Description
technical field
[0001] The invention belongs to the field of construction engineering, and relates to a prefabricated shear wall component, in particular to a production method of the prefabricated shear wall component. Background technique
[0002] The prefabricated building is a building that is assembled by dismantling the structural components of the building in advance and transporting them to the site through reliable connections after they are prefabricated in the factory. This kind of building is characterized by fast construction speed, less restricted by climatic conditions, labor saving, and improved building quality. The prefabricated shear wall structure is currently the most widely used prefabricated building in my country.
[0003] With the advancement of urbanization, about 4 billion m of new buildings are built every year in the world. 2 of residential buildings, and my country's annual new building area ranks first in the world. There is a large demand fo...
Examples
Embodiment
[0067] like Figure 1 to Figure 14 As shown, the present embodiment provides a production method of a prefabricated shear wall member, the method comprising the following steps:
[0068] Step 1, determine the length of the side form according to the side length of the target prefabricated shear wall member, determine the length of the steel bar according to the length of the side form; The position of the exposed part of the concealed beam steel bar 12, the position of the exposed part of the open stirrup or the stirrup 13, the position of the steel bar sleeve 14 and the position of the suspension ring 15, and the threaded hole 7 corresponding to the position of the steel bar is provided on the steel bar to obtain Threaded hole rod 1-7;
[0069] Step 2, place the threaded hole rod 1-7 in the fixed connection groove 1-6 of a pair of half-side mold units 1-5, and the two ends of the threaded hole rod 1-7 are respectively supported on the blind end of the fixed connection groove...