A multi-source construction data analysis and storage method and device

By conducting credibility assessment and edge weight correction on multi-source construction data, constructing a correlation graph and performing path compression, the problems of poor alignment quality and low storage efficiency of multi-source construction data are solved, and efficient data management and anomaly tracing are achieved.

CN122412893APending Publication Date: 2026-07-17CHINA CONSTR FIFTH ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610865064.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-16
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing technologies for multi-source construction data analysis suffer from problems such as data jitter, spatial drift, poor alignment quality due to event duplication, inaccurate edge weight allocation, inability to extract the main construction chain, and lack of conflict backtracking and hierarchical storage mechanisms.

Method used

By collecting multi-source construction data, encoding is performed based on time reference and grid division, data source reliability is calculated, and time window width and grid granularity are adjusted to align the data; an association graph is constructed and edge weights are corrected, path compression is performed, the longest construction main chain is extracted, differential fingerprints are generated and locally reassembled and stored.

Benefits of technology

It achieves efficient data alignment and storage, reduces computational analysis and storage overhead, supports rapid tracing of construction anomalies and reliable data management, and meets the needs of high-frequency tracing and high-consistency analysis of modern engineering data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122412893A_ABST
    Figure CN122412893A_ABST
Patent Text Reader

Abstract

本发明提供一种多源施工数据分析与存储方法、装置,所述方法包括采集多源施工数据,经时间基准与网格划分编码得到时空片段序列;通过到达抖动、空间漂移、事件重复率计算各数据源可信度,据此调整时间窗宽与网格粒度,完成原始数据对齐,生成对齐时空片段序列;基于对齐序列构建含时间、空间、事件节点的关联图,建立时序、空间、实体三类边并设定初始边权,结合节点拓扑稳定性参数计算修正系数,优化得到修正边权;对关联图做路径压缩,折叠复合节点、剔除孤立支路,提取最长施工主链;基于主链生成差异指纹,偏离约束模板时触发冲突回溯,局部重组关联图得到分层存储块,标记后写入存储库。