Methods and apparatus for satellite switching with beam steering in mobile communications
Beam steering during satellite switching in NTN systems addresses communication delays and interruptions in higher frequency bands by adjusting reception filters and incorporating Tsat_beam, improving network efficiency and scheduling.
Patent Information
- Application Number
- PCT/CN2026/095347
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-05-08
- Filing Date
- 2026-05-08
- Publication Date
- 2026-11-12
AI Technical Summary
Existing satellite switching techniques in non-terrestrial networks (NTN) face challenges in higher frequency bands due to increased path loss and beam-related operations, leading to communication delays and interruptions, which are not adequately addressed by current timing models.
Implementing beam steering during satellite switching procedures by adjusting the downlink spatial domain reception filter, synchronizing with the target satellite, and incorporating a time parameter (Tsat_beam) to account for beam steering delays, particularly in higher frequency NTN scenarios.
Enhances communication efficiency and scheduling by accurately characterizing delays and interruptions, facilitating seamless satellite switching with reduced latency and signaling overhead.
Smart Images

Figure CN2026095347_12112026_PF_FP_ABST
Abstract
Description
METHODS AND APPARATUS FOR SATELLITE SWITCHING WITH BEAM STEERING IN MOBILE COMMUNICATIONSCROSS REFERENCE TO RELATED PATENT APPLICATION (S)
[0001] The present disclosure is part of a non-provisional patent application claiming the priority benefit of U.S. Patent Application No. 63 / 802,571, filed 8 May 2025, and U.S. Patent Application No. 63 / 802,589, filed 8 May 2025, the contents of which herein being incorporated by reference in their entirety.TECHNICAL FIELD
[0002] The present disclosure is generally related to wireless communications and, more particularly, to methods and apparatus for satellite switching with beam steering in mobile communications.BACKGROUND
[0003] Unless otherwise indicated herein, approaches described in this section are not prior art to the claims listed below and are not admitted as prior art by inclusion in this section.
[0004] In wireless communication systems, a user equipment (UE) may operate in various deployment scenarios, including terrestrial network (TN) deployments and non-terrestrial network (NTN) deployments such as satellite-based communication systems. In NTN systems, communication may be established between the UE and a satellite acting as a network node, and mobility procedures may be required when the serving satellite changes.
[0005] In some NTN deployments, such as low Earth orbit (LEO) satellite systems, a UE may switch from a serving satellite to a target satellite while operating on the same frequency. In such scenarios, a satellite switching procedure with re-synchronization may be performed, in which the UE re-establishes synchronization with the target satellite without performing a radio frequency band change.
[0006] Existing techniques for mobility in NTN systems may include handover-based procedures or satellite switching procedures with re-synchronization. Compared with handover procedures, satellite switching with re-synchronization may reduce signaling overhead and latency. In some implementations, timing requirements for such procedures may be defined in terms of interruption time for hard switching or switching delay for soft switching, which may depend on factors such as cell search time, processing time, timing uncertainty, and other parameters.
[0007] With the evolution of NTN deployments toward higher frequency bands, additional considerations may arise. For example, higher frequency operations may involve increased path loss and may require the UE to employ multiple antenna elements or beamforming techniques to maintain reliable communication links.
[0008] The introduction of beam-related operations during satellite switching may lead to additional delays and potential interruptions in communication. These delays may depend on factors such as the time required for beam adjustment, synchronization procedures, and other processing operations. As a result, existing timing models for satellite switching may need to be extended to account for such additional factors, particularly in higher frequency NTN scenarios. Furthermore, accurate characterization of delays and interruptions during satellite switching may be beneficial for network-side operations, such as scheduling and mobility management.
[0009] Accordingly, there is a need for improved techniques that support satellite switching in NTN systems, particularly in higher frequency deployments, while accounting for beam-related operations and associated timing effects, so as to facilitate efficient communication, scheduling, and mobility management.SUMMARY
[0010] The following summary is illustrative only and is not intended to be limiting in any way. That is, the following summary is provided to introduce concepts, highlights, benefits, and advantages of the novel and non-obvious techniques described herein. Select implementations are further described below in the detailed description. Thus, the following summary is not intended to identify essential features of the claimed subject matter, nor is it intended for use in determining the scope of the claimed subject matter.
[0011] One objective of the present disclosure is proposing schemes, concepts, designs, systems, methods, and apparatus pertaining to satellite switching with beam steering in mobile communications. It is believed that the above-described issue would be avoided or otherwise alleviated by implementing one or more of the proposed schemes described herein.
[0012] In one aspect, a method may involve a user equipment (UE) steering a downlink spatial domain reception filter toward a target satellite during a satellite switching procedure. The method may also involve the UE synchronizing with the target satellite during the satellite switching procedure. A time associated with the steering of the downlink spatial domain reception filter may be included in a delay associated with the satellite switching procedure.
[0013] In one aspect, a method may involve a network node determining a delay associated with a satellite switching procedure for a user equipment (UE) switching from a serving satellite to a target satellite. The method may also involve the network node scheduling communications with the UE based on the delay associated with the satellite switching procedure. The delay may comprise a time associated with steering of a downlink spatial domain reception filter of the UE toward the target satellite during the satellite switching procedure.
[0014] In one aspect, a user equipment (UE) may comprise a transceiver which, during operation, wirelessly communicates with a network node. The UE may also comprise a processor communicatively coupled to the transceiver. The processor, during operation, may perform operations comprising steering a downlink spatial domain reception filter toward a target satellite during a satellite switching procedure. The processor, during operation, may also perform operations comprising synchronizing with the target satellite during the satellite switching procedure. A time associated with the steering of the downlink spatial domain reception filter may be included in a delay associated with the satellite switching procedure.
[0015] It is noteworthy that, although description provided herein may be in the context of certain radio access technologies, networks and network topologies such as Long-Term Evolution (LTE) , LTE-Advanced, LTE-Advanced Pro, 5th Generation (5G) , New Radio (NR) , Internet-of-Things (IoT) and Narrow Band Internet of Things (NB-IoT) , Industrial Internet of Things (IIoT) , beyond 5G (B5G) , and 6th Generation (6G) , the proposed concepts, schemes and any variation (s) / derivative (s) thereof may be implemented in, for and by other types of radio access technologies, networks and network topologies. Thus, the scope of the present disclosure is not limited to the examples described herein.BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are included to provide a further understanding of the disclosure and are incorporated in and constitute a part of the present disclosure. The drawings illustrate implementations of the disclosure and, together with the description, serve to explain the principles of the disclosure. It is appreciable that the drawings are not necessarily in scale as some components may be shown to be out of proportion than the size in actual implementation in order to clearly illustrate the concept of the present disclosure.
[0017] FIG. 1 is a diagram depicting an example scenario of a communication environment in which various solutions and schemes in accordance with the present disclosure may be implemented.
[0018] FIG. 2 is a diagram depicting an example scenario of a hard satellite switch in accordance with an implementation of the present disclosure.
[0019] FIG. 3 is a diagram depicting an example scenario of a soft satellite switch in accordance with an implementation of the present disclosure.
[0020] FIG. 4 is a block diagram of an example communication system in accordance with an implementation of the present disclosure.
[0021] FIG. 5 is a flowchart of an example process in accordance with an implementation of the present disclosure.
[0022] FIG. 6 is a flowchart of another example process in accordance with an implementation of the present disclosure. DETAILED DESCRIPTION OF PREFERRED IMPLEMENTATIONS
[0023] Detailed embodiments and implementations of the claimed subject matters are disclosed herein. However, it shall be understood that the disclosed embodiments and implementations are merely illustrative of the claimed subject matters which may be embodied in various forms. The present disclosure may, however, be embodied in many different forms and should not be construed as limited to the exemplary embodiments and implementations set forth herein. Rather, these exemplary embodiments and implementations are provided so that description of the present disclosure is thorough and complete and will fully convey the scope of the present disclosure to those skilled in the art. In the description below, details of well-known features and techniques may be omitted to avoid unnecessarily obscuring the presented embodiments and implementations. Overview
[0024] Implementations in accordance with the present disclosure relate to various techniques, methods, schemes, and / or solutions pertaining to satellite switching with beam steering. According to the present disclosure, a number of possible solutions may be implemented separately or jointly. That is, although these possible solutions may be described below separately, two or more of these possible solutions may be implemented in one combination or another.
[0025] In the present disclosure, non-terrestrial network (NTN) refers to a network that uses radio frequency (RF) and information processing resources carried on high, medium, and low orbit satellites or other high-altitude communication platforms to provide communication services for UEs. According to the load capacity on the satellite, there are two typical scenarios, namely: transparent payload and regenerative payload. In transparent payload mode, the satellite does not process the signal and waveform in the communication service but, rather, only functions as an RF amplifier to forward data. In regenerative payload mode, the satellite, other than RF amplification, also has the processing capabilities of modulation / demodulation, coding / decoding, switching, routing, and so on.
[0026] In some scenarios, a user equipment (UE) in an NTN, such as a low Earth orbit (LEO) satellite system, may switch from a serving satellite to a target satellite while operating on the same frequency. In such cases, a satellite switch with re-synchronization may be performed, in which the UE does not perform an RF band switch but re-establishes synchronization with the target satellite. For example, as satellites move along their orbits, a serving satellite may move out of coverage while another satellite enters the service area, and the UE switches to the new satellite accordingly. In some implementations, traditional mobility solutions may rely on handover procedures to switch to a new satellite, which may introduce relatively longer delays due to signaling and processing overhead. To address this, satellite switch with re-synchronization has been introduced, for example, in frequency range 1 (FR1) NTN scenarios, to reduce delay and signaling complexity compared to handover-based approaches.
[0027] However, in some scenarios, when extending the satellite switch with re-synchronization to higher frequency bands, such as Ku band or Ka band, additional considerations may arise. In particular, the UE may need to steer a downlink spatial domain reception filter, for example, by adjusting its reception beam direction, toward the target satellite. Such beam steering operations may introduce additional delay and potential interruption during the satellite switching procedure.
[0028] In some implementations, it may be beneficial to identify and characterize such delays and interruptions associated with beam steering and satellite switching, so as to facilitate network scheduling and mobility management. For example, a network may take into account expected interruption periods when scheduling communications with the UE. Accordingly, there is a need to support satellite switching with re-synchronization in higher frequency NTN scenarios while considering beam steering operations and their associated timing impacts.
[0029] In some scenarios, in NR SAN FR2-NTN handover, an additional delay may be introduced due to beam steering operations performed by a UE. In particular, a parameter denoted as Tsat_beam may represent an additional time required for the UE to steer a downlink spatial domain reception filter toward a target cell or target satellite. In some implementations, when the UE indicates an electronically steerable antenna capability (e.g., via ntn-VSAT-AntennaType-r18) , the value of Tsat_beam may be determined based on a periodicity of synchronization signals, such as Tsat_beam = 3 × Trs. In some implementations, when the UE indicates a mechanically steerable antenna capability, the value of Tsat_beam may be determined based on an angular offset, for example Tsat_beam = Oangle / 22.5 s, where Oangle represents an angle difference, as observed by the UE, between a direction of a serving satellite and a direction of a target satellite.
[0030] In some scenarios, for a hard satellite switch with re-synchronization in FR1 NTN, an interruption time may be defined as a time interval between t-service and a time instance when a UE is ready to receive any downlink (DL) channel or signal and transmit any uplink (UL) channel or signal to or from a target satellite. When an intra-frequency hard switch to an NR SAN cell is commanded, the interruption time may be required to be less than a threshold denoted as Tinterrupt, where Tinterrupt = Tsearch + Tprocessing + TΔ + Tmargin. Otherwise, no specific interruption time requirement may be applied.
[0031] In some implementations, Tsearch may represent a time required for the UE to search for the target NR SAN cell, assuming that the target cell is not already known when the UE starts synchronizing with the target satellite. For example, when a signal quality condition such as Es / Iot ≥ -2 dB is satisfied, Tsearch may be equal to Tfirst_SSB. In some implementations, Tsearch may be determined based on non-discontinuous reception (non-DRX) target cell search times regardless of whether DRX is used by the UE. In some implementations, TΔ may correspond to a timing uncertainty parameter defined elsewhere, Tprocessing may represent a UE processing time (e.g., up to 10 ms) , and Tmargin may represent a time for synchronization signal block (SSB) post-processing (e.g., up to 2 ms) .
[0032] In some implementations, Tfirst_SSB may represent a time to an end of a first complete SSB burst of the target satellite, where a location of the SSB burst may be determined based on a periodicity and location of SSB of a source satellite, and, if configured, a parameter such as ssb-TimeOffset and a propagation delay difference between a serving satellite and the target satellite, as defined in relevant specifications. In some scenarios, the UE may skip measurements for other cells or satellites, except for the serving satellite and the target satellite, during a time period from t-service until completion of the satellite switching procedure.
[0033] In some scenarios, for a soft satellite switch with re-synchronization in FR1 NTN, a satellite switch delay may be defined as a time interval from t-serviceStart to a time instance when a UE is ready to start transmission of new uplink PRACH channel or transmission of new uplink PUSCH channel. When an intra-frequency soft switch to an NR SAN cell is commanded, the satellite switch delay may be required to be less than a threshold denoted as Tsoft_switch, where Tsoft_switch = max (t-service -t-serviceStart, Tsearch + TΔ + Tmargin) + Tprocessing.
[0034] In some implementations, Tsearch may represent a time required for the UE to search for the target NR SAN cell, assuming that the target cell is not already known when the handover command is received. For example, when a signal quality condition such as Es / Iot ≥ -2 dB is satisfied, Tsearch may be equal to Tfirst_SSB. In some implementations, Tsearch may be determined based on non-DRX target cell search times regardless of whether DRX is used. In some implementations, TΔ may correspond to a timing uncertainty parameter defined in relevant specifications, Tprocessing may represent UE processing time (e.g., up to 10 ms) , and Tmargin may represent additional processing margin associated with SSB processing.
[0035] In some scenarios, during a time period from t-serviceStart to t-service, scheduling restrictions may be applied. In some implementations, locations of SSB symbols of the target satellite, where such scheduling restrictions apply, may be determined based on a periodicity and location of SSB of a source satellite, a configured parameter such as ssb-TimeOffset, and a propagation delay difference between a serving satellite and the target satellite, as defined in relevant specifications.
[0036] In some implementations, the UE may skip measurements for cells or satellites other than the serving satellite and the target satellite during a time period from t-serviceStart until completion of the satellite switching procedure. In some scenarios, the UE may maintain a connection with the source non-geostationary orbit (NGSO) satellite during the switching process, for example when SSBs from the serving satellite and the target satellite are spaced apart by at least one orthogonal frequency division multiplexing (OFDM) symbol in the time domain at the UE receiver.
[0037] In some scenarios, the current approach extends a satellite switch with re-synchronization to higher frequency NTN deployments, such as Ku band (e.g., around 20 GHz) and Ka band (e.g., around 30 GHz) . In such higher frequency conditions, channel attenuation may be more severe, and a UE may utilize multiple antenna elements to enhance reception performance. Accordingly, during a satellite switching procedure, the UE may perform additional operations related to adjusting a downlink spatial domain reception filter, for example, by steering a reception beam direction toward a target satellite.
[0038] In some implementations, to characterize the impact of such beam steering operations, a time parameter denoted as Tsat_beam may be introduced. The parameter Tsat_beam may represent a time required for the UE to adjust or steer its reception beam. In some scenarios, such a parameter may not be considered in existing FR1 satellite switching mechanisms, for example, because lower frequency deployments may not require beam steering with multiple antenna elements.
[0039] In some scenarios, additional considerations may be introduced during a satellite switching procedure. For example, a direction of antenna reception may be taken into account when switching between satellites. In a hard satellite switch, the coverage areas of satellites may not overlap, and an interruption may occur. In such cases, both the UE and the satellite (or network) may consider an interruption time, and the interruption time may include the beam steering time Tsat_beam, which represents an additional delay introduced by beam adjustment. In some implementations, a timing of triggering beam steering at the UE may be between a service switching time (e.g., t-Service) and a first SSB of the target satellite.
[0040] In some scenarios, in a soft satellite switch, coverage areas of satellites may overlap, and the UE may operate under different conditions compared to the hard switch case. In some implementations, different timing scenarios may arise depending on the extent of overlap, and the UE behavior during the switching procedure may vary accordingly.
[0041] In some scenarios, based on ephemeris information associated with a target satellite or target cell, a UE may steer a downlink spatial domain reception filter toward the target satellite during a satellite switching procedure. In some implementations, the UE may perform such beam steering after or at a service switching time (e.g., t-Service) and before a first SSB of the target satellite, so as to be ready for reception from the target satellite. In some implementations, a time parameter denoted as Tsat_beam may be considered to represent a time required for the UE to steer the downlink spatial domain reception filter toward the target satellite after or at t-Service. In some scenarios, Tsat_beam may correspond to a duration required for the UE to adjust or rotate a reception beam direction. In some scenarios, such a parameter may not be considered in existing FR1 satellite switching mechanisms. For example, in lower frequency deployments, beam steering based on multiple antenna elements may not be required, and therefore, a beam steering-related delay may not be explicitly introduced. However, in higher frequency scenarios, the inclusion of Tsat_beam may facilitate more accurate characterization of timing behavior during satellite switching procedures.
[0042] In some scenarios, for a hard satellite switch, coverage areas of a serving satellite and a target satellite may not overlap, and a service interruption may occur during a satellite switching procedure. For example, a serving satellite may move out of coverage, the UE may temporarily lose connection, and subsequently a target satellite may become available, after which the UE performs re-synchronization with the target satellite. In some implementations, an interruption time may be defined as a time interval between a service switching time (e.g., t-Service) and a time instance when the UE is ready to receive any DL channel or signal and transmit any UL channel or signal to or from the target satellite. In some scenarios, the interruption time may be required to be less than a threshold, for example Tsat_beam + Tsearch +Tprocessing + TΔ + Tmargin. In some implementations, based on ephemeris information associated with the target satellite or target cell, the UE may steer a downlink spatial domain reception filter toward the target satellite after or at t-Service and before a first SSB of the target satellite. The time required for such beam steering may be represented by Tsat_beam, and may be considered as part of the interruption time. In some scenarios, both the UE and the network may take into account the interruption time during the hard satellite switching procedure. In some implementations, the network may avoid scheduling data transmission during the interruption period, since the UE may not be able to transmit or receive signals during that time interval.
[0043] FIG. 2 illustrates an example scenario 200 of a hard satellite switch in accordance with an implementation of the present disclosure. In some scenarios, during a hard satellite switch, coverage areas of a serving satellite and a target satellite may not overlap, and a service interruption may occur. For example, a serving satellite may move out of coverage, the UE may experience a service interruption, and subsequently a target satellite may become available, after which the UE performs re-synchronization with the target satellite. In some implementations, based on ephemeris information associated with the target satellite or target cell, the UE may steer a downlink spatial domain reception filter toward the target satellite after or at a service switching time (e.g., t-Service) and before a first synchronization signal block (SSB) of the target satellite. A time required for such beam steering may be represented by Tsat_beam, which corresponds to a duration required for the UE to adjust its reception beam direction. In some scenarios, an interruption time for the hard satellite switch may be defined as a time interval between t-Service and a time instance when the UE is ready to receive any DL channel or signal and transmit any UL channel or signal to or from the target satellite. In some implementations, the interruption time may be required to be less than Tsat_beam + Tsearch + Tprocessing + TΔ + Tmargin, and may be expressed as Tinterrupt =Tsat_beam + Tsearch + Tprocessing + TΔ + Tmargin. In some implementations, both the UE and the network may take into account the interruption time during the hard satellite switching procedure. In some scenarios, the network may avoid scheduling data transmission during the interruption period, since the UE may not be able to transmit or receive signals during that time interval.
[0044] In some scenarios, for a hard satellite switch with re-synchronization, requirements corresponding to an interruption time may be applied. In some implementations, an interruption time may be defined by replacing a conventional parameter with a formulation in which Tinterrupt = Tsat_beam +Tsearch + Tprocessing + TΔ + Tmargin. In some implementations, parameters such as Tsearch, Tprocessing, TΔ, and Tmargin may follow definitions specified in related specifications. In some scenarios, an additional parameter Tsat_beam may be introduced to represent a time required for a UE to steer a downlink spatial domain reception filter toward a target cell or target satellite. In some implementations, when the UE indicates an electronically steerable antenna capability (e.g., via ntn-VSAT-AntennaType-r19) , the parameter Tsat_beam may be determined as a multiple of a synchronization signal periodicity, for example, Tsat_beam = 3 × TSSB, where TSSB corresponds to a periodicity of SSBs of a source satellite. In some implementations, when the UE indicates a mechanically steerable antenna capability, the parameter Tsat_beam may be determined based on an angular offset, for example, Tsat_beam = Oangle / 22.5 s, where Oangle represents an angle difference, as observed by the UE, between a serving satellite and a target satellite.
[0045] In some scenarios, for a soft satellite switch, coverage areas of a serving satellite and a target satellite may overlap, and a UE may perform at least part of synchronization while still within the overlap region, thereby reducing interruption. In such scenarios, a switch delay time for the soft satellite switch may be expressed as max (t-service -t-serviceStart, Tsat_beam + Tsearch + TΔ + Tmargin) + Tprocessing. In some implementations, the UE may start to perform cell search on the target satellite before t-Service by steering a downlink spatial domain reception filter toward the target satellite. At t-Service, the UE may stop connection with the serving satellite and switch to the target satellite. An interruption may start from t-Service, and a length of the interruption may depend on a time difference between t-service and t-serviceStart. In some scenarios, when an overlap duration is sufficient, the UE may complete cell search and synchronization during the overlap period. In such a case, the UE may be ready at t-Service, and the interruption may be relatively short. For example, the interruption length may correspond to Tprocessing when (t-service -t-serviceStart) ≥ (Tsearch + TΔ + Tmargin) . In some scenarios, when the overlap duration is insufficient, the UE may not complete synchronization before t-Service, and may need to continue synchronization after t-Service. In such a case, the interruption may be longer. For example, the interruption length may correspond to Tprocessing + (t-service -t-serviceStart) - (Tsearch + TΔ + Tmargin) when (t-service -t-serviceStart) < (Tsearch + TΔ + Tmargin) .
[0046] FIG. 3 illustrates an example scenario 300 of a hard satellite switch in accordance with an implementation of the present disclosure. In some scenarios, for a soft satellite switch, coverage areas of a serving satellite and a target satellite may overlap, and a satellite switch delay time may be defined as a time interval from t-serviceStart to a time instance when a UE is ready to start transmission of new uplink PRACH channel or transmission of new uplink PUSCH channel. In some implementations, the delay time may be required to be less than Tprocessing plus a maximum of (1) a time difference between t-service and t-serviceStart and (2) Tsat_beam + Tsearch + TΔ + Tmargin. Accordingly, the switch delay time may be expressed as Tsoft_switch = max (t-service -t-serviceStart, Tsat_beam + Tsearch + TΔ + Tmargin) +Tprocessing. In some implementations, Tsat_beam may represent a time required for the UE to steer a downlink spatial domain reception filter toward the target satellite after or at t-serviceStart. In some scenarios, the UE may start to perform cell search on the target satellite before t-service by steering the downlink spatial domain reception filter toward the target satellite. In some scenarios, an interruption may start from t-service, and an interruption length may depend on a time difference between t-service and t-serviceStart. In some implementations, when (t-service -t-serviceStart) ≥ (Tsearch + TΔ + Tmargin) , the interruption length may correspond to Tprocessing. In some implementations, when (t-service -t-serviceStart) < (Tsearch + TΔ + Tmargin) , the interruption length may correspond to Tprocessing + (t-service -t-serviceStart) - (Tsearch + TΔ + Tmargin) .
[0047] In some scenarios, for a soft satellite switch with re-synchronization, requirements corresponding to satellite switch delay may be applied. In some implementations, a parameter Tsoft_switch may be defined as Tsoft_switch = max (t-service -t-serviceStart, Tsat_beam + Tsearch + TΔ + Tmargin) +Tprocessing, where parameters such as Tsearch, Tprocessing, TΔ, and Tmargin may follow definitions specified in related specifications. In some implementations, an additional parameter Tsat_beam may represent a time required for a UE to steer a downlink spatial domain reception filter toward a target cell. When the UE indicates an electronically steerable antenna capability (e.g., via ntn-VSAT-AntennaType-r19) , Tsat_beam may be determined based on a periodicity of synchronization signal blocks, for example Tsat_beam = 3 × TSSB, where TSSB corresponds to a periodicity of SSBs of a source satellite.
[0048] In some scenarios, during a time period from t-serviceStart to t-service, scheduling restrictions may be applied. In some implementations, when a configuration such as deriveSSB-IndexFromCell is enabled, the UE may not be expected to transmit uplink signals (e.g., PUCCH, PUSCH, or SRS) or receive downlink channels (e.g., PDCCH, PDSCH, TRS, or CSI-RS) on SSB symbols to be measured, and on data symbols before and after each consecutive SSB symbol within a measurement timing window (e.g., SMTC window duration) . In some implementations, when deriveSSB-IndexFromCell is not enabled, the UE may not be expected to transmit or receive signals on all symbols within the SMTC window duration, and on data symbols before and after the SMTC window duration. In some implementations, a parameter KRX_switch may represent a switch period for the UE to steer the downlink spatial domain reception filter toward a target cell, and KRX_switch may be set to 1. In some scenarios, the requirements associated with the satellite switch delay may not apply when a time span from a last slot of system information (SI) transmission within an SI modification period, where a last updated value for t-ServiceStart-r18 is first acquired by the UE, to a first slot corresponding to t-ServiceStart-r18 is less than a threshold (e.g., 1 second) .
[0049] In some scenarios, satellite switching with re-synchronization in FR2-NTN may be applied to both hard satellite switch and soft satellite switch in a quasi-earth fixed scenario, for example, when a UE switches from one FR2-NTN cell to another. In some implementations, such requirements may be applicable when the UE has valid parameters associated with a target cell, such as ephemeris information, common timing advance, downlink and uplink polarization information, frequency offset parameters, and mobility-related parameters. Otherwise, a satellite switching delay or an interruption time may be longer than expected. In some scenarios, satellite switching with re-synchronization may be extended to higher frequency NTN deployments, such as Ku band or Ka band. In such higher frequency conditions, channel attenuation may be more severe, and a UE may utilize multiple antenna elements to enhance reception performance. Accordingly, the UE may perform beam steering by adjusting a downlink spatial domain reception filter toward a target satellite during a satellite switching procedure.
[0050] In some implementations, a parameter Tsat_beam may be introduced to represent a time required for the UE to steer a reception beam. In some scenarios, such a parameter may not be considered in lower frequency deployments, for example, in FR1 NTN, where beam steering based on multiple antenna elements may not be required. In some scenarios, for a hard satellite switch, the coverage areas of a serving satellite and a target satellite may not overlap, and a service interruption may occur. For example, a serving satellite may move out of coverage, the UE may lose connection, and a target satellite may subsequently become available, after which the UE performs re-synchronization. In some implementations, both the UE and a network may take into account an interruption time, and the network may avoid scheduling data transmission during the interruption period.
[0051] In some scenarios, for a soft satellite switch, the coverage areas of a serving satellite and a target satellite may overlap. In such cases, the UE may perform at least part of synchronization during the overlap period, thereby reducing interruption. In some implementations, UE behavior during the overlap period may vary depending on an overlap duration. For example, when the overlap duration is sufficient, the UE may complete cell search and synchronization before a service switching time, and the interruption may be relatively short. When the overlap duration is insufficient, the UE may not complete synchronization before the service switching time, and the interruption may be longer. In some implementations, the UE may steer a downlink spatial domain reception filter based on ephemeris information associated with a target satellite, for example, including satellite position, velocity, and timing information. In some scenarios, a timing of triggering beam steering may be between a service switching time (e.g., t-Service) and a first SSB of the target satellite, such that the UE may complete beam steering before receiving the first SSB.
[0052] In some scenarios, an interruption time for a hard satellite switch may include a beam steering delay, and may be expressed as a combination of Tsat_beam, Tsearch, Tprocessing, TΔ, and Tmargin. In some implementations, a satellite switch delay for a soft satellite switch may be determined starting from t-serviceStart, while an interruption time may be determined starting from t-Service, and the two timing references may be different. In some implementations, a network may consider the interruption time when scheduling communications with the UE, for example, by avoiding scheduling during a time period when the UE is not expected to transmit or receive signals. In some scenarios, different antenna types may be considered. For example, when the UE utilizes electronically steerable antennas, a beam steering time may be relatively short, for example, proportional to a synchronization signal periodicity. When the UE utilizes mechanically steerable antennas, a beam steering time may be longer and may require additional signaling. In some implementations, the focus may be on electronically steerable antennas. Illustrative Implementations
[0053] FIG. 4 illustrates an example communication system 400 having an example communication apparatus 410 and an example network apparatus 420 in accordance with an implementation of the present disclosure. Each of communication apparatus 410 and network apparatus 420 may perform various functions to implement schemes, techniques, processes, and methods described herein pertaining to satellite switching with beam steering, including scenarios / schemes described above as well as processes 500 and 600 described below.
[0054] Communication apparatus 410 may be a part of an electronic apparatus, which may be a UE such as a portable or mobile apparatus, a wearable apparatus, a wireless communication apparatus, or a computing apparatus. For instance, communication apparatus 410 may be implemented in a smartphone, a smartwatch, a personal digital assistant, an electronic control unit (ECU) in a vehicle, a digital camera, or a computing equipment such as a tablet computer, a laptop computer, or a notebook computer. Communication apparatus 410 may also be a part of a machine-type apparatus, which may be an IoT, NB-IoT, or IIoT UE such as an immobile or a stationary apparatus, a home apparatus, a roadside unit (RSU) , a wire communication apparatus, or a computing apparatus. For instance, communication apparatus 410 may be implemented in a smart thermostat, a smart fridge, a smart door lock, a wireless speaker, or a home control center. Alternatively, communication apparatus 410 may be implemented in the form of one or more integrated-circuit (IC) chips such as, for example and without limitation, one or more single-core processors, one or more multi-core processors, one or more reduced-instruction-set computing (RISC) processors, or one or more complex-instruction-set computing (CISC) processors. Communication apparatus 410 may include at least some of those components shown in FIG. 4, such as a processor 412, for example. Communication apparatus 410 may further include one or more other components not pertinent to the proposed scheme of the present disclosure (e.g., internal power supply, display device and / or user interface device) , and, thus, such component (s) of communication apparatus 410 are neither shown in FIG. 4 nor described below in the interest of simplicity and brevity.
[0055] Network apparatus 420 may be a part of an electronic apparatus, which may be a network node such as a satellite, a BS, a cell, a router, or a gateway of a 4G / 5G / B5G / 6G, NR, IoT, NB-IoT, IIoT, or NTN network. For instance, network apparatus 420 may be implemented in a satellite or an eNB / gNB / TRP in a 4G / 5G, NR, IoT, NB-IoT, IIoT, or NTN network. Alternatively, network apparatus 420 may be implemented in the form of one or more IC chips such as, for example and without limitation, one or more single-core processors, one or more multi-core processors, or one or more RISC or CISC processors. Network apparatus 420 may include at least some of those components shown in FIG. 4, such as a processor 422, for example. Network apparatus 420 may further include one or more other components not pertinent to the proposed scheme of the present disclosure (e.g., internal power supply, display device and / or user interface device) , and, thus, such component (s) of network apparatus 420 are neither shown in FIG. 4 nor described below in the interest of simplicity and brevity.
[0056] In one aspect, each of processor 412 and processor 422 may be implemented in the form of one or more single-core processors, one or more multi-core processors, or one or more CISC processors. That is, even though a singular term “a processor” is used herein to refer to processor 412 and processor 422, each of processor 412 and processor 422 may include multiple processors in some implementations and a single processor in other implementations in accordance with the present disclosure. In another aspect, each of processor 412 and processor 422 may be implemented in the form of hardware (and, optionally, firmware) with electronic components including, for example and without limitation, one or more transistors, one or more diodes, one or more capacitors, one or more resistors, one or more inductors, one or more memristors and / or one or more varactors that are configured and arranged to achieve specific purposes in accordance with the present disclosure. In other words, in at least some implementations, each of processor 412 and processor 422 is a special-purpose machine specifically designed, arranged and configured to perform specific tasks in a device (e.g., as represented by communication apparatus 410) and a network node (e.g., as represented by network apparatus 420) in accordance with various implementations of the present disclosure.
[0057] In some implementations, communication apparatus 410 may also include a transceiver 416 coupled to processor 412 and capable of wirelessly transmitting and receiving data. In some implementations, transceiver 416 may be capable of wirelessly communicating with different types of UEs and / or wireless networks of different RATs. In some implementations, transceiver 416 may be equipped with a plurality of antenna ports (not shown) such as, for example, four antenna ports. That is, transceiver 416 may be equipped with multiple transmit antennas and multiple receive antennas for beamforming and multiple-input multiple-output (MIMO) wireless communications. In some implementations, network apparatus 420 may also include a transceiver 426 coupled to processor 422. Transceiver 426 may include a transceiver capable of wirelessly transmitting and receiving data. In some implementations, transceiver 426 may be capable of wirelessly communicating with different types of UEs of different RATs. In some implementations, transceiver 426 may be equipped with a plurality of antenna ports (not shown) such as, for example, four antenna ports. That is, transceiver 426 may be equipped with multiple transmit antennas and multiple receive antennas for beamforming and MIMO wireless communications.
[0058] In some implementations, communication apparatus 410 may further include a memory 414 coupled to processor 412 and capable of being accessed by processor 412 and storing data therein. In some implementations, network apparatus 420 may further include a memory 424 coupled to processor 422 and capable of being accessed by processor 422 and storing data therein. Each of memory 414 and memory 424 may include a type of random-access memory (RAM) such as dynamic RAM (DRAM) , static RAM (SRAM) , thyristor RAM (T-RAM) and / or zero-capacitor RAM (Z-RAM) . Alternatively, or additionally, each of memory 414 and memory 424 may include a type of read-only memory (ROM) such as mask ROM, programmable ROM (PROM) , erasable programmable ROM (EPROM) and / or electrically erasable programmable ROM (EEPROM) . Alternatively, or additionally, each of memory 414 and memory 424 may include a type of non-volatile random-access memory (NVRAM) such as flash memory, solid-state memory, ferroelectric RAM (FeRAM) , magnetoresistive RAM (MRAM) , and / or phase-change memory.
[0059] Each of communication apparatus 410 and network apparatus 420 may be a communication entity capable of communicating with each other using various proposed schemes in accordance with the present disclosure. For illustrative purposes and without limitation, a description of capabilities of communication apparatus 410, as a UE, and network apparatus 420, as a network node, is provided below with processes 500 and 600. Illustrative Processes
[0060] FIG. 5 illustrates an example process 500 in accordance with an implementation of the present disclosure. Process 500 may be an example implementation of above scenarios / schemes, whether partially or completely, with respect to enhancements on satellite switching with beam steering. Process 500 may represent an aspect of implementation of features of communication apparatus 410. Process 500 may include one or more operations, actions, or functions as illustrated by one or more of blocks 510 to 520. Although illustrated as discrete blocks, various blocks of process 500 may be divided into additional blocks, combined into fewer blocks, or eliminated, depending on the desired implementation. Moreover, the blocks of process 500 may be executed in the order shown in FIG. 5 or, alternatively, in a different order. Process 500 may be implemented by or in communication apparatus 410 or any suitable UE or machine-type device. Solely for illustrative purposes and without limitation, process 500 is described below in the context of communication apparatus 410, as a UE, and network apparatus 420, as a network node (e.g., gNB / satellite / TRP / relay) . Process 500 may begin at block 510.
[0061] At block 510, process 500 may involve processor 412 of communication apparatus 410, steering a downlink spatial domain reception filter toward a target satellite during a satellite switching procedure. Process 500 may proceed from block 510 to block 520.
[0062] At block 520, process 500 may involve processor 412 synchronizing with the target satellite during the satellite switching procedure. A time associated with the steering of the downlink spatial domain reception filter may be included in a delay associated with the satellite switching procedure.
[0063] In some implementations, the delay associated with the satellite switching procedure may comprise a satellite switching delay associated with a soft satellite switch in which coverage areas of a serving satellite and the target satellite overlap, and the satellite switching delay may correspond to a time interval between a service start time associated with the satellite switching procedure and a time instance in an event that communication apparatus 410 is ready to start transmission of new uplink PRACH channel or transmission of new uplink PUSCH channel.
[0064] In some implementations, the satellite switching delay may comprise a beam steering time associated with the steering of the downlink spatial domain reception filter toward the target satellite and a cell search time associated with identifying the target satellite. In some implementations, the beam steering time may be determined based on a periodicity of synchronization signal blocks transmitted by the serving satellite. In some implementations, communication apparatus 410 may steer the downlink spatial domain reception filter toward the target satellite after the service start time associated with the satellite switching procedure.
[0065] In some implementations, communication apparatus 410 may refrain from transmitting uplink signals or receiving downlink channels during at least a portion of a time period between the service start time and a service switching time associated with the satellite switching procedure. In some implementations, communication apparatus 410 may refrain from transmitting or receiving signals during at least one guard symbol before and after a beam steering period associated with the steering of the downlink spatial domain reception filter.
[0066] In some implementations, communication apparatus 410 may perform a cell search for the target satellite before the service switching time by the steering of the downlink spatial domain reception filter toward the target satellite. In some implementations, an interruption associated with the satellite switching procedure may start from the service switching time, and a length of the interruption may depend on a time difference between the service switching time and the service start time. In some implementations, the length of the interruption may correspond to a processing time associated with synchronization processing in an event that the time difference between the service switching time and the service start time is greater than or equal to a preparation time required for cell search.
[0067] In some implementations, the length of the interruption may correspond to the processing time plus an additional duration in an event that the time difference between the service switching time and the service start time is smaller than a preparation time required for cell search. In some implementations, the delay associated with the satellite switching procedure may comprise an interruption time associated with a hard satellite switch in which coverage areas of a serving satellite and the target satellite do not overlap, and the interruption time may correspond to a time interval between a service switching time associated with the satellite switching procedure and a time instance in an event that communication apparatus 410 is ready to receive a downlink signal from the target satellite.
[0068] In some implementations, the interruption time may comprise a beam steering time associated with the steering of the downlink spatial domain reception filter toward the target satellite, and the beam steering time may be determined based on a periodicity of synchronization signal blocks transmitted by the serving satellite In some implementations, the interruption time further may comprise at least one of a cell search time associated with identifying the target satellite and a processing time associated with synchronization processing.
[0069] In some implementations, the beam steering time may be determined based on an angular offset between a serving satellite and the target satellite, and the angular offset may correspond to a difference between a direction of the serving satellite and a direction of the target satellite observed by communication apparatus 410. In some implementations, the steering of the downlink spatial domain reception filter may be triggered based on ephemeris information associated with the target satellite, and the steering of the downlink spatial domain reception filter may be performed before a first synchronization signal block transmitted by the target satellite.
[0070] In some implementations, the satellite switching procedure may be performed between a serving satellite cell and the target satellite cell in a frequency range 2 non-terrestrial network. In some implementations, the steering of the downlink spatial domain reception filter may be performed using an electronically steerable antenna array or a mechanically steerable antenna.
[0071] FIG. 6 illustrates an example process 600 in accordance with an implementation of the present disclosure. Process 600 may be an example implementation of above scenarios / schemes, whether partially or completely, with respect to enhancements on satellite switching with beam steering. Process 600 may represent an aspect of implementation of features of network apparatus 420. Process 600 may include one or more operations, actions, or functions as illustrated by one or more of blocks 610 and 620. Although illustrated as discrete blocks, various blocks of process 600 may be divided into additional blocks, combined into fewer blocks, or eliminated, depending on the desired implementation. Moreover, the blocks of process 600 may be executed in the order shown in FIG. 6 or, alternatively, in a different order. Process 600 may be implemented by or in network apparatus 420 as well as any variations thereof. Solely for illustrative purposes and without limitation, process 600 is described below in the context of communication apparatus 410, as a UE, and network apparatus 420, as a network node. Process 600 may begin at block 610.
[0072] At block 610, process 600 may involve processor 422 of network apparatus 420 determining a delay associated with a satellite switching procedure for communication apparatus 410 switching from a serving satellite to a target satellite. Process 600 may proceed from block 610 to block 620.
[0073] At block 620, process 600 may involve processor 422 scheduling communications with communication apparatus 410 based on the delay associated with the satellite switching procedure. The delay may comprise a time associated with steering of a downlink spatial domain reception filter of communication apparatus 410 toward the target satellite during the satellite switching procedure. Additional Notes
[0074] The herein-described subject matter sometimes illustrates different components contained within, or connected with, different other components. It is to be understood that such depicted architectures are merely examples, and that in fact many other architectures can be implemented which achieve the same functionality. In a conceptual sense, any arrangement of components to achieve the same functionality is effectively "associated" such that the desired functionality is achieved. Hence, any two components herein combined to achieve a particular functionality can be seen as "associated with" each other such that the desired functionality is achieved, irrespective of architectures or intermedial components. Likewise, any two components so associated can also be viewed as being "operably connected" , or "operably coupled" , to each other to achieve the desired functionality, and any two components capable of being so associated can also be viewed as being "operably couplable" , to each other to achieve the desired functionality. Specific examples of operably couplable include but are not limited to physically mateable and / or physically interacting components and / or wirelessly interactable and / or wirelessly interacting components and / or logically interacting and / or logically interactable components.
[0075] Further, with respect to the use of substantially any plural and / or singular terms herein, those having skill in the art can translate from the plural to the singular and / or from the singular to the plural as is appropriate to the context and / or application. The various singular / plural permutations may be expressly set forth herein for sake of clarity.
[0076] Moreover, it will be understood by those skilled in the art that, in general, terms used herein, and especially in the appended claims, e.g., bodies of the appended claims, are generally intended as “open” terms, e.g., the term “including” should be interpreted as “including but not limited to, ” the term “having” should be interpreted as “having at least, ” the term “includes” should be interpreted as “includes but is not limited to, ” etc. It will be further understood by those within the art that if a specific number of an introduced claim recitation is intended, such an intent will be explicitly recited in the claim, and in the absence of such recitation no such intent is present. For example, as an aid to understanding, the following appended claims may contain usage of the introductory phrases "at least one" and "one or more" to introduce claim recitations. However, the use of such phrases should not be construed to imply that the introduction of a claim recitation by the indefinite articles "a" or "an" limits any particular claim containing such introduced claim recitation to implementations containing only one such recitation, even when the same claim includes the introductory phrases "one or more" or "at least one" and indefinite articles such as "a" or "an, " e.g., “a” and / or “an” should be interpreted to mean “at least one” or “one or more; ” the same holds true for the use of definite articles used to introduce claim recitations. In addition, even if a specific number of an introduced claim recitation is explicitly recited, those skilled in the art will recognize that such recitation should be interpreted to mean at least the recited number, e.g., the bare recitation of "two recitations, " without other modifiers, means at least two recitations, or two or more recitations. Furthermore, in those instances where a convention analogous to “at least one of A, B, and C, etc. ” is used, in general such a construction is intended in the sense one having skill in the art would understand the convention, e.g., “a system having at least one of A, B, and C” would include but not be limited to systems that have A alone, B alone, C alone, A and B together, A and C together, B and C together, and / or A, B, and C together, etc. In those instances where a convention analogous to “at least one of A, B, or C, etc. ” is used, in general such a construction is intended in the sense one having skill in the art would understand the convention, e.g., “a system having at least one of A, B, or C” would include but not be limited to systems that have A alone, B alone, C alone, A and B together, A and C together, B and C together, and / or A, B, and C together, etc. It will be further understood by those within the art that virtually any disjunctive word and / or phrase presenting two or more alternative terms, whether in the description, claims, or drawings, should be understood to contemplate the possibilities of including one of the terms, either of the terms, or both terms. For example, the phrase “A or B” will be understood to include the possibilities of “A” or “B” or “A and B. ”
[0077] From the foregoing, it will be appreciated that various implementations of the present disclosure have been described herein for purposes of illustration, and that various modifications may be made without departing from the scope and spirit of the present disclosure. Accordingly, the various implementations disclosed herein are not intended to be limiting, with the true scope and spirit being indicated by the following claims.
Claims
1.A method, comprising:steering, by a user equipment (UE) , a downlink spatial domain reception filter toward a target satellite during a satellite switching procedure; andsynchronizing, by the UE, with the target satellite during the satellite switching procedure,wherein a time associated with the steering of the downlink spatial domain reception filter is included in a delay associated with the satellite switching procedure.2.The method of Claim 1, wherein the delay associated with the satellite switching procedure comprises a satellite switching delay associated with a soft satellite switch in which coverage areas of a serving satellite and the target satellite overlap, and wherein the satellite switching delay corresponds to a time interval between a service start time associated with the satellite switching procedure and a time instance in an event that the UE is ready to start transmission of new uplink PRACH channel or transmission of new uplink PUSCH channel tothe target satellite.3.The method of Claim 2, wherein the satellite switching delay comprises:a beam steering time associated with the steering of the downlink spatial domain reception filter toward the target satellite; anda cell search time associated with identifying the target satellite.4.The method of Claim 3, wherein the beam steering time is determined based on a periodicity of synchronization signal blocks transmitted by the serving satellite.5.The method of Claim 2, wherein the UE steers the downlink spatial domain reception filter toward the target satellite after the service start time associated with the satellite switching procedure.6.The method of Claim 2, wherein the UE refrains from transmitting uplink signals or receiving downlink channels during at least a portion of a time period between the service start time and a service switching time associated with the satellite switching procedure.7.The method of Claim 6, wherein the UE refrains from transmitting or receiving signals during at least one guard symbol before and after a beam steering period associated with the steering of the downlink spatial domain reception filter.8.The method of Claim 2, wherein the UE performs a cell search for the target satellite before the service switching time by the steering of the downlink spatial domain reception filter toward the target satellite.9.The method of Claim 2, wherein an interruption associated with the satellite switching procedure starts from the service switching time, and wherein a length of the interruption depends on a time difference between the service switching time and the service start time.10.The method of Claim 9, wherein the length of the interruption corresponds to a processing time associated with synchronization processing in an event that the time difference between the service switching time and the service start time is greater than or equal to a preparation time required for cell search.11.The method of Claim 9, wherein the length of the interruption corresponds to the processing time plus an additional duration in an event that the time difference between the service switching time and the service start time is smaller than a preparation time required for cell search.12.The method of Claim 1, wherein the delay associated with the satellite switching procedure comprises an interruption time associated with a hard satellite switch in which coverage areas of a serving satellite and the target satellite do not overlap, and wherein the interruption time corresponds to a time interval between a service switching time associated with the satellite switching procedure and a time instance in an event that the UE is ready to receive a downlink signal from the target satellite.13.The method of Claim 12, wherein the interruption time comprises a beam steering time associated with the steering of the downlink spatial domain reception filter toward the target satellite, and wherein the beam steering time is determined based on a periodicity of synchronization signal blocks transmitted by the serving satellite.14.The method of Claim 1, wherein the interruption time further comprises at least one of:a cell search time associated with identifying the target satellite; anda processing time associated with synchronization processing.15.The method of Claim 1, wherein the beam steering time is determined based on an angular offset between a serving satellite and the target satellite, and wherein the angular offset corresponds to a difference between a direction of the serving satellite and a direction of the target satellite observed by the UE.16.The method of Claim 1, wherein the steering of the downlink spatial domain reception filter is triggered based on ephemeris information associated with the target satellite, and wherein the steering of the downlink spatial domain reception filter is performed before a first synchronization signal block transmitted by the target satellite.17.The method of Claim 1, wherein the satellite switching procedure is performed between a serving satellite cell and the target satellite cell in a frequency range 2 non-terrestrial network.18.The method of claim 1, wherein the steering of the downlink spatial domain reception filter is performed using an electronically steerable antenna array or a mechanically steerable antenna.19.A user equipment (UE) , comprising:a transceiver which, during operation, wirelessly communicates with a network node; anda processor communicatively coupled to the transceiver such that, during operation, the processor performs operations comprising:steering a downlink spatial domain reception filter toward a target satellite during a satellite switching procedure; andsynchronizing with the target satellite during the satellite switching procedure,wherein a time associated with the steering of the downlink spatial domain reception filter is included in a delay associated with the satellite switching procedure.20.A method, comprising:determining, by a network node, a delay associated with a satellite switching procedure for a user equipment (UE) switching from a serving satellite to a target satellite; andscheduling, by the network node, communications with the UE based on the delay associated with the satellite switching procedure,wherein the delay comprises a time associated with steering of a downlink spatial domain reception filter of the UE toward the target satellite during the satellite switching procedure.
