043] The NW IF unit 130 provides a communication interface that realizes a connection with the NGC side, etc. For example, the NW IF unit 130 can include interfaces such as X2, Xn, N2, and N3.
[0044] The transmission-related information receiving unit 140 receives the transmission-related information transmitted from the IAB node 100B. Specifically, the transmission-related information may be information on the presence and / or absence of simultaneous transmission to a parent node (upper node) and a child node (lower node) (as viewed from the IAB node 100B), information on the transmission power of the downlink to the child node (lower node) (such as a downlink transmission power value), information taking into account the transmission power of the downlink (such as a PHR (Power Headroom Report) taking into account a downlink transmission power value), capability information indicating capability regarding simultaneous transmission, and the like.
[0045] In addition to / instead of information on downlink transmission power to a child node (lower node) (such as a downlink transmission power value), the transmission related information receiving unit 140 may receive information on uplink transmission power from the child node (lower node) (such as an uplink transmission power value), power control information instructing to increase (UP), decrease (DOWN) or maintain (KEEP) the DL transmission power from the parent node, and / or a DL reception power target value and actual DL reception power. This enables the control unit 150, which will be described later, to perform control to improve the power imbalance between parent link DL reception (Rx) and child link UL transmission (Tx) in the IAB node 100B. That is, the control unit 150 can control the DL transmission power of the DU based on the information received by the transmission related information receiving unit 140.
[0046] The control unit 150 executes control of each functional block constituting the wireless communication node 100A. In particular, in this embodiment, the control unit 150 controls the UL transmission power of the MT of the IAB node 100B based on the transmission related information received by the transmission related information receiving unit 140. For example, the control unit 150 may control the UL transmission power of the MT of the IAB node 100B by transmitting power control information that explicitly indicates the UL transmission power of the MT of the IAB node 100B to the IAB node 100B, or may control the UL transmission power of the MT of the IAB node 100B implicitly by transmitting information that specifies the UL resource of the MT of the IAB node 100B as Soft. In addition, the control unit 150 is not limited to adjusting the UL transmission power itself in the IAB node 100B, and may control the UL transmission power of the MT of the IAB node 100B by controlling the UL transmission timing in the IAB node 100B. For example, in the IAB node 100B, although MT transmission and DU transmission should be performed simultaneously, transmission power control may be performed by controlling by transmitting timing control information or the like so that MT reception and DU transmission and / or MT transmission and DU reception are performed simultaneously. In this way, controlling the total transmission power (MT and DU combined) by controlling the timing is also included in the transmission power control of the present application.
[0047] (2.2) Wireless communication node 100B 4 is a functional block diagram of a wireless communication node 100B constituting an IAB node. As shown in FIG. 4, the wireless communication node 100B includes a connection unit 160, a wireless transmission unit 161, a wireless reception unit 162, a control unit 170, and a transmission-related information transmission unit 180.
[0048] The connection unit 160 provides an interface used for connection with a higher-level node and a lower-level node. Specifically, the connection unit 160 provides a function of a Mobile Termination (MT) used for communication with a higher-level node and a function of a Distributed Unit (DU) used for communication with a lower-level node.
[0049] The wireless transmission unit 161 transmits a wireless signal conforming to the 5G specifications. Also, the wireless reception unit 162 transmits a wireless signal conforming to the 5G specifications. In this embodiment, the wireless transmission unit 161 and the wireless reception unit 162 perform wireless communication (communication on the MT side) with the wireless communication node 100A constituting a parent node, and wireless communication (communication on the DU side) with a child node (including the case of the UE 200).
[0050] The control unit 170 executes control of each functional block constituting the wireless communication node 100 B. In particular, in this embodiment, the control unit 170 executes control related to the transmission power of the MT and / or DU.
[0051] As a specific embodiment, in controlling UL transmission power to a parent node (upper node), the control unit 170 assumes DL transmission power to a child node that can share the transmission power when simultaneous transmission is performed to the parent node (upper node) and the child node (lower node). More specifically, the control unit 170 may assume DL transmission power in calculating the maximum transmission power (e.g., PCMAX) and / or the available transmission power (e.g., PH: Power Headroom). The control unit 170 may also perform UL transmission power control taking the DL transmission power into consideration.
[0052] As another aspect, when simultaneous transmission is performed to a parent node (upper node) and a child node (lower node), a UL transmission power control different from that when the simultaneous transmission is not performed may be assumed. More specifically, when simultaneous transmission is performed, the control unit 170 may set and / or execute UL transmission power control assuming DL transmission power different from that when the simultaneous transmission is not performed.
[0053] As an example, the IAB node may set a target value (such as a UL transmission power target value) of the UL transmission power of the MT based on the DL transmission power of the DU, and control the UL transmission power of the MT based on the difference (such as PH) between the target value and the actual UL transmission power. For example, the IAB node may notify a parent node (upper node) of a PHR or the like, and receive explicit or implicit UL transmission power control information based on the notification from the parent node (upper node).
[0054] Note that the specific means of UL transmission power control by the control unit 170 is not limited to adjusting the UL transmission power itself, such as reducing the UL transmission power by assuming (taking into account / taking into account) the DL transmission power, but may control the UL transmission power of the MT by controlling the UL transmission timing. For example, the control unit 170 may control the transmission power by controlling the timing so that the simultaneous operation of MT transmission and DU transmission, which should be performed originally, is changed to the simultaneous operation of MT reception and DU transmission and / or the simultaneous operation of MT transmission and DU reception. Also, assuming (taking into account / taking into account) the DL transmission power is not limited to assuming (taking into account / taking into account) the DL transmission power amount or DL transmission power value, but may mean assuming (taking into account / taking into account) whether or not there is DL transmission power (presence or absence of DL transmission power).
[0055] In the following description of the embodiment, an example of controlling UL transmission power by assuming (taking into account / taking into account) DL transmission power will be mainly described, but the present invention is not limited to this, and DL transmission power may be controlled by assuming (taking into account / taking into account) UL transmission power. Therefore, in this embodiment, UL transmission power and / or DL transmission power may be controlled by assuming (taking into account / taking into account) DL transmission power and / or UL transmission power. In other words, in this embodiment, the transmission power value of one link is calculated including the transmission power value of the other link. Here, the transmission power value may be a nominal transmission power value, an actually measured transmission power value, a theoretical transmission power value, a total transmission power value, a maximum transmission power value, a target value of transmission power, an ideal transmission power value, or what is called an available transmission power value.
[0056] The transmission-related information transmitting unit 180 transmits the transmission-related information to the parent node (upper node). Specifically, the transmission-related information may be information on the presence and / or possibility of simultaneous transmission to the parent node (upper node) and the child node (lower node), resource configuration and / or timing information in the case of simultaneous transmission, information on the transmission power of the downlink to the child node (lower node) (such as a downlink transmission power value), information taking into account the transmission power of the downlink (such as a PHR (Power Headroom Report) taking into account a downlink transmission power value), capability information indicating capability regarding simultaneous transmission, and the like.
[0057] The transmission related information transmitting unit 180 may transmit information on uplink transmission power (such as uplink transmission power value) from a child node (lower node) in addition to / instead of information on downlink transmission power (such as downlink transmission power value) to the child node (lower node). The transmission related information transmitting unit 180 may transmit power control information instructing to increase (UP), decrease (DOWN), or maintain (KEEP) the DL transmission power from the parent node so that the balance between the UL transmission power from the child node and the DL transmission power from the parent node is maintained, and may transmit a DL reception power target value and an actual DL reception power, etc. Specifically, the transmission related information transmitting unit 180 can transmit transmission related information instructing to DOWN the DL transmission power when the actual DL reception power is higher than the DL reception power target value, and transmit transmission related information instructing to UP the DL transmission power when the actual DL reception power is lower than the DL reception power target value. Furthermore, when the actual DL reception power is the same as the DL reception power target value, the transmission related information transmitting unit 180 may transmit transmission related information instructing to keep the DL transmission power.
[0058] The transmission-related information transmitted to the parent node (upper node) does not necessarily have to be direct instruction information as in the above example, and may be any information that allows the parent node to take transmission power into consideration.
[0059] (2.3)UE200 5 is a functional block diagram of a UE 200 constituting a child node. As shown in FIG. 5, the UE 200 includes a wireless transmitting unit 210, a wireless receiving unit 220, and a control unit 240.
[0060] The wireless transmission unit 210 transmits a wireless signal conforming to the 5G specifications. Also, the wireless reception unit 220 transmits a wireless signal conforming to the 5G specifications. In this embodiment, the wireless transmission unit 210 and the wireless reception unit 220 perform wireless communication with the wireless communication node 100B constituting the IAB node. Note that the UE 200 may directly communicate with the parent node (wireless communication node 100A).
[0061] The control unit 240 executes control of each functional block constituting the UE 200 .
[0062] (3) Operation of wireless communication system Next, a description will be given of the operation of the wireless communication system 10. Specifically, a description will be given of the operation of controlling the UL transmission power by the IAB node.
[0063] (3.1) Multiplexing and Communication Systems in the IAB First, the multiplexing and communication method in the IAB will be described.
[0064] In 3GPP Release-17, in addition to TDM, FDM and SDM are applicable. Also, in 3GPP Release-17, full-duplex is also applicable. In the case of FDM and SDM, the same time resource can be shared by MT and DU in the IAB node. That is, in the IAB node, MT transmission (UL Parent BH) and DU transmission (DL Access or DL Child BH) are performed using the same time resource.
[0065] (3.2) Issues when using the same time resources in IAB nodes As described above, when an IAB node uses the same time resources for MT and DU, that is, when MT and DU operate simultaneously, the UL transmission power of the MT and the UL transmission power of the DU may compete with each other. If there is an upper limit or other constraint on the transmission power, problems may arise such as the inability to transmit radio signals normally.
[0066] More specifically, when simultaneous transmission is performed within an intra-panel, the transmission power is divided between UL transmission and DL transmission, so that DL transmission may affect UL PCMAX and PHR. Conventionally, IAB nodes with limited transmission power could not reduce UL transmission power in response to simultaneous DL transmission.
[0067] (3.3) Example of operation In the following, an operation example that solves the above-mentioned problem will be described. Specifically, in the case where an MT and a DU of an IAB node transmit simultaneously using the same time resource, an operation example that enables simultaneous transmission of an MT and a DU by controlling the UL transmission power of the MT assuming (taking into account / taking into account) the DL transmission power of the DU will be described.
[0068] (3.3.0) Overview Broadly speaking, an IAB node can operate as follows: (i) A method for taking into account the DL transmission power of the DU in the UL transmission power control of the MT (ii) A method of separating UL power control for simultaneous transmission and non-simultaneous transmission The specific details are explained below.
[0069] (3.3.1.1) Operation example 1-1 In this operation example 1-1, (i) as an example of a method of considering DL transmission power of DU in UL transmission power control of MT, a case where DL power of DU is considered in calculation of maximum transmission power (specifically PCMAX) and / or calculation of available transmission power (specifically PHR) will be described. Note that the calculation results of PCMAX, PHR, etc. can be transmitted to a network such as a parent node 100A as upper layer signaling. Note that in the following description of calculation formulas, etc., the UE is described as the main subject because conventional standards are defined as formulas for UE, but in this embodiment, the IAB node 100B is applied as the main subject. Therefore, in the following description, UE may be replaced with IAB node 100B.
[0070] As a background of the operation example 1-1, when a UE transmits a PUSCH using an index j of a parameter set configuration and an index l of a PUSCH power control adjustment state in an active bandwidth component (BWP) b of a carrier f of a serving cell c, the UE transmits a PUSCH with a PUSCH transmission power P PUSCH,b,f,c (i,j,q d, l) is determined by the following formula (see TS38.213), where the unit is [dBm].
number
[0071] As shown in the above formula, P CMAX,f,c (i) is the maximum transmit power of the mobile station UEi after taking into account the required power backoff on the carrier f of the serving cell c, and P O_PUSCH,b,f,c (j) is the reference power offset value broadcast in the serving cell c, and M PUSCH , RB,b,f,c (i) is the number of resource blocks allocated to the mobile station UEi in the serving cell c, and α b,f,c (j) is the gradient value of the fractional TPC (Transmission Power Control) broadcast in the serving cell c, and PL b,f,c (q d ) is the path loss in the serving cell c measured by the mobile station UEi, and Δ TF,b,f,c (i) is a power offset value determined based on the modulation scheme and coding rate used in the mobile station UEi, and f b,f,c (i, l) is the closed loop power conditioning correction value used in the mobile station UEi.
[0072] In addition, the maximum output power P CMAX,f,c is set so that the corresponding measured peak EIRP (Effective Isotropic Radiated Power) falls within the following range (upper limit to lower limit) (see TS38.101-2 for example). Powerclassis the nominal UE power class, MPR is Maximum Power Reduction, ΔMB is peak EIRP relaxation, P-MPR is Power Management MPR, A-MPR is Additional MPR, and T is Tolerance.
number
[0073] Among the variables included in the above formula for PCMAX, the path loss PL is unknown to the higher-level node (such as the base station), so the lower-level node (in this example, the mobile station UEi) is configured to feed back a PHR (Power Headroom Report) when the path loss PL changes. Here, PH is the ratio of the maximum transmission power Pcmax and the current transmission power P shown in the above formula, as shown below. PUSCH It is a difference value from Pcmax and can be a positive value or a negative value. In this sense, the maximum transmission power Pcmax does not indicate the upper limit of the transmission power, but may mean the target value of the transmission power. Also, PH may mean the available transmission power, or may mean the difference or offset value between Pcmax or the target value of the transmission power.
number
[0074] In this operation example, the power control using the quantities such as PH and PCMAX as described above is calculated taking into consideration the DL transmission power of the DU in order to make it suitable for simultaneous transmission of the MT and DU. That is, in the conventional calculation method described above, in an IAB node with a transmission power restriction, the MT cannot reduce the UL transmission power for simultaneous transmission of child links, so in this operation example, an extension is made to the conventional calculation method.
[0075] In the operational example 1-1, the following options may be adopted as a method for taking the DU transmission power into account in calculating PCMAX. (Option 1) Add "Power childlink" (transmission power of the child link) to the PCMAX calculation formula. (Option 2) Add "Power childlink" (transmission power of the child link) as MPR / PMPR.
[0076] In the following operation example, Power_childlink represents the power reduction due to simultaneous transmission of the child link.
[0077] <Operation example of IAB node in FR1> That is, in this example, the UE is allowed to set the maximum output power PCMAX,f,c in carrier f of serving cell c in each slot within the following range (lower limit PCMAX_L,f,c to upper limit PCMAX_H,f,c). That is, as shown by the underlined part of the following formula, an extension introducing Power_childlink is performed in the calculation of PCMAX.
Equation
[0078] <Operation example of IAB node in FR2> In this example, the maximum output power PCMAX,f,c in carrier f of serving cell c may be set so that it is within the following range. That is, as shown by the underlined part of the following formula, an extension introducing Power_childlink is performed in the calculation of the corresponding EIRP of PCMAX. UMAX,f,c
Equation
[0079] In another example of the following IAB node operation, Power_childlink represents an additional power reduction due to simultaneous transmission of the child link in addition to the power reduction by MPR or PMPR.
[0080] <Another example of the operation of the IAB node in FR1> That is, in this example, the UE is allowed to set the maximum output power PCMAX,f,c of carrier f in serving cell c in each slot within the following range (upper limit value PCMAX_H,f,c to lower limit value PCMAX_L,f,c). That is, as shown by the underlined part of the following formula, an extension introducing -Power_childlink is performed in the calculation of PCMAX. [Number]
[0081] <Another example of the operation of the IAB node in FR2> In this example, the maximum output power PCMAX,f,c of carrier f in serving cell c may be set so that the corresponding measured peak EIRP P UMAX,f,c is within the following range. That is, as shown by the underlined part of the following formula, an extension introducing -Power_childlink is performed in the calculation of the corresponding EIRP of PCMAX. [Number]
[0082] According to the above operation examples or alternative examples of the IAB node in FR1 and FR2, the MT can reduce PCMAX in response to the simultaneous transmission of the child link. Note that in this example, the UE operation of UL power control (i.e., the operation of the IAB node) has no change except for the understanding of PCMAX.
[0083] Note that in the above operation example 1-1, the following options may be adopted. (Option 1) Do not change the PHR calculation method. (Option 2) Notify the applicability of PCMAX with the PHR MAC CE.
[0084] In option 1, there is no change to the PHR except for the understanding of PCMAX. In this case, IAB nodes may reduce PCMAX for simultaneous transmissions on child links, assuming that Power_childlink is always applied.
[0085] In option 2, the PHR MAC CE can include an indication of whether PCMAX is being reduced due to child link transmissions, for example a single bit indication of 1 or 0, allowing PCMAX to have different values depending on whether there is a power reduction due to simultaneous child link transmissions or not.
[0086] In addition, in the operation example 1-1, there are the following options for reporting "Power_childlink". (Option 1) Do not report the Power_childlink value to networks such as gNB. (Option 2) Report the Power_childlink value to networks such as gNB.
[0087] A new MAC CE may be introduced for this reporting, or the existing PHR MAC CE may be extended to include the value for this reporting.
[0088] (3.3.1.2) Operation example 1-2 In this operation example 1-2, the DL transmission power of the DU is taken into consideration in the operation of the power control of the MT of the IAB node. More specifically, the transmission power to the child node is reported to the parent node so that the parent node can control the power. In this example, Power_childlink represents the additional power reduction of PCMAX due to simultaneous transmission of the child link, as shown below. Note that in this operation example 1-2, the formula for PCMAX itself is not changed.
[0089] In this operation example, "Power_Childlink" is added to the formula for calculating the transmission power of each UL channel signal. For example, the IAB node MT operation of PUSCH power control is as follows, and introduces an additional power reduction of PCMAX as shown in the underlined part.
number
[0090] In addition, the IAB node MT operation of PUCCH power control is as follows, which introduces an additional power reduction of PCMAX as shown in the underlined part:
number
[0091] Also, the IAB node MT operation of SRS power control is as follows, which introduces an additional power reduction of PCMAX as shown in the underlined part:
number
[0092] In this operation example 1-2, it is necessary to inform the parent node of the value of Power_childlink (i.e., the DL transmission power value of the DU). For this report, a new MAC CE may be introduced. Alternatively, the existing PHR MAC CE may be extended to include the value of Power_childlink.
[0093] Based on Operation Example 1-2, the PHR has the following options: (Option 1) There is no change to the pH calculation. (Option 2) Consider "Power_childlink" when calculating PH.
[0094] As an option 2, for example, the power consumption of the child link is included in the PH calculation as follows. That is, as shown in the underlined part of the following formula, the power consumption of the child link is reduced in the PH calculation. Note that the PHR MAC CE may include a one-bit indication of whether the power consumption of the child link is included in the PH calculation.
number
[0095] In the above, the formula for PCMAX has been described taking the maximum output power set for the UE as an example, but when applying this to the IAB node MT, the formula may be simplified. For example, PMPR exists in the formula for PCMAX for the UE, but may be omitted in the formula for PCMAX for the IAB node. In addition, coefficients related to π / 2 BPSK and UL Duty cycle may be omitted.
[0096] (3.3.2.1) Operation example 2-1 In the following operation examples 2-1 and 2-2, UL power control is divided into cases where simultaneous transmission is performed and where it is not performed. First, in operation example 2-1, UL transmission power control is set for each case where simultaneous transmission is performed and where it is not performed. In other words, when transmitting simultaneously to a child link and a parent link, different UL power control parameters may be set to be used than when not transmitting simultaneously to the child link and the parent link. For example, two nominal power values may be set.
[0097] First, some background on UL power control parameters.
[0098] The following formula is used for PUSCH power control: P 0_PUSCH =P 0_Nominal_PUSCH +P 0_UE_PUSCH Here, P 0_Nominal_PUSCH is a cell-specific parameter provided by p0-NominalWithGrant. Also, P 0_UE_PUSCH is provided by the P0-PUSCH-AlphaSet and the P0-PUSCH-Set.
[0099] In addition, in PUSCH power control, f b,f,c(i,l) is the power control adjustment state for closed-loop power control, where l is the closed-loop index. More specifically, l={0, 1} indicates that the UE is configured with (two) twoPUSCH-PC-AdjustmentStates, and l=0 indicates that the UE is not configured with (two) twoPUSCH-PC-AdjustmentStates.
[0100] In addition, the following formula is used for PUCCH power control: P 0_PUCCH =P 0_Nominal_PUCCH +P 0_UE_PUCCH Here, P 0_Nominal_PUCCH is a cell-specific parameter provided by p0-Nominal. Also, P 0_UE_PUCCH is provided by P0-PUCCH. Also, g b,f,c (i,l) is the power control adjustment state for closed-loop power control, where l is the closed-loop index. l={0, 1} indicates that the UE is configured with (two) twoPUCCH-PC-AdjustmentStates, and l=0 indicates that the UE is not configured with (two) twoPUCCH-PC-AdjustmentStates.
[0101] In addition, in the SRS power control, P 0_SRS is provided by P0 in the SRS resource set configuration.
[0102] In this operation example 2-1, new power control parameters P0_nominal_PUSCH_IAB, and / or P0_UE_PUSCH_IAB, and / or P0_nominal_PUCCH_IAB, and / or P0_UE_PUCCH_IAB, and / or P0_SRS_IAB can be set for UL power control when there is simultaneous transmission on the child link.
[0103] Here, Fig. 6 is a diagram showing an example in which a new power control parameter is set in PUSCH-ConfigCommon, Fig. 7 is a diagram showing an example in which a new power control parameter is set in P0-PUSCH-AlphaSet, Fig. 8 is a diagram showing an example in which a new power control parameter is set in P0-PUSCH-Set-r16, Fig. 9 is a diagram showing an example in which a new power control parameter is set in PUCCH-ConfigCommon, Fig. 10 is a diagram showing an example in which a new power control parameter is set in P0-PUCCH, and Fig. 11 is a diagram showing an example in which a new power control parameter is set in SRS-ResourceSet. Note that the underlined parts shown in the figures are new extension parts.
[0104] That is, when there is simultaneous UL transmission on the parent link and simultaneous transmission on the child link (shown in "the case when there is simultaneous Tx on child link"), the new power control parameters are used, whereas when there is no simultaneous UL transmission on the parent link and simultaneous transmission on the child link (shown in "the case when there is no simultaneous Tx on child link"), the conventional power control parameters are used.
[0105] (3.3.2.2) Operation example 2-2 In this operation example 2-2, different power controls are performed for the cases of simultaneous transmission and non-simultaneous transmission. For example, the following method may be performed. Operation example 2-2-1: A method of extending f_(b,f,c) (i,l) and adding simultaneous transmission or not to the power control state Extend DCI format 2_2 Notify in DCI format 0_0 / 0_1 / 1_0 / 1_1 Option 1: Use 1 bit to indicate whether or not to transmit simultaneously Option 2: Determine whether or not to transmit simultaneously based on the resource settings Example 2-2-2: How to add a new setting parameter (x) Extend DCI format 2_2 and notify x Notify in DCI format 0_0 / 0_1 / 1_0 / 1_1 Option 1: Use 1 bit to indicate whether or not to transmit simultaneously Option 2: Determine whether or not to transmit simultaneously based on the resource settings
[0106] In this operation example 2-2, if there is a simultaneous transmission on the child link, a different closed-loop adjustment is calculated for the UL transmission when the new higher layer signaling indicates a different closed-loop adjustment state for the simultaneous transmission on the child link.
[0107] In this operation example 2-2-1, when there is simultaneous transmission in the child link in the PUSCH power control adjustment state f_(b,f,c)(i,l) and the PUCCH power control adjustment state g_(b,f,c)(i,l), a different closed-loop index l is used. For example, If the UE is configured with two PUSCH-PC-AdjustmentStates, use l={0, 1} if there is no simultaneous transmission on the child link, and use l={2, 3} if there is simultaneous transmission on the child link. If the UE is not configured with two PUSCH-PC-AdjustmentStates, l=0 is used if there is no simultaneous transmission on the child link, and l=1 is used if there is simultaneous transmission on the child link. If the UE is configured with two PUCCH-PC-AdjustmentStates, use l={0, 1} if there is no simultaneous transmission on the child link, and use l={2, 3} if there is simultaneous transmission on the child link. · If the UE is not configured with two PUCCH-PC-AdjustmentStates, l=0 is used if there are no simultaneous transmissions on the child links and l=1 is used if there are simultaneous transmissions on the child links.
[0108] In addition, in this operation example 2-2-2, a new index such as "x" is added to the power control adjustment state of the PUSCH / PUCCH. For example, for f_(b,f,c) (i,l,x) and g_(b,f,c) (i,l,x), x=0 is used when there is no simultaneous transmission on the child link, and x=1 is used when there is simultaneous transmission on the child link. Note that x=0 is used when higher layer signaling does not indicate a different power adjustment state for simultaneous transmission on the child link.
[0109] In option 1 of operation example 2-2-1, 1 bit is used in the DCI format to indicate whether or not simultaneous transmission is performed. In the TPC command of DCI format 2_2, the closed loop index can be specified. In the conventional DCI format 2_2, when two PUSCH-PC-AdjustmentStates or two PUCCH-PC-AdjustmentStates are set, the 1-bit closed loop indicator of DCI format 2_2 indicates the closed loop index. In other cases, the conventional closed loop indicator is 0 bit.
[0110] Therefore, DC format 2_2 is extended to increase the closed-loop indication to 2 bits if two PUSCH-PC-AdjustmentStates or two PUCCH-PC-AdjustmentStates are set, and to increase the closed-loop indication to 1 bit if two PUSCH-PC-AdjustmentStates or two PUCCH-PC-AdjustmentStates are not set.
[0111] The following options are available in a TPC (Transmission Power Control) command of DCI format 0_0, 0_1, 1_0, or 1_1. Option 1: One bit indicates TPC with no simultaneous transmissions or with simultaneous transmissions on the child link. Option 2: Determine the closed-loop index implicitly. For example, if there is a hard-DL or soft-DL DU symbol indicated as available (IA) in the DU symbol overlapping with the scheduled MT UL transmission, determine the TPC for simultaneous transmission, otherwise determine the TPC for no simultaneous transmission. Note that for hard-DL, if link direction reporting of the F symbol of the DU is supported, hard F is reported as DL. Also, for soft-DL, if link direction reporting of the F symbol of the DU is supported, soft F is reported as DL.
[0112] In operation example 2-2-2, the TPC command of DCI format 2_2 is extended, and a new field of 1 bit is used to indicate "x". If the new higher layer signaling indicates a different closed-loop adjustment state for simultaneous transmission of child links, the new indicator is 1 bit, otherwise it is 0 bit. Note that in the case of the TPC command of DCI format 0_0 or 0_1 or 1_0 or 1_1, it is the same as operation example 2-2-1.
[0113] Note that for option 1, one bit is used to explicitly indicate "x", while for option 2, the closed-loop index can be determined implicitly. For example, if there is a hard-DL or soft-DL DU symbol indicated as IA in the DU symbol overlapping with the UL transmission of the scheduled MT, the TPC is determined as if there is a simultaneous transmission, i.e., x=1, otherwise the TPC is determined as if there is no simultaneous transmission, i.e., x=0.
[0114] (3.3.3) Example 3 In the operation example 3, the IAB node 100B transmits capability information indicating capability regarding simultaneous transmission to the network such as the upper node 100A. For example, the following information indicating the capability of the IAB may be added. -Whether or not the UL transmission power of IAB-MT can be supported considering the transmission power of IAB-DU ·Whether "Power childlink" can be applied to PCMAX ·Whether to report "Power childlink" -Whether to set whether to transmit UL power control parameters simultaneously -Whether to set simultaneous transmission of UL transmission power control
[0115] In other words, the following Capabilities may be indicated as new IAB features and signaling: · Whether the new IAB UL power control is supported (for simultaneous transmission of child links) ·Whether to apply Power_childlink to PCMAX · Whether to report the value of Power_childlink Whether to support different UL power control parameters in case of simultaneous transmission of child links ·Whether to support different closed-loop regulation states in case of simultaneous transmission of child links
[0116] (4) Actions and Effects According to the above-described embodiment, the following advantageous effects can be obtained. Specifically, in controlling the UL transmission power to an upper node (wireless communication node 100A), the wireless communication node (wireless communication node 100B) assumes DL transmission power to the lower node that can share the transmission power when simultaneous transmission to the upper node (wireless communication node 100A) and a lower node (e.g., UE 200) is performed.
[0117] As a result, in the past, when simultaneous transmission was performed intra-panel, the transmission power was divided between UL transmission and DL transmission, which could result in the DL transmission affecting the UL PCMAX, PHR, etc., making it impossible to perform normal simultaneous transmission. However, in this embodiment, even in an IAB node with limited transmission power, it is possible to reduce the UL transmission power in response to the DL transmission involved in the simultaneous transmission.
[0118] In addition, in this embodiment, DL transmission power is assumed in the calculation of the maximum transmission power (PCMAX) and / or the available transmission power (PH). This makes it possible to calculate an appropriate maximum transmission power (PCMAX) and / or the available transmission power (PH) taking into account the DL transmission power value of the child link in simultaneous transmission in which DL transmission of the child link affects the maximum transmission power (PCMAX) and / or the available transmission power (PHR) of the parent link, thereby realizing normal simultaneous transmission.
[0119] In addition, in this embodiment, the UL transmission power control to the upper node (wireless communication node 100A) is performed taking into account the DL transmission power. This makes it possible to execute UL transmission power control appropriate for simultaneous transmission, taking into account the presence or absence of DL transmission power, the power value, etc.
[0120] In addition, in this embodiment, when a wireless communication node (wireless communication node 100B) performs simultaneous transmission to an upper node and a lower node (e.g., UE 200) in controlling the UL transmission power to an upper node (wireless communication node 100A), the wireless communication node assumes UL transmission power control to the upper node that is different from the case where the simultaneous transmission is not performed.
[0121] As a result, when simultaneous transmission is performed, UL transmission power control suitable for simultaneous transmission, which is different from when simultaneous transmission is not performed, can be performed, making it possible to realize normal simultaneous transmission and normal non-simultaneous transmission.
[0122] Furthermore, in this embodiment, when simultaneous transmission is performed, unlike when simultaneous transmission is not performed, UL transmission power control is set and / or executed assuming DL transmission power to a lower node (e.g., UE 200). This makes it possible to separate the setting and / or execution of UL transmission power control for non-simultaneous transmission from the setting and / or execution of UL transmission power control for simultaneous transmission, thereby realizing normal simultaneous transmission and normal non-simultaneous transmission.
[0123] In addition, in this embodiment, the presence and / or possibility of simultaneous transmission to an upper node (wireless communication node 100A) and a lower node (e.g., UE 200), resource configuration and / or timing information in the case of such simultaneous transmission, UL transmission power to the lower node, information taking into account such UL transmission power (PCMAX and PHR, which are different from conventional information), and / or capability information indicating the capability regarding such simultaneous transmission is transmitted to the upper node (wireless communication node 100A) or the network.
[0124] This allows the upper node (wireless communication node 100A) or the network to know information such as the presence or absence of child link transmission, transmission power, resources, timing, and capability information regarding simultaneous transmission, and can perform appropriate UL scheduling or power control, etc.
[0125] (5) Other embodiments Although the embodiment has been described above, it will be apparent to those skilled in the art that the present invention is not limited to the description of the embodiment and that various modifications and improvements are possible.
[0126] In the above embodiment, an example of controlling UL transmission power by assuming (taking into account / taking into account) DL transmission power has been mainly described, but the present invention is not limited to this, and DL transmission power may be controlled by assuming (taking into account / taking into account) UL transmission power in the opposite manner to the above (replace UL transmission power with DL transmission power in the above). In this way, in this embodiment, UL transmission power and / or DL transmission power may be controlled by assuming (taking into account / taking into account) DL transmission power and / or UL transmission power.
[0127] In addition, for example, in the above-mentioned embodiment, the names of parent node, IAB node, and child node are used, but as long as a wireless communication node configuration in which a wireless backhaul between wireless communication nodes such as gNBs and wireless access to terminals are integrated is adopted, the names may be different. For example, they may be simply called a first node, a second node, etc., or may be called an upper node, a lower node, a relay node, an intermediate node, etc.
[0128] Furthermore, the wireless communication node may simply be called a communication device or a communication node, and may be read as a wireless base station.
[0129] In the above-described embodiment, the terms downlink (DL) and uplink (UL) are used, but other terms may be used. For example, they may be replaced with or correspond to terms such as forward link, reverse link, access link, and backhaul. Alternatively, terms such as first link, second link, first direction, and second direction may simply be used.
[0130] Moreover, the block diagrams (FIGS. 3 to 5) used in the description of the above-mentioned embodiments show functional blocks. These functional blocks (components) are realized by any combination of at least one of hardware and software. Moreover, the method of realizing each functional block is not particularly limited. That is, each functional block may be realized by using one device that is physically or logically combined, or may be realized by using two or more devices that are physically or logically separated and directly or indirectly connected (for example, by using wires, wirelessly, etc.). The functional block may be realized by combining the one device or the multiple devices with software.
[0131] Functions include, but are not limited to, judgment, determination, judgment, calculation, computation, processing, derivation, investigation, search, confirmation, reception, transmission, output, access, resolution, selection, selection, establishment, comparison, assumption, expectation, consideration, broadcasting, notifying, communicating, forwarding, configuring, reconfiguring, allocating, mapping, and assignment. For example, a functional block (component) that performs the function of transmission is called a transmitting unit or a transmitter. As described above, there is no particular limitation on the method of realization of any of these.
[0132] Furthermore, the above-mentioned CU 50, the wireless communication nodes 100A to 100C, and the UE 200 (the device) may function as a computer that performs processing of the wireless communication method of the present disclosure. Fig. 12 is a diagram showing an example of a hardware configuration of the device. As shown in Fig. 12, the device may be configured as a computer device including a processor 1001, a memory 1002, a storage 1003, a communication device 1004, an input device 1005, an output device 1006, and a bus 1007.
[0133] In the following description, the term "apparatus" may be interpreted as a circuit, a device, a unit, etc. The hardware configuration of the apparatus may be configured to include one or more of the apparatuses shown in the drawings, or may be configured to exclude some of the apparatuses.
[0134] Each functional block of the device (see FIGS. 3 to 5) is realized by any hardware element of the computer device, or a combination of the hardware elements.
[0135] In addition, each function in the device is realized by loading a specific software (program) onto hardware such as the processor 1001, memory 1002, etc., so that the processor 1001 performs calculations, controls communication by the communication device 1004, and controls at least one of reading and writing of data in the memory 1002 and storage 1003.
[0136] The processor 1001 controls the entire computer by running, for example, an operating system, and may be configured by a central processing unit (CPU) including an interface with peripheral devices, a control unit, an arithmetic unit, a register, and the like.
[0137] Furthermore, the processor 1001 reads out programs (program codes), software modules, data, etc. from at least one of the storage 1003 and the communication device 1004 into the memory 1002, and executes various processes according to these. As the programs, programs that cause a computer to execute at least a part of the operations described in the above-mentioned embodiments are used. Furthermore, the above-mentioned various processes may be executed by one processor 1001, or may be executed simultaneously or sequentially by two or more processors 1001. The processor 1001 may be implemented by one or more chips. The programs may be transmitted from a network via a telecommunications line.
[0138] The memory 1002 is a computer-readable recording medium, and may be configured by at least one of, for example, a Read Only Memory (ROM), an Erasable Programmable ROM (EPROM), an Electrically Erasable Programmable ROM (EEPROM), a Random Access Memory (RAM), etc. The memory 1002 may also be called a register, a cache, a main memory (primary storage device), etc. The memory 1002 can store a program (program code), a software module, etc., capable of executing a method according to an embodiment of the present disclosure.
[0139] Storage 1003 is a computer-readable recording medium, and may be composed of at least one of, for example, an optical disk such as a Compact Disc ROM (CD-ROM), a hard disk drive, a flexible disk, a magneto-optical disk (e.g., a compact disk, a digital versatile disk, a Blu-ray (registered trademark) disk), a smart card, a flash memory (e.g., a card, a stick, a key drive), a floppy (registered trademark) disk, a magnetic strip, and the like. Storage 1003 may be referred to as an auxiliary storage device. The above-mentioned recording medium may be, for example, a database, a server, or other suitable medium including at least one of memory 1002 and storage 1003.
[0140] The communication device 1004 is hardware (transmission / reception device) for performing communication between computers via at least one of a wired network and a wireless network, and is also called, for example, a network device, a network controller, a network card, or a communication module.
[0141] The communication device 1004 may be configured to include a high-frequency switch, a duplexer, a filter, a frequency synthesizer, and the like to realize, for example, at least one of Frequency Division Duplex (FDD) and Time Division Duplex (TDD).
[0142] The input device 1005 is an input device (e.g., a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.) that accepts input from the outside. The output device 1006 is an output device (e.g., a display, a speaker, an LED lamp, etc.) that performs output to the outside. The input device 1005 and the output device 1006 may be integrated into one device (e.g., a touch panel).
[0143] In addition, each device such as the processor 1001 and the memory 1002 is connected by a bus 1007 for communicating information. The bus 1007 may be configured using a single bus, or may be configured using different buses between each device.
[0144] Furthermore, the device may be configured to include hardware such as a microprocessor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a programmable logic device (PLD), a field programmable gate array (FPGA), etc., and some or all of the functional blocks may be realized by the hardware. For example, the processor 1001 may be implemented using at least one of these pieces of hardware.
[0145] Furthermore, the notification of information is not limited to the aspects / embodiments described in the present disclosure, and may be performed using other methods. For example, the notification of information may be performed by physical layer signaling (e.g., Downlink Control Information (DCI), Uplink Control Information (UCI)), higher layer signaling (e.g., RRC signaling, Medium Access Control (MAC) signaling, broadcast information (Master Information Block (MIB), System Information Block (SIB)), other signals, or a combination of these. Furthermore, the RRC signaling may be called an RRC message, and may be, for example, an RRC Connection Setup message, an RRC Connection Reconfiguration message, or the like.
[0146] Each aspect / embodiment described in the present disclosure may be implemented in accordance with Long Term Evolution (LTE), LTE-Advanced (LTE-A), SUPER 3G, IMT-Advanced, 4th generation mobile communication system (4G), 5 th The present invention may be applied to at least one of a system using a next-generation mobile communication system (5G), Future Radio Access (FRA), New Radio (NR), W-CDMA (registered trademark), GSM (registered trademark), CDMA2000, Ultra Mobile Broadband (UMB), IEEE 802.11 (Wi-Fi (registered trademark)), IEEE 802.16 (WiMAX (registered trademark)), IEEE 802.20, Ultra-WideBand (UWB), Bluetooth (registered trademark), or other suitable system, and a next-generation system extended based on these. In addition, a combination of a plurality of systems (for example, a combination of at least one of LTE and LTE-A and 5G) may be applied.
[0147] The order of the steps, sequences, flow charts, etc. of each aspect / embodiment described in this disclosure may be changed unless inconsistent. For example, the methods described in this disclosure present elements of various steps using an example order, and are not limited to the particular order presented.
[0148] In the present disclosure, a specific operation performed by a base station may be performed by its upper node in some cases. In a network consisting of one or more network nodes having a base station, it is clear that various operations performed for communication with a terminal may be performed by at least one of the base station and other network nodes other than the base station (e.g., MME or S-GW, etc., but are not limited to these). Although the above example illustrates a case in which there is one other network node other than the base station, it may also be a combination of multiple other network nodes (e.g., MME and S-GW).
[0149] Information, signals (information, etc.) may be output from a higher layer (or a lower layer) to a lower layer (or a higher layer), and may be input and output via multiple network nodes.
[0150] The input / output information may be stored in a specific location (e.g., memory) or may be managed using a management table. The input / output information may be overwritten, updated, or appended. The output information may be deleted. The input information may be transmitted to another device.
[0151] The determination may be based on a value represented by a single bit (0 or 1), a Boolean (true or false) value, or a numerical comparison (e.g., comparison with a predetermined value).
[0152] Each aspect / embodiment described in this disclosure may be used alone, in combination, or switched according to execution. In addition, notification of specific information (e.g., notification that "X is the case") is not limited to being done explicitly, but may be done implicitly (e.g., not notifying the specific information).
[0153] Software shall be construed broadly to mean instructions, instruction sets, code, code segments, program code, programs, subprograms, software modules, applications, software applications, software packages, routines, subroutines, objects, executable files, threads of execution, procedures, functions, etc., whether referred to as software, firmware, middleware, microcode, hardware description language, or otherwise.
[0154] Additionally, software, instructions, information, etc. may be transmitted or received over a transmission medium. For example, if the software is transmitted from a website, server, or other remote source using wired and / or wireless technologies (such as coaxial cable, fiber optic cable, twisted pair, Digital Subscriber Line (DSL)), and / or wireless technologies (such as infrared, microwave, etc.), then these wired and / or wireless technologies are included within the definition of transmission media.
[0155] The information, signals, etc. described in this disclosure may be represented using any of a variety of different technologies. For example, the data, instructions, commands, information, signals, bits, symbols, chips, etc. that may be referred to throughout the above description may be represented by voltages, currents, electromagnetic waves, magnetic fields or magnetic particles, optical fields or photons, or any combination thereof.
[0156] In addition, the terms described in this disclosure and the terms necessary for understanding this disclosure may be replaced with terms having the same or similar meanings. For example, at least one of a channel and a symbol may be a signal (signaling). Also, a signal may be a message. Also, a component carrier (CC) may be called a carrier frequency, a cell, a frequency carrier, etc.
[0157] As used in this disclosure, the terms "system" and "network" are used interchangeably.
[0158] In addition, the information, parameters, etc. described in the present disclosure may be represented using absolute values, may be represented using relative values from a predetermined value, or may be represented using other corresponding information. For example, a radio resource may be indicated by an index.
[0159] The names used for the above-mentioned parameters are not limiting in any way. Furthermore, the formulas using these parameters may differ from those explicitly disclosed in this disclosure. The various channels (e.g., PUCCH, PDCCH, etc.) and information elements may be identified by any suitable names, and therefore the various names assigned to these various channels and information elements are not limiting in any way.
[0160] In this disclosure, terms such as "base station (BS)", "radio base station", "fixed station", "NodeB", "eNodeB (eNB)", "gNodeB (gNB)", "access point", "transmission point", "reception point", "transmission / reception point", "cell", "sector", "cell group", "carrier", "component carrier", etc. may be used interchangeably. A base station may also be referred to by terms such as a macro cell, a small cell, a femto cell, a pico cell, etc.
[0161] A base station can accommodate one or more (e.g., three) cells (also called sectors). When a base station accommodates multiple cells, the entire coverage area of the base station can be divided into multiple smaller areas, and each smaller area can also be provided with communication services by a base station subsystem (e.g., a small indoor base station (Remote Radio Head: RRH)).
[0162] The term "cell" or "sector" refers to part or all of the coverage area of a base station and / or a base station subsystem that provides communication services within that coverage.
[0163] In this disclosure, the terms "Mobile Station (MS)", "user terminal", "User Equipment (UE)", "terminal", etc. may be used interchangeably.
[0164] A mobile station may also be referred to by those skilled in the art as a subscriber station, mobile unit, subscriber unit, wireless unit, remote unit, mobile device, wireless device, wireless communication device, remote device, mobile subscriber station, access terminal, mobile terminal, wireless terminal, remote terminal, handset, user agent, mobile client, client, or some other suitable terminology.
[0165] At least one of the base station and the mobile station may be called a transmitting device, a receiving device, a communication device, etc. At least one of the base station and the mobile station may be a device mounted on a moving body, the moving body itself, etc. The moving body may be a vehicle (e.g., a car, an airplane, etc.), an unmanned moving body (e.g., a drone, an autonomous vehicle, etc.), or a robot (manned or unmanned). At least one of the base station and the mobile station may include a device that does not necessarily move during communication operation. For example, at least one of the base station and the mobile station may be an Internet of Things (IoT) device such as a sensor.
[0166] Furthermore, a base station in the present disclosure may be read as a mobile station (user terminal, the same applies below). For example, each aspect / embodiment of the present disclosure may be applied to a configuration in which communication between a base station and a mobile station is replaced with communication between multiple mobile stations (which may be called, for example, Device-to-Device (D2D) or Vehicle-to-Everything (V2X)). In this case, the mobile station may be configured to have the functions of a base station. Furthermore, terms such as "uplink" and "downlink" may be read as terms corresponding to communication between terminals (for example, "side"). For example, an uplink channel, a downlink channel, etc. may be read as a side channel.
[0167] Similarly, a mobile station in the present disclosure may be interpreted as a base station, in which case the base station may have the functions of a mobile station.
[0168] A radio frame may be composed of one or more frames in the time domain, where each of the one or more frames in the time domain may be referred to as a subframe. A subframe may further be composed of one or more slots in the time domain. A subframe may have a fixed time length (e.g., 1 ms) that is independent of numerology.
[0169] Numerology may be a communication parameter that applies to the transmission and / or reception of a signal or channel, and may indicate, for example, at least one of a SubCarrier Spacing (SCS), a bandwidth, a symbol length, a Cyclic Prefix length, a Transmission Time Interval (TTI), a number of symbols per TTI, a radio frame structure, a particular filtering operation that the transceiver performs in the frequency domain, a particular windowing operation that the transceiver performs in the time domain, etc.
[0170] A slot may consist of one or more symbols in the time domain (such as an Orthogonal Frequency Division Multiplexing (OFDM) symbol, a Single Carrier Frequency Division Multiple Access (SC-FDMA) symbol, etc.) A slot may be a numerology-based unit of time.
[0171] A slot may include multiple minislots. Each minislot may be composed of one or more symbols in the time domain. A minislot may also be called a subslot. A minislot may be composed of fewer symbols than a slot. A PDSCH (or PUSCH) transmitted in a time unit larger than a minislot may be called PDSCH (or PUSCH) mapping type A. A PDSCH (or PUSCH) transmitted using a minislot may be called PDSCH (or PUSCH) mapping type B.
[0172] A radio frame, a subframe, a slot, a minislot, and a symbol each represent a time unit for transmitting a signal. The radio frame, the subframe, the slot, the minislot, and the symbol may each be referred to by a different name.
[0173] For example, one subframe may be called a transmission time interval (TTI), multiple consecutive subframes may be called a TTI, or one slot or one minislot may be called a TTI. That is, at least one of the subframe and the TTI may be a subframe (1 ms) in the existing LTE, a period shorter than 1 ms (for example, 1-13 symbols), or a period longer than 1 ms. Note that the unit representing the TTI may be called a slot, minislot, etc., instead of a subframe.
[0174] Here, TTI refers to, for example, the minimum time unit for scheduling in wireless communication. For example, in an LTE system, a base station performs scheduling to allocate radio resources (such as frequency bandwidth and transmission power that can be used by each user terminal) to each user terminal in TTI units. Note that the definition of TTI is not limited to this.
[0175] The TTI may be a transmission time unit for a channel-encoded data packet (transport block), a code block, a code word, etc., or may be a processing unit for scheduling, link adaptation, etc. When a TTI is given, the time interval (e.g., the number of symbols) in which a transport block, a code block, a code word, etc. are actually mapped may be shorter than the TTI.
[0176] In addition, when one slot or one minislot is called TTI, one or more TTIs (i.e., one or more slots or one or more minislots) may be the minimum time unit of scheduling. Also, the number of slots (minislots) constituting the minimum time unit of scheduling may be controlled.
[0177] A TTI having a time length of 1 ms may be called a normal TTI (TTI in LTE Rel. 8-12), a normal TTI, a long TTI, a normal subframe, a normal subframe, a long subframe, a slot, etc. A TTI shorter than a normal TTI may be called a shortened TTI, a short TTI, a partial or fractional TTI, a shortened subframe, a short subframe, a minislot, a subslot, a slot, etc.
[0178] In addition, a long TTI (e.g., a normal TTI, a subframe, etc.) may be interpreted as a TTI having a time length exceeding 1 ms, and a short TTI (e.g., a shortened TTI, etc.) may be interpreted as a TTI having a TTI length shorter than the TTI length of a long TTI and equal to or greater than 1 ms.
[0179] A resource block (RB) is a resource allocation unit in the time domain and the frequency domain, and may include one or more consecutive subcarriers in the frequency domain. The number of subcarriers included in an RB may be the same regardless of the numerology, for example, 12. The number of subcarriers included in an RB may be determined based on the numerology.
[0180] In addition, the time domain of the RB may include one or more symbols and may be one slot, one minislot, one subframe, or one TTI in length. Each of one TTI, one subframe, etc. may be composed of one or more resource blocks.
[0181] One or more RBs may be called a physical resource block (PRB), a sub-carrier group (SCG), a resource element group (REG), a PRB pair, an RB pair, or the like.
[0182] Furthermore, a resource block may be composed of one or more resource elements (REs). For example, one RE may be a radio resource region of one subcarrier and one symbol.
[0183] A Bandwidth Part (BWP), which may also be referred to as a fractional bandwidth, may represent a subset of contiguous common resource blocks (RBs) for a numerology on a carrier, where the common RBs may be identified by the index of the RBs relative to a common reference point of the carrier. PRBs may be defined in a BWP and numbered within the BWP.
[0184] The BWP may include a BWP for UL (UL BWP) and a BWP for DL (DL BWP). One or more BWPs may be configured for a UE within one carrier.
[0185] At least one of the configured BWPs may be active, and the UE may not expect to transmit or receive a given signal / channel outside the active BWP. Note that the terms "cell", "carrier", etc. in this disclosure may be replaced with "BWP".
[0186] The above-mentioned structures of radio frames, subframes, slots, minislots, symbols, etc. are merely examples. For example, the number of subframes included in a radio frame, the number of slots per subframe or radio frame, the number of minislots included in a slot, the number of symbols and RBs included in a slot or minislot, the number of subcarriers included in an RB, the number of symbols in a TTI, the symbol length, the cyclic prefix (CP) length, etc. may be changed in various ways.
[0187] The terms "connected," "coupled," or any variation thereof, refer to any direct or indirect connection or coupling between two or more elements, and may include the presence of one or more intermediate elements between two elements that are "connected" or "coupled" to each other. The coupling or connection between elements may be physical, logical, or a combination thereof. For example, "connected" may be read as "access." As used in this disclosure, two elements may be considered to be "connected" or "coupled" to each other using at least one of one or more wires, cables, and printed electrical connections, as well as electromagnetic energy having wavelengths in the radio frequency range, microwave range, and optical (both visible and invisible) range, as some non-limiting and non-exhaustive examples.
[0188] The reference signal may also be abbreviated as Reference Signal (RS), and may be called a pilot depending on the applicable standard.
[0189] As used in this disclosure, the phrase "based on" does not mean "based only on," unless expressly stated otherwise. In other words, the phrase "based on" means both "based only on" and "based at least on."
[0190] The "means" in the configuration of each of the above devices may be replaced with "part," "circuit," "device," etc.
[0191] Any reference to an element using a designation such as "first," "second," etc., used in this disclosure does not generally limit the quantity or order of those elements. These designations may be used in this disclosure as a convenient way to distinguish between two or more elements. Thus, a reference to a first and a second element does not imply that only two elements may be employed therein or that the first element must precede the second element in some way.
[0192] When the terms "include," "including," and variations thereof are used in this disclosure, these terms are intended to be inclusive, as is the term "comprising." Further, as used in this disclosure, the term "or" is not intended to be an exclusive or.
[0193] In this disclosure, where articles have been added due to translation, such as a, an, and the in English, the disclosure may include that the nouns following these articles are in the plural form.
[0194] As used in this disclosure, the terms "determining" and "determining" may encompass a wide variety of actions. "Determining" and "determining" may include, for example, judging, calculating, computing, processing, deriving, investigating, looking up, search, inquiry (e.g., searching in a table, database, or other data structure), ascertaining, and the like. "Determining" and "determining" may also include receiving (e.g., receiving information), transmitting (e.g., sending information), input, output, accessing (e.g., accessing data in a memory), and the like. In addition, "judgment" and "decision" can include considering resolving, selecting, choosing, establishing, comparing, etc., to be a "judgment" or "decision." In other words, "judgment" and "decision" can include considering some action to be a "judgment" or "decision." In addition, "judgment" can be interpreted as "assuming," "expecting," "considering," etc.
[0195] In the present disclosure, the term "A and B are different" may mean "A and B are different from each other." The term may also mean "A and B are each different from C." Terms such as "separate" and "coupled" may also be interpreted in the same way as "different."
[0196] Although the present disclosure has been described in detail above, it is clear to those skilled in the art that the present disclosure is not limited to the embodiments described in the present disclosure. The present disclosure can be implemented in modified and altered forms without departing from the spirit and scope of the present disclosure as defined by the claims. Therefore, the description of the present disclosure is intended to be illustrative and does not have any limiting meaning on the present disclosure. [Explanation of symbols]
[0197] 10. Wireless communication systems 50 CU 100A, 100B, 100C wireless communication nodes 110 Radio transmitter 120 Radio receiver 130 NW IF Section 140 Transmission related information receiving unit 150 Control section 160 Connection 161 Radio transmitter 162 Radio receiving unit 170 Control section 180 Transmission related information transmission section UE 200 210 Radio transmitter 220 Radio receiving unit 230 Transmission related information receiving unit 240 Control Unit 1001 Processor 1002 Memory 1003 Storage 1004 Communication equipment 1005 Input Device 1006 Output device 1007 Bus
Claims
1. a connection part used for connecting to a higher-level node and connecting to a lower-level node; a control unit that, in a transmission power control of an uplink to the upper node, assumes a transmission power of a downlink to the lower node that can share the transmission power when simultaneous transmission is performed to the upper node and the lower node; Equipped with The control unit assumes a transmission power of the downlink in calculating the power headroom. Wireless communication node.
2. The wireless communication node according to claim 1 , wherein the control unit controls transmission power of an uplink to the upper node, taking into account transmission power of the downlink.
3. 3. The wireless communication node according to claim 1, further comprising a transmission unit that transmits to the upper node or to a network the presence or absence and / or possibility of simultaneous transmission to the upper node and the lower node, resource configuration and / or timing information in the case of the simultaneous transmission, downlink transmission power to the lower node, information taking into account the downlink transmission power, and / or capability information indicating the capability regarding the simultaneous transmission.
