Rectifying energy-dissipating and anti-collision facility and design method thereof
By installing rectification, energy dissipation, and scour prevention facilities downstream of the dam, and utilizing the inverted V-shaped structure and staggered elevation differences, the problem of flow failure caused by water level changes downstream of the dam project was solved, achieving flow regulation and scour prevention effects, and improving the safety and resilience of the project.
Patent Information
- Application Number
- CN202611007002.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-08
- Publication Date
- 2026-08-04
AI Technical Summary
Downstream energy dissipation and scour prevention facilities in traditional dam projects are prone to failure due to changes in hydraulic boundary conditions when faced with river channel erosion, water level drops, or tidal fluctuations. This can lead to the failure of energy dissipation structures and scour damage, threatening the safety of the project.
Design a flow rectification and energy dissipation anti-scour facility, including a base plate, a first-height flow rectification pier, a second-height flow rectification pier, and a low-lying area. The staggered arrangement forms an inverted V-shaped structure to adapt to the downcutting of the riverbed and the drop in water level downstream of the dam, adjust the flow pattern, reduce the flow velocity, and avoid scouring of the anti-scour channel area.
It effectively eliminates drop flows, hydraulic jumps, and water surface fluctuations, improves the resilience of energy dissipation and scour prevention facilities, ensures the safety of dam projects, reduces engineering workload and investment, and adapts to flow pattern adjustments in response to water level changes.