Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
A masonry structure and prefabricated technology, which is applied in building construction, building maintenance, construction, etc., can solve the problems of building exterior decoration and internal components damage, poor living comfort, and large energy consumption, so as to achieve low disturbance to residents, The effect of less wet work and less labor intensity
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2015-06-03
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to an anti-seismic reinforcement construction method of an existing masonry building. Background technique
[0002] The anti-seismic and thermal insulation performance of old houses can no longer meet the requirements of modern people for the living environment. Due to the relatively backward construction technology in the past, most buildings have not undergone anti-seismic reinforcement and energy-saving renovations, and the anti-seismic performance is poor. The materials fall off, some components have been damaged, the living comfort is poor, and the energy consumption is large. Contents of the invention
[0003] The purpose of the present invention is to provide an existing masonry house prefabricated structure seismic reinforcement construction method to solve the problem of poor seismic performance of old masonry houses, damage to building exteriors and internal components, poor living comfort, and low energy consumption. ...
Examples
Embodiment Construction
[0053] An assembled anti-seismic reinforcement structure of an existing masonry house, which is connected to the outside of the wall surface 1 of the original masonry structure, and includes wall panels 2, household panels 3, balcony panels 4 and external hanging panels corresponding to the original masonry structure. Plate 5, see for example figure 1As shown, the construction method for seismic reinforcement of prefabricated structures of existing masonry houses, the construction steps are as follows:
[0054] Step 1: Remove the external obstacles of the original masonry structure, carry out pre-renovation of the original underground pipelines that affect the new buildings before construction, and remove the illegal buildings (self-built small houses) of the residents.
[0055] Step 2, the first scaffold erection construction: connect the first scaffold with the original masonry structure, this scaffold is for the original balcony, air-conditioning board, overhanging eaves, g...