Managing power needs across multiple passenger facilities
By coordinating passenger transport facilities for grid balancing, the system addresses grid stability challenges, offering rapid frequency regulation and reduced infrastructure costs through optimized power demand management.
Patent Information
- Application Number
- CN201811317227.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2017-11-07
- Filing Date
- 2018-11-07
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2038-11-07
AI Technical Summary
The integration of renewable energy sources and volatile electricity demand in passenger transport systems poses challenges to grid stability, necessitating new methods to balance electricity supply and demand and maintain grid stability.
A system and method for coordinating and optimizing the power demand of passenger transportation facilities, such as elevators and escalators, by determining their available flexibility capacity and sending activation signals for load management to transform these facilities into grid resources for frequency regulation and demand management.
This solution provides rapid grid balancing services, reduces peak demand, lowers infrastructure costs, and minimizes demand charges by utilizing flexible passenger transport facilities as demand response resources.
Smart Images

Figure CN109754280B_ABST
Abstract
Description
Technical Field Background Art
[0001] In the power grid, electricity supply and demand must always be balanced. The shift in energy systems towards more renewable and distributed energy production poses significant challenges to electricity markets and participants. Large amounts of weather-dependent, intermittent renewable energy generation combined with the global trend towards increasing electricity consumption hamper the task of maintaining a balanced grid. This has led to a shift towards more demand-based electricity prices, which can have a negative impact on end customers with highly volatile load profiles. At the same time, grid operators are forced to purchase more frequency regulation and demand response capacity reserves to maintain grid stability.
[0002] The electricity demand of the existing passenger transport system is extremely volatile. Short peaks in electricity demand can be up to 30 times the average demand, resulting in significant transient peaks in electricity demand in buildings. On the other hand, the increase in renewable energy production and the increase in overall grid demand puts pressure on grid operators to have sufficient reserve capacity to maintain grid stability.
[0003] Therefore, new methods are constantly needed to maintain grid stability. It would therefore be beneficial to have a solution that could mitigate at least one of these disadvantages. Summary of the invention
[0004] According to at least some aspects, a solution for coordinating and optimizing a fleet of flexible demand passenger transportation facilities is provided that can transform problematic highly unstable loads into assets for grid operators by using them as a joint resource for frequency regulation and demand management.
[0005] According to a first aspect, a method for managing power demand of a plurality of passenger transport facilities in at least one building is provided. The method comprises obtaining first data about available time-dependent power consumption flexibility capacity from each passenger transport facility; obtaining second data from at least one external data source, the second data being independent of the operation of the passenger transport facility; determining an activation order for power demand management of the plurality of passenger transport facilities based on the obtained first data and second data; and sending a passenger transport facility-specific activation signal for power demand management to at least one passenger facility of the plurality of passenger transport facilities according to the activation order.
[0006] In one embodiment, the method further comprises obtaining third data on activation costs of available time-dependent electricity consumption flexibility capacity from each passenger transportation facility; and considering the third data when determining the activation order.
[0007] In one embodiment, additionally or alternatively, determining the activation sequence further comprises determining a grid frequency threshold for at least one passenger transportation facility; and sending the passenger transportation facility specific activation signal further comprises sending the grid frequency threshold to the at least one passenger transportation facility.
[0008] In one embodiment, additionally or alternatively, determining the activation order also includes determining a start time for starting power demand management and / or an end time for terminating power demand management; and sending a passenger transport facility-specific activation signal also includes sending the start time for starting power demand management and / or the end time for terminating power demand management to at least one passenger transport facility.
[0009] In one embodiment, additionally or alternatively, obtaining the second data from at least one external data source includes obtaining data from at least one of a weather report data source, an electricity cost data source, a utility signal data source, an electricity market data source, and a load profile of one or more buildings.
[0010] In one embodiment, additionally or alternatively, the method further comprises obtaining data regarding active power from each passenger transportation facility at predetermined intervals; and sending a verification that power demand management is implemented to a grid operator based on the active power data.
[0011] In one embodiment, the passenger transportation facility specific activation signal additionally or alternatively includes a request to reduce load, increase load, or feed energy back into the grid.
[0012] According to a second aspect, a method for managing power demand of a passenger transportation facility of a building is provided. The method comprises determining an available time-dependent power consumption flexibility capacity of the passenger transportation facility; and sending data indicating the available time-dependent power consumption flexibility capacity to an external control platform.
[0013] In one embodiment, the method further includes receiving an activation signal for power demand management from an external control platform in response to the transmitted data; and managing the power demand according to the received activation signal.
[0014] In one embodiment, additionally or alternatively, the activation signal comprises a grid frequency threshold, the grid frequency threshold comprising a limit frequency for activating power demand management; and the method further comprises initiating power demand management when the grid frequency threshold is reached.
[0015] In one embodiment, additionally or alternatively, the activation signal includes a start time for starting power demand management and / or an end time for terminating power demand management; and the method also includes starting power demand management according to the start time and / or terminating power demand management according to the end time.
[0016] In one embodiment, additionally or alternatively, the method further comprises creating a traffic forecast as a function of time; and determining an activation cost of the available time-dependent electricity consumption flexibility capacity based on the determined available flexibility capacity and the traffic forecast.
[0017] In one embodiment, the method further includes determining active power data of the passenger transportation facility; and transmitting the active power data to an external control platform.
[0018] According to a third aspect, there is provided an apparatus for managing power demand of a plurality of passenger transport facilities in at least one building. The apparatus comprises means for obtaining first data about available time-dependent power consumption flexibility capacity from each passenger transport facility; means for obtaining second data from at least one external data source, the second data being independent of the operation of the passenger transport facility; means for determining an activation order for power demand management of the plurality of passenger transport facilities based on the obtained first and second data; and means for sending a passenger transport facility-specific activation signal for power demand management to at least one passenger transport facility among the plurality of passenger transport facilities according to the activation order.
[0019] In one embodiment, the apparatus further comprises means for obtaining third data on activation costs of available time-dependent electricity consumption flexibility capacity from each passenger transport facility, and means for taking the third data into account when determining the activation order.
[0020] In one embodiment, additionally or alternatively, the device for determining the activation order includes a device for determining a grid frequency threshold for at least one passenger transportation facility; and the device for sending a passenger transportation facility-specific activation signal also includes a device for sending the grid frequency threshold to at least one passenger transportation facility.
[0021] In one embodiment, additionally or alternatively, the device for determining the activation order also includes a device for determining a start time for starting power demand management and / or an end time for terminating power demand management; and the device for sending a passenger transport facility-specific activation signal also includes a device for sending the start time for starting power demand management and / or the end time for terminating power demand management to at least one passenger transport facility.
[0022] In one embodiment, additionally or alternatively, obtaining the second data from at least one external data source includes obtaining data from at least one of a weather report data source, an electricity cost data source, a utility signal data source, an electricity market data source, and a load profile of one or more buildings.
[0023] In one embodiment, additionally or alternatively, the apparatus further comprises means for obtaining data on active power from each passenger transportation facility at predetermined intervals; and means for sending a verification of implementing power demand management to a grid operator based on the active power data.
[0024] In one embodiment, the passenger transportation facility specific activation signal additionally or alternatively includes a request to reduce load, increase load, or feed energy back into the grid.
[0025] According to a fourth aspect, there is provided an apparatus for managing power demand of a passenger transport facility of a building. The apparatus comprises means for determining available time-dependent power consumption flexibility capacity of the passenger transport facility, and means for sending data indicating the available time-dependent power consumption flexibility capacity to an external control platform.
[0026] In one embodiment, the apparatus further comprises means for receiving an activation signal for power demand management from an external control platform in response to the transmitted data; and means for managing power demand according to the received activation signal.
[0027] In one embodiment, additionally or alternatively, the activation signal comprises a grid frequency threshold comprising a limit frequency for activating power demand management; and the apparatus further comprises means for initiating power demand management when the grid frequency threshold is reached.
[0028] In one embodiment, additionally or alternatively, the activation signal includes a start time for starting power demand management and / or an end time for terminating power demand management; and the device also includes a device for starting power demand management according to the start time and / or terminating power demand management according to the end time.
[0029] In one embodiment, additionally or alternatively, the apparatus further comprises means for creating a traffic forecast as a function of time; and means for determining an activation cost of the available time-dependent power consumption flexibility capacity based on the determined available flexibility capacity and the traffic forecast.
[0030] In one embodiment, additionally or alternatively, the apparatus further comprises means for determining active power data of the passenger transportation facility; and means for sending the active power data to the control platform.
[0031] According to a fifth aspect, there is provided a computer program comprising program code, which, when executed by at least one processing unit, causes the at least one processing unit to perform the method of the first aspect or the second aspect.
[0032] According to a sixth aspect, a computer readable medium comprising a program code is provided, wherein when the program code is executed by at least one processor, the at least one processor executes the method of the first aspect or the second aspect.
[0033] According to a seventh aspect, there is provided an apparatus for managing power demand of a plurality of passenger transport facilities in at least one building. The apparatus comprises at least one processor, and at least one memory connected to the at least one processor. The at least one memory stores program instructions, which, when executed by the at least one processor, cause the apparatus to obtain first data about available time-related power consumption flexibility capacity from each of a plurality of passenger transport facilities; obtain second data from at least one external data source, the second data being independent of the operation of the passenger transport facility; determine an activation order for power demand management of the plurality of passenger transport facilities based on the obtained first data and second data; and send a passenger transport facility-specific activation signal for power demand management to at least one of the plurality of passenger transport facilities according to the activation order.
[0034] According to an eighth aspect, there is provided an apparatus for managing power demand of a passenger transportation facility of a building. The apparatus comprises at least one processor, and at least one memory connected to the at least one processor. The at least one memory stores program instructions, which when executed by the at least one processor, cause the apparatus to determine available time-dependent power consumption flexibility capacity of the passenger transportation facility; and send data indicating the available time-dependent power consumption flexibility capacity to an external control platform.
[0035] For example, the above-mentioned apparatus may be implemented using at least one processor; at least one processor and at least one memory connected to at least one processor; or at least one processor, at least one memory connected to at least one processor, and an input / output interface connected to at least one processor. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The accompanying drawings are included to provide a further understanding of the present invention and constitute a part of this specification. The accompanying drawings illustrate embodiments of the present invention and together with the description help explain the principles of the present invention. In the drawings:
[0037] Figure 1 A block diagram of a system for flexibly managing power requirements of multiple passenger transportation facilities is shown according to one aspect.
[0038] Figure 2 A flow chart of a method for coordinating and optimizing power consumption of multiple passenger transportation facilities according to one aspect is shown.
[0039] Figure 3A flow chart of a method for managing power demand of a passenger facility of a building according to one aspect is shown.
[0040] Figure 4 A block diagram of an apparatus for managing power demand for a plurality of passenger transportation facilities is shown according to one aspect.
[0041] Figure 5 A block diagram of an apparatus for managing power demand of a passenger facility of a building is shown according to one aspect. DETAILED DESCRIPTION
[0042] The following description illustrates a solution aimed at providing flexible demand response resources for balancing the electrical grid.
[0043] Figure 1 A block diagram of a system for flexibly managing power requirements of multiple passenger transportation facilities according to one aspect is shown. Passenger transportation facilities refer to, for example, elevators, escalators, or conveyors.
[0044] The system includes a plurality of passenger facilities 102A, 102B, 102C, which are communicatively connected to an external control platform 100, i.e., an aggregation platform. The passenger facilities 102A, 102B, 102C may be physically located at locations far from each other, or they may be located in the same building. In addition, in one embodiment, all passenger facilities 102A, 102B, 102C may be operated by the same entity. The control platform 100 may also be communicatively connected to at least one external data source 104, providing data such as about the power market, the reserve market, or the demand management market. The control platform 100 is configured to coordinate and optimize the power management of the passenger facilities 102A, 102B, 102C based on data obtained from the facilities, at least one external data source 104. The passenger facilities 102A, 102B, 102C may therefore include a so-called aggregator that combines small-scale consumption and production into a large entity that can participate in different power markets.
[0045] Figure 2 A flow chart of a method for managing power demand of a plurality of passenger transportation facilities in at least one building according to one aspect is shown. The steps discussed below may be performed by the control platform 100 .
[0046] At 200, first data about available time-dependent electricity consumption flexibility capacity from passenger facilities in at least one building is obtained. Available flexibility capacity may refer to an amount of electricity that can be released for further use in grid demand, for example in frequency regulation. The term "time-dependent" may refer to the fact that the available consumption flexibility capacity may vary. In other words, there may be available consumption flexibility capacity during a first time window, while there may be no available consumption flexibility capacity during a second time window.
[0047] At 202, second data is obtained from at least one external data source. The second data may be independent of the operation of the passenger transportation facility (102A, 102B, 102C). The external data source may include obtaining data from, for example, a weather report data source, a power cost data source, a utility signal data source, a power market data source, a load profile of one or more buildings, or any other data source that is independent of the operation of the passenger transportation facility and provides data required for power demand management of the plurality of passenger transportation facilities.
[0048] At 204, an activation order for power demand management of the plurality of passenger transport facilities is determined based on the obtained first data and second data. This means, for example, that in addition to the power consumption flexibility capacity received from the passenger transport facilities, information from other data sources is also considered when determining the activation order. The activation order may be arranged in such a way that the passenger transport facility with the lowest activation cost may be activated first. Similarly, the passenger transport facility with the highest activation cost may be activated last.
[0049] At 206, a passenger transport facility specific activation signal for power demand management is sent to at least one passenger transport facility according to the activation sequence. The activation signal may include, for example, a request to reduce load, increase load, or feed energy back into the grid, for example, from an energy storage coupled to the passenger transport facility.
[0050] In an example, the control platform 100 may send information to the operator of the power grid 106 indicating how much available time-dependent power consumption flexibility capacity it must provide. The operator may then reply by confirming the entire indicated amount of available time-dependent power consumption flexibility capacity or a subset of the entire amount. Thus, the activation signal sent by the control platform 100 may relate to the entire indicated amount of available time-dependent power consumption flexibility capacity or a subset of the entire amount. In another embodiment, the reply from the operator may relate to only a portion of the indicated amount of the control platform 100.
[0051] As an example, the control platform 100 may send an activation signal to all passenger facilities with available power consumption flexibility capacity to reduce loads in order to save electricity costs when the obtained second data indicates that the power cost is high. As another example, the control platform 100 may send an activation signal only to some passenger facilities with available power consumption flexibility capacity to reduce loads, and some passenger facilities to be able to feed energy from their corresponding energy storage back to the grid.
[0052] In one embodiment, third data on the activation cost of available time-related power consumption flexibility capacity can be obtained from each passenger transport facility. The activation cost can indicate the profitability of activating the power management of the passenger transport facility by considering potential incentives, savings, possible waiting and / or transportation time costs, and passenger experience. The obtained third data can then be considered when determining the activation order. For example, a passenger transport facility may be able to provide significant power consumption savings within a specific time period, but at the same time there are significant savings costs, for example, due to extended passenger waiting and / or transportation time. This may then lead to a decision that the cost is too high at the control platform 100 and the power consumption savings are not applied.
[0053] In another embodiment, determining the activation order may further include determining a grid frequency threshold for at least one passenger transport facility. In other words, those with the lowest activation cost may have a grid frequency threshold closer to the nominal value (i.e., closer to 50 Hz or 60 Hz) and will be activated first when the frequency begins to drift above or below the nominal value. Those with higher activation costs may have a grid frequency threshold further away from the nominal value and will only be activated if an earlier activation is not sufficient to correct the frequency. Then, sending the passenger transport facility specific activation signal may also include sending the grid frequency threshold to the at least one passenger transport facility.
[0054] As an example, when the grid frequency drifts below 50 Hz, one or more passenger facilities may be requested to reduce load, and when the grid frequency drifts below 49.9 Hz, some other passenger facilities may be requested to reduce load. In another example, when the frequency exceeds 50 Hz, one or more passenger facilities may be requested to charge their energy storage from the grid, thereby providing, for example, nighttime load to the grid.
[0055] In another embodiment, determining the activation sequence may further include determining a start time for starting power demand management and / or an end time for terminating power demand management. Thus, when sending a passenger transport facility specific activation signal, the control platform may additionally send a start time for starting power demand management and / or an end time for terminating power demand management to at least one passenger transport facility. Alternatively, the control platform may send a certain length of power demand management (e.g., 10 minutes from now), or a start time and length of power demand management (e.g., starting at 06:00 and continuing for 30 minutes) to at least one passenger transport facility.
[0056] In order to verify to the grid operator that power demand management has been achieved, data about active power can be obtained from each passenger facility at predetermined intervals, and verification can be sent to the grid operator based on the active power data. Verification may be required, for example, if the control platform 100 has bid for available power management in the power market. Therefore, the control platform 100 is able to verify that power management has been achieved according to the bid to obtain incentives.
[0057] Figure 3 A flow chart of a method for managing power demand of passenger transportation facilities in a building according to another aspect is shown.
[0058] At 300, available time-dependent power consumption flexibility capacity of the passenger transportation facility is determined. Available flexibility capacity may refer to the amount of power that can be released for further use in grid demand, for example, when frequency regulation is required. This may be achieved on the passenger transportation facility side by utilizing energy storage coupled to the drive of the elevator, adjusting drive parameters such as drive speed or acceleration, or turning off energy consuming features such as lights or air conditioning.
[0059] At 302 , data indicative of available time-dependent power consumption flexibility capacity is sent to the control platform 100 .
[0060] Optionally, at 304, an activation signal for power demand management may be received from the control platform 100 in response to the transmitted data. Thereafter, at 306, power demand may be managed according to the received activation signal. In one embodiment, power demand management may also be initiated after a grid frequency threshold is reached. The grid frequency threshold may include a grid frequency limit for activating power demand management. In an example, when the grid frequency drifts below 50 Hz, the activation signal may instruct the passenger facility to reduce load. In another example, when the grid frequency drifts below 49.9 Hz, the activation signal may instruct the passenger facility to reduce load. In another example, when the frequency exceeds 50 Hz, the passenger facility may be requested to charge its energy storage from the grid to provide, for example, nighttime load to the grid.
[0061] In another embodiment, the activation signal may include a start time for starting power demand management and / or an end time for terminating power demand management. Thus, the passenger transportation facility may then start power demand management according to the start time and / or terminate power demand management according to the end time. Alternatively, the passenger transportation facility may receive a certain length of power demand management (e.g., 10 minutes from now), or a start time and length of power demand management (e.g., starting at 06:00 and continuing for 30 minutes) from the control platform.
[0062] In another embodiment, a traffic forecast as a function of time can be created. A traffic forecast can be created to estimate, for example, the traffic intensity of the day or the next hour. Thereafter, the activation cost of the available time-dependent power consumption flexibility capacity can be determined based on the available time-dependent power consumption flexibility capacity and the traffic forecast. The activation cost can then indicate the profitability of activating power management by considering potential savings and passenger experience. For example, high available flexibility capacity and low estimated traffic intensity can indicate a small activation cost, while low available flexibility capacity and higher estimated traffic intensity can indicate a large activation cost. The activation cost with data indicating the available time-dependent power consumption flexibility capacity can be sent to the control platform 100. In one embodiment, active power data for passenger transportation facilities can also be determined and sent to the control platform 100.
[0063] Figure 2 and Figure 3 The solution shown in is able to respond very quickly to fluctuations in grid frequency, with a Class II response time. Therefore, it can be a valuable asset in providing grid balancing services to grid operators. In addition, reduced peak power demand can result in lower capacity requirements for building distribution systems, reduced demand charges, and reduced costs for feeder cables, transformers, UPS, and backup generators.
[0064] The disclosed solution may also provide the ability to provide high-value grid services, such as via frequency regulation.In addition, the disclosed solution may reduce infrastructure costs for building power systems, minimize demand charges, and shift demand to low-price times.
[0065] Furthermore, the disclosed solution may also provide the ability to almost infinitely expand the pool of available flexible passenger transport facilities, which are then coordinated by the control platform. Robustness is ensured by distributing the decision-making process among all passenger transport facilities in the network. Furthermore, these independent passenger transport facilities are fully resistant to the failure of a single DEF that affects the operation of the entire pool.
[0066] Figure 4A block diagram of an apparatus 400 for coordinating and optimizing power consumption of multiple passenger transportation facilities is shown according to one aspect.
[0067] The device 400 shown may include a controller or processor 402 (e.g., a signal processor, a microprocessor, an ASIC, or other control and processing logic circuit) for performing tasks such as signal encoding, data processing, input / output processing, power control, and / or other functions. The device 400 shown may include one or more memories 404. The memory 404 may include non-removable memory and / or removable memory. The non-removable memory may include RAM, ROM, flash memory, a hard disk, or other well-known memory storage technologies. The memory 404 may be used to store data and / or code for running one or more applications.
[0068] The device 400 may include an input / output interface so that the device 400 can communicate with other devices. The device 400 may also include a network interface 406 so that it can communicate with an external device or network. The network interface 406 may include a wired or wireless transceiver for communicating with an external device or network. The memory 404 may store operating system software 408 that controls the operation of the device 400. The memory 404 may also include one or more applications 410 that can be executed by the processor 402. The components of the device 400 shown are compatible and inclusive, because any component can be deleted and other components can be added.
[0069] The memory 404 may include a computer program that, when executed by the processor 402, causes the device 400 to obtain first data about available time-related power consumption flexibility capacity from each passenger transport facility; obtain second data from at least one external data source, the second data being independent of the operation of the passenger transport facility; determine an activation order for power demand management of multiple passenger transport facilities based on the obtained first data and second data; and send a passenger transport facility-specific activation signal for power demand management to at least one passenger facility among the multiple passenger facilities based on the activation order.
[0070] also, Figure 4 Any combination of the components disclosed in the disclosure, for example, at least one of the processor 402 and the memory 404 can constitute a device for obtaining first data about available time-related power consumption flexibility capacity from each passenger transport facility; a device for obtaining second data from at least one external data source, the second data being independent of the operation of the passenger transport facility; a device for determining an activation order for power demand management of multiple passenger transport facilities based on the obtained first data and second data; and a device for sending a passenger transport facility-specific activation signal for power demand management to at least one passenger facility among the multiple passenger facilities according to the activation order.
[0071] Figure 5 A block diagram of an apparatus 500 for managing power demand of a passenger facility of a building is shown according to one aspect.
[0072] The device 500 shown may include a controller or processor 502 (e.g., a signal processor, a microprocessor, an ASIC, or other control and processing logic circuit) for performing tasks such as signal encoding, data processing, input / output processing, power control, and / or other functions. The device 500 shown may include one or more memories 504. The memory 504 may include non-removable memory and / or removable memory. The non-removable memory may include RAM, ROM, flash memory, a hard disk, or other well-known memory storage technologies. The memory 504 may be used to store data and / or code for running one or more applications.
[0073] The device 500 may include an input / output interface so that the device 500 can communicate with other devices. The device 500 may also include a network interface 506 so that it can communicate with an external device or network. The network interface 506 may include a wired or wireless transceiver for communicating with an external device or network. The memory 504 may store operating system software 508 that controls the operation of the device 500. The memory 504 may also include one or more applications 510 that can be executed by the processor 502. The components of the device 500 shown are compatible and inclusive, because any component can be deleted and other components can be added.
[0074] The memory 504 may include a computer program that, when executed by the processor 502, causes the apparatus 500 to determine available time-dependent electricity consumption flexibility capacity of the passenger transportation facility; and to send data indicating the available time-dependent electricity consumption flexibility capacity to an external control platform.
[0075] also, Figure 5 Any combination of the components disclosed in the disclosure, for example, at least one of the processor 502 and the memory 504 can constitute a device for determining the available time-related power consumption flexibility capacity of a passenger transportation facility; and a device for sending data indicating the available time-related power consumption flexibility capacity to an external control platform.
[0076] Example embodiments may be implemented with software, hardware, application logic, or a combination of software, hardware, and application logic. Example embodiments may store information related to the various methods described herein. The information may be stored in one or more memories, such as a hard disk, an optical disk, a magneto-optical disk, a RAM, etc. One or more databases may store information for implementing example embodiments. The database may be organized using a data structure (e.g., a record, a table, an array, a field, a graph, a tree, a list, etc.) included in one or more memories or storage devices listed herein. The method described with respect to example embodiments may include an appropriate data structure for storing data collected and / or generated by the method of the device and subsystem of the example embodiments in one or more databases.
[0077] As will be understood by those skilled in the art of computers and / or software, all or part of the example embodiments can be conveniently implemented using one or more general purpose processors, microprocessors, digital signal processors, microcontrollers, etc. programmed according to the teachings of the example embodiments. As will be understood by those skilled in the art of software, based on the teachings of the example embodiments, programmers of ordinary skill can easily prepare appropriate software. In addition, as will be understood by those skilled in the art of electrical engineering, the example embodiments can be implemented by preparing application specific integrated circuits or by an appropriate network of interconnected traditional component circuits. Therefore, the example is not limited to any specific combination of hardware and / or software. Stored on any one or combination of computer readable media, the example may include software for controlling the components of the example embodiments, software for driving the components of the example embodiments, software for enabling the components of the example embodiments to interact with human users, etc. Such computer readable media may also include a computer program for executing all or part of the processing performed in implementing the example embodiments (if the processing is distributed). The computer code device of the example may include any suitable interpretable or executable code mechanism, including but not limited to scripts, interpretable programs, dynamic link libraries (DLLs), Java classes and applets, complete executable programs, etc. In the context of this document, a "computer-readable medium" may be any medium or device that can contain, store, communicate, propagate, or transmit instructions for use by or in conjunction with an instruction execution system, device, or apparatus, such as a computer. A computer-readable medium may include a computer-readable storage medium, which may be any medium or device that can contain or store instructions for use by or in conjunction with an instruction execution system, device, or apparatus, such as a computer. A computer-readable medium may include any suitable medium that participates in providing instructions to a processor for execution. Such a medium may take a variety of forms, including, but not limited to, non-volatile media, volatile media, transmission media, and the like.
[0078] Although the basic novel features as applied to the preferred embodiments thereof have been shown and described and pointed out, it should be understood that various omissions and substitutions and changes in the form and details of the described apparatus and methods may be made by those skilled in the art without departing from the spirit of the invention. For example, it is expressly contemplated that all combinations of those elements and / or method steps that perform substantially the same functions in substantially the same manner to achieve the same results are within the scope of the present disclosure. In addition, it should be recognized that the structures and / or elements and / or method steps shown and / or described in conjunction with any disclosed form or embodiment may be incorporated into any other disclosed or described or suggested form or embodiment as a general matter of design choice. In addition, in the claims, the means-plus-function clause is intended to cover the structures described herein that perform the functions described, and includes not only structural equivalents, but also equivalent structures.
[0079] Applicants hereby disclose separately each individual feature described herein and any combination of two or more such features, as long as such features or combinations can be performed based on this specification as a whole, regardless of whether such features or combinations of features solve any problems disclosed herein, and without limiting the scope of the claims. Applicants indicate that the disclosed aspects / embodiments may include any such individual features or combinations of features. In view of the foregoing description, it will be apparent to those skilled in the art that various modifications may be made within the scope of the present disclosure.
Claims
1. A method for managing power demand of a plurality of passenger transportation facilities in at least one building, the method comprising: obtaining first data regarding available time-dependent power consumption flexibility capacity from each passenger transportation facility; obtaining second data from at least one external data source, the second data being independent of the operation of the passenger transportation facility; determining an activation order for power demand management of a plurality of passenger transportation facilities based on the obtained first data and second data; obtaining third data on activation costs of available time-dependent electricity consumption flexibility capacity from each passenger transportation facility; as well as taking into account the third data when determining the activation order; and sending a passenger transport facility specific activation signal for power demand management to at least one passenger transport facility among the plurality of passenger transport facilities according to the activation order, Wherein obtaining the third data comprises: estimating the traffic intensity of each of the plurality of passenger transport facilities in a predetermined time period.
2. The method of claim 1, wherein determining the activation sequence further comprises determining a grid frequency threshold for at least one passenger transportation facility; and sending a passenger transportation facility-specific activation signal further comprises sending the grid frequency threshold to at least one passenger transportation facility.
3. A method as claimed in claim 1, wherein determining the activation order also includes determining a start time for starting power demand management and / or an end time for terminating power demand management; and sending a passenger facility-specific activation signal also includes sending the start time for starting power demand management and / or the end time for terminating power demand management to at least one passenger facility.
4. The method of any one of claims 1 to 3, wherein obtaining the second data from at least one external data source comprises obtaining data from at least one of a weather report data source, an electricity cost data source, a utility signal data source, an electricity market data source, and a load profile of one or more buildings.
5. The method according to any one of claims 1 to 3, further comprising: obtaining data regarding active power from each passenger transportation facility at predetermined intervals; as well as Verification of electricity demand management based on active power data is sent to grid operators.
6. The method of any one of claims 1 to 3, wherein the passenger transportation facility specific activation signal comprises a request to reduce load, increase load, or feed energy back into the grid.
7. A method for managing power demand of a passenger facility of a building, the method comprising: Determine the available time-related electricity consumption flexibility capacity at passenger transportation facilities; Create traffic forecasts as a function of time; as well as determining an activation cost of the available time-dependent electricity consumption flexibility capacity based on the determined available flexibility capacity and the traffic forecast; as well as transmitting data indicative of available time-dependent power consumption flexibility capacity to an external control platform; receiving, in response to the transmitted data, an activation signal for power demand management from an external control platform; as well as Manage power demand based on received activation signals, The determining of the available time-dependent power consumption flexibility capacity of the passenger transportation facility comprises: estimating the traffic intensity of the passenger transportation facility in a predetermined time period.
8. The method of claim 7, wherein: The activation signal comprises a grid frequency threshold, the grid frequency threshold comprising a limit frequency for activating power demand management; and wherein the method further comprises: Initiate power demand management when grid frequency thresholds are reached.
9. The method of claim 7, wherein: The activation signal includes a start time for starting power demand management and / or an end time for terminating power demand management; and wherein the method further includes: Initiate power demand management based on the start time; and / or Terminate power demand management according to the end time.
10. The method according to any one of claims 7 to 9, further comprising: Determine active power data for passenger transportation facilities; as well as Send active power data to the control platform.
11. An apparatus for managing power requirements of a plurality of passenger transportation facilities in at least one building, the apparatus comprising: means for obtaining first data regarding available time-dependent power consumption flexibility capacity from each passenger transportation facility; means for obtaining second data from at least one external data source, the second data being independent of the operation of the passenger transportation facility; means for determining an activation order of power demand management of a plurality of passenger transportation facilities based on the obtained first data and second data; as well as means for obtaining third data on activation costs of available time-dependent electricity consumption flexibility capacity from each passenger transportation facility; as well as means for taking into account third data when determining the activation sequence; as well as means for sending a passenger transport facility specific activation signal for power demand management to at least one passenger transport facility of the plurality of passenger transport facilities according to an activation order, Wherein obtaining the third data comprises: estimating the traffic intensity of each of the plurality of passenger transport facilities in a predetermined time period.
12. The apparatus of claim 11, further comprising: An apparatus for implementing the method of any one of claims 1 to 6.
13. An apparatus for managing the power demand of a passenger facility of a building, the apparatus comprising: means for determining available time-dependent power consumption flexibility capacity of a passenger transportation facility; as well as means for creating a flow forecast as a function of time; as well as means for determining an activation cost of the available time-dependent electricity consumption flexibility capacity based on the determined available flexibility capacity and the flow forecast; means for transmitting data indicative of available time-dependent power consumption flexibility capacity to an external control platform; means for receiving, in response to the transmitted data, an activation signal for power demand management from an external control platform; as well as means for managing power demand in response to a received activation signal, The determining of the available time-dependent power consumption flexibility capacity of the passenger transportation facility comprises: estimating the traffic intensity of the passenger transportation facility in a predetermined time period.
14. The apparatus of claim 13, further comprising: Apparatus for implementing the method of any one of claims 7 to 10.
15. A system comprising: The device as claimed in claim 11; and A plurality of devices as claimed in claim 13.