Side slope rescuing counter pressure adverse construction method and structure thereof
A construction method and technology for slopes, applied in foundation structure engineering, foundation structure tests, excavation, etc., can solve problems such as unsatisfactory rescue effects of slopes, unsuitable for slope rescue, long strength generation period, etc., and shorten the total The effect of construction period, civilized construction and improvement of stability coefficient
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-02-22
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of prevention and control of slope stability, and relates to the rescue of slopes around roads, railways or bridges, water conservancy embankment projects and soft soil foundation pit engineering slopes, in particular to a construction method for slope rescue and reverse pressure reverse operation and its structure. Background technique
[0002] With the rapid development of social economy in recent years, more and more large-scale projects are being built, resulting in a gradual increase in the scale and frequency of disasters such as slope instability and slippage, which has become a great threat to human social security. One of the geo-environmental disasters affected. For example, slope (including foundation pit) slippage is a common engineering accident, which often causes buried damage to machinery and equipment, casualties, a large amount of property loss, and also threatens other buildings adjacent ...
Examples
Embodiment
[0076] In this embodiment, on the basis of analyzing the cause of slope failure and potential failure mode, the slope is reinforced by the reverse pressure method, and it provides a useful reference for the rescue of similar engineering accidents.
[0077] Such as figure 1 - Figure 4 As shown, the present embodiment provides a construction method for slope rescue and reverse pressure, which specifically includes the following steps:
[0078] The first step: construction preparation
[0079] Make technical and safety disclosures to the construction personnel; familiarize yourself with and check the technical performance of machinery and equipment; clean up the site, level the site, and take corresponding protective measures for those that need protection; select the source of back pressure materials and build temporary passages.
[0080] Step 2: Determine the 100 geometric elements of the slope body
[0081] Measure 100 geometric elements of the side slope body in the area...