PUSCH transmission method, device, equipment and storage medium
By using the received instruction information in the terminal to determine the target transmission resource arrangement, the DCI bit overflow problem caused by PUSCH transmission in the MTRP scenario is solved, and more efficient transmission resource management is achieved.
Patent Information
- Application Number
- JP2023541935
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2021-01-15
- Filing Date
- 2022-01-14
- Publication Date
- 2025-04-21
- Estimated Expiration
- 2042-01-14
AI Technical Summary
In the MTRP scenario, the DCI overshoot required for repeated transmission of PUSCH, especially due to the increase in parameters of the TPMI and SRS resource sets, resulting in bit overflow of the DCI.
The target transmission resource arrangement is determined by using the received instruction information in the terminal, including the SRS resource indication information and the TPMI indication information, and when necessary, PTRS transmission port indication information is used to reduce bit overflow of the SRI and TPMI fields.
It effectively reduces the bit overflow of DCI when PUSCH transmission resource allocation, and supports more flexible management of multiple transmission relationships in MTRP scenarios without increasing the bit capacity of DCI.
Smart Images

Figure 0007665759000010 
Figure 0007665759000011 
Figure 0007665759000012
Abstract
Description
[Technical field]
[0001] (CROSS REFERENCE TO RELATED APPLICATIONS) This application claims priority to China Patent Application No. 202110057894.8, filed in China on January 15, 2021, the entire contents of which are incorporated herein by reference.
[0002] The present application relates to the field of communication technology, and in particular to a PUSCH transmission method, device, apparatus, and storage medium. [Background technology]
[0003] In a Multi-Path Reliable Tree-Based Routing Protocol for Wireless Sensor Networks (MTRP) scenario, a Physical Uplink Shared Channel (PUSCH) transmission may adopt at least one set of spatial relationships and at least one set of wideband Transmitted Precoding Matrix Indicator (TPMI).
[0004] In the prior art, PUSCH repeat transmission supports adopting up to two sets of spatial relationships, but the corresponding TPMI also requires two sets of parameters. In the MTRP scenario, up to two SRS resource sets for codebook or non-codebook transmission can be configured. The SRI field and TPMI field of the corresponding downlink control information (DCI) that schedules PUSCH need to be expanded by twice the original number of bits to indicate the corresponding two sets of parameters, and the overhead of DCI becomes very large. Summary of the Invention [Problem to be solved by the invention]
[0005] An objective of the embodiments of the present application is to provide a PUSCH transmission method, device, apparatus, and storage medium that can reduce DCI overhead in an MTRP scenario. [Means for solving the problem]
[0006] According to a first aspect, there is provided a PUSCH transmission method, the method comprising: The terminal determines, based on the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; transmitting a PUSCH based on the target transmission resource allocation; Here, the first instruction information is Sounding Reference Signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; and a phase tracking reference signal, a phase tracking signal (PTRS), and a transmission port indication.
[0007] According to a second aspect, there is provided a PUSCH transmission method, the method comprising: The network side transmits first instruction information to the terminal; The first indication information is used to instruct a terminal to determine a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; a phase tracking reference signal, a PTRS, and a transmission port indication.
[0008] According to a third aspect, there is provided a PUSCH transmission device, the device comprising: a first determination module for determining, according to the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; a first transmission module for transmitting a PUSCH according to the target transmission resource configuration; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; and a phase tracking reference signal, a phase tracking signal (PTRS), and a transmission port indication.
[0009] According to a fourth aspect, there is provided a PUSCH transmission device, the device comprising: a first sending module for sending first instruction information to the terminal; The first indication information is used to instruct a terminal to determine a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; and a phase tracking reference signal, a phase tracking signal (PTRS), and a transmission port indication.
[0010] According to a fifth aspect there is provided a terminal device comprising a processor, a memory and a program or instructions stored in the memory and operable to run on the processor, the program or instructions being operable when executed by the processor to implement the steps of the method according to the first aspect.
[0011] According to a sixth aspect, there is provided a network side device comprising a processor, a memory, and a program or instructions stored in the memory and operable to run on the processor, the program or instructions, when executed by the processor, realising the steps of the method according to the second aspect.
[0012] According to a seventh aspect, there is provided a readable storage medium having a program or instructions stored thereon, the program or instructions, when executed by a processor, performing steps of the method according to the first aspect or performing steps of the method according to the second aspect.
[0013] According to an eighth aspect, there is provided a chip, the chip comprising a processor and a communication interface, the communication interface being coupled to the processor, the processor running a machine program or instructions to implement the method of the first aspect or to be used to implement the method of the second aspect. Effect of the Invention
[0014] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources. [Brief description of the drawings]
[0015] [Figure 1] 1 is a block diagram of a wireless communication system to which an embodiment of the present application can be applied. [Diagram 2] 2 is a flowchart of a PUSCH transmission method according to an embodiment of the present application; [Diagram 3] 2 is a second flowchart of a PUSCH transmission method according to an embodiment of the present application. [Figure 4]1 is a structural schematic diagram of a PUSCH transmission device according to an embodiment of the present application; [Diagram 5] 2 is a second structural schematic diagram of a PUSCH transmission device according to an embodiment of the present application; [Figure 6] 1 is a structural schematic diagram of a communication device according to an embodiment of the present application; [Figure 7] FIG. 2 is a schematic diagram of the hardware structure of a terminal device according to an embodiment of the present application; [Figure 8] FIG. 2 is a schematic diagram of the hardware structure of a network side device according to an embodiment of the present application; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] The following clearly describes the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only some of the embodiments of the present application, and not all of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present application are all within the scope of protection of the present application.
[0017] The terms "first," "second," etc. in the specification and claims of the present application are intended to distinguish between similar objects and are not intended to describe a particular order or sequence. It is to be understood that data so used are interchangeable where appropriate, such that the embodiments of the present application may be performed in an order other than that shown or described herein, and that the objects distinguished by "first" and "second" are generally of the same type and do not limit the number of objects, e.g., the first object may be one or more. Note that "and / or" in the specification and claims represents at least one of the objects connected, and the character " / " generally represents an "or" relationship between the related objects.
[0018] It should be noted that the techniques described in the embodiments of the present application are not limited to Long Term Evolution (LTE) / LTE-Advanced (LTE-A) systems, but can also be applied to other wireless communication systems, such as Code Division Multiple Access (CDMA), Time Division Multiple Access (TDMA), Frequency Division Multiple Access (FDMA), Orthogonal Frequency Division Multiple Access (OFDMA), Single-carrier Frequency-Division Multiple Access (SC-FDMA), and other systems. The terms "system" and "network" in the embodiments of the present application are always used interchangeably, and the techniques described may be used in the above-mentioned systems and radio technologies, or in other systems and radio technologies. Although the following description describes a New Radio (NR) system for illustrative purposes and uses NR terminology in most of the description below, these techniques may be applied to applications other than NR system applications, such as 6th Generation (6G) communication systems.
[0019] FIG. 1 is a block diagram of a wireless communication system to which the embodiment of the present application can be applied. The wireless communication system includes a terminal 11 and a network side device 12. Here, the terminal 11 may be called a terminal device or a user terminal (User Equipment, UE), and the terminal 11 may be a terminal side device such as a mobile phone, a tablet personal computer, a laptop computer (or called a notebook computer), a personal digital assistant (PDA), a palmtop computer, a netbook, an ultra-mobile personal computer (UMPC), a mobile Internet device (MID), a wearable device (Wearable Device) or a vehicle-mounted device (VUE), a pedestrian terminal (PUE), etc., and the wearable device includes a bracelet, an earphone, glasses, etc. It should be noted that the specific type of the terminal 11 in the embodiment of the present application is not limited. The network side equipment 12 may be a base station or a core network, where the base station may be called a Node B, an evolved Node B, an access point, a base transceiver station (BTS), a radio base station, a radio transceiver, a basic service set (BSS), an extended service set (ESS), a B node, an evolved B node (eNB), a home B node, a home evolved B node, a WLAN access point, a WiFi node, a transmitting receiving point (TRP), or any other suitable term in the art, and as long as the same technical effect is achieved, the base station is not limited to a specific technical term, and it should be explained that in the embodiments of this application, only a base station in an NR system is taken as an example, but the specific type of the base station is not limited.
[0020] In a multi-transmission point / multi-antenna panel (multi-TRP / multi-panel) scenario in a communication system, the reliability of transmission and the throughput performance can be increased. In a downlink link, a UE can receive the same or different data from multiple TRPs. In an uplink link, a UE can transmit different data to multiple TRPs. Here, multiple CORESETs that the network side can configure for a UE are associated with different RRC parameters CORESETPoolIndex and correspond to different TRPs. Each TRP schedules its uplink transmission PUSCH by transmitting its respective DCI, that is, in a multi-TRP scenario, a multi-DCI is adopted to schedule PUSCH transmission. The communication system further reinforces the PUSCH in the MTRP, and the UE can transmit the same data to two TRPs.
[0021] In the MTRP scenario, one transport block (TB) of the PUSCH can be repeatedly transmitted to multiple TRPs. The repeated transmission of the PUSCH adopts multiple sets of parameters including spatial relationships, precoding matrices, power control, etc., each for a different TRP. The conventional technology supports the repeated transmission of the PUSCH to adopt up to two sets of spatial relationships, and the corresponding TPMI also needs two sets of parameters. In the MTRP scenario, up to two SRS resource sets for codebook or non-codebook transmission can be configured. The SRI field and TPMI field of the corresponding DCI that schedules the PUSCH need to extend the original bit number by one to indicate the corresponding two sets of parameters. 0100
[0022] In uplink full power transmission, up to four SRS resources can be configured in each SRS resource set, and multiple TPMIs can be introduced to indicate full power transmission codebooks. However, the bit overhead of the SRI field and the TPMI field itself is very large. If the conventional method is continued to be adopted and the SRI field and the TPMI field are directly doubled, the overhead of the DCI will be very large. And the MTRP scenario may support PUSCH repetition transmission to more TRPs, in which case the conventional method will not be applicable.
[0023] In order to overcome the above drawbacks, this application proposes a PUSCH transmission method and apparatus.
[0024] Hereinafter, the PUSCH transmission method according to the embodiments of the present application will be described in detail with reference to several embodiments and application scenarios thereof in conjunction with the drawings.
[0025] FIG. 2 is a flowchart of a PUSCH transmission method according to an embodiment of the present application. As shown in FIG. 2, the method includes the following steps:
[0026] Step 200: the terminal determines, according to the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; Step 210. Transmitting a PUSCH according to the target transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; a phase tracking reference signal (PTRS) and a transmission port indication; The at least one transmission resource allocation includes: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or is indicated by the MAC layer.
[0027] Alternatively, the target transmission resource allocation may be a resource allocation for transmitting a PUSCH of the terminal.
[0028] Alternatively, for codebook-based PUSCH transmission, the network side may configure an SRS resource set obtained for the UE based on uplink transmission CSI, and each SRS resource set may include two SRS resources, where the number of ports included in the two SRS resources may be the same, that is, both may be 1, 2, or 4 ports. The two SRS resources are configured to correspond to different beams.
[0029] The network side obtains uplink channel information by measuring SRS on different SRS resources, selects parameters such as spatial relationship, precoding matrix, power control, MCS, etc. of PUSCH transmission for the UE based on the uplink channel information, and indicates these transmission parameters for the UE through the SRI field / TPMI field / TPC field / MCS field in DCI format 0_1 / 0_2 for scheduling PUSCH. The spatial relationship and port that are the same as the SRS resource indicated by the SRI field can be adopted when transmitting PUSCH.
[0030] Alternatively, for non-codebook transmission, four SRS resources may be configured in each resource set SRS resource set for non-codebook transmission, and the number of ports of all SRS resources may be 1. In each SRS resource set, an associated CSI-RS for the UE to measure a downlink channel may be configured, and based on channel reciprocity, the UE may assume that the measured downlink channel is an uplink channel, and may calculate a precoding matrix for uplink transmission based on the channel information, and may adopt the precoding matrix to precode the SRS and transmit it to the network side, and the network side may determine the precoding used by the UE to transmit the PUSCH based on the measured precoded SRS, and indicate it by the SRI field of the DCI for scheduling the PUSCH. That is, the precoding matrix to be adopted for the PUSCH transmission may be indicated by indicating a subset of all precoded SRS resources transmitted by the UE by the SRI field.
[0031] Alternatively, SRS resource indication information may be employed to indicate an SRS resource, and the terminal may employ a spatial relationship and a port that are the same as the SRS resource to transmit the PUSCH.
[0032] Alternatively, the indication TPMI indication information may be employed to indicate a precoding matrix, and the terminal may employ the precoding matrix to precode the SRS.
[0033] Alternatively, PTRS transmission port indication information may be employed to indicate the PTRS transmission port, and the PTRS-DMRS association field may indicate in which layer the PTRS is uploaded, and the terminal may determine in which layer the PTRS is uploaded.
[0034] Alternatively, one layer may correspond to one DM-RS port.
[0035] Alternatively, the TPMI indication information, the PTRS transmission port indication information, and the TPMI indication information may indicate corresponding information in resource allocation for transmitting the PUSCH by any one or any combination of the TPMI indication information.
[0036] Alternatively, after determining the target transmission resource allocation, that is, after determining the resource allocation for transmitting the PUSCH, the PUSCH may be transmitted based on the resource allocation for transmitting the PUSCH.
[0037] Optionally, the terminal may determine, according to first indication information in the DCI, a target transmission resource allocation indicated by the first indication information; Here, the first indication information is used to indicate a target transmission resource allocation among at least one transmission resource allocation.
[0038] Optionally, the network side may include first indication information in DCI and send it to the terminal, and the terminal may obtain the first indication information therein after receiving the DCI, and determine a target transmission resource allocation indicated by the first indication information; As can be understood, the first indication information only includes indication content, and the specific transmission resource configuration content may be separately sent to the terminal by the network side, or may be pre-defined or pre-configured by a protocol, or may be indicated by the RRC layer, or may be indicated by the MAC layer.
[0039] Optionally, in an MTRP scenario, the PUSCH transmission may adopt at least one set of spatial relationships, at least one set of TPMI.
[0040] Alternatively, multiple sets of spatial relationships, multiple sets of TPMI parameters may be proposed, i.e., one or multiple transmission resource allocations may be proposed; alternatively, corresponding resource indication may be performed by multiple indication methods, and it is possible to support transmitting PUSCH to multiple TRPs while ensuring low overhead of DCI for scheduling PUSCH repeated transmission.
[0041] Optionally, when determining a target transmission resource allocation indicated by the first indication information, the terminal may determine the target transmission resource allocation indicated by the first indication information in one or more transmission resource allocations based on the first indication information.
[0042] The embodiments of the present application indicate at least one transmission resource configuration, i.e., multiple sets of transmission parameters, for UE PUSCH repeated transmission, while ensuring that DCI overhead is not increased excessively.
[0043] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0044] Optionally, the SRS resource indication information includes an SRI field code point value; The terminal determines, based on first indication information in the DCI, a target transmission resource allocation indicated by the first indication information, determining target SRI field code point information among at least one SRI field code point information according to the SRI field code point value in the DCI; and determining, by the terminal, target SRI field code point information among at least one SRI field code point information, The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or being indicated by a MAC layer; Here, the SRI field code point information is associated with at least one SRS resource, or the SRI field code point information is associated with at least one SRS resource group.
[0045] Alternatively, the SRS resource indication information may include an SRI field code point value and may be a single low bit value.
[0046] Optionally, the at least one transmission resource configuration may include at least one SRI field code point information; Optionally, the SRI field codepoint information is associated with at least one SRS resource; Optionally, the SRI field code point information is associated with at least one SRS resource group; Optionally, the terminal can determine, based on the SRI field code point value, a target SRI field code point information indicated by the SRI field code point value among at least one SRI field code point information, and further obtain an SRS resource or an SRS resource group associated with the target SRI field code point information.
[0047] Alternatively, the different SRI field code point values have a one-to-one correspondence with the at least one SRI field code point information, and the correspondence between the different SRI field code point values and the at least one SRI field code point information is pre-indicated by a network side, or pre-defined by a protocol, or pre-configured, or indicated by a second signaling, and the second signaling is an RRC layer signaling or a MAC layer signaling.
[0048] Alternatively, the different SRI field code point values may have a one-to-one correspondence with at least one SRI field code point information, and the terminal can determine target SRI field code point information that has a one-to-one correspondence with the SRI field code point value among the at least one SRI field code point information based on the SRI field code point value.
[0049] Alternatively, the correspondence between different SRI field code point values and the at least one SRI field code point information may be pre-indicated by the network side, pre-defined by a protocol, pre-configured, or indicated by a second signaling, where the second signaling is an RRC layer signaling or a MAC layer signaling.
[0050] Optionally, the correspondence between different SRI field code point values and the at least one SRI field code point information may be described by a table.
[0051] For example, as shown in Table 1 below, the network side configures two SRS resource sets for non-codebook transmission for the UE, and four SRS resources (with indexes 0, 1, 2, and 3) are configured in each resource set, and the UE receives higher layer signaling MAC CE from the network side, which includes four codepoints, where the SRI field of the DCI is 2 bits and corresponds to the four codepoints.
[0052] [Table 1]
[0053] Based on Table 1, when the SRI field code point value of the DCI scheduling PUSCH repeat transmission is 0, it indicates that the PUSCH repeat transmission corresponds to one set of spatial relationships, and all repeat transmission occasions of the PUSCH are transmitted adopting the same spatial relationship as the first SRS resource of the first SRS resource set.
[0054] When the SRI field codepoint value of the DCI for scheduling a PUSCH repeat transmission is 1, this PUSCH repeat transmission corresponds to two sets of spatial relationships, the first spatial relationship is the same as the first SRS resource of the first SRS resource set, and the second spatial relationship is the same as the first SRS resource of the second SRS resource set. The first and second repeat transmission occasions of the PUSCH repeat transmission adopt the first spatial relationship for transmission, and the third and fourth repeat transmission occasions adopt the second spatial relationship for transmission.
[0055] When the SRI field codepoint value of the DCI for scheduling a PUSCH repeat transmission is 2, it indicates that the PUSCH repeat transmission corresponds to two sets of spatial relationships, the first spatial relationship is the same as the second SRS resource of the first SRS resource set, and the second spatial relationship is the same as the first SRS resource of the second SRS resource set. The first and second repeat transmission occasions of the PUSCH repeat transmission adopt the first spatial relationship for transmission, and the third and fourth repeat transmission occasions adopt the second spatial relationship for transmission.
[0056] When the SRI field codepoint value of the DCI scheduling the PUSCH repeat transmission is 3, it indicates that the PUSCH repeat transmission corresponds to one set of spatial relationships, and all the PUSCH repeat transmission occasions are transmitted adopting the same spatial relationship as the second SRS resource of the second SRS resource set.
[0057] For example, as shown in Table 1 below, the network side configures two SRS resource sets for codebook transmission for the UE, and two SRS resources are configured in each resource set, and the UE receives higher layer signaling MAC CE from the network side, which includes four SRI field code point information, where the SRI field of DCI is 2 bits, and can be 00 or 01 or 10 or 11, corresponding to four SRI field code point values.
[0058] [Table 2]
[0059] For example, as shown in Table 2 below, the network side configures two SRS resource sets for non-codebook transmission for the UE, and four SRS resources (with indexes 0, 1, 2, and 3) are configured in each resource set, and the UE receives higher layer signaling MAC CE from the network side, which includes four SRI field code point information, where the SRI field of DCI is 2 bits and can be 00 or 01 or 10 or 11, corresponding to four SRI field code point values.
[0060] [Table 3]
[0061] According to Table 2, if the SRI field codepoint value of the DCI scheduling the PUSCH repeat transmission is 0, it may indicate that the PUSCH repeat transmission corresponds to two SRS resource groups, and the PUSCH transmission occasions are respectively associated with two SRS resource groups. The ports corresponding to the PUSCH transmission occasions associated with the first SRS resource group are the same as the SRS resource(s) with indexes 0, 1, and 2 in the first SRS resource set. The ports corresponding to the PUSCH transmission occasions associated with the second SRS resource group are the same as the SRS resource(s) with indexes 1, 2, and 3 in the first SRS resource set.
[0062] When the SRI field codepoint value of the DCI scheduling the PUSCH repeat transmission is 0, it indicates that the PUSCH repeat transmission corresponds to two SRS resource groups, and the PUSCH transmission occasion is associated with two SRS resource groups, respectively. The port corresponding to the PUSCH transmission occasion associated with the first SRS resource group is the same as the SRS resource(s) with indexes 1 and 2 in the first SRS resource set. The port corresponding to the PUSCH transmission occasion associated with the second SRS resource group is the same as the SRS resource(s) with indexes 2 and 3 in the first SRS resource set.
[0063] When the SRI field codepoint value of the DCI scheduling the PUSCH repeat transmission is 2, it indicates that the PUSCH repeat transmission is associated with one SRS resource group, and the ports corresponding to all transmission occasions of the PUSCH are the same as the SRS resource(s) with indexes 0, 1, 2, and 3 in the first SRS resource set.
[0064] When the SRI field codepoint value of the DCI scheduling the PUSCH repeat transmission is 3, it indicates that the PUSCH repeat transmission is associated with one SRS resource group, and the ports corresponding to all transmission occasions of the PUSCH are the same as the SRS resource(s) with indexes 0, 1, 2, and 3 in the second SRS resource set.
[0065] For example, as shown in Table 3 below, the network side configures two SRS resource sets for codebook transmission for the UE, and two SRS resources are configured in each set. The UE can receive a MAC CE, and the MAC CE activates one SRS resource in each set, that is, if the bit number of the SRI field is 0, there is no need to indicate SRI codepoint information, and the SRI field of the DCI indicates the SRI field codepoint value by 2 bits.
[0066] [Table 4]
[0067] For example, as shown in Table 4 below, the network side configures two SRS resource sets for codebook transmission for the UE, and each set has four SRS resources. The UE receives a MAC CE, and the MAC CE activates the two SRS resources in each set. The two SRS resources may have the same spatial relationship or the same port information, or may not be restricted. In this case, there is no need to indicate SRI field code point information, and the SRI field of the DCI indicates the SRI field code point value by 3 bits / 4 bits.
[0068] [Table 5]
[0069] For example, as shown in Table 5 below, when only one SRS resource is configured in each SRS resource set for codebook transmission configured by the network side, there is no need for the MAC CE to indicate this correspondence, i.e., a separate table. The number of SRI field bits of the DCI is determined by the number of SRS resource sets, and when the SRS resource set is 1, the SRI field of the DCI indicates the SRI field code point value by 0 bit (i.e., no indication is required), and when the SRS resource set is 2, the SRI field of the DCI indicates the SRI field code point value by 2 bits.
[0070] [Table 6]
[0071] Optionally, the multiple SRS resources or resource groups associated with the SRI field codepoint information belong to different SRS resource sets.
[0072] Alternatively, the multiple SRS resources or resource groups associated with the SRI field code point information may belong to different SRS resource sets.
[0073] Alternatively, only one SRS resource, two SRS resources, or four SRS resources may be configured in one SRS resource set.
[0074] Alternatively, only one SRS resource group, two SRS resource groups, or four SRS resource groups may be configured in one SRS resource set.
[0075] Alternatively, if the network side, protocol, MAC layer, or RRC layer configures multiple SRS resource sets for codebook transmission for the terminal, the multiple SRS resources associated with one SRS field code point information are from different SRS resource sets.
[0076] Alternatively, when the network side, protocol, MAC layer, or RRC layer configures multiple SRS resource sets for non-codebook transmission for the terminal, multiple SRS resource groups associated with one code point information may be from different SRS resource sets.
[0077] Alternatively, in each code point information, the number of SRS resources in all SRS resource groups may be the same.
[0078] Alternatively, the number of PUSCH transmission ports of the SRS resource associated with one code point information is the same.
[0079] Optionally, the SRS resources in each of the SRS resource groups belong to the same SRS resource set.
[0080] Alternatively, the SRS resources in each SRS resource group may be from the same SRS resource set.
[0081] Optionally, determining target SRI field code point information among at least one SRI field code point information based on the SRI field code point value in the DCI includes: determining a number of bits of the SRI field based on a number of the at least one SRI field code point information; and determining a range of values of the SRI field code points in the DCI based on the number of bits of the SRI field.
[0082] Alternatively, the number of bits of the SRI field may be determined based on the number of at least one SRI field code point information. For example, if the number of SRI field code point information is 5, the number of bits of the SRI field may be at least 3 bits, and the range of the SRI field code point value may be 000 to 111, i.e., 0 to 7. For example, if the number of SRI field code point information is 4, the number of bits of the SRI field may be at least 2 bits, and the range of the SRI field code point value may be 00 to 11, i.e., 0 to 4.
[0083] Alternatively, when determining the SRS resource indication from the DCI, the SRS resource indication may be determined based on the SRS resource indication and / or based on a range of values of the SRI field codepoint.
[0084] Optionally, transmitting a PUSCH based on the target transmission resource allocation includes: determining an SRS resource associated with a PUSCH repeated transmission occasion according to the target transmission resource configuration; and transmitting a PUSCH based on an SRS resource associated with the repeating transmission occasion.
[0085] Optionally, when the target transmission resource configuration is target SRI field code point information, determine a corresponding SRS resource according to the target SRI field code point information, that is, determine an SRS resource associated with a repeated transmission occasion of the PUSCH; Optionally, after determining the SRS resource associated with the repeated transmission occasion of the PUSCH, the PUSCH may be transmitted based on the SRS resource associated with the repeated transmission occasion.
[0086] Optionally, determining an SRS resource associated with a repeat transmission occasion of a PUSCH based on the target transmission resource configuration includes: Determining a mapping scheme between at least one SRS resource or resource group associated with the target SRI field code point information and a PUSCH transmission occasion; and determining an SRS resource associated with a repeat transmission occasion of the PUSCH based on the mapping scheme.
[0087] Alternatively, when determining a corresponding SRS resource based on the target SRI field code point information, a mapping scheme between at least one SRS resource or resource group related to the target SRI field code point information and a PUSCH transmission occasion may be determined, and an SRS resource related to a PUSCH repeated transmission occasion may be determined based on the mapping scheme.
[0088] As can be understood, the mapping relationship may be understood as a one-to-one correspondence between at least one SRS resource or resource group and a PUSCH transmission occasion.
[0089] Optionally, one transmission occasion of the PUSCH is associated with one or more SRS resources or SRSs.
[0090] Optionally, the transmission spatial relationship and port corresponding to one transmission occasion of the PUSCH are the same as the associated SRS resource or SRS resource group.
[0091] Alternatively, if the number of repeated transmissions of the PUSCH is two or more, the mapping scheme may be The at least one SRS resource or resource group may be interleaved or sequentially mapped with multiple repeated transmission times of the PUSCH.
[0092] Optionally, at least one SRS resource or resource group may be interleaved mapped with multiple repeated transmission periods of the PUSCH.
[0093] Alternatively, the at least one SRS resource or resource group is one-to-one associated with a plurality of repeated transmission times of a PUSCH after being cycled through in a sequential order; Optionally, taking the at least one SRS resource as an example where the at least one SRS resource includes a first resource and a second resource, or a first resource group and a second resource group, when the at least one SRS resource or resource group is interleaved mapped with multiple repeated transmission times of the PUSCH, the following mapping scheme may be adopted:
[0094] A first repeated transmission occasion of the PUSCH is associated with a first SRS resource or a first SRS resource group in the SRI field code point information; the second repeat transmission occasion is associated with a second SRS resource or a second SRS resource group in the SRI field codepoint information; the third transmission occasion is associated with a first SRS resource or a first SRS resource group in the SRI field codepoint information; the fourth repeat transmission occasion is associated with a second SRS resource or a second SRS resource group in the SRI field code point information; Let us consider the following points in order.
[0095] Optionally, at least one SRS resource or resource group and multiple repeated transmission times of the PUSCH may be mapped sequentially.
[0096] Optionally, the at least one SRS resource or resource group, after being partially repeatedly cycled in sequence, is entirely associated one-to-one with a number of repeated transmission times of the PUSCH.
[0097] Optionally, taking the at least one SRS resource as an example where the at least one SRS resource includes a first resource and a second resource, or a first resource group and a second resource group, when the at least one SRS resource or resource group is sequentially mapped to multiple repeated transmission times of the PUSCH, the following mapping scheme may be adopted:
[0098] The first and second repeated transmission occasions of the PUSCH are associated with a first SRS resource or a first SRS resource group in the SRI field code point information; the third and fourth repeat transmission occasions are associated with a second SRS resource or a second SRS resource group in the SRI field codepoint information; the fifth and sixth repeat transmission occasions are associated with a first SRS resource or a first SRS resource group in the SRI field codepoint information; the seventh and eighth repeat transmission occasions are associated with a second SRS resource or a second SRS resource group in the SRI field codepoint information; Let us consider the following points in order.
[0099] Alternatively, if the number of repeated transmissions of the PUSCH is 1, the mapping scheme may be The at least one SRS resource or resource group may be sequentially mapped one-to-one with a plurality of partial repeat transmission occasions in one repeat transmission occasion of a PUSCH, and the plurality of partial repeat transmission occasions may constitute the one repeat transmission time.
[0100] Alternatively, when the number of repeated transmissions of the PUSCH is one, at least one SRS resource or resource group may be one-to-one mapped to some of the repeated transmission occasions of one repeated transmission occasion of the PUSCH in sequence.
[0101] Optionally, for example, where the at least one SRS resource includes a first resource and a second resource, or a first resource group and a second resource group, the first [N / 2] symbols of a PUSCH transmission occasion are associated with the first SRS resource or the first SRS resource group, and the remaining N-[N / 2] symbols are associated with the second SRS resource or the second SRS resource group.
[0102] Alternatively, the first SRS resource / SRS resource group and the second SRS resource / SRS resource group may be determined according to the order in the SRI code point information, or according to the index (SRS resource set ID) size of the SRS resource set to which they belong.
[0103] Optionally, an order of at least one SRS resource or resource group is determined based on an associated order in the target SRI field codepoint information.
[0104] Optionally, an order of at least one SRS resource or resource group may be determined based on an associated order in the target SRI field codepoint information.
[0105] Optionally, for example, where the at least one SRS resource includes a first resource and a second resource, or a first resource group and a second resource group, the first SRS resource / SRS resource group and the second SRS resource / SRS resource group may be determined according to an order in the SRI codepoint information.
[0106] Optionally, the order of at least one SRS resource or resource group is determined based on an index (SRS resource set ID) of the SRS resource set to which it belongs.
[0107] Optionally, the order of at least one SRS resource or resource group may be determined based on an index (SRS resource set ID) of the SRS resource set to which it belongs.
[0108] Alternatively, in an example where at least one SRS resource includes a first resource and a second resource, or a first resource group and a second resource group, the first SRS resource / SRS resource group and the second SRS resource / SRS resource group may be determined according to the size of the index (SRS resource set ID) of the SRS resource set to which they belong.
[0109] Optionally, different SRS resource sets are associated with different CORESETPoolIndexes; The different DCIs are from CORESETs associated with the different CORESETPoolIndexes.
[0110] Alternatively, the SRI fields of different DCIs may indicate SRS resources or SRS resource groups from different SRS resource sets.
[0111] Optionally, different SRS resource sets are associated with different CORESETPoolIndexes.
[0112] Optionally, the different DCIs are from CORESETs associated with different CORESETPoolIndexes.
[0113] Optionally, the PTRS transmission port indication information includes PTRS-DMRS association field indication information; Here, the terminal determines, based on the first indication information in the DCI, a target transmission resource allocation indicated by the first indication information, Determining PTRS-DMRS association field indication information in the DCI according to a third signaling of the RRC layer or the MAC layer; determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to the PTRS-DMRS association field indication information; The DMRS transmission port is associated with an SRS resource or an SRS resource group that transmits a PUSCH.
[0114] Alternatively, the PTRS transmission port indication information may include PTRS-DMRS association field indication information, and first determine the PTRS-DMRS association field indication information in the DCI, and then determine a target association relationship indicated by the PTRS-DMRS association field indication information in at least one association relationship between the PTRS port and the DMRS transmission port based on the PTRS-DMRS association field indication information.
[0115] Furthermore, it can determine in which layer the PTRS is uploaded based on the target association relationship between the PTRS port and the DMRS transmission port; For example, one layer may correspond to one DMRS transmission port, and it may be determined that the PTRS is uploaded in the layer corresponding to the associated DMRS transmission port.
[0116] Optionally, the third signaling comprises: Maximum number of PTRS ports, The maximum transmission rank number and / or the number of SRS ports.
[0117] Optionally, the third signaling may include a maximum number of PTRS ports; Optionally, the third signaling may include a maximum transmission rank number and / or an SRS port number.
[0118] For example, the PTRS-DMRS association field indication information in the DCI may be determined based on the maximum number of PTRS ports and the maximum transmission rank number.
[0119] Optionally, the determining of the PTRS-DMRS association field indication information in the DCI based on the third signaling of the RRC layer or the MAC layer includes: Determining a number of bits of PTRS-DMRS association field indication information in DCI according to the third signaling; and determining a range of the PTRS-DMRS association field indication in the DCI based on a bit number of the PTRS-DMRS association field indication.
[0120] Optionally, when determining the PTRS-DMRS association field indication information in the DCI based on the third signaling, the number of bits of the PTRS-DMRS association field indication information in the DCI may be determined based on the third signaling, and the range of the PTRS-DMRS association field indication information in the DCI may also be determined.
[0121] For example, the number of bits of the PTRS-DMRS association field indication information may be 3 bits, and the range of the PTRS-DMRS association field indication information may be 000 to 111, i.e., 0 to 7; for example, the number of bits of the PTRS-DMRS association field indication information may be at least 2 bits, and the range of the PTRS-DMRS association field indication information may be 00 to 11, i.e., 0 to 4.
[0122] Alternatively, when determining the PTRS-DMRS association field indication information from the DCI, the PTRS-DMRS association field indication information may be determined based on the bit size of the PTRS-DMRS association field indication information and / or based on the range taken by the PTRS-DMRS association field indication information.
[0123] Optionally, the PTRS-DMRS association field indication information comprises a second value of the PTRS-DMRS association field; The distinct second values have a one-to-one correspondence with the at least one association relationship.
[0124] Optionally, the PTRS-DMRS association field indication information may include a second value of the PTRS-DMRS association field, which may be, for example, 0 or 1 or 2 or 3.
[0125] Optionally, determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port based on the PTRS-DMRS association field indication information includes: and determining, based on a second value of the PTRS-DMRS association field, an association relationship corresponding to the second value as a target association relationship.
[0126] Optionally, based on a second value of the PTRS-DMRS association field, the association relationship corresponding to the second value may be determined as the target association relationship.
[0127] For example, if the second value ranges from 0 to 3, and 0, 1, 2, and 3 correspond one-to-one to four different association relationships, respectively, then based on the specific value of the second value, a target association relationship that corresponds one-to-one to this value can be determined.
[0128] Optionally, determining a number of bits of the PTRS-DMRS association field indication information in the DCI based on the third signaling includes: If the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 2, determining the number of bits of the PTRS-DMRS association field indication information as 2 bits. Further, a second value of the PTRS-DMRS association field indication information can be determined.
[0129] Alternatively, if the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 2, the number of bits of the PTRS-DMRS association field indication information may be determined as 2 bits.
[0130] Optionally, the second value of the PTRS-DMRS association field indication information includes a third value of a most significant bit (MSB) and a fourth value of a least significant bit (LSB).
[0131] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 2 bits, the second value of the PTRS-DMRS association field indication information may include a third value of the most significant bit (MSB) and a fourth value of the least significant bit (LSB).
[0132] Optionally, a third value of the most significant bit MSB comprises 0 or 1; Wherein, if the third value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the third value of the most significant bit MSB is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0133] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 2 bits, and the third value of the most significant bit (MSB) is 0, the terminal may determine that the target association relationship includes, but is not limited to, that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 2 bits, and the third value of the most significant bit MSB is 1, the terminal can determine that the target association relationship includes, but is not limited to, that PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0134] Optionally, the fourth value of the least significant bit LSB comprises 0 or 1; Wherein, if the fourth value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the fourth value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0135] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 2 bits, and the fourth value of the least significant bit (LSB) is 0, the terminal may determine that the target association relationship includes, but is not limited to, that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 2 bits, and the fourth value of the least significant bit (LSB) is 1, the terminal may determine that the target association relationship includes that PTRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group.
[0136] Optionally, the above association relationship may be expressed based on Table 6 below.
[0137] [Table 7]
[0138] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 2 bits, when the terminal receives higher layer signaling, the UE's maximum transmission rank is 3 (maxRank is configured to be 3), and the maximum number of PT-RS ports is configured to be 2, the PTRS-DMRS association field may be indicated based on 2 bits, that is, as shown in the table below, and the association relationship may be further represented based on the following Table 7.
[0139] [Table 8]
[0140] Optionally, when all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to the PTRS-DMRS association field indication information includes: determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port based on only some bit information of the PTRS-DMRS association field indication information; The certain bit is the MSB or the LSB.
[0141] Alternatively, if all transmission occasions of the PUSCH scheduled by one DCI are associated with the same SRS resource or SRS resource group, the terminal may decode only the MSB or only the LSB.
[0142] Optionally, determining a number of bits of PTRS-DMRS association field indication information in DCI based on the maximum transmission rank number and the maximum number of PTRS ports includes: If the maximum PTRS port number is 1 and the maximum transmission rank number is 3 or 4, determining the number of bits of the PTRS-DMRS association field indication information as 4 bits.
[0143] Alternatively, if the maximum PTRS port number is 1 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information may be determined as 4 bits.
[0144] Optionally, the second value of the PTRS-DMRS association field indication information includes a fifth value of the most significant bit (MSB) and a sixth value of the least significant bit (LSB); The most significant bits MSB are 2 bits, and the least significant bits LSB are 2 bits.
[0145] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, the second value may include a fifth value of the most significant bit (MSB) and a sixth value of the least significant bit (LSB).
[0146] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, the most significant bit MSB may be the first two most significant bits, and the least significant bit LSB may be the last two least significant bits.
[0147] Alternatively, the fifth value of the most significant bit MSB is 0 or 1 or 2 or 3; Wherein, if the fifth value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit MSB is 3, the target association relationship includes that the PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0148] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the fifth most significant bit (MSB) is 0, the terminal may determine that the target association relationship includes that the PTRS port 0 is associated with a first scheduled DM-RS port associated with a first SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the fifth most significant bit (MSB) is 1, the terminal may determine that the target association relationship includes that the PTRS port 0 is associated with a second scheduled DM-RS port associated with a first SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the fifth most significant bit (MSB) value is 2, the terminal may determine that the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the fifth value of the most significant bit (MSB) is 3, the terminal may determine that the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0149] Alternatively, the sixth value of the least significant bit (LSB) is 0 or 1 or 2 or 3; Wherein, if the sixth value of the least significant bit (LSB) is 0, the target association relationship includes that the TRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 1, the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 3, the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0150] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the sixth value of the least significant bit (LSB) is 0, the terminal may determine that the target association relationship includes that the TRS port 0 is associated with a first scheduled DM-RS port associated with a second SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the sixth value of the least significant bit (LSB) is 1, the terminal may determine that the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the sixth value of the least significant bit (LSB) is 2, the terminal may determine that the target association relationship includes that the PTRS port 0 is associated with a third scheduled DM-RS port associated with a second SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the sixth value of the least significant bit (LSB) is 3, the terminal may determine that the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0151] Optionally, the above association relationship may be expressed based on Table 7 below.
[0152] [Table 9]
[0153] Optionally, when all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to the PTRS-DMRS association field indication information includes: determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port based on only some bit information of the PTRS-DMRS association field indication information; The part of bits is the MSB.
[0154] Alternatively, if all transmission occasions of the PUSCH scheduled by one DCI are associated with the same SRS resource or SRS resource group, the terminal decodes only the MSB.
[0155] Optionally, determining a number of bits of PTRS-DMRS association field indication information in DCI based on the maximum transmission rank number and the maximum number of PTRS ports includes: If the maximum PTRS port number is 2 and the maximum transmission rank number is 3 or 4, determining the number of bits of the PTRS-DMRS association field indication information as 4 bits.
[0156] Alternatively, if the maximum PTRS port number is 2 and the maximum transmission rank number is 3 or 4, the terminal may determine the number of bits of the PTRS-DMRS association field indication information as 4 bits.
[0157] Optionally, the second value of the PTRS-DMRS association field indication information includes a seventh value of the first bit, an eighth value of the second bit, a ninth value of the third bit, and a tenth value of the fourth bit.
[0158] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, the second value may include a seventh value of the first bit, an eighth value of the second bit, a ninth value of the third bit, and a tenth value of the fourth bit.
[0159] Alternatively, the seventh value of the first bit is 0 or 1; Wherein, if the seventh value of the first bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the seventh value of the first bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0160] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the seventh value of the first bit is 0, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the seventh value of the first bit is 1, the terminal may determine that the target association relationship includes that the one sharing PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0161] Alternatively, the eighth value of the second bit is 0 or 1; Wherein, if the eighth value of the second bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the eighth value of the second bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0162] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the eighth value of the second bit is 0, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the eighth value of the second bit is 1, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0163] Alternatively, the ninth value of the third bit is 0 or 1; Wherein, if the ninth value of the third bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the ninth value of the third bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0164] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the ninth value of the third bit is 0, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the ninth value of the third bit is 1, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0165] Alternatively, the tenth value of the fourth bit is 0 or 1; Wherein, if the tenth value of the fourth bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the tenth value of the fourth bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0166] Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the tenth value of the fourth bit is 0, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; Alternatively, when the number of bits of the PTRS-DMRS association field indication information is 4 bits, if the tenth value of the fourth bit is 1, the terminal may determine that the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0167] Alternatively, when all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port may include: determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port based on only some bit information of the PTRS-DMRS association field indication information; The portion of bits includes a first bit and a second bit.
[0168] Alternatively, if all transmission occasions of the PUSCH scheduled by one DCI are associated with the same SRS resource or SRS resource group, the terminal may decode only the first bit and the second bit.
[0169] Optionally, when the first indication information includes TPMI indication information, transmitting a PUSCH based on the target transmission resource includes: The method includes adopting and transmitting one or more target TPMIs indicated by the TPMI indication information according to a first transmission method or a second transmission method.
[0170] Alternatively, the PUSCH may be transmitted employing one or more target TPMIs.
[0171] Alternatively, the PUSCH may be transmitted using one or more target TPMIs according to multiple transmission schemes.
[0172] Alternatively, the transmission method may be selected, specifically, when the transmission employs a first transmission method or when the transmission employs a second transmission method.
[0173] Optionally, the bit size of the TPMI indication information may be determined based on the indication of the fifth signaling sent by the RRC layer or the MAC layer, and the range of the content of the TPMI indication information may be determined based on the bit size of the TPMI indication information, for example, the TPMI indication information may include a TPMI codepoint value, and the TPMI codepoint configuration information corresponding to the TPMI codepoint value may be determined, and it should be noted that the TPMI codepoint configuration information is associated with the configuration of multiple TPMIs. Then, the target TPMI codepoint configuration information may be determined based on the TPMI codepoint value, and the TPMI available for transmission may be determined.
[0174] Optionally, the first transmission method is: The PUSCH transmission occasions associated with different SRS resources or SRS resource groups all include transmitting using a first TPMI of the one or more target TPMIs.
[0175] Alternatively, when the first transmission manner is adopted, PUSCH transmission occasions associated with different SRS resources may all be transmitted using the same TPMI.
[0176] Optionally, the first TPMI is determined based on a TPMI indication; Here, the TPMI instruction information is TPMI field-related information in the DCI, and / or The fourth signaling is sent by the RRC layer or the MAC layer.
[0177] Optionally, the first TPMI may be determined based on the TPMI indication information; Optionally, the first TPMI may be determined based on TPMI field related information in the DCI; Optionally, the first TPMI may be determined based on a fourth signaling transmitted by an RRC layer or a MAC layer; Alternatively, the first TPMI may be determined based on TPMI field related information in the DCI and a fourth signaling sent by the RRC layer or the MAC layer.
[0178] Optionally, the second transmission method is: Each PUSCH transmission occasion associated with a different SRS resource or SRS resource group may transmit using a different one of the one or more target TPMIs.
[0179] Optionally, when the second transmission manner is adopted, PUSCH transmission occasions associated with different SRS resources or SRS resource groups are transmitted using different TPMIs among the one or more target TPMIs, respectively.
[0180] Optionally, the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may each transmit using a different TPMI among the one or more target TPMIs. The SRS resource or SRS resource group associated with a PUSCH transmission occasion has a one-to-one correspondence with the TPMI used in the PUSCH transmission occasion.
[0181] Optionally, when the second transmission manner is adopted, an SRS resource or an SRS resource group associated with a PUSCH transmission occasion has a one-to-one correspondence with the TPMI used in the PUSCH transmission occasion.
[0182] Optionally, the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may each transmit using different TPMIs among the one or more target TPMIs. The TPMI used in the PUSCH transmission occasions associated with different SRS resources or SRS resource groups is determined based on the TPMI indication information; Here, the TPMI instruction information is TPMI field-related information in the DCI, and / or The fifth signaling is sent by the RRC layer or the MAC layer.
[0183] Optionally, when a second transmission manner is adopted, a TPMI used in a PUSCH transmission occasion associated with a different SRS resource or SRS resource group may be determined based on the TPMI indication information; Alternatively, the TPMI indication information may be TPMI field related information in the DCI; Optionally, the TPMI indication information may be a fifth signaling sent by an RRC layer or a MAC layer; Optionally, the TPMI used in the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may be jointly determined based on TPMI field related information in the DCI and a fifth signaling sent by the RRC layer or the MAC layer. Optionally, the step of transmitting by adopting one or more target TPMIs indicated by the TPMI indication information according to the first transmission manner or the second transmission manner may include: determining, based on the sixth signaling, to adopt and transmit one or more target TPMIs based on the first transmission manner; or determining, based on the sixth signaling, to adopt and transmit one or more target TPMIs based on a second transmission manner; The sixth signaling is RRC layer signaling and / or MAC layer signaling.
[0184] Optionally, switching between the first and second transmission schemes may be performed based on sixth signaling.
[0185] Optionally, when determining to adopt one or more target TPMIs for transmission based on a first transmission method according to the sixth signaling, if the current transmission method is the first transmission method, keep it as it is, and if the current transmission method is the second transmission method, switch to the first transmission method; Optionally, when it is determined based on the sixth signaling to adopt one or more target TPMIs for transmission based on the second transmission method, if the current transmission method is the first transmission method, it may switch to the second transmission method, and if the current transmission method is the second transmission method, it may remain as is.
[0186] Optionally, the sixth signaling includes RRC configuration information and / or MAC CE indication signaling.
[0187] Optionally, the sixth signaling may be RRC configuration information; Optionally, the sixth signaling may be a MAC CE indication signaling; Alternatively, when the sixth signaling indicates, the RRC configuration information and the MAC CE indication signaling may indicate separately or jointly.
[0188] Optionally, the SRS resource indication and / or the TPMI indication is associated with the first signaling.
[0189] Optionally, the TPMI field and / or the PTRS-DMRS association field is associated with higher layer signaling, i.e., the first signaling, that includes SRS resource codepoint information.
[0190] Alternatively, when the UE receives a MAC CE including SRI field and TPMI field code points and issues a HARQ ACK feedback in slot n and slot m (m>=n) respectively, the indication SRI field code point information and TPMI code point information corresponding to counting backwards 3 ms from the m slot are validated.
[0191] Optionally, the association relationship between the TPMI indication information and the first signaling is: When all the SRI field code point information included in the first signaling is associated with only one SRS resource, or when all the SRS resources associated with all the SRI field code point information belong to the same SRS resource set, the TPMI indication information has a one-to-one correspondence with the PUSCH repeat transmission occasion.
[0192] Alternatively, when all the SRI field code point information included in the first signaling is associated with only one SRS resource, or when all the SRS resources associated with all the SRI field code point information belong to the same SRS resource set, the TPMI indication information may have a one-to-one correspondence with the spatial relationship adopted for PUSCH repetitive transmission.
[0193] Alternatively, if each code point included in the upper layer signaling includes only one SRS resource, or if the SRS resources included in all code points belong to the same SRS resource set, the TPMI indication method may be the same as the indication method of a conventional communication system.
[0194] Alternatively, when each code point included in the upper layer signaling includes only one SRS resource / SRS resource group, or when all SRS resources / SRS resource groups included in all code points belong to the same SRS resource set, the method of indicating the PTRS-DMRS association may be the same as the method of indicating in a conventional communication system.
[0195] Alternatively, if the terminal has not received the higher layer signaling, the method of indicating the TPMI field and the PTRS-DMRS association may be the same as the indication method in a conventional communication system.
[0196] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0197] FIG. 3 is a second flowchart of a PUSCH transmission method according to an embodiment of the present application. As shown in FIG. 3, the method includes the following steps:
[0198] Step 300, The network side sends first instruction information to the terminal; The first indication information is used to instruct a terminal to determine a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; and a phase tracking reference signal, a phase tracking signal (PTRS), and a transmission port indication.
[0199] The at least one transmission resource allocation includes: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or is indicated by the MAC layer.
[0200] Alternatively, the target transmission resource allocation may be a resource allocation for the terminal to transmit the PUSCH.
[0201] Alternatively, for codebook-based PUSCH transmission, the network side may configure an SRS resource set obtained for the UE based on uplink transmission CSI, and each SRS resource set may include two SRS resources, where the number of ports included in the two SRS resources may be the same, that is, both may be 1, 2, or 4 ports. The two SRS resources are configured to correspond to different beams.
[0202] The network side obtains uplink channel information by measuring SRS on different SRS resources, selects parameters such as spatial relationship, precoding matrix, power control, MCS, etc. of PUSCH transmission for the UE based on the uplink channel information, and indicates these transmission parameters for the UE through the SRI field / TPMI field / TPC field / MCS field in DCI format 0_1 / 0_2 for scheduling PUSCH. The spatial relationship and port that are the same as the SRS resource indicated by the SRI field can be adopted when transmitting PUSCH.
[0203] Alternatively, for non-codebook transmission, four SRS resources may be configured in each resource set SRS resource set for non-codebook transmission, and the number of ports of all SRS resources may be 1. In each SRS resource set, an associated CSI-RS for the UE to measure a downlink channel may be configured, and based on channel reciprocity, the UE may assume that the measured downlink channel is an uplink channel, and may calculate a precoding matrix for uplink transmission based on the channel information, and may employ the precoding matrix to precode the SRS and transmit it to the network side, and the network side may determine the precoding used by the UE to transmit the PUSCH based on the measured precoded SRS, and indicate it by the SRI field of the DCI for scheduling the PUSCH. That is, the precoding matrix to be adopted for the PUSCH transmission may be indicated by indicating a subset of all precoded SRS resources transmitted by the UE by the SRI field.
[0204] Alternatively, the network side may indicate an SRS resource through SRS resource indication information in the first indication information, and the terminal adopts the same spatial relationship and port as this SRS resource to transmit the PUSCH.
[0205] Optionally, the network side may indicate a precoding matrix through the indication TPMI indication information in the first indication information, and the terminal adopts the precoding matrix to precode the SRS.
[0206] Alternatively, the network side may indicate a PTRS transmission port through PTRS transmission port indication information in the first indication information, and indicate in which layer the PTRS is uploaded in a PTRS-DMRS association field; Alternatively, one layer may correspond to one DM-RS port.
[0207] Alternatively, the network side may indicate corresponding information in resource allocation for transmitting PUSCH by any one or any combination of the TPMI indication information, the PTRS transmission port indication information, and the TPMI indication information in the first indication information.
[0208] Alternatively, after determining the target transmission resource allocation, that is, after determining the resource allocation for transmitting the PUSCH, the PUSCH may be transmitted based on the resource allocation for transmitting the PUSCH.
[0209] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0210] It should be mentioned that for the PUSCH transmission method according to the embodiment of the present application, the execution body can be a PUSCH transmission device or a control module for executing the PUSCH transmission method in the PUSCH transmission device. In the embodiment of the present application, the PUSCH transmission device according to the embodiment of the present application is described by taking the execution of the PUSCH transmission method by the PUSCH transmission device as an example.
[0211] FIG. 4 is a structural schematic diagram of a PUSCH transmission device according to an embodiment of the present application. As shown in FIG. 4, the device includes: a first determining module 410 and a first transmitting module 420, where: The first determination module 410 is used for determining, according to the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; The first transmission module 420 is used to transmit a PUSCH according to the target transmission resource configuration; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; and a phase tracking reference signal, a phase tracking signal (PTRS), and a transmission port indication.
[0212] The at least one transmission resource allocation includes: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or is indicated by the MAC layer.
[0213] Optionally, the PUSCH transmission device may determine, by a first determination module 410, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation based on the received first indication information, and transmit a PUSCH based on the target transmission resource allocation by a first transmission module 420.
[0214] It should be noted here that the above-mentioned apparatus according to the embodiment of the present application can realize all the method steps realized by the above-mentioned method embodiment and can achieve the same technical effects, and the same parts and beneficial effects as those of the method embodiment in this embodiment will not be specifically described here.
[0215] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0216] Optionally, the SRS resource indication information includes an SRI field code point value; The first determination module further comprises: According to the SRI field code point value in the DCI, a target SRI field code point information among at least one SRI field code point information is determined, and the at least one SRI field code point information is determined by the terminal: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or being indicated by a MAC layer; Here, the SRI field code point information is associated with at least one SRS resource, or the SRI field code point information is associated with at least one SRS resource group.
[0217] Alternatively, the different SRI field code point values have a one-to-one correspondence with the at least one SRI field code point information, and the correspondence between the different SRI field code point values and the at least one SRI field code point information is pre-indicated by a network side, or pre-defined by a protocol, or pre-configured, or indicated by a second signaling, and the second signaling is an RRC layer signaling or a MAC layer signaling.
[0218] Optionally, the SRS resources or resource groups associated with the SRI field codepoint information belong to different SRS resource sets.
[0219] Optionally, the SRS resources in each of the SRS resource groups belong to the same SRS resource set.
[0220] Optionally, the first determination module further comprises: determining a number of bits of the SRI field based on a number of the at least one SRI field code point information; It is used to determine the range of the SRI field code point value in DCI based on the number of bits of the SRI field.
[0221] Optionally, the first transmission module further comprises: determining an SRS resource associated with a PUSCH repeated transmission occasion according to the target transmission resource configuration; It is used to transmit a PUSCH according to an SRS resource associated with the repeated transmission occasion.
[0222] Optionally, the first transmission module further comprises: Determining a mapping scheme between at least one SRS resource or resource group associated with the target SRI field code point information and a PUSCH transmission occasion; According to the mapping scheme, the SRS resource associated with the repeated transmission occasion of the PUSCH is determined.
[0223] Alternatively, if the number of repeated transmissions of the PUSCH is two or more, the mapping scheme may be The at least one SRS resource or resource group may be interleaved or sequentially mapped with multiple repeated transmission times of the PUSCH.
[0224] Alternatively, if the number of repeated transmissions of the PUSCH is 1, the mapping scheme may be The at least one SRS resource or resource group may be sequentially mapped one-to-one with a plurality of partial repeat transmission occasions in one repeat transmission occasion of a PUSCH, and the plurality of partial repeat transmission occasions may constitute the one repeat transmission time.
[0225] Optionally, an order of at least one SRS resource or resource group is determined based on an associated order in the target SRI field codepoint information.
[0226] Optionally, the order of at least one SRS resource or resource group is determined based on an index (SRS resource set ID) of the SRS resource set to which it belongs.
[0227] Optionally, different SRS resource sets are associated with different CORESETPoolIndexes; The different DCIs are from CORESETs associated with the different CORESETPoolIndexes.
[0228] Optionally, the PTRS transmission port indication information includes PTRS-DMRS association field indication information; wherein the first determination module further comprises: Determining PTRS-DMRS association field indication information in the DCI according to a third signaling of the RRC layer or the MAC layer; determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to the PTRS-DMRS association field indication information; The DMRS transmission port is associated with an SRS resource or an SRS resource group that transmits a PUSCH.
[0229] Optionally, the third signaling comprises: Maximum number of PTRS ports, The maximum transmission rank number and / or the number of SRS ports.
[0230] Optionally, the first determination module further comprises: Determining a number of bits of PTRS-DMRS association field indication information in DCI according to the third signaling; It is used to determine the range of the PTRS-DMRS association field indication information in the DCI according to the number of bits of the PTRS-DMRS association field indication information.
[0231] Optionally, the PTRS-DMRS association field indication information comprises a second value of the PTRS-DMRS association field; The distinct second values have a one-to-one correspondence with the at least one association relationship.
[0232] Optionally, the first determination module further comprises: Used to determine, based on a second value of the PTRS-DMRS association field, an association relationship corresponding to the second value as a target association relationship.
[0233] Optionally, the first determination module further comprises: When the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 2, the number of bits of the PTRS-DMRS association field indication information is used to determine the number of bits as 2 bits.
[0234] Optionally, the second value of the PTRS-DMRS association field indication information includes a third value of a most significant bit (MSB) and a fourth value of a least significant bit (LSB).
[0235] Optionally, a third value of the most significant bit MSB comprises 0 or 1; Wherein, if the third value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the third value of the most significant bit MSB is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0236] Optionally, the fourth value of the least significant bit LSB comprises 0 or 1; Wherein, if the fourth value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the fourth value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0237] Optionally, when all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, the first determining module further comprises: Determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to only some bit information of the PTRS-DMRS association field indication information; The certain bit is the MSB or the LSB.
[0238] Optionally, the first determination module further comprises: If the maximum PTRS port number is 1 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is used to determine it as 4 bits.
[0239] Optionally, the second value of the PTRS-DMRS association field indication information includes a fifth value of the most significant bit (MSB) and a sixth value of the least significant bit (LSB); The most significant bits MSB are 2 bits, and the least significant bits LSB are 2 bits.
[0240] Alternatively, the fifth value of the most significant bit MSB is 0 or 1 or 2 or 3; Wherein, if the fifth value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit MSB is 3, the target association relationship includes that the PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0241] Alternatively, the sixth value of the least significant bit (LSB) is 0 or 1 or 2 or 3; Wherein, if the sixth value of the least significant bit (LSB) is 0, the target association relationship includes that the TRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 1, the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 3, the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0242] Optionally, when all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, the first determining module further comprises: Determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to only some bit information of the PTRS-DMRS association field indication information; The part of bits is the MSB.
[0243] Optionally, the first determination module further comprises: If the maximum PTRS port number is 2 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is used to determine it as 4 bits.
[0244] Optionally, the second value of the PTRS-DMRS association field indication information includes a seventh value of the first bit, an eighth value of the second bit, a ninth value of the third bit, and a tenth value of the fourth bit.
[0245] Alternatively, the seventh value of the first bit is 0 or 1; Wherein, if the seventh value of the first bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the seventh value of the first bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0246] Alternatively, the eighth value of the second bit is 0 or 1; Wherein, if the eighth value of the second bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the eighth value of the second bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0247] Alternatively, the ninth value of the third bit is 0 or 1; Wherein, if the ninth value of the third bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the ninth value of the third bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0248] Alternatively, the tenth value of the fourth bit is 0 or 1; Wherein, if the tenth value of the fourth bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the tenth value of the fourth bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0249] Optionally, when all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, the first determining module further comprises: Determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to only some bit information of the PTRS-DMRS association field indication information; The portion of bits includes a first bit and a second bit.
[0250] Optionally, when the first instruction information includes TPMI instruction information, the first transmission module further comprises: It is used to adopt and transmit one or more target TPMIs indicated by the TPMI indication information according to the first transmission method or the second transmission method.
[0251] Optionally, the first transmission method is: The PUSCH transmission occasions associated with different SRS resources or SRS resource groups all include transmitting using a first TPMI of the one or more target TPMIs.
[0252] Optionally, the first TPMI is determined based on a TPMI indication; Here, the TPMI instruction information is TPMI field-related information in the DCI, and / or The fourth signaling is sent by the RRC layer or the MAC layer.
[0253] Optionally, the second transmission method is: Each PUSCH transmission occasion associated with a different SRS resource or SRS resource group may transmit using a different one of the one or more target TPMIs.
[0254] Optionally, the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may each transmit using different TPMIs among the one or more target TPMIs. The SRS resource or SRS resource group associated with a PUSCH transmission occasion has a one-to-one correspondence with the TPMI used in the PUSCH transmission occasion.
[0255] Optionally, the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may each transmit using different TPMIs among the one or more target TPMIs. The TPMI used in the PUSCH transmission occasions associated with different SRS resources or SRS resource groups is determined based on the TPMI indication information; Here, the TPMI instruction information is TPMI field-related information in the DCI, and / or The fifth signaling is sent by the RRC layer or the MAC layer.
[0256] Optionally, the first transmission module further comprises: determining, based on the sixth signaling, to adopt and transmit one or more target TPMIs based on the first transmission manner; or and determining, according to the sixth signaling, to adopt one or more target TPMIs for transmission according to the second transmission manner; The sixth signaling is RRC layer signaling and / or MAC layer signaling.
[0257] Optionally, the sixth signaling includes RRC configuration information and / or MAC CE indication signaling.
[0258] Optionally, the SRS resource indication and / or the TPMI indication is associated with the first signaling.
[0259] Optionally, the association relationship between the TPMI indication information and the first signaling is: When all the SRI field code point information included in the first signaling is associated with only one SRS resource, or when all the SRS resources associated with all the SRI field code point information belong to the same SRS resource set, the TPMI indication information has a one-to-one correspondence with the PUSCH repeat transmission occasion.
[0260] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0261] The PUSCH transmission device in the embodiment of the present application may be a device or electronic device having an operating system, or may be a component, integrated circuit, or chip in a terminal. The electronic device may be a mobile terminal or a non-mobile terminal. Exemplarily, the mobile terminal may include, but is not limited to, the types of terminals 11 listed above, and the non-mobile terminal may be a server, a network attached storage (NAS), a personal computer (PC), a television (TV), a deposit machine or a self-service machine, etc., and the embodiment of the present application is not specifically limited.
[0262] The PUSCH transmission device according to the embodiment of the present application can realize each process realized by the embodiment of the method of FIG. 2 and achieve the same technical effect, and will not be further described here to avoid repetition.
[0263] FIG. 5 is a second structural schematic diagram of a PUSCH transmission device according to an embodiment of the present application. As shown in FIG. 5, the device includes: a first transmitting module 510, where: The first sending module 510 is used for sending first instruction information to the terminal; The first indication information is used to instruct a terminal to determine a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; a phase tracking reference signal (PTRS) and a transmission port indication; The at least one transmission resource allocation includes: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or is indicated by the MAC layer.
[0264] Optionally, the PUSCH transmission device sends first indication information to the terminal via a first sending module 510, instructing the terminal to determine a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation.
[0265] It should be noted here that the above-mentioned apparatus according to the embodiment of the present application can realize all the method steps realized by the above-mentioned method embodiment and can achieve the same technical effects, and the same parts and beneficial effects as those of the method embodiment in this embodiment will not be specifically described here.
[0266] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0267] Optionally, the SRS resource indication information includes an SRI field code point value; The SRI field code point value is used to indicate target SRI field code point information among at least one SRI field code point information, and the at least one SRI field code point information is provided by a terminal as follows: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or being indicated by a MAC layer; Here, the SRI field code point information is associated with at least one SRS resource, or the SRI field code point information is associated with at least one SRS resource group.
[0268] Alternatively, the different SRI field code point values have a one-to-one correspondence with the at least one SRI field code point information, and the correspondence between the different SRI field code point values and the at least one SRI field code point information is pre-indicated by a network side, or pre-defined by a protocol, or pre-configured, or indicated by a second signaling, and the second signaling is an RRC layer signaling or a MAC layer signaling.
[0269] Optionally, the multiple SRS resources or resource groups associated with the SRI field codepoint information belong to different SRS resource sets.
[0270] Optionally, the SRS resources in each of the SRS resource groups belong to the same SRS resource set.
[0271] Optionally, an order of at least one SRS resource or resource group is determined based on an associated order in the target SRI field codepoint information.
[0272] Optionally, the order of at least one SRS resource or resource group is determined based on an index (SRS resource set ID) of the SRS resource set to which it belongs.
[0273] Optionally, different SRS resource sets are associated with different CORESETPoolIndexes; The different DCIs are from CORESETs associated with the different CORESETPoolIndexes.
[0274] Optionally, the PTRS transmission port indication information includes PTRS-DMRS association field indication information; The PTRS-DMRS association field indication information is used to determine a target association relationship among at least one association relationship between the PTRS port and the DMRS transmission port; The DMRS transmission port is associated with an SRS resource or an SRS resource group that transmits a PUSCH.
[0275] Optionally, the third signaling comprises: Maximum number of PTRS ports, The maximum transmission rank number and / or the number of SRS ports.
[0276] Optionally, the PTRS-DMRS association field indication information comprises a second value of the PTRS-DMRS association field; The distinct second values have a one-to-one correspondence with the at least one association relationship.
[0277] Alternatively, if the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 2, the number of bits of the PTRS-DMRS association field indication information is determined as 2 bits.
[0278] Optionally, the second value of the PTRS-DMRS association field indication information includes a third value of a most significant bit (MSB) and a fourth value of a least significant bit (LSB).
[0279] Optionally, a third value of the most significant bit MSB comprises 0 or 1; Wherein, if the third value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the third value of the most significant bit MSB is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0280] Optionally, the fourth value of the least significant bit LSB comprises 0 or 1; Wherein, if the fourth value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the fourth value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0281] Alternatively, if the maximum PTRS port number is 1 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is determined as 4 bits.
[0282] Optionally, the second value of the PTRS-DMRS association field indication information includes a fifth value of the most significant bit (MSB) and a sixth value of the least significant bit (LSB); The most significant bits MSB are 2 bits, and the least significant bits LSB are 2 bits.
[0283] Alternatively, the fifth value of the most significant bit MSB is 0 or 1 or 2 or 3; Wherein, if the fifth value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit MSB is 3, the target association relationship includes that the PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0284] Alternatively, the sixth value of the least significant bit (LSB) is 0 or 1 or 2 or 3; Wherein, if the sixth value of the least significant bit (LSB) is 0, the target association relationship includes that the TRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 1, the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 3, the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0285] Alternatively, if the maximum PTRS port number is 2 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is determined as 4 bits.
[0286] Optionally, the second value of the PTRS-DMRS association field indication information includes a seventh value of the first bit, an eighth value of the second bit, a ninth value of the third bit, and a tenth value of the fourth bit.
[0287] Alternatively, the seventh value of the first bit is 0 or 1; Wherein, if the seventh value of the first bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the seventh value of the first bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0288] Alternatively, the eighth value of the second bit is 0 or 1; Wherein, if the eighth value of the second bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the eighth value of the second bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0289] Alternatively, the ninth value of the third bit is 0 or 1; Wherein, if the ninth value of the third bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the ninth value of the third bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0290] Alternatively, the tenth value of the fourth bit is 0 or 1; Wherein, if the tenth value of the fourth bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the tenth value of the fourth bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0291] Optionally, the association relationship between the TPMI indication information and the first signaling is: When all the SRI field code point information included in the first signaling is associated with only one SRS resource, or when all the SRS resources associated with all the SRI field code point information belong to the same SRS resource set, the TPMI indication information has a one-to-one correspondence with the PUSCH repeat transmission occasion.
[0292] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0293] The PUSCH transmission device in the embodiment of the present application may be a device, or may be a component, integrated circuit, or chip in a terminal. The device may be a mobile terminal or a non-mobile terminal. Exemplarily, the mobile terminal may include, but is not limited to, the types of terminals 11 listed above, and the non-mobile terminal may be a server, a network attached storage (NAS), a personal computer (PC), a television (TV), a deposit payment machine or a self-service machine, etc., and the embodiment of the present application is not specifically limited.
[0294] The PUSCH transmission device in the embodiment of the present application may be a device having an operating system, which may be the Android operating system, the ios operating system, or other possible operating systems, and the embodiment of the present application is not specifically limited.
[0295] The PUSCH transmission device according to the embodiment of the present application can realize each process realized by the embodiment of the method of FIG. 3 and achieve the same technical effect, and will not be further described here to avoid repetition of description.
[0296] Optionally, Figure 6 is a structural schematic diagram of a communication device according to an embodiment of the present application. As shown in Figure 6, the communication device 600 includes a processor 601, a memory 602, and a program or instruction stored in the memory 602 and capable of running on the processor 601. For example, when the communication device 600 is a terminal, when the program or instruction is executed by the processor 601, each process of the above method embodiment can be realized and the same technical effect can be achieved. When the communication device 600 is a network side device, when the program or instruction is executed by the processor 601, each process of the above method embodiment can be realized and the same technical effect can be achieved. In order to avoid repetition, no further description will be given here.
[0297] FIG. 7 is a hardware structure schematic diagram of a terminal device according to an embodiment of the present application.
[0298] The terminal 700 includes at least some of the following components, but is not limited to: a radio frequency unit 701, a network module 702, an audio output unit 703, an input unit 704, a sensor 705, a display unit 706, a user input unit 707, an interface unit 708, a memory 709, and a processor 710.
[0299] As can be understood by those skilled in the art, the terminal 700 may further include a power source (e.g., a battery) for powering each component, and the power source may be logically connected to the processor 710 by a power management system, so that the power management system can realize functions such as charge / discharge management and power consumption management. The terminal structure shown in Figure 7 does not constitute a limitation on the terminal, and the terminal may include more or less components than the number of components shown, or a combination of some components, or a different arrangement of components, and will not be further described here.
[0300] It should be understood that in the embodiment of the present application, the input unit 704 may include a graphics processor (Graphics Processing Unit, GPU) 7041 and a microphone 7042, and the graphics processor 7041 processes image data of still or video images obtained by an image capture device (e.g., a camera) in a video capture mode or an image capture mode. The display unit 706 may include a display panel 7061, and the display panel 7061 may be arranged in the form of a liquid crystal display, an organic light emitting diode, etc. The user input unit 707 includes a touch panel 7071 and other input devices 7072. The touch panel 7071 is also called a touch screen. The touch panel 7071 may include two parts: a touch detection device and a touch controller. The other input devices 7072 may include, but are not limited to, a physical keyboard, function keys (e.g., volume control buttons, switch buttons, etc.), a trackball, a mouse, and a control lever, which will not be described further herein.
[0301] In the embodiment of the present application, the radio frequency unit 701 receives information from the communication partner, causes the processor 710 to process the information, and transmits the information to be transmitted to the communication partner. In general, the radio frequency unit 701 includes, but is not limited to, an antenna, at least one amplifier, a transceiver, a coupler, a low noise amplifier, a duplexer, etc.
[0302] The memory 709 may be used to store software programs or instructions and various data. The memory 709 may mainly include a program or instruction storage area and a data storage area, where the program or instruction storage area can store an operating system, an application program or instruction required for at least one function (e.g., a sound playback function, an image playback function, etc.), etc. The memory 709 may include a high-speed random access memory or a non-volatile memory, where the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. For example, the memory 709 may be at least one magnetic disk memory device, a flash memory device, or other non-volatile solid-state memory device.
[0303] The processor 710 may include one or more processing units. Optionally, the processor 710 may integrate an application processor and a modem processor, where the application processor mainly processes an operating system, a user interface, and application programs or instructions, and the modem processor mainly processes wireless communication, such as a baseband processor. As can be understood, the modem processor does not have to be integrated into the processor 710.
[0304] Here, the processor 710: The terminal determines, based on the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; The PUSCH is transmitted according to the target transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; a phase tracking reference signal (PTRS) and a transmission port indication; The at least one transmission resource allocation includes: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or is indicated by the MAC layer.
[0305] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0306] Optionally, the SRS resource indication information includes an SRI field code point value; The terminal determines, based on first indication information in the DCI, a target transmission resource allocation indicated by the first indication information, determining target SRI field code point information among at least one SRI field code point information according to the SRI field code point value in the DCI; and determining, by the terminal, target SRI field code point information among at least one SRI field code point information, The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or being indicated by a MAC layer; Here, the SRI field code point information is associated with at least one SRS resource, or the SRI field code point information is associated with at least one SRS resource group.
[0307] Alternatively, the different SRI field code point values have a one-to-one correspondence with the at least one SRI field code point information, and the correspondence between the different SRI field code point values and the at least one SRI field code point information is pre-indicated by a network side, or pre-defined by a protocol, or pre-configured, or indicated by a second signaling, and the second signaling is an RRC layer signaling or a MAC layer signaling.
[0308] Optionally, the multiple SRS resources or resource groups associated with the SRI field codepoint information belong to different SRS resource sets.
[0309] Optionally, the SRS resources in each of the SRS resource groups belong to the same SRS resource set.
[0310] Optionally, determining target SRI field code point information among at least one SRI field code point information based on the SRI field code point value in the DCI includes: determining a number of bits of the SRI field based on a number of the at least one SRI field code point information; and determining a range of values of the SRI field code points in the DCI based on the number of bits of the SRI field.
[0311] Optionally, transmitting a PUSCH based on the target transmission resource allocation includes: determining an SRS resource associated with a PUSCH repeated transmission occasion according to the target transmission resource configuration; and transmitting a PUSCH based on an SRS resource associated with the repeating transmission occasion.
[0312] Optionally, the processor 710 may: Determining a mapping scheme between at least one SRS resource or resource group associated with the target SRI field code point information and a PUSCH transmission occasion; According to the mapping scheme, the SRS resource associated with the repeated transmission occasion of the PUSCH is determined.
[0313] Alternatively, if the number of repeated transmissions of the PUSCH is two or more, the mapping scheme may be The at least one SRS resource or resource group may be interleaved or sequentially mapped with multiple repeated transmission times of the PUSCH.
[0314] Alternatively, if the number of repeated transmissions of the PUSCH is 1, the mapping scheme may be The at least one SRS resource or resource group may be sequentially mapped one-to-one with a plurality of partial repeat transmission occasions in one repeat transmission occasion of a PUSCH, and the plurality of partial repeat transmission occasions may constitute the one repeat transmission time.
[0315] Optionally, an order of at least one SRS resource or resource group is determined based on an associated order in the target SRI field codepoint information.
[0316] Optionally, the order of at least one SRS resource or resource group is determined based on an index (SRS resource set ID) of the SRS resource set to which it belongs.
[0317] Optionally, different SRS resource sets are associated with different CORESETPoolIndexes; The different DCIs are from CORESETs associated with the different CORESETPoolIndexes.
[0318] Optionally, the PTRS transmission port indication information includes PTRS-DMRS association field indication information; Here, the terminal determines, based on the first indication information in the DCI, a target transmission resource allocation indicated by the first indication information, Determining PTRS-DMRS association field indication information in the DCI according to a third signaling of the RRC layer or the MAC layer; determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to the PTRS-DMRS association field indication information; The DMRS transmission port is associated with an SRS resource or an SRS resource group that transmits a PUSCH.
[0319] Optionally, the third signaling comprises: Maximum number of PTRS ports, The maximum transmission rank number and / or the number of SRS ports.
[0320] Optionally, the determining of the PTRS-DMRS association field indication information in the DCI based on the third signaling of the RRC layer or the MAC layer includes: Determining a number of bits of PTRS-DMRS association field indication information in DCI according to the third signaling; and determining a range of the PTRS-DMRS association field indication in the DCI based on a bit number of the PTRS-DMRS association field indication.
[0321] Optionally, the PTRS-DMRS association field indication information comprises a second value of the PTRS-DMRS association field; The distinct second values have a one-to-one correspondence with the at least one association relationship.
[0322] Optionally, the processor 710 may: Used to determine, based on a second value of the PTRS-DMRS association field, an association relationship corresponding to the second value as a target association relationship.
[0323] Optionally, the processor 710 may: When the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 2, the number of bits of the PTRS-DMRS association field indication information is used to determine the number of bits as 2 bits.
[0324] Optionally, the second value of the PTRS-DMRS association field indication information includes a third value of a most significant bit (MSB) and a fourth value of a least significant bit (LSB).
[0325] Optionally, a third value of the most significant bit MSB comprises 0 or 1; Wherein, if the third value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the third value of the most significant bit MSB is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0326] Optionally, the fourth value of the least significant bit LSB comprises 0 or 1; Wherein, if the fourth value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the fourth value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0327] Alternatively, if all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, the processor 710: Determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to only some bit information of the PTRS-DMRS association field indication information; The certain bit is the MSB or the LSB.
[0328] Optionally, the processor 710 may: If the maximum PTRS port number is 1 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is used to determine it as 4 bits.
[0329] Optionally, the second value of the PTRS-DMRS association field indication information includes a fifth value of the most significant bit (MSB) and a sixth value of the least significant bit (LSB); The most significant bits MSB are 2 bits, and the least significant bits LSB are 2 bits.
[0330] Alternatively, the fifth value of the most significant bit MSB is 0 or 1 or 2 or 3; Wherein, if the fifth value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit MSB is 3, the target association relationship includes that the PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0331] Alternatively, the sixth value of the least significant bit (LSB) is 0 or 1 or 2 or 3; Wherein, if the sixth value of the least significant bit (LSB) is 0, the target association relationship includes that the TRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 1, the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 3, the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0332] Alternatively, if all the repeated transmission occasions of the PUSCH are associated with the same SRS resource or SRS resource group, the processor 710: Determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to only some bit information of the PTRS-DMRS association field indication information; The part of bits is the MSB.
[0333] Optionally, the processor 710 may: If the maximum PTRS port number is 2 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is used to determine it as 4 bits.
[0334] Optionally, the second value of the PTRS-DMRS association field indication information includes a seventh value of the first bit, an eighth value of the second bit, a ninth value of the third bit, and a tenth value of the fourth bit.
[0335] Alternatively, the seventh value of the first bit is 0 or 1; Wherein, if the seventh value of the first bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the seventh value of the first bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0336] Alternatively, the eighth value of the second bit is 0 or 1; Wherein, if the eighth value of the second bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the eighth value of the second bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0337] Alternatively, the ninth value of the third bit is 0 or 1; Wherein, if the ninth value of the third bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the ninth value of the third bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0338] Alternatively, the tenth value of the fourth bit is 0 or 1; Wherein, if the tenth value of the fourth bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the tenth value of the fourth bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0339] Optionally, the processor 710 may: Determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to only some bit information of the PTRS-DMRS association field indication information; The portion of bits includes a first bit and a second bit.
[0340] Optionally, the processor 710 may: It is used to adopt and transmit one or more target TPMIs indicated by the TPMI indication information according to the first transmission method or the second transmission method.
[0341] Optionally, the first transmission method is: The PUSCH transmission occasions associated with different SRS resources or SRS resource groups all include transmitting using a first TPMI of the one or more target TPMIs.
[0342] Optionally, the first TPMI is determined based on a TPMI indication; Here, the TPMI instruction information is TPMI field-related information in the DCI, and / or The fourth signaling is sent by the RRC layer or the MAC layer.
[0343] Optionally, the second transmission method is: Each PUSCH transmission occasion associated with a different SRS resource or SRS resource group may transmit using a different one of the one or more target TPMIs.
[0344] Optionally, the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may each transmit using different TPMIs among the one or more target TPMIs. The SRS resource or SRS resource group associated with a PUSCH transmission occasion has a one-to-one correspondence with the TPMI used in the PUSCH transmission occasion.
[0345] Optionally, the PUSCH transmission occasions associated with different SRS resources or SRS resource groups may each transmit using different TPMIs among the one or more target TPMIs. The TPMI used in the PUSCH transmission occasions associated with different SRS resources or SRS resource groups is determined based on the TPMI indication information; Here, the TPMI instruction information is TPMI field-related information in the DCI, and / or The fifth signaling is sent by the RRC layer or the MAC layer.
[0346] Optionally, the processor 710 may: determining, based on the sixth signaling, to adopt and transmit one or more target TPMIs based on the first transmission manner; or and determining, according to the sixth signaling, to adopt one or more target TPMIs for transmission according to the second transmission manner; The sixth signaling is RRC layer signaling and / or MAC layer signaling.
[0347] Optionally, the sixth signaling includes RRC configuration information and / or MAC CE indication signaling.
[0348] Optionally, the SRS resource indication and / or the TPMI indication is associated with the first signaling.
[0349] Optionally, the association relationship between the TPMI indication information and the first signaling is: When all the SRI field code point information included in the first signaling is associated with only one SRS resource, or when all the SRS resources associated with all the SRI field code point information belong to the same SRS resource set, the TPMI indication information has a one-to-one correspondence with the PUSCH repeat transmission occasion.
[0350] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0351] The terminal equipment embodiment in the embodiments of the present application is a product embodiment corresponding to the above method embodiment, and all the implementation methods in the above method embodiment can be applied to this terminal equipment embodiment and achieve the same or similar technical effects, so they will not be described further here.
[0352] FIG. 8 is a hardware structural schematic diagram of a network side device according to an embodiment of the present application.
[0353] As shown in Fig. 8, the network side device 800 includes an antenna 801, a radio frequency device 802, and a baseband device 803. The antenna 801 and the radio frequency device 802 are connected. In the uplink direction, the radio frequency device 802 receives information via the antenna 801 and transmits the received information to the baseband device 803 for processing. In the downlink direction, the baseband device 803 processes information to be transmitted and transmits it to the radio frequency device 802, and the radio frequency device 802 processes the received information and then transmits it via the antenna 801.
[0354] The above frequency band processing device may be located in a baseband device 803, and the method performed by the network side equipment in the above embodiments may be implemented in the baseband device 803, which includes a processor 804 and a memory 805.
[0355] The baseband device 803 may include, for example, at least one baseband board, on which multiple chips are installed, and as shown in FIG. 8, one of the chips is, for example, a processor 804, which is connected to a memory 805, and calls the program in the memory 805 to perform the network side equipment operation shown in the above method embodiment.
[0356] The baseband device 803 may further include a network interface 806, which is used to exchange information with the radio frequency device 802, and which is, for example, a common public radio interface (abbreviated as CPRI).
[0357] Specifically, the network side equipment of the embodiment of the present application further includes instructions or programs stored in memory 805 and capable of running on processor 804, and processor 804 can call the instructions or programs in memory 805 to execute the method performed by each module shown in FIG. 5 and achieve the same technical effect, which will not be described further here in order to avoid repetition.
[0358] Here, the processor 804: used for transmitting first instruction information to a terminal; The first indication information is used to instruct a terminal to determine a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation; Here, the first instruction information is Sounding reference signal (SRS) resource indication information; Precoding matrix indication TPMI indication information; a phase tracking reference signal (PTRS) and a transmission port indication; The at least one transmission resource allocation includes: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or is indicated by the MAC layer.
[0359] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0360] Optionally, the SRS resource indication information includes an SRI field code point value; The SRI field code point value is used to indicate target SRI field code point information among at least one SRI field code point information, and the at least one SRI field code point information is provided by a terminal as follows: The network side is instructed in advance; being predefined by a protocol; Being pre-positioned; Indicated by the RRC layer; and / or being indicated by a MAC layer; Here, the SRI field code point information is associated with at least one SRS resource, or the SRI field code point information is associated with at least one SRS resource group.
[0361] Alternatively, the different SRI field code point values have a one-to-one correspondence with the at least one SRI field code point information, and the correspondence between the different SRI field code point values and the at least one SRI field code point information is pre-indicated by a network side, or pre-defined by a protocol, or pre-configured, or indicated by a second signaling, and the second signaling is an RRC layer signaling or a MAC layer signaling.
[0362] Optionally, the SRS resources or resource groups associated with the SRI field codepoint information belong to different SRS resource sets.
[0363] Optionally, the SRS resources in each of the SRS resource groups belong to the same SRS resource set.
[0364] Optionally, an order of at least one SRS resource or resource group is determined based on an associated order in the target SRI field codepoint information.
[0365] Optionally, the order of at least one SRS resource or resource group is determined based on an index (SRS resource set ID) of the SRS resource set to which it belongs.
[0366] Optionally, different SRS resource sets are associated with different CORESETPoolIndexes; The different DCIs are from CORESETs associated with the different CORESETPoolIndexes.
[0367] Optionally, the PTRS transmission port indication information includes PTRS-DMRS association field indication information; The PTRS-DMRS association field indication information is used to determine a target association relationship among at least one association relationship between the PTRS port and the DMRS transmission port; The DMRS transmission port is associated with an SRS resource or an SRS resource group that transmits a PUSCH.
[0368] Optionally, the third signaling comprises: Maximum number of PTRS ports, The maximum transmission rank number and / or the number of SRS ports.
[0369] Optionally, the PTRS-DMRS association field indication information comprises a second value of the PTRS-DMRS association field; The distinct second values have a one-to-one correspondence with the at least one association relationship.
[0370] Alternatively, if the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 2, the number of bits of the PTRS-DMRS association field indication information is determined as 2 bits.
[0371] Optionally, the second value of the PTRS-DMRS association field indication information includes a third value of a most significant bit (MSB) and a fourth value of a least significant bit (LSB).
[0372] Optionally, a third value of the most significant bit MSB comprises 0 or 1; Wherein, if the third value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the third value of the most significant bit MSB is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0373] Optionally, the fourth value of the least significant bit LSB comprises 0 or 1; Wherein, if the fourth value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the fourth value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0374] Alternatively, if the maximum PTRS port number is 1 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is determined as 4 bits.
[0375] Optionally, the second value of the PTRS-DMRS association field indication information includes a fifth value of the most significant bit (MSB) and a sixth value of the least significant bit (LSB); The most significant bits MSB are 2 bits, and the least significant bits LSB are 2 bits.
[0376] Alternatively, the fifth value of the most significant bit MSB is 0 or 1 or 2 or 3; Wherein, if the fifth value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit (MSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the fifth value of the most significant bit MSB is 3, the target association relationship includes that the PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0377] Alternatively, the sixth value of the least significant bit (LSB) is 0 or 1 or 2 or 3; Wherein, if the sixth value of the least significant bit (LSB) is 0, the target association relationship includes that the TRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 1, the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the sixth value of the least significant bit (LSB) is 3, the target association relationship includes that PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0378] Alternatively, if the maximum PTRS port number is 2 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is determined as 4 bits.
[0379] Optionally, the second value of the PTRS-DMRS association field indication information includes a seventh value of the first bit, an eighth value of the second bit, a ninth value of the third bit, and a tenth value of the fourth bit.
[0380] Alternatively, the seventh value of the first bit is 0 or 1; Wherein, if the seventh value of the first bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the seventh value of the first bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0381] Alternatively, the eighth value of the second bit is 0 or 1; Wherein, if the eighth value of the second bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the eighth value of the second bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the first SRS resource or SRS resource group.
[0382] Alternatively, the ninth value of the third bit is 0 or 1; Wherein, if the ninth value of the third bit is 0, the target association relationship includes that the one sharing the PTRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the ninth value of the third bit is 1, the target association relationship includes that the one sharing the PTRS port 0 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0383] Alternatively, the tenth value of the fourth bit is 0 or 1; Wherein, if the tenth value of the fourth bit is 0, the target association relationship includes that the one sharing the PTRS port 1 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; When the tenth value of the fourth bit is 1, the target association relationship includes that the one sharing the PTRS port 1 is associated with the second scheduled DM-RS port associated with the second SRS resource or SRS resource group.
[0384] Optionally, the association relationship between the TPMI indication information and the first signaling is: When all the SRI field code point information included in the first signaling is associated with only one SRS resource, or when all the SRS resources associated with all the SRI field code point information belong to the same SRS resource set, the TPMI indication information has a one-to-one correspondence with the PUSCH repeat transmission occasion.
[0385] In an embodiment of the present application, a target transmission resource allocation for transmitting a PUSCH is instructed to a terminal by at least one of SRS resource indication information, TPMI indication information, and PTRS transmission port indication information, thereby reducing the bit overhead of the SRI field and / or the TPMI field when allocating PUSCH transmission resources.
[0386] The network side equipment embodiment in the embodiments of the present application is a product embodiment corresponding to the above method embodiment, and all the implementation methods in the above method embodiments can be applied to this network side equipment embodiment and achieve the same or similar technical effects, so they will not be described further here.
[0387] The embodiments of the present application further provide a readable storage medium, on which a program or instruction is stored, and when the program or instruction is executed by a processor, each process of the above-mentioned PUSCH transmission method embodiment can be realized and the same technical effect can be achieved. In order to avoid repetition, no further description will be given here.
[0388] Wherein, the processor is the processor in the terminal described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.
[0389] The embodiment of the present application further provides a chip, the chip includes a processor and a communication interface, the communication interface is coupled to the processor, the processor runs a program or instruction of a network side device, and is used to realize each process of the embodiment of the above PUSCH transmission method, and can achieve the same technical effect. In order to avoid repetition, no further description will be given here.
[0390] It should be understood that the chips referred to in the embodiments of the present application may be referred to as system level chips, system chips, chip systems, or systems on chips.
[0391] It should be explained that in this specification, the terms "comprise", "include", or any other variants thereof are intended to cover the non-exclusive "comprise", whereby a process, method, article, or apparatus that includes a set of elements includes not only those elements, but also other elements not specifically listed or inherent to such process, method, article, or apparatus. In the absence of further limitations, an element limited by the phrase "comprises a" does not exclude the presence of other elements in the process, method, article, or apparatus that includes the element. It should be pointed out that the scope of the method and apparatus in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may include performing functions in an essentially simultaneous manner or in the reverse order based on the functions involved, for example, the described method can be performed in a different order than described, and various steps can be added, omitted, or combined. Also, features described with reference to some examples can be combined in other examples.
[0392] From the above description of the embodiments, it is clear to those skilled in the art that the methods of the above embodiments can be realized in the form of software and a necessary general-purpose hardware platform. Of course, they can also be realized in hardware, but in many cases the former is a more preferred embodiment. Based on this understanding, the technical solution of the present application may be substantially or in part embodied in the form of a software product. The computer software product is stored in a storage medium (e.g., ROM / RAM, magnetic disk, optical disk) and includes some instructions for causing a terminal (which may be a mobile phone, computer, server, or network device, etc.) to execute the methods described in each embodiment of the present application.
[0393] The above describes the embodiments of the present application in conjunction with the drawings, but the present application is not limited to the above specific embodiments. The above specific embodiments are merely illustrative and not limiting. Those skilled in the art can take the suggestions of this application and make many forms without departing from the spirit and scope of the claims of this application, all of which belong to the protection scope of this application.
Claims
1. A physical uplink shared channel (PUSCH) transmission method, comprising: The terminal determines, based on the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation, where the first indication information includes PTRS-DMRS association field indication information; transmitting a PUSCH based on the target transmission resource allocation; The terminal determines, based on the received first indication information, a target transmission resource allocation indicated by the first indication information in at least one transmission resource allocation, The terminal determines a number of bits of PTRS-DMRS association field indication information in DCI according to signaling of an RRC layer, the signaling of the RRC layer including a maximum PTRS port number and a maximum transmission rank number; Determining a range of the PTRS-DMRS association field indication information in the DCI based on a bit number of the PTRS-DMRS association field indication information; determining a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port according to a range of the PTRS-DMRS association field indication information; If the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 3 or 4, determine the number of bits of the PTRS-DMRS association field indication information as 4 bits; If the maximum PTRS port number is 1 and the maximum transmission rank number is 2, determine the number of bits of the PTRS-DMRS association field indication information as 2 bits; When the number of bits of the PTRS-DMRS association field indication information is 2 bits, a value of a most significant bit (MSB) of the PTRS-DMRS association field indication information includes 0 or 1, where, when the value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with a first scheduled DM-RS port associated with a first SRS resource or SRS resource group, and when the value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with a second scheduled DM-RS port associated with a first SRS resource or SRS resource group; When the number of bits of the PTRS-DMRS association field indication information is 2 bits, a value of a least significant bit (LSB) of the PTRS-DMRS association field indication information includes 0 or 1, where, when the value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with a first scheduled DM-RS port associated with a second SRS resource or SRS resource group, and when the value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; The first SRS resource or SRS resource group and the second SRS resource or SRS resource group are determined according to a magnitude of an index value of an SRS resource set.
2. The PUSCH transmission method of claim 1, wherein different values within a range taken by the PTRS-DMRS association field indication information correspond one-to-one to at least one association relationship between the PTRS port and the DMRS transmission port.
3. The first indication information further includes sounding reference signal (SRS) resource indication information; If the code point value of the SRS resource indication information is 0, indicate an SRS resource in a first SRS resource set; If the code point value of the SRS resource indication information is 1, indicate an SRS resource in a second SRS resource set; The PUSCH transmission method according to claim 1 , wherein, when a code point value of the SRS resource indication information is 2 or 3, the SRS resource indication information indicates an SRS resource in the first SRS resource set and an SRS resource in the second SRS resource set.
4. If the code point value of the SRS resource indication information is 2, indicate an SRS resource in the first SRS resource set and an SRS resource in the second SRS resource set; Or, The PUSCH transmission method according to claim 3 , wherein, when a code point value of the SRS resource indication information is 3, the SRS resource indication information indicates an SRS resource in the second SRS resource set and an SRS resource in the first SRS resource set.
5. When the number of bits of the PTRS-DMRS association field indication information is 4 bits, a value of the first 2 bits of the PTRS-DMRS association field indication information is 0, 1, 2, or 3, and a value of the last 2 bits of the PTRS-DMRS association field indication information is 0, 1, 2, or 3; Wherein, if the value of the first 2 bits is 0, the target association relationship includes that the PTRS port 0 is associated with the first scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the value of the first 2 bits is 1, the target association relationship includes that the PTRS port 0 is associated with a second scheduled DM-RS port associated with a first SRS resource or SRS resource group; When the value of the first 2 bits is 2, the target association relationship includes that the PTRS port 0 is associated with the third scheduled DM-RS port associated with the first SRS resource or SRS resource group; When the value of the first 2 bits is 3, the target association relationship includes that the PTRS port 0 is associated with the fourth scheduled DM-RS port associated with the first SRS resource or SRS resource group; If the value of the last 2 bits is 0, the target association relationship includes that the TRS port 0 is associated with the first scheduled DM-RS port associated with the second SRS resource or SRS resource group; If the value of the last 2 bits is 1, the target association relationship includes that the TRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; If the value of the last 2 bits is 2, the target association relationship includes that the PTRS port 0 is associated with a third scheduled DM-RS port associated with a second SRS resource or SRS resource group; 2. The method of claim 1, wherein if the value of the last 2 bits is 3, the target association relationship includes that the PTRS port 0 is associated with a fourth scheduled DM-RS port associated with a second SRS resource or SRS resource group.
6. A PUSH transmission method as described in claim 5, wherein the maximum number of PTRS ports is 1.
7. The first instruction information further includes: Sounding reference signal (SRS) resource indication information; and a precoding matrix indication TPMI indication information.
8. A physical uplink shared channel (PUSCH) transmission method, comprising: The network side sends RRC layer signaling to the terminal; The network side sends first instruction information to the terminal; The first indication information includes PTRS-DMRS association field indication information; The signaling of the RRC layer is used to configure the PTRS-DMRS association field indication information; The RRC layer signaling is used to determine the number of bits of PTRS-DMRS association field indication information in the DCI, and the RRC layer signaling includes a maximum PTRS port number and a maximum transmission rank number; The number of bits of the PTRS-DMRS association field indication information is used to determine the range of the PTRS-DMRS association field indication information in the DCI; The range of the PTRS-DMRS association field indication information is used to determine a target association relationship among at least one association relationship between a PTRS port and a DMRS transmission port; If the maximum PTRS port number is 1 or 2 and the maximum transmission rank number is 3 or 4, the number of bits of the PTRS-DMRS association field indication information is 4 bits; If the maximum PTRS port number is 1 and the maximum transmission rank number is 2, the number of bits of the PTRS-DMRS association field indication information is 2 bits; When the number of bits of the PTRS-DMRS association field indication information is 2 bits, a value of a most significant bit (MSB) of the PTRS-DMRS association field indication information includes 0 or 1, where, when the value of the most significant bit (MSB) is 0, the target association relationship includes that the PTRS port 0 is associated with a first scheduled DM-RS port associated with a first SRS resource or SRS resource group, and when the value of the most significant bit (MSB) is 1, the target association relationship includes that the PTRS port 0 is associated with a second scheduled DM-RS port associated with a first SRS resource or SRS resource group; When the number of bits of the PTRS-DMRS association field indication information is 2 bits, a value of a least significant bit (LSB) of the PTRS-DMRS association field indication information includes 0 or 1, where, when the value of the least significant bit (LSB) is 0, the target association relationship includes that the PTRS port 0 is associated with a first scheduled DM-RS port associated with a second SRS resource or SRS resource group, and when the value of the least significant bit (LSB) is 1, the target association relationship includes that the PTRS port 0 is associated with a second scheduled DM-RS port associated with a second SRS resource or SRS resource group; The first SRS resource or SRS resource group and the second SRS resource or SRS resource group are determined according to a magnitude of an index value of an SRS resource set.
9. The PUSCH transmission method of claim 8, wherein different values within a range taken by the PTRS-DMRS association field indication information correspond one-to-one to at least one association relationship between the PTRS port and the DMRS transmission port.
10. The first indication information further includes sounding reference signal (SRS) resource indication information; If the code point value of the SRS resource indication information is 0, indicate an SRS resource in a first SRS resource set; If the code point value of the SRS resource indication information is 1, indicate an SRS resource in a second SRS resource set; The PUSCH transmission method according to claim 8 , wherein, when a code point value of the SRS resource indication information is 2 or 3, the SRS resource indication information indicates an SRS resource in the first SRS resource set and an SRS resource in the second SRS resource set.
11. If the code point value of the SRS resource indication information is 2, indicate an SRS resource in the first SRS resource set and an SRS resource in the second SRS resource set; Or, The PUSCH transmission method according to claim 10, wherein, when a code point value of the SRS resource indication information is 3, the SRS resource indication information indicates an SRS resource in the second SRS resource set and an SRS resource in the first SRS resource set.
12. A terminal device including a processor, a memory, and a program or instructions stored in the memory and operable on the processor, the program or instructions being executed by the processor to realize the steps of the physical uplink shared channel (PUSCH) transmission method according to any one of claims 1 to 7.
13. A network side device comprising: a processor; a memory; and a program or instructions stored in the memory and operable on the processor, the program or instructions being executed by the processor to implement steps of a physical uplink shared channel (PUSCH) transmission method according to any one of claims 8 to 11.