Work management system, work management method, and program

The work management system addresses the challenge of accurately managing work situations by using a positioning system, work detection unit, and information generation unit to track worker positions and work status, resulting in efficient and comprehensive work management.

JP2025053426APending Publication Date: 2025-04-07TOPPAN HOLDINGS INC
1 Cites 0 Cited by

Patent Information

Application Number
JP2023162437
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-09-26
Publication Date
2025-04-07

AI Technical Summary

Technical Problem

Existing work management systems lack the ability to accurately and efficiently manage the work situation of workers at a work site, including tracking the start and end of work and generating comprehensive work status information.

Method used

A work management system that includes a positioning system to measure worker positions, a work detection unit to identify the start and end of work based on predetermined operations, and an information generation unit that creates work status information from start to finish based on worker positions and work detection results.

Benefits of technology

Enables efficient and accurate management of work situations by providing comprehensive work status information for each worker, from the start to the end of their work period, thereby improving operational visibility and management efficiency.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

To efficiently acquire information on a work state of a worker at a work site.SOLUTION: A work management system includes a positioning system for measuring the position of a worker existing at a work site, a work detection part for detecting that work is started on the basis of prescribed operation corresponding to a start of the work by the worker, and detecting that the work is completed on the basis of prescribed operation corresponding to the end of the work by the worker, and an information generation part for generating work state information showing a work state for a work period from the start of the work to the end for each worker on the basis of the position of the worker measured by the positioning system and a detection result of the work detection part.SELECTED DRAWING: Figure 8
Need to check novelty before this filing date? Find Prior Art