A timing dynamic scheduling method for multi-carrier plate grabbing in an unloading link of an electroplating production line
By prioritizing the expected time of the carrier plates and planning the shortest path in the electroplating production line, and combining the unloading position information, the execution instruction sequence of the robotic arm is generated. This solves the problem of the separation between the robotic arm's grasping order and the allocation of the unloading position, and realizes the efficient and seamless transfer of multiple carrier plates, thereby improving the overall production efficiency.
Patent Information
- Application Number
- CN202610669646.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-05-15
- Publication Date
- 2026-07-21
- Estimated Expiration
- 2046-05-15
AI Technical Summary
In the unloading process of existing electroplating production lines, the gripping sequence of robotic arms and the allocation of unloading positions are disconnected, resulting in frequent waiting of multiple plates, robotic arms running idly or colliding, and excessively long plate dwell time, which reduces the overall production efficiency of the line.
Prioritize the loading based on the expected time of electroplating of the carrier plate, plan the conflict-free grasping sequence using the shortest path first rule, and generate the execution instruction sequence of the robotic arm by combining the status information of the unloading position. This ensures the coordinated matching between the grasping sequence and the unloading position, and achieves seamless connection and efficient flow of multiple carrier plates in the unloading process.
It improves the overall operating efficiency of the electroplating production line, reduces the idle running and waiting time of the robotic arm, optimizes the utilization of space resources, avoids time overlap and spatial interference, and enhances the smoothness of the production line and the utilization rate of equipment.