Railway pier and beam combining structure suitable for multi-span long coupling and large expansion and contraction quantity beams on two sides
A technology of expansion and contraction, which is applied in the direction of bridges, bridge parts, bridge construction, etc., can solve problems such as poor ride comfort, too large bridge piers, and low bridge rigidity, and achieve strong terrain adaptability, improved overall layout, and good adaptability Effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-11-13
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of bridge structures, in particular to a pier-beam combination structure suitable for railway bridges with long joints on both sides and large expansion and contraction. Background technique
[0002] For bridge positions with large span requirements, spanning a wide range of waters, and deep water depths, foundation works often account for more than half of the total investment, and the number of pier installations in the water must be reduced as much as possible. The current conventional hole-span arrangement in this area is difficult to apply, and the continuous arrangement of long-connected and large-span bridges is often required. In the railway bridge or highway-rail level bridge project, the problems of adopting this layout form are that the continuous setting of long-span bridges leads to long temperature spans, difficult setting of rail temperature expansion and expansion regulators, and superpositio...
Examples
Embodiment Construction
[0019] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0020] To build a flat road-rail bridge in a certain place, the bridge includes a long-connected large-scale beam section structure with a length of 400-600m, and according to the existing technology, the long-linked large-scale beam section is transitioned by building a transition span containing two piers There are problems of too many piers and high cost. This embodiment provides a new type of transition structure connecting long-connected and large-scale beams on both sides.
[0021] Such as Figure 1~3 , a pier-beam combination structure suitable for railway bridges with long-connected and large-scale expansion on both sides. The joint expansion beam 3 includes a cap 1 and a bridge pier 2 located on the cap 1 , and a pier-beam joint section and a beam portion 6 are arranged on the bridge pier 2 .