Hoisting method for large-span hinged type herringbone steel arch
A hoisting method and technology for steel arches, which are applied in the processing of building materials, construction, building structure, etc., can solve the problems of difficult installation, easy deformation of the arch, and can not meet the technical requirements of installation, etc. Easy to install effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2015-06-10
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a hoisting method, in particular to a hoisting method of a large-span articulated herringbone steel arch. Background technique
[0002] The herringbone steel arch structure was mostly seen in the 1960s and 1970s, but this kind of structure is rare in China now. Herringbone steel arch frame includes component I and component II, each part is welded H-shaped steel, the top of component I and component II is hingedly connected, the two column feet of the arch frame are hingedly connected with the base on the embedded plate, multi-pronged arch frame Form the main frame of the plant. The span between the two columns of many large factory buildings is generally more than 50 meters, and the roof elevation is more than 30 meters.
[0003] At present, there are two ways to install this large-span articulated herringbone-shaped steel arch: one is sub-piece hoisting, that is, component I and component II are hoisted separately and then ...
Examples
Embodiment Construction
[0027] Preferred embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0028] figure 1 It is a schematic diagram of a herringbone steel arch structure, such as figure 1 As shown, the herringbone steel arch 1 includes symmetrically arranged components I101 and II102. Both components I101 and II102 are welded H-shaped steels, and may also be made of other suitable materials. The tops of the component I101 and the component II102 are hingedly connected by a pin, and the distance between the two columns 2 of the component I101 and the component II102 is the design width; after hoisting, the two columns 2 and the base on the embedded plate 3 4 hinged connections. The herringbone steel arch 1 is hoisted according to the following steps:
[0029] Step 1. If Figure 4 As shown, on the ground, the tops of member I101 and member II102 of the herringbone steel arch 1 are hinged and connected by pins to assemble...